CN204267981U - Pump line bucket patch device - Google Patents

Pump line bucket patch device Download PDF

Info

Publication number
CN204267981U
CN204267981U CN201420612101.XU CN201420612101U CN204267981U CN 204267981 U CN204267981 U CN 204267981U CN 201420612101 U CN201420612101 U CN 201420612101U CN 204267981 U CN204267981 U CN 204267981U
Authority
CN
China
Prior art keywords
iron sheet
iron
pump line
patch device
line bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420612101.XU
Other languages
Chinese (zh)
Inventor
蒋鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420612101.XU priority Critical patent/CN204267981U/en
Application granted granted Critical
Publication of CN204267981U publication Critical patent/CN204267981U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of pump line bucket patch device, comprise cover pumping vehicle arm rack piping failure place U-iron sheet, be clamped in soft gasket between U-iron sheet and pump line, for fixing U-iron sheet iron hoop and tighten the nut of U-iron sheet and iron hoop; U-iron sheet is close on damaged pumping vehicle arm rack pipeline, soft gasket encloses along the concave edge of U-iron sheet around one, and be close to and be fixed on U-iron sheet, iron hoop is looped around on damaged pumping vehicle arm rack pipeline and docks with the two ends, left and right of U-iron sheet, makes the nut screwing clamping of the airtight mending-leakage of U-iron sheet at iron hoop two ends.The utility model greatly reduces on the one hand potential safety hazard in construction, shut-down, replace tubes and concrete loss, on the other hand, the utility model pump line bucket patch device is with low cost, simple to operate, also greatly reduces engineering time during pumping vehicle arm rack piping failure simultaneously.

Description

Pump line bucket patch device
Technical field
The utility model relates to engineering machinery accessory technical field, particularly relates to a kind of pump line bucket patch device.
Background technique
Concrete mixer is made up of the pump housing and delivery pipe, and the power of concrete mixer sends the power of motor to oil hydraulic pump group or back axle by power transfer case, and oil hydraulic pump promotes the work of piston driving concrete pump.Then the boom on pump truck and pumping vehicle arm rack pipeline is utilized, by concrete conveyance to certain height and distance.Pumping vehicle arm rack pipeline just plays a significant role in the operation process of concrete mixer, and in concrete work progress, car jib pipeline is easy to breakage, worn out, is easy to cause leaking material and even injures people or thing by a crashing object in work progress.
Conventional treatment in existing technology needs to stop construction changing pump line, wastes time and energy like this and affects construction, even producing dispute, and when situation is serious, pump truck supplier also needs the loss of reparation building site.So existing treatment scheme is badly in need of being improved.
Model utility content
For the deficiency existed in above-mentioned technology, the utility model provide a kind of can the pump line bucket patch device of quick, convenient process.
In order to achieve the above object, a kind of pump line bucket patch device of the utility model, comprise the U-iron sheet covering pumping vehicle arm rack piping failure place, the soft gasket making to seal between U-iron sheet and pump line, for fixing U-iron sheet iron hoop and tighten the nut of U-iron sheet and iron hoop; U-iron sheet is close on damaged pumping vehicle arm rack pipeline, soft gasket encloses along the concave edge of U-iron sheet around one, and be close to and be fixed on U-iron sheet, iron hoop is looped around on damaged pumping vehicle arm rack pipeline and docks with the two ends, left and right of U-iron sheet, makes the nut screwing clamping of the airtight mending-leakage of U-iron sheet at iron hoop two ends.
Wherein, the U-iron sheet of this pump line bucket patch device is the U-shaped arc iron plate adapting to pumping vehicle arm rack pipeline radian, and the U-iron sheet thickness cast by high ferromanganese is 2cm-4cm.
Wherein, this pump line bucket patch device also comprises protrusion hanger, and convex hanger protrudes on U-iron sheet both sides, and convex hanger is provided with aperture, and iron hoop two ends are respectively by the aperture on convex hanger and nut screwing clamping.
Wherein, iron hoop two ends are designed to external thread structure respectively, and the external thread structure on iron hoop right through the aperture on convex hanger, and matches with the nut for female thread structure.
Wherein, a secondary iron hoop of this pump line bucket patch device and a pair convex hanger and a pair nut match, and according to the difference of pumping vehicle arm rack duct length, arrange the iron hoop of different tricks in the neutral position of U-iron sheet.
The beneficial effects of the utility model are: compared with prior art, the utility model pump line bucket patch device is by using U-iron sheet, soft gasket, iron hoop and nut, the pumping vehicle arm rack pipeline of breakage is carried out mending-leakage process, can when pumping vehicle arm rack piping failure galls, pipeline need not be dismantled, only with directly pump line bucket patch device being fixed on pump line breakage spot, constructing in five minutes and just can continue to carry out smoothly.The utility model greatly reduces on the one hand potential safety hazard in construction, shut-down, replace tubes and concrete loss, on the other hand, the utility model pump line bucket patch device is with low cost, simple to operate, also greatly reduces engineering time during pumping vehicle arm rack piping failure simultaneously.
Accompanying drawing explanation
Fig. 1 is the structural drawing of pump line bucket patch device;
Fig. 2 is U-iron sheet and pad Local map.
Primary component symbol description is as follows:
10, U-iron sheet 11, iron hoop
12, hanger 13, nut is protruded
14, pumping vehicle arm rack pipeline 15, soft gasket.
Embodiment
In order to more clearly state the utility model, below in conjunction with accompanying drawing, the utility model is further described.
Refer to Fig. 1 and Fig. 2, a kind of pump line bucket patch device of the utility model, comprise the U-iron sheet 10 covering pumping vehicle arm rack pipeline 14 breakage spot, the soft gasket 15 making to seal between U-iron sheet 10 and pumping vehicle arm rack pipeline 14, for fixing U-iron sheet 10 iron hoop 11 and tighten the nut 13 of U-iron sheet 10 and iron hoop 11; U-iron sheet 10 is close on damaged pumping vehicle arm rack pipeline 14, soft gasket 15 encloses along the concave edge of U-iron sheet 10 around one, and be close to and be fixed on U-iron sheet 10, iron hoop 11 is looped around on damaged pumping vehicle arm rack pipeline 14 and docks with the two ends, left and right of U-iron sheet 10, makes the nut 13 of the airtight mending-leakage of U-iron sheet 10 be tightened in iron hoop two ends.
Compared to prior art, the pump line bucket patch device that the utility model provides is by using U-iron sheet, iron hoop and nut, the pumping vehicle arm rack pipeline of breakage is carried out mending-leakage process, can when pumping vehicle arm rack piping failure galls, pipeline need not be dismantled, only with directly pump line bucket patch device being fixed on pump line breakage spot, constructing in five minutes and just can continue to carry out smoothly.The utility model greatly reduces on the one hand potential safety hazard in construction, shut-down, replace tubes and concrete loss, on the other hand, the utility model pump line bucket patch device is with low cost, simple to operate, also greatly reduces engineering time during pumping vehicle arm rack piping failure simultaneously.
In the present embodiment, the U-iron sheet 10 of this pump line bucket patch device answers the U-shaped arc iron plate of pumping vehicle arm rack pipeline 14 radian, and U-iron sheet 10 thickness cast by high ferromanganese is 2cm-4cm.The radian design of U-iron sheet can make U-iron sheet 10 be more prone to reach obturation effect; U-iron sheet 10 adopts the high ferromanganese of 2cm-4cm, and material is softer flexible on the one hand, and material is wear-resisting on the other hand, long service life.
In the present embodiment, this pump line bucket patch device also comprises protrusion hanger 12, and convex hanger 12 protrudes on U-iron sheet 10 both sides, and convex hanger 12 is provided with aperture, and iron hoop 11 two ends are tightened respectively by the aperture on convex hanger 12 and nut 13.Certainly, this case is not limited to convex hanger 12, also can be hook or other can fix the device of iron hoop 11, as long as the device of iron hoop 11 can be fixed, all belong to simple deformation or the conversion of this case, fall into protection domain of the present utility model.
In the present embodiment, iron hoop 11 two ends are designed to external thread structure respectively, and the external thread structure on iron hoop 11 right through the aperture on convex hanger 12, and matches with the nut 13 for female thread structure.The design of internal and external threads structure makes can move freely between iron hoop 11 and nut 13, and the utility model pump line bucket patch device so just can be made to be applicable to the pumping vehicle arm rack pipeline of different radii.
In the present embodiment, a secondary iron hoop 11 of this pump line bucket patch device and a pair convex hanger 12 and a pair nut 13 match, and according to the difference of pumping vehicle arm rack duct length, arrange the iron hoop of different tricks in the neutral position of U-iron sheet.So just, according to the difference of leak size, the pump line bucket patch device of different length can be set, increase iron hoop number, so just add the using scope of pump line bucket patch device.
Advantage of the present utility model is:
1, the utility model greatly reduces on the one hand potential safety hazard in construction, shut-down, replace tubes and concrete loss, on the other hand, the utility model pump line bucket patch device is with low cost, simple to operate, also greatly reduces engineering time during pumping vehicle arm rack piping failure simultaneously.
2, U-iron sheet adopts the high ferromanganese of 2cm-4cm, and material is softer flexible on the one hand, and material is wear-resisting on the other hand, long service life.
3, the design of internal and external threads structure makes can move freely between iron hoop and nut, and the utility model pump line bucket patch device so just can be made to be applicable to the pumping vehicle arm rack pipeline of different radii.
4, according to the difference of leak size, the pump line bucket patch device of different length can be set, increase iron hoop number, so just add the using scope of pump line bucket patch device.
Be only several specific embodiment of the present utility model above, but the utility model is not limited thereto, the changes that any person skilled in the art can think of all should fall into protection domain of the present utility model.

Claims (5)

1. a pump line bucket patch device, is characterized in that, comprise cover pumping vehicle arm rack piping failure place U-iron sheet, be clamped in soft gasket between U-iron sheet and pump line, for fixing U-iron sheet iron hoop and tighten the nut of U-iron sheet and iron hoop; U-iron sheet is close on damaged pumping vehicle arm rack pipeline, soft gasket encloses along the concave edge of U-iron sheet around one, and be close to and be fixed on U-iron sheet, iron hoop is looped around on damaged pumping vehicle arm rack pipeline and docks with the two ends, left and right of U-iron sheet, makes the nut screwing clamping of the airtight mending-leakage of U-iron sheet at iron hoop two ends.
2. pump line bucket patch device according to claim 1, is characterized in that, the U-iron sheet of this pump line bucket patch device is the U-shaped arc iron plate adapting to pumping vehicle arm rack pipeline radian, and the U-iron sheet thickness cast by high ferromanganese is 2cm-4cm.
3. pump line bucket patch device according to claim 1, it is characterized in that, this pump line bucket patch device also comprises protrusion hanger, and convex hanger protrudes on U-iron sheet both sides, convex hanger is provided with aperture, and iron hoop two ends are respectively by the aperture on convex hanger and nut screwing clamping.
4. pump line bucket patch device according to claim 3, is characterized in that, iron hoop two ends are designed to external thread structure respectively, and the external thread structure on iron hoop right through the aperture on convex hanger, and matches with the nut for female thread structure.
5. according to the arbitrary described pump line bucket patch device of claim 1-4, it is characterized in that, one secondary iron hoop of this pump line bucket patch device and a pair convex hanger and a pair nut match, and according to the difference of pumping vehicle arm rack duct length, arrange the iron hoop of different tricks in the neutral position of U-iron sheet.
CN201420612101.XU 2014-10-22 2014-10-22 Pump line bucket patch device Expired - Fee Related CN204267981U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420612101.XU CN204267981U (en) 2014-10-22 2014-10-22 Pump line bucket patch device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420612101.XU CN204267981U (en) 2014-10-22 2014-10-22 Pump line bucket patch device

Publications (1)

Publication Number Publication Date
CN204267981U true CN204267981U (en) 2015-04-15

Family

ID=52802848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420612101.XU Expired - Fee Related CN204267981U (en) 2014-10-22 2014-10-22 Pump line bucket patch device

Country Status (1)

Country Link
CN (1) CN204267981U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110230748A (en) * 2019-06-17 2019-09-13 中国五冶集团有限公司 A kind of stainless steel pipes localized seepage repairing and reinforcing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110230748A (en) * 2019-06-17 2019-09-13 中国五冶集团有限公司 A kind of stainless steel pipes localized seepage repairing and reinforcing method

Similar Documents

Publication Publication Date Title
CN201145123Y (en) Seal cover for first-aid repairing gas pipeline
CN104832713A (en) Erecting equipment for petroleum transmission pipeline
CN203052097U (en) Multifunctional big-head huff section
CN104344117A (en) Connecting flange for asphalt pipelines
CN204267981U (en) Pump line bucket patch device
CN204164544U (en) A kind of ductile iron pipe slip-preventing structure
CN203979769U (en) A kind of novel Hough breakdown joint
CN103292046A (en) Fixing clamping ring for water-cooled cables
CN204704541U (en) A kind of pipe connection sealer
CN205991235U (en) A kind of GRP pipe installation tool
CN104019324B (en) The quick maintenance device of Underwater Two-layer oil transport pipeline
CN203395495U (en) Enhancement structure for weak part of pipeline
CN102297315A (en) Under-pressure fluid-guiding sealing device for emergency repair of pipe
CN105179873A (en) Leakage repair cover for pipeline stretching-out articles
CN204530516U (en) Large-scale assembling type steel corrugated culvert
CN205155451U (en) Pipeline leaks drainage device
CN204852771U (en) Novel leaking stoppage anchor clamps are pressed in flange area
CN203517094U (en) Three-way leakage blocking tool
CN203099125U (en) Telescopic structure for mine pasty fluid filling pipeline
CN201844157U (en) Hydraulic pipeline leaking stopping device
CN204176224U (en) The two-tube pipe elbow of intelligence prefabricated direct-buried thermal insulation pipe working steel tube
CN204174940U (en) The tensioning equipment of steel-structured circular flange high-strength bolt
CN204042316U (en) A kind of mechanism hand
CN209469931U (en) A kind of emergency antipriming
CN203770854U (en) Waterstop structure of water pump water outlet pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150415

Termination date: 20161022

CF01 Termination of patent right due to non-payment of annual fee