CN204314154U - A kind of float-type exhaust apparatus - Google Patents

A kind of float-type exhaust apparatus Download PDF

Info

Publication number
CN204314154U
CN204314154U CN201420746622.4U CN201420746622U CN204314154U CN 204314154 U CN204314154 U CN 204314154U CN 201420746622 U CN201420746622 U CN 201420746622U CN 204314154 U CN204314154 U CN 204314154U
Authority
CN
China
Prior art keywords
float
container
blind plate
tested
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420746622.4U
Other languages
Chinese (zh)
Inventor
王福新
刘佳宁
王玉
刘红禹
王涛
钱江
王记兵
张玉杰
刘颖
杜玉玲
黄伟昌
王雪
佟纪福
吴松
冯峰
孙中华
郭雪枫
曲斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Huibo Heat Energy Equipment Co Ltd
Original Assignee
Shenyang Huibo Heat Energy Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Huibo Heat Energy Equipment Co Ltd filed Critical Shenyang Huibo Heat Energy Equipment Co Ltd
Priority to CN201420746622.4U priority Critical patent/CN204314154U/en
Application granted granted Critical
Publication of CN204314154U publication Critical patent/CN204314154U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The utility model relates to a kind of float-type exhaust apparatus, and it includes pipe connecting flange, suppresses blind plate, tensimeter, and its technical essential is: described pipe connecting flange, pad and suppress blind plate is installed in container to be tested flange-interface place by fastening bolt; Blind plate is provided with one and is tightly connected place suppressing, sealing junction is connected with the resistance to compression flexible pipe of a band float in container to be tested, and sealing junction is connected with vent valve by metal tube outside container to be tested; Also be provided with a test inlet suppressing on blind plate, be also connected with the manometric water intaking valve of band outward at test inlet.The technical problems to be solved in the utility model, is to provide a kind of float-type gas exhauster that thoroughly can solve emptying gas problem.Utilize the buoyancy of float, can reach container head to be tested, to realize the object of vent gas, and the resistance to compression flexible pipe be connected with float is flexible, and handling are easily, easy to operate, saves time, laborsaving, and labour intensity is low.

Description

A kind of float-type exhaust apparatus
Technical field
The utility model relates to a kind of closed container pressure and regulates correlative technology field, specifically a kind of float-type exhaust apparatus be applicable in closed container with pressure.And be applicable to the closed container product with pressure that all splendid attire media are liquid.
Background technology
Current Pressure Vessel series products relates to numerous areas, and being widely used in the departments such as electric power, chemical industry, oil, machinery, metallurgy, nuclear energy, Aeronautics and Astronautics, is indispensable nucleus equipment in production run.Emptying for the gas in container container gas-liquid space that makes is become fluid space, substantially increase the security of operation, decrease the possibility occurring accident, avoid the danger because container gas-liquid mixed produces, decrease the corrosion that gas-liquid space is caused to container simultaneously, improve security and the serviceable life of the container of gas-liquid space motion.Particularly in closed container manufacture, maintenance, when transformation need carry out hydro-test, cannot by emptying for gas in container maybe can gas in container is the emptying but situation that input ratio is larger, this device can convenient, fast realization gas in container is emptying.
Such as, in container products, most pressure vessel and equipment is equipped with the related accessories such as manhole, exhausr port, for maintenance and use brings convenience, but highly professional, difficulty strengthens in the fabrication process.Also have some containers due to design parameter restriction can not designing and arranging gas port, this brings difficulty just to product testing and detection.The container that great majority manufacture completion all should carry out withstand voltage test by design document regulation, wherein hydro-test is its main test method, after hydro-test specifically refers to that container is made or overhauled, for checking whether container has seepage or abnormal deformation, to find the latent defect in vessel fabrication or maintenance; The macro strength of examination container, ensures the necessary load-bearing capacity of safe operation under design pressure, and the pressure test being medium with liquid (being generally water) of carrying out.
In the process of carrying out hydro-test, the first step is gas in test chamber should emptying be full of liquid, in process of the test, container should be kept to observe the drying on surface.Therefore emptying gas in container is for test, and whether success is most important.Begin to rehearse above prior art adopts mostly gas port, or go deep into the mode of a gas outlet, and the former increases manufacture difficulty and risk of leakage, and the latter can not be emptied completely gas.In addition, some container does not allow at container upper opening, or do not allow gas to enter.This device effectively can solve the problem of this type of container hydro-test exhaust process.
For solving this difficult problem, thorough emptying gas in container, increases work efficiency, reduce corrosion simultaneously, improve security and serviceable life, need the device of gas in a kind of special emptying receptacles, and there is not been reported can to realize the float-type exhaust apparatus of above-mentioned purpose at present.This device has a extensive future, be applicable to multiple occasion and operating environment, is easy to operation.
Utility model content
The purpose of this utility model is for container emptying gas difficulty in prior art, maybe needs the present situation of increase perforate exhaust and provides a kind of float-type exhaust apparatus be applicable in closed container with pressure, thoroughly can solve the problem of emptying gas.
The purpose of this utility model is achieved through the following technical solutions: a kind of float-type exhaust apparatus, it includes pipe connecting flange, pad, suppress blind plate, tensimeter, it is characterized in that: described pipe connecting flange, pad and suppress blind plate is installed in container to be tested flange-interface place by fastening bolt; Blind plate is provided with one and is tightly connected place suppressing, sealing junction is connected with the resistance to compression flexible pipe of a band float in container to be tested, and sealing junction is connected with vent valve by metal tube outside container to be tested; Also be provided with a test inlet suppressing on blind plate, be also connected with the manometric water intaking valve of band outward at test inlet.
Described metal tube is the external metal winding pipe of its height higher than container head to be tested.
Float bottom is added with weight, and weight vertical line is coaxial with float upper end air flue, ensures that upper airways is in float summit all the time.
Be welded and fixed connection resistance to compression flexible pipe by float, enter from pipe connecting flange, be sealedly attached to the outer blind plate of pipe connecting flange, resistance to compression flexible pipe TOE, add wound gasket to be connected with blind plate sealing, external metal winding pipe is communicated with tensimeter, inner due to buoyancy, float rises to container top, during injection test liquid, arrival top is completely only had to be full of container, i.e. vent gas, the flexible pipe that float connects just can enter liquid, reaches the object of emptying gas.
For vertical vessel hydro-test, generally need be horizontally-arranged by it when suppressing, the metal resistance to compression flexible pipe of float will be connected with, stretch in housing by the pipe connecting flange on housing, resistance to compression hose end with suppress blind plate sealing and be connected, flexible pipe is connected with external metal winding pipe through suppressing blind plate, and metal winding pipe is welded on to be suppressed on blind plate, and the other end of external metal winding pipe is connected with vent valve.When housing injection test liquid, float rises to case top due to buoyancy, after liquid is full of housing completely, represent the whole emptying of gas, when test chamber wall metal temperature and fluid temperature close to time, slowly can boost to design pressure, confirm the follow-up test pressure being depressed into regulation of continuing rising of No leakage, the dwell time is generally no less than 30min; Then be down to design pressure, pressurize enough time checks, during inspection, pressure remains unchanged.In process of the test, container No leakage, without visible distortion and abnormal noise.Be hydro-test to pass through, container meets design requirement.After hydro-test, liquid should be drained, with pressurized air, inside be dried up.
Design feature of the present utility model:
First for float is fixedly connected with resistance to compression flexible pipe and is connected, the requirement of resistance to compression flexible pipe can bear the pressure born needed for container to be tested, and the flexible pipe other end adds screw thread and suppresses blind plate sealing and be connected.
The utility model has following beneficial effect and advantage:
1, utilize the buoyancy of float, the liquid level of test(ing) liquid can be made thoroughly to reach container head, realize the object of emptying gas.
2, the flexible pipe of this structure is flexible, and handling are easily, easy to operate, saves time, laborsaving, the features such as labour intensity is low, and range of application is wide.
Accompanying drawing explanation
Fig. 1 is that structural representation sketch cuts open in office of the present utility model.
Main Reference Numerals illustrates: 1 is shell of tank to be tested, and 2 is float, and 3 is resistance to compression flexible pipe, 4 is pipe connecting flange, and 5 is external metal winding pipe, and 6 is vent valve, 7 is fastening bolt, and 8 for suppressing blind plate, and 9 is pad, 10 is test liquid, 11 is inlet, and 12 is the place that is tightly connected, and 13 is water intaking valve, 14 is tensimeter, and 15 is weight.
The utility model is described in further detail by example below in conjunction with accompanying drawing; but following example is only the utility model example wherein; do not represent the rights protection scope that the utility model limits, rights protection scope of the present utility model is as the criterion with claims.
Embodiment
example 1
As shown in Figure 1,4 in figure is pipe connecting flange, and 6 is vent valve, and 9 is pad, and 8 for suppressing blind plate, and 14 is tensimeter, described pipe connecting flange 4, pad 9 and suppress blind plate 8 is installed in shell of tank 1 to be tested flange-interface place by fastening bolt 7; Blind plate 8 is provided with one and is tightly connected place 12 suppressing, sealing connects the resistance to compression flexible pipe 3 that 12 places are connected with a band float 2 in shell of tank 1 to be tested, sealing junction 12 is connected with vent valve 6 by external metal winding pipe 5 outside shell of tank 1 to be tested, and the height of this external metal winding pipe 5 is higher than the top of container to be tested; Also be provided with a test inlet 11 suppressing on blind plate 8, at the outer water intaking valve 13 being also connected with band tensimeter 14 of test inlet 11.
In addition, as shown in fig. 1, be also connected with a weight 15 in the bottom of float 2, the vertical line of this weight 15 is coaxial with float 2 upper end air flue, ensures that upper airways is in ball float summit all the time.
Comprise float 2, resistance to compression flexible pipe 3, external metal winding pipe 5.Shell of tank 1 to be tested is before carrying out hydro-test, need air in emptying housing, by inlet 11 injection test liquid 10, float 2 drives resistance to compression flexible pipe 3 slowly to rise due to buoyancy, resistance to compression flexible pipe 3 other end is by pipe connecting flange 4, pad 9 and suppress blind plate 8 and stretch out, be tightly connected with external metal winding pipe 5 and be connected, require junction No leakage.
This device Job Operations step is as follows:
1., by the resistance to compression flexible pipe 3 with float 2 first go deep into enclosure interior by pipe connecting flange 4, notice that the length of metal resistance to compression flexible pipe 3 wants appropriateness, be advisable so that housing tip can be touched.
2., at pipe connecting flange 4 supplied shim 9, then add a cover and suppress blind plate 8.
3., the external part of resistance to compression flexible pipe 3 stretches out by suppressing blind plate 8, with external metal winding pipe 5 and suppress blind plate 8 bolted and be tightly connected, adds wound gasket, to guarantee junction No leakage in connection procedure.Additional fastening bolt 7 is fixed pipe connecting flange 4, pad 9 and is suppressed blind plate 8.
4., slowly generally water is adopted by liquid injection port 11 to injection test liquid 10(in housing 1), float 2 slowly drives resistance to compression flexible pipe 3 to rise due to buoyancy, resistance to compression flexible pipe 3 top is in above float 2 to utilize weight 15 to ensure, injection test liquid 10 is continued when float 2 arrives case top, when seeing that liquid appears in external metal winding pipe 5 and vent valve 6, after uniform liquid flows out, prove that enclosure interior is to fill liquid completely, the emptying of the gas in test chamber.In process of the test, container should be kept to observe the drying on surface.
5., external metal winding pipe 5 is connected with vent valve 6, also will guarantee to seal No leakage.
5., external metal winding pipe 5 is connected with vent valve 6, also will guarantee to seal No leakage.
6., when test chamber wall metal temperature and fluid temperature close to time, slowly can boost to design pressure, confirm the follow-up test pressure being depressed into regulation of continuing rising of No leakage, the dwell time is generally no less than 30min; Then be down to design pressure, pressurize enough time checks, during inspection, pressure remains unchanged.
7., in process of the test, container No leakage, without visible distortion and abnormal noise.Be hydro-test to pass through, container meets design requirement.
8., after hydro-test, liquid should be drained, then with pressurized air, inside be dried up; Whole process terminates, thus achieves the purpose of this utility model.

Claims (3)

1. a float-type exhaust apparatus, it includes pipe connecting flange, pad, suppresses blind plate, and tensimeter is characterized in that: described pipe connecting flange, pad and suppress blind plate is installed in container to be tested flange-interface place by fastening bolt; Blind plate is provided with one and is tightly connected place suppressing, sealing junction is connected with the resistance to compression flexible pipe of a band float in container to be tested, and sealing junction is connected with vent valve by metal tube outside container to be tested; Also be provided with a test inlet suppressing on blind plate, be also connected with the manometric water intaking valve of band outward at test inlet.
2. float-type exhaust apparatus according to claim 1, is characterized in that: described metal tube is the external metal winding pipe of its height higher than container head to be tested.
3. float-type exhaust apparatus according to claim 1, is characterized in that: be also provided with a weight at float bottom, this weight vertical line is coaxial with float top air flue.
CN201420746622.4U 2014-12-03 2014-12-03 A kind of float-type exhaust apparatus Active CN204314154U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420746622.4U CN204314154U (en) 2014-12-03 2014-12-03 A kind of float-type exhaust apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420746622.4U CN204314154U (en) 2014-12-03 2014-12-03 A kind of float-type exhaust apparatus

Publications (1)

Publication Number Publication Date
CN204314154U true CN204314154U (en) 2015-05-06

Family

ID=53136460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420746622.4U Active CN204314154U (en) 2014-12-03 2014-12-03 A kind of float-type exhaust apparatus

Country Status (1)

Country Link
CN (1) CN204314154U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104359766A (en) * 2014-12-03 2015-02-18 沈阳汇博热能设备有限公司 Float type exhaust device
CN117890037A (en) * 2024-03-14 2024-04-16 济南百惠凯希汽车零部件有限公司 Tightness detection device for engine exhaust butterfly valve assembly

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104359766A (en) * 2014-12-03 2015-02-18 沈阳汇博热能设备有限公司 Float type exhaust device
CN117890037A (en) * 2024-03-14 2024-04-16 济南百惠凯希汽车零部件有限公司 Tightness detection device for engine exhaust butterfly valve assembly
CN117890037B (en) * 2024-03-14 2024-05-07 济南百惠凯希汽车零部件有限公司 Tightness detection device for engine exhaust butterfly valve assembly

Similar Documents

Publication Publication Date Title
CN204486130U (en) Transformer vacuum varnish apparatus
CN204314154U (en) A kind of float-type exhaust apparatus
CN108413032B (en) Tower type pressure container and working method thereof
CN104359766A (en) Float type exhaust device
CN208032518U (en) Explosion-proof splashproof reclaiming type reaction kettle
CN207430244U (en) A kind of high pressure is fed in batches device
CN101518725B (en) Novel reaction kettle
CN201708006U (en) Vacuum oil filling device of amorphous transformer
CN208203993U (en) A kind of tower pressure vessel
CN207865020U (en) Natural Gas tank peculiar to vessel
CN107537417A (en) A kind of flexible electromagnetic sealing reaction kettle device of fully automatic hydraulic for Chemical Manufacture
CN201419093Y (en) Novel reaction vessel
CN201425576Y (en) Buffer device for high-temperature high-pressure toxic and harmful gas test device
CN203910438U (en) Oil guide pipe structure of vacuum butterfly valve of transformer
CN210603769U (en) Ammonia leakage test device
CN201892606U (en) Leak hunting device for reaction kettle
CN207421619U (en) A kind of pipeline pumping equipment
CN208985832U (en) Power transformer
CN208140318U (en) A kind of condition of high temperature tightness measuring device of gasket
CN204785553U (en) Leak protection gas gas holder
CN204679223U (en) altitude simulation test device
CN205402233U (en) A multi -functional water injection head for liquefied gas cylinder
CN206038242U (en) Helium leak test sealing device for steam generator
CN206208467U (en) Gas cylinder test device for air tightness
CN212348712U (en) Improved generation pressure-fired reation kettle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant