CN204277410U - The seal charging apparatus of ball valve group installation - Google Patents

The seal charging apparatus of ball valve group installation Download PDF

Info

Publication number
CN204277410U
CN204277410U CN201420758796.2U CN201420758796U CN204277410U CN 204277410 U CN204277410 U CN 204277410U CN 201420758796 U CN201420758796 U CN 201420758796U CN 204277410 U CN204277410 U CN 204277410U
Authority
CN
China
Prior art keywords
mentioned
seal receptacle
pressure cap
seal
filler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420758796.2U
Other languages
Chinese (zh)
Inventor
戴美云
吴金贵
张凤萍
徐卫波
蒋炜敏
田保国
龚丁权
蒋艳智
王纪秋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG VALOGIN TECHNOLOGY Co Ltd
Original Assignee
ZHEJIANG VALOGIN TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG VALOGIN TECHNOLOGY Co Ltd filed Critical ZHEJIANG VALOGIN TECHNOLOGY Co Ltd
Priority to CN201420758796.2U priority Critical patent/CN204277410U/en
Application granted granted Critical
Publication of CN204277410U publication Critical patent/CN204277410U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Automatic Assembly (AREA)

Abstract

The utility model provides the seal charging apparatus of a kind of ball valve group installation, belongs to field of mechanical technique.It solve the problem that existing ball valve group process of assembling is wasted time and energy.The seal charging apparatus of this ball valve group installation, comprise workbench, all be fixed on the support on workbench and there is the positioning seat of located cavity, charging apparatus also comprises and to be arranged at above positioning seat and the seal receptacle locating piece be connected with support, seal receptacle locating piece has and expects chamber for holding putting of seal receptacle, vertically compressing rod is provided with above seal receptacle locating piece, support is fixed with lift cylinder and lift cylinder can drive above-mentioned compressing rod through seal receptacle locating piece and by be positioned at put material chamber seal receptacle be depressed into located cavity place, workbench is also fixed with chute feeder, chute feeder side be provided with feed mechanism and this feed mechanism can by the seal receptacle be positioned in chute feeder along chute feeder be delivered to put material chamber in.The seal charging apparatus of this ball valve group installation has the high advantage of operating efficiency.

Description

The seal charging apparatus of ball valve group installation
Technical field
The utility model belongs to field of mechanical technique, relates to the installation of a kind of ball valve group, particularly relates to the seal charging apparatus of a kind of ball valve group installation.
Background technology
Ball valve is that a kind of opening and closing element (spheroid) is driven by valve rod, and around the valve that ball valve axis rotates.
Existing ball valve generally by having the valve body of neck, spool, valve rod, filler and pressure cap etc. form.Wherein, spool is positioned at valve body and this spool is connected with valve rod the inner, and valve rod outer end reaches outside neck.Spool both sides be fixed with a seal receptacle respectively and described valve rod between two seal receptacles.Filler is positioned at neck, and this filler is tubular and is set on valve rod, and pressure cap is set on valve rod and pressure cap lower end is threaded in neck, neck madial wall has annular shoulder block, and filler two ends offsets with annular shoulder block and pressure cap respectively.
The sealing that existing ball valve realizes ball valve basically by seal receptacle and pressure cap extruding filler is avoided occurring leaking.And existing ball valve is when producing, substantially is mostly by loading filler, seal receptacle and pressure cap manually, time-consuming and effort.
Summary of the invention
The purpose of this utility model is the problems referred to above existed for prior art, proposes the seal charging apparatus of the high ball valve group installation of a kind of operating efficiency.
The purpose of this utility model realizes by following technical proposal: the seal charging apparatus of ball valve group installation, comprise workbench, all be fixed on the support on workbench and there is the positioning seat of located cavity, it is characterized in that, described charging apparatus also comprises and to be arranged at above above-mentioned positioning seat and the seal receptacle locating piece be connected with support, sealing seat locating piece has and expects chamber for holding putting of seal receptacle, also vertically compressing rod is provided with above described seal receptacle locating piece, support is fixed with lift cylinder and lift cylinder can drive above-mentioned compressing rod through described seal receptacle locating piece and by be positioned at put material chamber seal receptacle be depressed into above-mentioned located cavity place, described workbench is also fixed with chute feeder, described chute feeder side is provided with feed mechanism and the seal receptacle be positioned in chute feeder can be delivered to above-mentioned putting in material chamber along chute feeder by this feed mechanism.
During work, first valve body is fixed on positioning seat, then feed mechanism the seal receptacle being positioned at chute feeder is delivered on seal receptacle locating piece putting material chamber, then lift cylinder startup drives compressing rod move down thus be pressed in valve body by seal receptacle, above-mentioned process is carried out automatically, load seal receptacle manually relative to passing through in prior art, there is the advantage that operating efficiency is high.
In the seal charging apparatus of above-mentioned ball valve group installation, the notch of described chute feeder upward, vertically be provided with above this chute feeder can for seal receptacle sheathed wear material bar, this upper end and above-mentioned support wearing material bar removably connects, wear expect bar lower end and chute feeder just to and wear expect bar lower end and chute feeder bottom between distance be greater than the thickness of a seal receptacle and be less than the thickness of two seal receptacles.
During work, dozens of seal receptacle is set in successively to be worn on material bar, adjacent two seal receptacles are abutted together and only have a seal receptacle can enter in chute feeder at every turn, by wearing sheathed several seal receptacle on material bar, can improve the operating efficiency of this charging apparatus further.Wherein, removably connecting can be that screw is fixed, and also can be clamping.
In the seal charging apparatus of above-mentioned ball valve group installation, described seal receptacle locating piece take the shape of the letter U and opening towards the direction of above-mentioned chute feeder, turnover panel is provided with below described seal receptacle locating piece, the edge of this turnover panel is fixed with contiguous block, and the outside portion of this contiguous block and above-mentioned seal receptacle locating piece is hinged and turnover panel has the trend recovering level after rotating around pin joint.
Form above-mentioned putting between turnover panel and seal receptacle locating piece madial wall and expect chamber; Seal receptacle is transported to above turnover panel under the conveying of feed mechanism, and then compressing rod moves down and offsets with turnover panel and makes turnover panel rotate to put around pin joint and expect that chamber is opened, thus seal receptacle is pressed in valve body.After press-in, compressing rod moves away from turnover panel, now, turnover panel can automatically restore to level, thus improves the operating efficiency of this charging apparatus further.
In the seal charging apparatus of above-mentioned ball valve group installation, described turnover panel comprises all horizontally disposed turnover panel one and turnover panel two, the outer end edges of turnover panel one and turnover panel two is along corresponding hinged with the both sides of above-mentioned seal receptacle locating piece respectively by a contiguous block, and the inner edge of turnover panel one and turnover panel two is just to setting.
By turnover panel one and turnover panel two are set and turnover panel one and turnover panel two corresponding with the both sides of seal receptacle locating piece hinged respectively by contiguous block, make charging ram can promote turnover panel more like a cork to rotate and turnover panel can more easily and swimmingly return, thus improve the operating efficiency of this charging apparatus further.
In the seal charging apparatus of above-mentioned ball valve group installation, described compressing rod comprises the guide rod that vertically arranges and is sheathed on and presses down guide pin bushing outside guide rod, described support is also connected with the guide rod cylinder that energy drive leader moves up and down, the inner of above-mentioned turnover panel one and turnover panel two has the breach of semicircular in shape respectively, two semicircular breach are oppositely arranged and form a manhole, the position of this through hole and above-mentioned guide rod just to and the diameter of through hole be greater than the diameter of guide rod and be less than the above-mentioned external diameter pressing down guide pin bushing, the described external diameter pressing down guide pin bushing is greater than the internal diameter of seal receptacle.
During work, seal receptacle is delivered to above through hole under the effect of feed mechanism, then move down at the effect lower guide rod of guide rod cylinder and make sealed socket sleeve be located on guide rod through seal receptacle and through hole according to this, then lift cylinder starts drive and presses down guide pin bushing and move down and to offset with seal receptacle and to drive seal receptacle to be pressed in valve body.By arranging guide rod, to pressing down guide pin bushing, by seal receptacle, the process be pressed in valve body plays guide effect, enables seal receptacle smooth and easy and is stably pressed in valve body, thus improves the operating efficiency of this charging apparatus further.
In the seal charging apparatus of above-mentioned ball valve group installation, described charging apparatus also comprises the Fibre Optical Sensor that can detect and whether have seal receptacle in above-mentioned seal receptacle locating piece.
Can send a signal to guide rod cylinder when Fibre Optical Sensor detects seal receptacle and make guide rod cylinder work, whole process automatically completes, thus improves the operating efficiency of this charging apparatus further.
In the seal charging apparatus of above-mentioned ball valve group installation, described feed mechanism comprises feedblock and feeding cylinder, and described feedblock is positioned at above-mentioned chute feeder and feeding cylinder can promote feedblock moves around along chute feeder.
Feeding cylinder start feedblock is moved along chute feeder towards seal receptacle locating piece direction and the most at last seal receptacle be delivered to put material chamber in, and in this course, feedblock part is being worn between material bar and chute feeder, avoid being set in the seal receptacle worn on material bar to drop in chute feeder, thus improve the operating efficiency of this charging apparatus further.Feed mechanism also can comprise other structure, and such as, be made up of eccentric wheel, push rod, feedblock and motor, wherein, eccentric wheel is placed in chute feeder, and push rod and motor are connected to eccentric both sides, and the push rod other end is connected with feedblock.
In the seal charging apparatus of above-mentioned ball valve group installation, described charging apparatus also comprises horizontally disposed installation shaft, installation shaft cylinder, installation shaft motor, filler can be delivered to the filler feed appliance of filler station and pressure cap can be delivered to the pressure cap feed appliance of pressure cap station, described installation shaft, pressure cap station, filler station and above-mentioned positioning seat are arranged in order on same level straight line, what installation shaft comprised axle sleeve and was arranged in that in axle sleeve and outer end stretches out axle sleeve to above-mentioned positioning seat direction wears material axle, the end described axle sleeve being positioned at above-mentioned positioning seat side have can with the installation cavity of pressure cap mating shapes, above-mentioned installation shaft cylinder can promote above-mentioned installation shaft and move to described positioning seat direction, described installation shaft motor can drive above-mentioned axle sleeve circumference to rotate.
During use, filler feed appliance and pressure cap feed appliance work simultaneously and make that filler station delivered to by filler, pressure cap is delivered to pressure cap station respectively; Then installation shaft cylinder start drive installation shaft to move to positioning seat direction filler to be set in wear on material axle, pressure cap is fixed in installation cavity, then installation shaft continuation is mobile makes filler and pressure cap all be pressed in valve body, then installation shaft electric motor starting drives axle sleeve rotate thus pressure cap is screwed in valve body in advance, whole process automatically completes, thus improves the operating efficiency of this charging apparatus further.
In the seal charging apparatus of above-mentioned ball valve group installation, described positioning seat has positioning port relative to the side of above-mentioned installation shaft.
When valve body is put in positioning seat, the link for being connected with pressure cap on valve body snaps onto in positioning port and is located by valve body, thus when avoiding pressure cap to screw in, valve body shakes, and then improves the operating efficiency of this charging apparatus further.
In the seal charging apparatus of above-mentioned ball valve group installation, described filler feed appliance comprises filler vibrating disk, filler cylinder and filler transfer block, described filler transfer block is arranged at the downside of the discharge end of above-mentioned filler vibrating disk and the upside of filler transfer block has the feeding port running through in the horizontal direction and offer, the end face of the discharge end of above-mentioned filler vibrating disk is closed and offers stuffing hole with above-mentioned feeding port corresponding position on the downside of end, described filler transfer block comprises the main body one that piston rod outer end that is inner and above-mentioned filler cylinder is connected and the flexible block one being connected to aforementioned body one outer end, above-mentioned feeding port is formed between described flexible block one upper end and main body one outer end, the lower end of described flexible block one and aforementioned body one hinged and when flexible block one flexible block one upper end after pin joint rotates has the trend of moving to feeding port direction.
During work, under the vibrations of filler vibrating disk, make filler drop in feeding port from stuffing hole, then filler is delivered to filler station by the startup of filler cylinder, then installation shaft cylinder starts and filler is set in wear on material axle, then filler cylinder drives filler transfer block to reset, now flexible block one rotates around pin joint and filler transfer block can be resetted swimmingly, thus improves the operating efficiency of this charging apparatus further.
In the seal charging apparatus of above-mentioned ball valve group installation, described pressure cap feed appliance comprises pressure cap vibrating disk, pressure cap cylinder and pressure cap transfer block, described pressure cap transfer block is arranged at the downside of the discharge end of above-mentioned pressure cap vibrating disk and the upside of pressure cap transfer block has the pressing cap port running through in the horizontal direction and offer, the end face of the discharge end of above-mentioned pressure cap vibrating disk is closed and offers pressure cap hole with above-mentioned pressing cap port corresponding position on the downside of end, described pressure cap transfer block comprises the main body two that piston rod outer end that is inner and above-mentioned pressure cap cylinder is connected and the flexible block two being connected to aforementioned body two outer end, above-mentioned pressing cap port is formed between described flexible block two upper end and main body two outer end, the lower end of described flexible block two and aforementioned body two hinged and when flexible block two flexible block two upper end after pin joint rotates has the trend of moving to pressing cap port direction.
During work, under the vibrations of pressure cap vibrating disk, make pressure cap drop in pressing cap port from pressure cap hole, then pressure cap is delivered to pressure cap station by the startup of pressure cap cylinder, then the startup of installation shaft cylinder makes pressure cap be fixed in installation cavity, then pressure cap cylinder drives pressure cap transfer block to reset, now flexible block two rotates around pin joint and pressure cap transfer block can be resetted swimmingly, thus improves the operating efficiency of this charging apparatus further.
Compared with prior art, the seal charging apparatus of this ball valve group installation has the following advantages:
1, whole table apparatus runs automatically, loading seal receptacle manually, having the advantage that operating efficiency is high relative to passing through in prior art.
2, by arranging guide rod, to pressing down guide pin bushing, by seal receptacle, the process be pressed in valve body plays guide effect, enables seal receptacle smooth and easy and is stably pressed in valve body, thus improves the operating efficiency of this charging apparatus further.
3, in feeding process, feedblock part is being worn between material bar and chute feeder, avoids being set in the seal receptacle worn on material bar and drops in chute feeder, thus improve the operating efficiency of this charging apparatus further.
Accompanying drawing explanation
Fig. 1 is the perspective view of this charging apparatus.
Fig. 2 is guide rod and the syndeton schematic diagram pressing down guide pin bushing.
Fig. 3 is the syndeton schematic diagram of installation shaft and installation shaft motor.
Fig. 4 is the syndeton schematic diagram of feed mechanism and chute feeder.
Fig. 5 is the left TV structure schematic diagram of this charging apparatus.
Fig. 6 is the structural representation of positioning seat.
Fig. 7 is the structural representation of seal receptacle locating piece.
Fig. 8 is the plan structure schematic diagram of seal receptacle locating piece.
Fig. 9 is the structural representation of filler feed appliance (pressure cap feed appliance) and filler vibrating disc (pressure cap vibrating disc).
In figure, 1, workbench; 2, positioning seat; 2a, located cavity; 2b, positioning port; 3, support; 4, seal receptacle locating piece; 4a, put material chamber; 4b, turnover panel one; 4c, turnover panel two; 4d, through hole; 4e, contiguous block; 5, compressing rod; 5a, guide rod; 5b, press down guide pin bushing; 6, lift cylinder; 7, chute feeder; 8, installation shaft; 8a, axle sleeve; 8b, wear material axle; 9, installation shaft cylinder; 10, installation shaft motor; 11, limit base; 12, material bar is worn; 13, holder; 14, feeding cylinder; 15, feedblock; 16, supporting seat; 17, lead; 18, sliding seat; 19, guide rod cylinder; 20, guide rail; 20a, slide block; 21, filler vibrating disk; 21a, stuffing hole; 22, filler cylinder; 23, filler transfer block; 23a, feeding port; 23b, main body one; 23c, flexible block one; 24, pressure cap vibrating disk; 24a, pressure cap hole; 25, pressure cap cylinder; 26, pressure cap transfer block; 26a, pressing cap port; 26b, main body two; 26c, flexible block two.
Detailed description of the invention
Be below specific embodiment of the utility model and by reference to the accompanying drawings, the technical solution of the utility model is further described, but the utility model be not limited to these embodiments.
As shown in Figure 1 and Figure 5, the seal charging apparatus of this ball valve group installation is made up of workbench 1, positioning seat 2, support 3, seal receptacle locating piece 4, compressing rod 5, lift cylinder 6, chute feeder 7, feed mechanism, installation shaft 8, installation shaft cylinder 9, installation shaft motor 10, filler feed appliance, pressure cap feed appliance etc.
Support 3 is vertically arranged on workbench 1, and positioning seat 2 to be fixed on workbench 1 and to be positioned at frame side.As shown in Figure 6, this positioning seat 2 has the located cavity 2a for placing valve body, positioning seat 2 has positioning port 2b relative to the side of installation shaft 8.Workbench 1 is also fixed with limit base 11, and described chute feeder 7 to be laterally fixed on limit base 11 and to be positioned at the same side of frame with positioning seat 2.
As shown in Figure 7, seal receptacle locating piece 4 is fixed in frame, sealing seat locating piece 4 has for hold seal receptacle put material chamber 4a, chute feeder 7 side be provided with feed mechanism and this feed mechanism can by the seal receptacle be positioned in chute feeder 7 along chute feeder 7 be delivered to put material chamber 4a in.
Specifically, as shown in Figure 1 and Figure 4, upward, be vertically provided with above this chute feeder 7 and can expect bar 12 for sheathed the wearing of seal receptacle, this wears and expects that the upper end of bar 12 and support 3 removably connect the notch of chute feeder 7.In the present embodiment, support 3 is laterally fixed with a holder 13, holder 13 offers locating hole and wears and expect that bar 12 upper end is connected in locating hole.Nature, is worn material bar 12 and to be connected with holder 13 by screw and to be also fine.Wear material bar 12 lower end and chute feeder 7 just to and wear expect bar 12 lower end and chute feeder 7 bottom between distance be greater than the thickness of a seal receptacle and be less than the thickness of two seal receptacles.During work, dozens of seal receptacle is set in successively to be worn on material bar 12, and adjacent two seal receptacles are abutted together and only have a seal receptacle can enter in chute feeder 7 at every turn.
Feed mechanism comprises feeding cylinder 14 and the feedblock 15 in strip, wherein, the cylinder body of feeding cylinder 14 is fixed on limit base 11, feedblock 15 is positioned at chute feeder 7, during use, feeding cylinder 14 start feedblock 15 is moved along chute feeder 7 towards seal receptacle locating piece 4 direction and the most at last seal receptacle be delivered to put material chamber 4a in, and in this course, feedblock 15 part is being worn between material bar 12 and chute feeder 7, avoid being set in the seal receptacle worn on material bar 12 to drop in chute feeder 7, thus improve the operating efficiency of this charging apparatus further.
As shown in Figure 7 and Figure 8, seal receptacle locating piece 4 take the shape of the letter U and the opening of sealing seat locating piece 4 towards the direction of chute feeder 7.Be provided with a turnover panel below seal receptacle locating piece 4 and between turnover panel and seal receptacle locating piece 4 madial wall, form above-mentioned putting and expect chamber 4a.Wherein, turnover panel comprises all horizontally disposed turnover panel one 4b and turnover panel two 4c, the outer end edges of turnover panel one 4b and turnover panel two 4c is along corresponding with the both sides of seal receptacle locating piece 4 hinged respectively by a contiguous block 4e, and the inner edge of turnover panel one 4b and turnover panel two 4c is just to setting.The inner of turnover panel one 4b and turnover panel two 4c has the breach of semicircular in shape respectively, and two semicircular breach are oppositely arranged and form a manhole 4d.Also be provided with Fibre Optical Sensor in seal receptacle locating piece 4, and this optical fiber biography sensor can detect in seal receptacle locating piece 4 whether have seal receptacle.
As shown in Figure 1 and Figure 5, support 3 upper end is fixed with a supporting seat 16, and cylinder body and the supporting seat 16 of lift cylinder 6 fix.Two leads 17 are vertically provided with between supporting seat 16 and workbench 1, two leads 17 slidably connect a sliding seat 18 and the piston rod of lift cylinder 6 is connected with sliding seat 18, thus make lift cylinder 6 drive sliding seat 18 relative to lead 17 upper and lower translation.
Compressing rod 5 is positioned at above seal receptacle locating piece 4 and lift cylinder 6 can drive compressing rod 5 through seal receptacle locating piece 4 and be depressed into located cavity 2a place by being positioned at the seal receptacle putting material chamber 4a.As depicted in figs. 1 and 2, compressing rod 5 comprises the guide rod 5a that vertically arranges and is sheathed on and presses down guide pin bushing 5b outside guide rod 5a.Sliding seat 18 side is connected with guide rod cylinder 19 and this guide rod cylinder 19 can move up and down by drive leader 5a.The upper end pressing down guide pin bushing 5b is connected mutually with the cylinder body of guide rod cylinder 19.In the present embodiment, the position of the through hole 4d formed between turnover panel one 4b and turnover panel two 4c and guide rod 5a and press down guide pin bushing 5b just to and the diameter of through hole 4d be greater than the diameter of guide rod 5a and be less than the external diameter pressing down guide pin bushing 5b, the external diameter pressing down guide pin bushing 5b is greater than the internal diameter of seal receptacle.
As shown in figures 1 to 6, workbench 1 is also provided with a guide rail 20 and seal receptacle locating piece 4 between guide rail 20 and chute feeder 7.Guide rail 20 is connected with a slide block 20a, the piston rod of installation shaft cylinder 9 is connected with slide block 20a and makes slide block 20a can relative to seal receptacle locating piece 4 alternating translational.Installation shaft motor 10 to be fixed on slide block 20a and the output shaft of this installation shaft motor 10 is connected with installation shaft 8.Specifically, what installation shaft 8 comprised axle sleeve 8a and was arranged in that in axle sleeve 8a and outer end stretches out axle sleeve 8a to positioning seat 2 direction wears material axle 8b.Wherein, end axle sleeve 8a being positioned at positioning seat 2 side have can with the installation cavity of pressure cap mating shapes and installation shaft motor 10 can propeller shaft sleeve 8a circumference rotate.In the present embodiment, wear material axle 8b and axle sleeve 8a all can axial stretching and both in be equipped with and make both all have outwardly directed spring.
Filler feed appliance and pressure cap feed appliance lay respectively at guide rail 20 both sides.Wherein, as shown in Figure 9, filler feed appliance comprises filler vibrating disk 21, filler cylinder 22 and filler transfer block 23, filler transfer block 23 is arranged at the downside of the discharge end of filler vibrating disk 21 and the upside of filler transfer block 23 has the feeding port 23a running through in the horizontal direction and offer, the end face of the discharge end of filler vibrating disk 21 is closed and offers stuffing hole 21a with feeding port 23a corresponding position on the downside of end, filler transfer block 23 comprises main body one 23b that piston rod outer end that is inner and filler cylinder 22 is connected and flexible block one 23c being connected to main body one 23b outer end, feeding port 23a is formed between flexible block one 23c upper end and main body one 23b outer end, the lower end of flexible block one 23c and main body one 23b hinged and when flexible block one 23c flexible block one 23c upper end after pin joint rotates has the trend of moving to feeding port 23a direction.In the present embodiment, the torsion spring making flexible block one 23c upper end have the trend of moving to feeding port 23a direction is provided with between flexible block one 23c and main body one 23b.
Pressure cap feed appliance comprises pressure cap vibrating disk 24, pressure cap cylinder 25 and pressure cap transfer block 26, pressure cap transfer block 26 is arranged at the downside of the discharge end of pressure cap vibrating disk 24 and the upside of pressure cap transfer block 26 has the pressing cap port 26a running through in the horizontal direction and offer, the end face of the discharge end of pressure cap vibrating disk 24 is closed and offers pressure cap hole 24a with pressing cap port 26a corresponding position on the downside of end, pressure cap transfer block 26 comprises main body two 26b that piston rod outer end that is inner and pressure cap cylinder 25 is connected and flexible block two 26c being connected to main body two 26b outer end, pressing cap port 26a is formed between flexible block two 26c upper end and main body two 26b outer end, the lower end of flexible block two 26c and main body two 26b hinged and when flexible block two 26c flexible block two 26c upper end after pin joint rotates has the trend of moving to pressing cap port 26a direction.In the present embodiment, the torsion spring making flexible block one 23c upper end have the trend of moving to feeding port 23a direction is provided with between flexible block one 23c and main body one 23b.
When the seal charging apparatus of this ball valve group installation uses, first valve body is placed on to snap onto in positioning port 2b on positioning seat 2 and by link valve body being used for be connected with pressure cap and valve body is located.Then feeding cylinder 14, pressure cap vibrating disk 24 and filler vibrating disk 21 work simultaneously.
Wherein, under the effect of feeding cylinder 14 feedblock 15 move along chute feeder 7 towards seal receptacle locating piece 4 direction and the most at last seal receptacle be delivered to put material chamber 4a in and just right with through hole 4d position, and in this course, feedblock 15 part is being worn between material bar 12 and chute feeder 7, avoids being set in the seal receptacle worn on material bar 12 and drops in chute feeder 7; Can send a signal to guide rod cylinder 19 when Fibre Optical Sensor detects seal receptacle make guide rod cylinder 19 work, drive guide rod 5a to move down and make sealed socket sleeve be located on guide rod 5a through seal receptacle and through hole 4d according to this, then lift cylinder 6 starts to drive guide rod cylinder 19 to move down thus drives and presses down guide pin bushing 5b and to move down and the weight overcoming contiguous block 4e makes turnover panel one 4b and turnover panel two 4c around pin joint rotation thus is pressed in valve body by seal receptacle, when press down guide pin bushing 5b moves away from turnover panel time, turnover panel one 4b and turnover panel two 4c can recover level under the effect of contiguous block 4e weight.
Under the vibrations of filler vibrating disk 21, make filler drop in feeding port 23a from stuffing hole 21a, then filler cylinder 22 starts filler is delivered to filler station; Under the vibrations of pressure cap vibrating disk 24, make pressure cap drop in pressing cap port 26a from pressure cap hole 24a, then pressure cap cylinder 25 starts pressure cap is delivered to pressure cap station, and installation shaft 8, pressure cap station, filler station and positioning seat 2 are arranged in order on same level straight line; Then installation shaft cylinder 9 starts and filler is set in wear on material axle 8b, pressure cap is fixed in installation cavity, now installation shaft 8 can stop mobile, in that moment, filler cylinder 22 works and drives that filler transfer block 23 resets, pressure cap cylinder 25 work strip dynamic pressure cap transfer block 26 resets, and now flexible block one 23c and flexible block two 26c rotates around pin joint respectively and filler transfer block 23 and pressure cap transfer block 26 can be resetted swimmingly under the effect of pressure cap and filler.When filler transfer block 23 and pressure cap transfer block 26 depart from pressure cap and filler respectively, elasticity link stopper one and flexible block two 26c reset respectively under the effect of torsion spring.Then installation shaft 8 cylinder is reworked and is made installation shaft 8 continue move to positioning seat 2 direction and be pressed in valve body by filler and pressure cap, then installation shaft motor 10 starts, drive axle sleeve 8a rotate thus pressure cap is screwed in valve body in advance, thus complete press-in once.
Specific embodiment described herein is only to the explanation for example of the utility model spirit.The utility model person of ordinary skill in the field can make various amendment or supplements or adopt similar mode to substitute to described specific embodiment, but can't depart from spirit of the present utility model or surmount the scope that appended claims defines.

Claims (10)

1. the seal charging apparatus of ball valve group installation, comprise workbench (1), all be fixed on the support (3) on workbench (1) and there is the positioning seat (2) of located cavity (2a), it is characterized in that, described charging apparatus also comprises and is arranged at above-mentioned positioning seat (2) top and the seal receptacle locating piece (4) be connected with support (3), sealing seat locating piece (4) has and expects chamber (4a) for holding putting of seal receptacle, described seal receptacle locating piece (4) top is also vertically provided with compressing rod (5), support (3) is fixed with lift cylinder (6) and lift cylinder (6) above-mentioned compressing rod (5) can be driven through described seal receptacle locating piece (4) and by be positioned at put material chamber (4a) seal receptacle be depressed into above-mentioned located cavity (2a) place, described workbench (1) is also fixed with chute feeder (7), described chute feeder (7) side is provided with feed mechanism and the seal receptacle be positioned in chute feeder (7) can be delivered to above-mentioned putting in material chamber (4a) along chute feeder (7) by this feed mechanism.
2. the seal charging apparatus of ball valve group installation according to claim 1, it is characterized in that, the notch of described chute feeder (7) upward, this chute feeder (7) top is vertically provided with can expect bar (12) for sheathed the wearing of seal receptacle, this upper end and above-mentioned support (3) wearing material bar (12) removably connects, wear material bar (12) lower end and chute feeder (7) just to and wear expect bar (12) lower end and chute feeder (7) bottom between distance be greater than the thickness of a seal receptacle and be less than the thickness of two seal receptacles.
3. the seal charging apparatus of ball valve group installation according to claim 1 and 2, it is characterized in that, described seal receptacle locating piece (4) take the shape of the letter U and opening towards the direction of above-mentioned chute feeder (7), described seal receptacle locating piece (4) below is provided with turnover panel, the edge of this turnover panel is fixed with contiguous block (4e), and this contiguous block (4e) and the outside portion of above-mentioned seal receptacle locating piece (4) are hinged and turnover panel has the trend recovering level after rotating around pin joint.
4. the seal charging apparatus of ball valve group installation according to claim 3, it is characterized in that, described turnover panel comprises all horizontally disposed turnover panel one (4b) and turnover panel two (4c), the outer end edges of turnover panel one (4b) and turnover panel two (4c) is along corresponding hinged with the both sides of above-mentioned seal receptacle locating piece (4) respectively by a contiguous block (4e), and the inner edge of turnover panel one (4b) and turnover panel two (4c) is just to setting.
5. the seal charging apparatus of ball valve group installation according to claim 4, it is characterized in that, what described compressing rod (5) comprised the guide rod (5a) that vertically arranges and was sheathed on guide rod (5a) outside presses down guide pin bushing (5b), described support (3) is also connected with the guide rod cylinder (19) that energy drive leader (5a) moves up and down, the inner of above-mentioned turnover panel one (4b) and turnover panel two (4c) has the breach of semicircular in shape respectively, two semicircular breach are oppositely arranged and form a manhole (4d), the position of this through hole (4d) and above-mentioned guide rod (5a) just to and the diameter of through hole (4d) be greater than the diameter of guide rod (5a) and be less than the above-mentioned external diameter pressing down guide pin bushing (5b), the described external diameter pressing down guide pin bushing (5b) is greater than the internal diameter of seal receptacle.
6. the seal charging apparatus of ball valve group installation according to claim 1, it is characterized in that, described feed mechanism comprises feedblock (15) and feeding cylinder (14), and described feedblock (15) is positioned at above-mentioned chute feeder (7) and feeding cylinder (14) can promote feedblock (15) moves around along chute feeder (7).
7. the seal charging apparatus of ball valve group installation according to claim 1, it is characterized in that, described charging apparatus also comprises horizontally disposed installation shaft (8), installation shaft cylinder (9), installation shaft motor (10), filler can be delivered to the filler feed appliance of filler station and pressure cap can be delivered to the pressure cap feed appliance of pressure cap station, described installation shaft (8), pressure cap station, filler station and above-mentioned positioning seat (2) are arranged in order on same level straight line, what installation shaft (8) comprised axle sleeve (8a) and was arranged in that in axle sleeve (8a) and outer end stretches out axle sleeve (8a) to above-mentioned positioning seat (2) direction wears material axle (8b), the end described axle sleeve (8a) being positioned at above-mentioned positioning seat (2) side have can with the installation cavity of pressure cap mating shapes, above-mentioned installation shaft cylinder (9) can promote above-mentioned installation shaft (8) and move to described positioning seat (2) direction, described installation shaft motor (10) can drive above-mentioned axle sleeve (8a) circumference to rotate.
8. the seal charging apparatus of ball valve group installation according to claim 7, is characterized in that described positioning seat (2) has positioning port (2b) relative to the side of above-mentioned installation shaft (8).
9. the seal charging apparatus of the ball valve group installation according to claim 7 or 8, it is characterized in that, described filler feed appliance comprises filler vibrating disk (21), filler cylinder (22) and filler transfer block (23), described filler transfer block (23) is arranged at the downside of the discharge end of above-mentioned filler vibrating disk (21) and the upside of filler transfer block (23) has the feeding port (23a) running through in the horizontal direction and offer, the end face of the discharge end of above-mentioned filler vibrating disk (21) is closed and offers stuffing hole (21a) with above-mentioned feeding port (23a) corresponding position on the downside of end, described filler transfer block (23) comprises the main body one (23b) that piston rod outer end that is inner and above-mentioned filler cylinder (22) is connected and the flexible block one (23c) being connected to aforementioned body one (23b) outer end, above-mentioned feeding port (23a) is formed between described flexible block one (23c) upper end and main body one (23b) outer end, the lower end of described flexible block one (23c) and aforementioned body one (23b) hinged and when flexible block one (23c) flexible block one (23c) upper end after pin joint rotates has the trend of moving to feeding port (23a) direction.
10. the seal charging apparatus of the ball valve group installation according to claim 7 or 8, it is characterized in that, described pressure cap feed appliance comprises pressure cap vibrating disk (24), pressure cap cylinder (25) and pressure cap transfer block (26), described pressure cap transfer block (26) is arranged at the downside of the discharge end of above-mentioned pressure cap vibrating disk (24) and the upside of pressure cap transfer block (26) has the pressing cap port (26a) running through in the horizontal direction and offer, the end face of the discharge end of above-mentioned pressure cap vibrating disk (24) is closed and offers pressure cap hole (24a) with above-mentioned pressing cap port (26a) corresponding position on the downside of end, described pressure cap transfer block (26) comprises the main body two (26b) that piston rod outer end that is inner and above-mentioned pressure cap cylinder (25) is connected and the flexible block two (26c) being connected to aforementioned body two (26b) outer end, above-mentioned pressing cap port (26a) is formed between described flexible block two (26c) upper end and main body two (26b) outer end, the lower end of described flexible block two (26c) and aforementioned body two (26b) hinged and when flexible block two (26c) flexible block two (26c) upper end after pin joint rotates has the trend of moving to pressing cap port (26a) direction.
CN201420758796.2U 2014-12-06 2014-12-06 The seal charging apparatus of ball valve group installation Expired - Fee Related CN204277410U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420758796.2U CN204277410U (en) 2014-12-06 2014-12-06 The seal charging apparatus of ball valve group installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420758796.2U CN204277410U (en) 2014-12-06 2014-12-06 The seal charging apparatus of ball valve group installation

Publications (1)

Publication Number Publication Date
CN204277410U true CN204277410U (en) 2015-04-22

Family

ID=52860606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420758796.2U Expired - Fee Related CN204277410U (en) 2014-12-06 2014-12-06 The seal charging apparatus of ball valve group installation

Country Status (1)

Country Link
CN (1) CN204277410U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108747317A (en) * 2018-07-20 2018-11-06 广东新宝精密制造股份有限公司 A kind of spring card screwing device and assembly method
CN109158865A (en) * 2018-11-19 2019-01-08 中国科学院沈阳自动化研究所 A kind of automatic screwing device
CN109516096A (en) * 2018-12-31 2019-03-26 浙江嘉泰激光科技股份有限公司 A kind of sealing ring feeding mechanism of battery power joint weld equipment
CN110052824A (en) * 2019-04-25 2019-07-26 宁波继峰汽车零部件股份有限公司 A kind of integrated guide set assembly tooling
CN112692567A (en) * 2021-01-04 2021-04-23 浙江中德自控科技股份有限公司 Multi-specification assembling all-in-one machine for large ball valves
CN113441926A (en) * 2021-07-20 2021-09-28 甘桂发 Ball valve core feeding and directional supply device for assembling electronic drain valve
CN114102108A (en) * 2021-11-03 2022-03-01 陈敏睿 Automatic ball valve assembling equipment for drainage pipe

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108747317A (en) * 2018-07-20 2018-11-06 广东新宝精密制造股份有限公司 A kind of spring card screwing device and assembly method
CN109158865A (en) * 2018-11-19 2019-01-08 中国科学院沈阳自动化研究所 A kind of automatic screwing device
CN109158865B (en) * 2018-11-19 2019-07-19 中国科学院沈阳自动化研究所 A kind of automatic screwing device
CN109516096A (en) * 2018-12-31 2019-03-26 浙江嘉泰激光科技股份有限公司 A kind of sealing ring feeding mechanism of battery power joint weld equipment
CN109516096B (en) * 2018-12-31 2024-04-16 浙江嘉泰激光科技股份有限公司 Sealing ring feeding mechanism of storage battery power supply interface welding equipment
CN110052824A (en) * 2019-04-25 2019-07-26 宁波继峰汽车零部件股份有限公司 A kind of integrated guide set assembly tooling
CN110052824B (en) * 2019-04-25 2024-01-30 宁波继峰汽车零部件股份有限公司 Integrated guide sleeve assembly fixture
CN112692567A (en) * 2021-01-04 2021-04-23 浙江中德自控科技股份有限公司 Multi-specification assembling all-in-one machine for large ball valves
CN112692567B (en) * 2021-01-04 2021-12-28 浙江中德自控科技股份有限公司 Multi-specification assembling all-in-one machine for large ball valves
CN113441926A (en) * 2021-07-20 2021-09-28 甘桂发 Ball valve core feeding and directional supply device for assembling electronic drain valve
CN114102108A (en) * 2021-11-03 2022-03-01 陈敏睿 Automatic ball valve assembling equipment for drainage pipe

Similar Documents

Publication Publication Date Title
CN204277410U (en) The seal charging apparatus of ball valve group installation
CN105170398B (en) A kind of circular sponge pastes rubber-coated mechanism
CN204277443U (en) The valve ball charging apparatus of ball valve group installation
CN204381813U (en) Ball valve group is installed
CN206843013U (en) A kind of efficient cap rotating device of plastic bottle closure
CN107826286B (en) Bearing bottling and cover mechanism
CN205471560U (en) Silica gel embedment packaging machine
CN204036189U (en) Automatic transmission formula pot body edging system
CN104828529B (en) A kind of tipper used on closed-loop production line
CN208307112U (en) A kind of food processing filling machine
CN109940380A (en) A kind of assembling mechanism of perfume bottle cap
CN205628496U (en) Mechanism supplies to glue
CN105855871B (en) The chain assembly line of electrically heated rod kludge
CN104607555B (en) A kind of automatization lamp holder riveting point special plane
CN105414966A (en) Automatic assembly equipment of water tank
CN210971777U (en) Sealing device for food processing
CN110078006B (en) PET barreled beer plastic cover capping machine
CN208745119U (en) A kind of automatic blanking device of rubber preforming machine
CN104369904A (en) Plastic sleeve packaging device used for stepped shafts
CN105057474B (en) Necking device for clamping sleeve of enamel tank
CN105060210B (en) A kind of indenter device for automatic capping machine
CN210393639U (en) PET barreled beer plastic cover capping machine
CN205764860U (en) A kind of water-saving spray automatic assembly equipment
CN205069772U (en) Closing device with automatic gland cap device of battery
CN105758266B (en) Ammunition closing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150422