CN204287721U - Large scale scrolling curtain system - Google Patents

Large scale scrolling curtain system Download PDF

Info

Publication number
CN204287721U
CN204287721U CN201520003803.2U CN201520003803U CN204287721U CN 204287721 U CN204287721 U CN 204287721U CN 201520003803 U CN201520003803 U CN 201520003803U CN 204287721 U CN204287721 U CN 204287721U
Authority
CN
China
Prior art keywords
scrolling
large scale
suspension holdfast
pipe
curtain system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520003803.2U
Other languages
Chinese (zh)
Inventor
姜国梁
沈瑜
沈姣
陶春燕
姜茂德
陈浩
Original Assignee
Jiangsu Redleaf Audio and Visual Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Redleaf Audio and Visual Equipment Co Ltd filed Critical Jiangsu Redleaf Audio and Visual Equipment Co Ltd
Priority to CN201520003803.2U priority Critical patent/CN204287721U/en
Application granted granted Critical
Publication of CN204287721U publication Critical patent/CN204287721U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G03PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
    • G03BAPPARATUS OR ARRANGEMENTS FOR TAKING PHOTOGRAPHS OR FOR PROJECTING OR VIEWING THEM; APPARATUS OR ARRANGEMENTS EMPLOYING ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ACCESSORIES THEREFOR
    • G03B21/00Projectors or projection-type viewers; Accessories therefor
    • G03B21/54Accessories
    • G03B21/56Projection screens
    • G03B21/58Projection screens collapsible, e.g. foldable; of variable area

Abstract

This application discloses a kind of large scale scrolling curtain system, comprising: mounting bracket, mounting bracket comprises body of wall erecting frame and suspension holdfast, and body of wall erecting frame is fixed on body of wall, and suspension holdfast is provided with hook, and described hook is hung on described body of wall erecting frame; Core pipe, is fixed on suspension holdfast; Scrolling pipe, parallel core pipe is arranged; Projection screen, core pipe is fixed on its top, and its bottom is wound on scrolling pipe along the first clockwise; Motor, is fixed on suspension holdfast, and motor is connected to described scrolling pipe by pulling force rope, and pulling force rope is wound in the end of described scrolling pipe along the second clockwise, and the first clockwise is contrary with described first clockwise.In the utility model, the scrolling pipe being positioned at projection screen bottom can rely on its gravity to make act face smooth on the one hand, simultaneously in wrapup procedure, it can carry out active scrolling, rely on the wire rope being positioned at its both sides, share himself gravity, avoid it to pull effect to projection screen, improve the serviceable life of screen.

Description

Large scale scrolling curtain system
Technical field
The application belongs to projector equipment field, particularly relates to a kind of large scale scrolling curtain system.
Background technology
At present, no matter be portable small-business demonstration, multimedia conferencing room, classroom, stadiums, church, commercial location, large-scale auditorium, virtual display all adopt shadow casting technique to the jumbotron of cinema even greatly.Briefly, shadow casting technique be ray cast that projector is sent to projection screen, projection screen forms image, and then light reflexes to eye again.
In special occasion, generally can need large-sized projection screen, the width of such as projection screen reaches more than 5 meters, for giant-screen like this, controlling its surfacing is a more difficult problem, generally can use a larger steel axle of weight ratio in prior art, rely on gravity to make its act of face smooth.But because the weight ratio of steel axle is comparatively large, formed larger pull power to curtain face, particularly in projection screen wrapup procedure, curtain face is easy to be pullled disconnected.
Because in this, be necessary to provide a kind of novel large scale scrolling curtain system.
Utility model content
The purpose of this utility model is to provide a kind of large scale scrolling curtain system, to overcome deficiency of the prior art.
For achieving the above object, the utility model provides following technical scheme:
The embodiment of the present application discloses a kind of large scale scrolling curtain system, comprising:
Mounting bracket, described mounting bracket comprises body of wall erecting frame and suspension holdfast, and described body of wall erecting frame is fixed on body of wall, and described suspension holdfast is provided with hook, and described hook is hung on described body of wall erecting frame;
Core pipe, is fixed on described suspension holdfast;
Scrolling pipe, parallel described core pipe is arranged;
Projection screen, described core pipe is fixed on its top, and its bottom is wound on described scrolling pipe along the first clockwise;
Motor, is fixed on described suspension holdfast, and described motor is connected to described scrolling pipe by pulling force rope, and described pulling force rope is wound in the end of described scrolling pipe along the second clockwise, and described first clockwise is contrary with described first clockwise.
Preferably, in above-mentioned large scale scrolling curtain system, the output terminal of described motor is connected to a two-way serving sleeve, described two-way serving sleeve is rotatably installed on described suspension holdfast, described two-way serving sleeve is wound with two pulling force ropes, these two pulling force ropes are drawn from the both sides of two-way serving sleeve respectively, and are connected to the two ends of described scrolling pipe.
Preferably, in above-mentioned large scale scrolling curtain system, the two ends of described suspension holdfast are also respectively arranged with a pulley, and described pulling force rope is supported on described pulley.
Preferably, in above-mentioned large scale scrolling curtain system, described motor is rotated by serving sleeve two-way described in gear drive.
Preferably, in above-mentioned large scale scrolling curtain system, the width of described projection screen is greater than 5 meters.
Preferably, in above-mentioned large scale scrolling curtain system, be connected with at least one support bar between described core pipe and suspension holdfast, described support bar vertically extends.
Preferably, in above-mentioned large scale scrolling curtain system, the bottom of described support bar is provided with external thread, and the upper surface of described core pipe offers and coordinates described externally threaded fixed orifice.
Preferably, in above-mentioned large scale scrolling curtain system, the top of described support bar is fixed on described suspension holdfast by nut.
Preferably, in above-mentioned large scale scrolling curtain system, described suspension holdfast comprises main support and is positioned at left socle and the right support of described main support both sides, grafting is provided with the connecting link of level between described main support and left socle and between described main support and right support, and described motor is installed on described main support.
Compared with prior art, the utility model has the advantage of: in the utility model, the scrolling pipe being positioned at projection screen bottom can rely on its gravity to make act face smooth on the one hand, simultaneously in wrapup procedure, it can carry out active scrolling, relies on the wire rope being positioned at its both sides, shares himself gravity, avoid it to pull effect to projection screen, improve the serviceable life of screen.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present application or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, the accompanying drawing that the following describes is only some embodiments recorded in the application, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Figure 1 shows that the structural representation of large scale scrolling curtain system in the utility model specific embodiment;
Figure 2 shows that the schematic perspective view of mounting bracket in the utility model specific embodiment;
Figure 3 shows that the structural representation that in the utility model specific embodiment, body of wall erecting frame and body of wall are fixed;
Figure 4 shows that the decomposing schematic representation of suspension holdfast in the utility model specific embodiment;
Figure 5 shows that the scheme of installation of motor in the utility model specific embodiment.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, be described in detail the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, the every other embodiment that those of ordinary skill in the art obtain under the prerequisite not making creative work, all belongs to the scope of the utility model protection.
Shown in ginseng Fig. 1, large scale scrolling curtain system is greater than the projection screen of 5 meters mainly for width, but it should be noted that it equally also goes for undersized projection screen.
Large scale scrolling curtain system comprises mounting bracket 10, the core pipe 20 be fixed on mounting bracket 10, below core pipe 20 and the scrolling pipe 30 parallel with core pipe 20, the motor 50 that is connected to the projection screen 40 between core pipe 20 and scrolling pipe 30 and is fixed on mounting bracket 10.
Shown in composition graphs 2 and Fig. 3, mounting bracket 10 comprises body of wall erecting frame 11 and can hang on the suspension holdfast 12 on body of wall erecting frame 11.
The semi-girder 112 that body of wall erecting frame 11 is comprised pad 111 and fixed by welding manner and pad 111, pad 111 is fixed on body of wall by screw.Because pad 111 has certain thickness, between semi-girder 112 and metope, certain gap can be formed.
Suspension holdfast 12 being fixed with some hooks 121, by linking up with the effect of 121, can suspension holdfast 12 entirety being hung on semi-girder 112, simultaneously for convenience detach.
Shown in composition graphs 4, suspension holdfast 12 comprises main support 122 and is positioned at left socle 123 and the right support 124 of main support 122 both sides, and grafting is provided with the connecting link 125 of level between main support 122 and left socle 123 and between main support 122 and right support 124.Connecting link 125 is by inserting mode, and easy assembly and disassembly, during assembling, need after grafting completes to be fixed further by screw, to increase strong degree.
The two ends of core pipe 20 are individually fixed on left socle 123 and right support 124, and core pipe 20 is in order to the top of fixing projection screen 40.Because the projection screen 40 that is connected with scrolling pipe 30 can form a larger downward pulling force to core pipe 20, core pipe 20 length is comparatively large simultaneously, under the pulling force of projection screen 40, is easy to bend, and therefore can form impact to the flatness of projection screen.In order to avoid bending of core pipe 20, between the top of core pipe 20 and suspension holdfast 12, be preferably provided with 3 support bars 60.The bottom of support bar 60 is provided with external thread, and the top of core pipe 20 coordinates this external thread to be provided with fixed orifice, and can to realize with fixed orifice fixing by rotating for the bottom of support bar 60.The top of support bar 60 is fixed on suspension holdfast 12 preferably by nut.
Scrolling pipe 30 is installed on the bottom of projection screen 40, and it can carry out rolling along the first clockwise to projection screen 40.The two ends of scrolling pipe 30 are respectively equipped with a wirerope-winding end 31.
Shown in composition graphs 5, motor 50 is installed on main support 122, and its output terminal is connected to a two-way serving sleeve 70 by spiral gear 51, and two-way serving sleeve 70 can be driven to rotate.Two-way serving sleeve 70 has two synchronous reels 71, two reels 71 are wound with wire rope 80 along different clockwise respectively, two wire rope 80 are drawn from the both sides of two-way serving sleeve 70, two wire rope 80 are guided respectively by a pulley 90, and are wound in respectively on the wirerope-winding end 31 at scrolling pipe 30 two ends.Two pulleys 90 are installed on left socle 123 and right support 124 respectively.Wire rope is wound on wirerope-winding end 31 along the second clockwise, and the first hour hands are contrary with the second clockwise.Carry out in wrapup procedure at projection screen 40, wirerope-winding end 31 pairs of wire rope 80 at scrolling pipe 30 two ends discharge, and meanwhile, scrolling pipe 30 main part carries out rolling to projection screen 40.
In wrapup procedure, the wire rope at two ends plays certain supporting role to scrolling pipe 30, has shared scrolling pipe and has pullled effect to screen, projection screen therefore can be avoided to be pulled off.
Motor 50 can be connected with controller by wired or wireless mode, is controlled rotation direction and the velocity of rotation of motor 50 by controller.
It should be noted that, in this article, the such as relational terms of first and second grades and so on is only used for an entity or operation to separate with another entity or operational zone, and not necessarily requires or imply the relation that there is any this reality between these entities or operation or sequentially.And, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thus make to comprise the process of a series of key element, method, article or equipment and not only comprise those key elements, but also comprise other key elements clearly do not listed, or also comprise by the intrinsic key element of this process, method, article or equipment.When not more restrictions, the key element limited by statement " comprising ... ", and be not precluded within process, method, article or the equipment comprising described key element and also there is other identical element.
The above is only the embodiment of the application; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the application's principle; can also make some improvements and modifications, these improvements and modifications also should be considered as the protection domain of the application.

Claims (9)

1. a large scale scrolling curtain system, is characterized in that, comprising:
Mounting bracket, described mounting bracket comprises body of wall erecting frame and suspension holdfast, and described body of wall erecting frame is fixed on body of wall, and described suspension holdfast is provided with hook, and described hook is hung on described body of wall erecting frame;
Core pipe, is fixed on described suspension holdfast;
Scrolling pipe, parallel described core pipe is arranged;
Projection screen, described core pipe is fixed on its top, and its bottom is wound on described scrolling pipe along the first clockwise;
Motor, is fixed on described suspension holdfast, and described motor is connected to described scrolling pipe by pulling force rope, and described pulling force rope is wound in the end of described scrolling pipe along the second clockwise, and described first clockwise is contrary with described first clockwise.
2. large scale scrolling curtain system according to claim 1, it is characterized in that: the output terminal of described motor is connected to a two-way serving sleeve, described two-way serving sleeve is rotatably installed on described suspension holdfast, described two-way serving sleeve is wound with two pulling force ropes, these two pulling force ropes are drawn from the both sides of two-way serving sleeve respectively, and are connected to the two ends of described scrolling pipe.
3. large scale scrolling curtain system according to claim 2, is characterized in that: the two ends of described suspension holdfast are also respectively arranged with a pulley, and described pulling force rope is supported on described pulley.
4. large scale scrolling curtain system according to claim 2, is characterized in that: described motor is rotated by serving sleeve two-way described in gear drive.
5. large scale scrolling curtain system according to claim 1, is characterized in that: the width of described projection screen is greater than 5 meters.
6. large scale scrolling curtain system according to claim 1, is characterized in that: be connected with at least one support bar between described core pipe and suspension holdfast, described support bar vertically extends.
7. large scale scrolling curtain system according to claim 6, is characterized in that: the bottom of described support bar is provided with external thread, and the upper surface of described core pipe offers and coordinates described externally threaded fixed orifice.
8. large scale scrolling curtain system according to claim 6, is characterized in that: the top of described support bar is fixed on described suspension holdfast by nut.
9. large scale scrolling curtain system according to claim 1, it is characterized in that: described suspension holdfast comprises main support and is positioned at left socle and the right support of described main support both sides, grafting is provided with the connecting link of level between described main support and left socle and between described main support and right support, and described motor is installed on described main support.
CN201520003803.2U 2014-06-30 2015-01-05 Large scale scrolling curtain system Expired - Fee Related CN204287721U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520003803.2U CN204287721U (en) 2014-06-30 2015-01-05 Large scale scrolling curtain system

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201410307772 2014-06-30
CN201410307772X 2014-06-30
CN201520003803.2U CN204287721U (en) 2014-06-30 2015-01-05 Large scale scrolling curtain system

Publications (1)

Publication Number Publication Date
CN204287721U true CN204287721U (en) 2015-04-22

Family

ID=52870866

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201510002778.0A Pending CN104570572A (en) 2014-06-30 2015-01-05 Large-size screen rolling system
CN201520003803.2U Expired - Fee Related CN204287721U (en) 2014-06-30 2015-01-05 Large scale scrolling curtain system

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201510002778.0A Pending CN104570572A (en) 2014-06-30 2015-01-05 Large-size screen rolling system

Country Status (1)

Country Link
CN (2) CN104570572A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107643648A (en) * 2017-09-13 2018-01-30 广州励丰文化科技股份有限公司 A kind of city canopy of the heavens and its control method
CN107703710A (en) * 2017-09-13 2018-02-16 广州励丰文化科技股份有限公司 The Wind-Pressure Resistance system and its control method of a kind of city canopy of the heavens

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5510862A (en) * 1994-07-21 1996-04-23 Lieberman; Phillip L. Collapsible large screen audiovisual display system
CN201222161Y (en) * 2008-07-18 2009-04-15 深圳市白雪投影银幕有限公司 Mechanism for large-sized electric screen to regulate distortion of shaft-winding tube
CN103399454B (en) * 2013-08-05 2015-11-25 深圳市安联商用机器有限公司 A kind of screen and underwind mechanism and control method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107643648A (en) * 2017-09-13 2018-01-30 广州励丰文化科技股份有限公司 A kind of city canopy of the heavens and its control method
CN107703710A (en) * 2017-09-13 2018-02-16 广州励丰文化科技股份有限公司 The Wind-Pressure Resistance system and its control method of a kind of city canopy of the heavens

Also Published As

Publication number Publication date
CN104570572A (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CN204440002U (en) Large scale scrolling curtain
CN206594957U (en) A kind of multi-functional Display Rack of indoor design
CN209703988U (en) A kind of novel building hanger
CN204287721U (en) Large scale scrolling curtain system
CN107818868A (en) A kind of electromagnetism wire winding
CN201764221U (en) Lifting floor type bracket for flat-panel display device
CN108799799A (en) It is a kind of for meeting room can automatic controlled height projecting apparatus
CN203385989U (en) Screen and downward reeling type mechanism
CN205294724U (en) Can tertiary formula flexible frame of lifting
CN205956696U (en) But removal drape device of balancing
CN201739735U (en) Bamboo-joint electric hanger
CN203624728U (en) Steel wire winding mechanism
CN109826344A (en) A kind of element type building curtain wall
CN203781732U (en) Air conditioner external unit installation tool
CN202754478U (en) Top-mounted type rail trolley carrying platform
CN207532227U (en) industrial design display rack
CN104456025A (en) Sling wall-hanging support
CN210624115U (en) Image flaw is handled teaching and is used input device
CN207486404U (en) A kind of projecting apparatus expansion bracket
CN207243287U (en) A kind of tunnel abnormity display screen supporting rack suspended fixing device
CN205657783U (en) Wall -hanging flat -panel television elevating gear
CN207046715U (en) A kind of dual-purpose straddle truck of people's goods suitable for the high vertical shaft of small end face
CN110775861A (en) Electric lifting device for transformer
CN215006236U (en) Easily-detachable projector suspension bracket for exhibitions
CN204435828U (en) A kind of construction and installation suspension bracket

Legal Events

Date Code Title Description
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20151222

Address after: 215625, Jiangsu, Zhangjiagang province Fengzhen Jin (Hexing) Yang Kam Road on the east side

Patentee after: JIANGSU REDLEAF AUDIO & VISUAL EQUIPMENT CO., LTD.

Address before: 215600, Jiangsu, Suzhou, Fengzhen Zhangjiagang Kam Kam Road, No. 382, Jiangsu Hongye audio-visual equipment Limited by Share Ltd

Patentee before: Jiangsu Redleaf Audio & Visual Equipment Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150422

Termination date: 20190105