CN204271525U - Cable rolls off the production line fixing plate pulling device - Google Patents

Cable rolls off the production line fixing plate pulling device Download PDF

Info

Publication number
CN204271525U
CN204271525U CN201420759618.1U CN201420759618U CN204271525U CN 204271525 U CN204271525 U CN 204271525U CN 201420759618 U CN201420759618 U CN 201420759618U CN 204271525 U CN204271525 U CN 204271525U
Authority
CN
China
Prior art keywords
production line
cable
rolls
band iron
fixing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420759618.1U
Other languages
Chinese (zh)
Inventor
谷跃明
梁向泽
靳键云
赵若桥
李英锋
杜瑞
要利军
陈宝华
李永涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Linfen Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Linfen Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Linfen Power Supply Co of State Grid Shanxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420759618.1U priority Critical patent/CN204271525U/en
Application granted granted Critical
Publication of CN204271525U publication Critical patent/CN204271525U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model relates to and connects family cable in the fixture that rolls off the production line, and is specially cable and rolls off the production line fixing plate pulling device.Cable rolls off the production line fixing plate pulling device, and comprise band iron plate, the middle part of band iron plate is bent into 90 degree, and the both ends of band iron plate are all provided with bolt hole, is wherein provided with bolt in a bolt hole, bolt is fixed with Tea Service.During use, band iron plate is fixed on stringing pole by bolt hole, connects family cable in lower line process, and in the cable trough that the cable that rolls off the production line will be wrapped on Tea Service, during winding, Tea Service does not block, and operation is very easy, improves efficiency.The utility model provides cable and to roll off the production line fixing plate pulling device, this device is proven, make simple, fireballing feature of constructing, a construction group completed 8 places for the fastest one day and to roll off the production line installment work past, after the new fixture of use, same workmen can complete 12 place's cables and to roll off the production line installment work, and often installs and fix a place and can save Tea Service pulling-on piece 2.

Description

Cable rolls off the production line fixing plate pulling device
Technical field
The utility model relates to and connects family cable in the fixture that rolls off the production line, and is specially cable and rolls off the production line fixing plate pulling device.
Background technology
In the table rebuilding construction process of family, connect family cable and there is no professional fixture in lower line process, Tea Service arm-tie can only be used in construction, the structure of existing Tea Service arm-tie as shown in Figure 1, comprise two Tea Service sheets 1, the end of two Tea Service sheets 1 is connected by bolt 3, Tea Service 2 is also provided with between the end, one end of two Tea Services, but this Tea Service arm-tie was only used in overhead transmission line in the past, when fixedly rolling off the production line cable, in the cable trough that the cable that rolls off the production line will be wrapped on Tea Service, during operation, because Tea Service is fixed between two Tea Service sheets, be wound around cable very not put just, difficulty of construction is large, the recruitment time is long, so just cause labour intensity in operation construction large, cause efficiency low, construction cost is higher.
Summary of the invention
The utility model connects family cable in lower line process to solve, the problem that cable fixing operation of rolling off the production line is loaded down with trivial details, provides cable and to roll off the production line fixing plate pulling device.
The utility model adopts following technical scheme to realize: cable rolls off the production line fixing plate pulling device, comprise band iron plate, the middle part of band iron plate is bent into 90 degree, and the both ends of band iron plate are all provided with bolt hole, wherein be provided with bolt in a bolt hole, bolt is fixed with Tea Service.
During use, band iron plate is fixed on stringing pole by bolt hole, connects family cable in lower line process, and in the cable trough that the cable that rolls off the production line will be wrapped on Tea Service, during winding, Tea Service does not block, and operation is very easy, improves efficiency.
The utility model provides cable and to roll off the production line fixing plate pulling device, this device is proven, make simple, fireballing feature of constructing, a construction group completed 8 places for the fastest one day and to roll off the production line installment work past, after the new fixture of use, same workmen can complete 12 place's cables and to roll off the production line installment work, and often installs and fix a place and can save Tea Service pulling-on piece 2.
Accompanying drawing explanation
Fig. 1 is the structural representation of existing Tea Service arm-tie.
Fig. 2 is structural representation of the present utility model.
In figure: 1-Tea Service sheet, 2-Tea Service, 3-bolt, 4-band iron plate, 5-bolt hole.
Embodiment
Cable rolls off the production line fixing plate pulling device, and comprise band iron plate 4, the middle part of band iron plate 4 is bent into 90 degree, and the both ends of band iron plate 4 are all provided with bolt hole 5, is wherein provided with bolt 3 in a bolt hole, bolt is fixed with Tea Service 2.

Claims (1)

1. cable rolls off the production line fixing plate pulling device, it is characterized in that comprising band iron plate (4), the middle part of band iron plate (4) is bent into 90 degree, and the both ends of band iron plate (4) are all provided with bolt hole (5), wherein be provided with bolt (3) in a bolt hole, bolt be fixed with Tea Service (2).
CN201420759618.1U 2014-12-08 2014-12-08 Cable rolls off the production line fixing plate pulling device Expired - Fee Related CN204271525U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420759618.1U CN204271525U (en) 2014-12-08 2014-12-08 Cable rolls off the production line fixing plate pulling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420759618.1U CN204271525U (en) 2014-12-08 2014-12-08 Cable rolls off the production line fixing plate pulling device

Publications (1)

Publication Number Publication Date
CN204271525U true CN204271525U (en) 2015-04-15

Family

ID=52806370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420759618.1U Expired - Fee Related CN204271525U (en) 2014-12-08 2014-12-08 Cable rolls off the production line fixing plate pulling device

Country Status (1)

Country Link
CN (1) CN204271525U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104410004A (en) * 2014-12-08 2015-03-11 国家电网公司 Cable winding inserting fixing pull-plate device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104410004A (en) * 2014-12-08 2015-03-11 国家电网公司 Cable winding inserting fixing pull-plate device

Similar Documents

Publication Publication Date Title
CN203582181U (en) Coil line outgoing device
CN204271525U (en) Cable rolls off the production line fixing plate pulling device
CN204252623U (en) A kind of easy-to-mount bracing wire sheath
CN203545347U (en) Aluminum armor tape winding device
CN103588043B (en) Aluminium armor tape wrapping head and carry out the method for aluminium armor tape winding
CN203624728U (en) Steel wire winding mechanism
CN103247972B (en) Wire tractor
CN204847631U (en) Swift formula earth connection kinking ware
CN203034892U (en) Fixing structure for concrete pole tower stay wire tail wire
CN203547213U (en) Fixing device for stay wire binding
CN104410004A (en) Cable winding inserting fixing pull-plate device
CN203348873U (en) Fixing support for rod
CN203562618U (en) Telescopic power line
CN204265112U (en) Portable wire wound bracket for earch wrie
CN201985633U (en) Motor stator facilitating coiling
CN208119477U (en) Grounding wire pole bundled device
CN204486657U (en) Metal wire straightening device
CN204276593U (en) Street lamp post apparatus for bending
CN204490224U (en) Electrical wire sorting wrapping head
CN204318619U (en) Roll toilet paper anti-drop device
CN203707668U (en) Drawing gear for erecting wire
CN204538564U (en) A kind of wire stretcher
CN203397003U (en) Optical cable installing and fixing device
CN203649228U (en) Wire harness forming device
CN203265323U (en) Novel straightening device for bent steel pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150415

Termination date: 20171208