CN204258982U - A kind of supervisory control system for transmission line - Google Patents
A kind of supervisory control system for transmission line Download PDFInfo
- Publication number
- CN204258982U CN204258982U CN201420814635.0U CN201420814635U CN204258982U CN 204258982 U CN204258982 U CN 204258982U CN 201420814635 U CN201420814635 U CN 201420814635U CN 204258982 U CN204258982 U CN 204258982U
- Authority
- CN
- China
- Prior art keywords
- transmission line
- master controller
- client
- checkout gear
- control system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Alarm Systems (AREA)
Abstract
The utility model relates to transmission line intelligent monitoring system, specifically a kind of supervisory control system for transmission line, comprises master controller (1), checkout gear, multifunctional communication module (9); Described master controller (1), it is specially single-chip microcomputer, described checkout gear is connected with master controller (1) by input module (2), described checkout gear comprises monopod video camera (3), infra-red transmitter (4), receiver (5), laser range finder (6), wherein said infra-red transmitter (4), receiver (5) are installed on adjacent two base shaft tower relevant positions respectively, and described laser range finder (6) is arranged on shaft tower upper end; The utility model structure is simple, easy to use, effectively raises the safety of transmission line, and the daily tour solving power supply department is difficult to Timeliness coverage transmission line and suffers outside destroy and the problem of it being made to quick solution reaction.
Description
Technical field
The utility model relates to transmission line intelligent monitoring system, specifically a kind of supervisory control system for transmission line.
Background technology
In recent years, outside destroy transmission line facility, in ascendant trend year by year, has a strong impact on the safe operation of circuit, brings unnecessary loss and hidden danger to circuit operation maintenance, electric power netting safe running.According to statistics; 2004 there is the negative growth first over 10 years in the average power supply reliability in the whole nation; drop to 99.866%; the annual interruption duration being equivalent to China Urban Areas 10kV user is 11 hours 43 minutes; and the power outage of 70% is all because outside destroy electrical network causes; in order to further protection of electric power facility work be brought up to new stage, being necessary to analyze the situation of transmission line by outside destroy, and taking corresponding countermeasure.
Situation in electric transmission line channel is intricate, may change at any time, the change of all kinds of situations in line channel can be grasped in time, it is the key can grasping line security initiative, with regard to prevention outside destroy, three kinds of situations are had to need us to take seriously process by technological means in line channel, first, in recent years, my district highway build and the ordinary highway widening and improving impetus swift and violent, indivedual unit in charge of construction for the importance of ultra-high-tension power transmission line and the recognizing dangers after having an accident inadequate, in order to work to tight deadlines, ignore safety management, ignore the existence of neighbouring high-tension line, operate against regulations, barbarous construction, this type of accident occurrence probability causing Lifting Method in Pole Tower Integral Hoisting to tilt is more.Second, spring is the season that arboreal growth and people go out to go for an outing in early spring, fly a kite, and we will keep a close eye on arboreal growth situation under line, to highly close to wire safe distance situation prevented early, the place that existence may be flown a kite, threatens the safety of transmission line.3rd, have harm human activity, theft power transmission cable, threatens the safe operation of transmission line.In order to prevent the generation of above-mentioned situation, usual electric power system is all organize inspection group regularly to carry out circuit inspection to transmission line, find the situation threatening transmission line, then notify that maintenance personal carries out process maintenance, cause the increase of the labour intensity of staff, and it is low for the maintenance process efficiency of destroyed transmission line, often by inspection, group pinpoints the problems, and a summary is carried out to patrolled circuit institute produced problem, then notice transfers general headquarters, carrying out sending of maintenance process personnel, it extends the operating time of process maintenance, cannot make emergency case and reacting fast, although the effect of manpower is saved in the monitoring Ye Qi road of existing transmission line, but it is mainly for the supervision of job site, and the situation that the height of its plant threatens the transmission of electricity safety of path and kite etc. to hang over the power transmission cable of the theft transmission line of transmission line and man-made hazard is appointed so cannot carry out comprehensively careful supervision, its specific aim is not comprehensive, cause and use inconvenience.
Summary of the invention
For the problems referred to above, the utility model provides a kind of supervisory control system for transmission line, the daily tour solving power supply department is difficult to Timeliness coverage transmission line and suffers outside destroy and the problem of it being made to quick solution reaction, the monitoring solving existing transmission line be only limited to building site and specific aim not cause the maintenance of transmission line to solve efficiency by force low comprehensively, awkward problem.
For achieving the above object, the technical solution of the utility model is specific as follows:
For a supervisory control system for transmission line, comprise master controller 1, checkout gear, multifunctional communication module 9; It is characterized in that: described master controller 1, it is specially single-chip microcomputer, described checkout gear is connected with master controller 1 by input module 2, described checkout gear comprises monopod video camera 3, infra-red transmitter 4, receiver 5, laser range finder 6, wherein said infra-red transmitter 4, receiver 5 are installed on adjacent two base shaft tower relevant positions respectively, and described laser range finder 6 is arranged on shaft tower upper end; Described master controller 1 is connected with controller 8, and described controller 8 is connected with megaphone 7; Described master controller 1 is connected with multifunctional communication module 9, and described multifunctional communication module 9 is connected with wireless 3G12, and described wireless 3G12 is connected with monitor 11, and described monitor 11 is connected with client 10; Described master controller 1 is connected with electric supply installation 15; Described.
Wherein for a supervisory control system for transmission line, described client 10 comprises pc client, smart mobile phone client, user's multimedia message reception client.
Wherein for a supervisory control system for transmission line, described electric supply installation 15 is specially solar panel 14, and described solar panel 14 is connected with described battery 13.
The beneficial effects of the utility model are:
The utility model structure is simple, easy to use, easy to operate, improve operating efficiency, easy to use, effectively raise the safety of transmission line, the daily tour solving power supply department is difficult to Timeliness coverage transmission line and suffers outside destroy and the problem of it being made to quick solution reaction; The setting of monopod video camera 3, is conducive to the monitoring to transmission line environment around shaft tower and IMAQ; Infra-red transmitter 4, receiver 5 mounted in pairs are on adjacent two base shaft tower relevant positions, be conducive to monitoring the safe operation of external force behavior to equipment in real time to cause a hidden trouble, the setting of laser range finder 6, be conducive to judging whether the superelevation such as trees, tower crane object crosses height of reporting to the police by distance Monitoring Data, and recorded a video by monopod video camera 3, the setting of megaphone 7, be conducive to when external force threaten transmission line safe time, to its warning of propagandaing directed to communicate, the setting of electric supply installation 15, be conducive to powering to use equipment, energy-conserving and environment-protective; Reduce the labour intensity of staff, improve the protective efficacy of transmission line, be conducive to reflecting in time transmission line what happens and monitoring in real time, save trouble and labor, monitoring is comprehensively, practical reliable.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Wherein, 1. master controller, 2. input module, 3. monopod video camera, 4. infra-red transmitter, 5. receiver, 6. laser range finder, 7. megaphone, controller 8, multifunctional communication module 9, client 10, monitor 11, wireless 3G12, battery 13, solar panel 14, electric supply installation 15.
Embodiment
Below in conjunction with specification drawings and specific embodiments, the utility model is further described:
For a supervisory control system for transmission line, comprise master controller 1, checkout gear, multifunctional communication module 9; It is characterized in that: described master controller 1, it is specially single-chip microcomputer, described checkout gear is connected with master controller 1 by input module 2, described checkout gear comprises monopod video camera 3, infra-red transmitter 4, receiver 5, laser range finder 6, wherein said infra-red transmitter 4, receiver 5 are installed on adjacent two base shaft tower relevant positions respectively, and described laser range finder 6 is arranged on shaft tower upper end; Described master controller 1 is connected with controller 8, and described controller 8 is connected with megaphone 7; Described master controller 1 is connected with multifunctional communication module 9, and described multifunctional communication module 9 is connected with wireless 3G12, and described wireless 3G12 is connected with monitor 11, and described monitor 11 is connected with client 10; Described master controller 1 is connected with electric supply installation 15; Described.
Wherein for a supervisory control system for transmission line, described client 10 comprises pc client, smart mobile phone client, user's multimedia message reception client.
Wherein for a supervisory control system for transmission line, described electric supply installation 15 is specially solar panel 14, and described solar panel 14 is connected with described battery 13.
The utility model in use, be that core controls mainly through master controller 1 with single-chip microcomputer, by infra-red transmitter 4, receiver 5 and laser range finder 6 pairs of transmission lines and transmission facility thereof are monitored in real time by the threat of external force behavior, and judge trees by Monitoring Data, whether the superelevation objects such as tower crane cross the monitoring of height of reporting to the police, when infra-red transmitter 4, when receiver 5 and laser range finder 6 detect and find the threat by external force behavior of transmission line and transmission facility thereof, then monopod video camera 3 carries out recording a video and the collection of image, and be sent to master controller 1 by input module 2, by multifunctional communication module 9, detection and image information thereof are sent to monitor 11 by wireless 3G12 by master controller 1 simultaneously, and be sent to client 10 by monitor 11, be sent to the pc client of client 10, smart mobile phone client, user's multimedia message receives client, the pc client of client 10 sends order by wireless 3G12 to master controller 1 simultaneously, master controller 1 controls megaphone 7 by controller 8 to carry out early warning and propagandas directed to communicate, the smart mobile phone client of client 10 simultaneously, user's multimedia message receives client notice maintenance process personnel and carries out maintenance process.
The utility model structure is simple, easy to use, easy to operate, improve operating efficiency, easy to use, effectively raise the safety of transmission line, the daily tour solving power supply department is difficult to Timeliness coverage transmission line and suffers outside destroy and the problem of it being made to quick solution reaction; The setting of monopod video camera 3, is conducive to the monitoring to transmission line environment around shaft tower and IMAQ; Infra-red transmitter 4, receiver 5 mounted in pairs are on adjacent two base shaft tower relevant positions, be conducive to monitoring the safe operation of external force behavior to equipment in real time to cause a hidden trouble, the setting of laser range finder 6, be conducive to judging whether the superelevation such as trees, tower crane object crosses height of reporting to the police by distance Monitoring Data, and recorded a video by monopod video camera 3, the setting of megaphone 7, be conducive to when external force threaten transmission line safe time, to its warning of propagandaing directed to communicate, the setting of electric supply installation 15, be conducive to powering to use equipment, energy-conserving and environment-protective; Reduce the labour intensity of staff, improve the protective efficacy of transmission line, be conducive to reflecting in time transmission line what happens and monitoring in real time, save trouble and labor, monitoring is comprehensively, practical reliable.
Claims (3)
1., for a supervisory control system for transmission line, comprise master controller (1), checkout gear, multifunctional communication module (9); It is characterized in that: described master controller (1), it is specially single-chip microcomputer, described checkout gear is connected with master controller (1) by input module (2), described checkout gear comprises monopod video camera (3), infra-red transmitter (4), receiver (5), laser range finder (6), wherein said infra-red transmitter (4), receiver (5) are installed on adjacent two base shaft tower relevant positions respectively, and described laser range finder (6) is arranged on shaft tower upper end; Described master controller (1) is connected with controller (8), and described controller (8) is connected with megaphone (7); Described master controller (1) is connected with multifunctional communication module (9), described multifunctional communication module (9) is connected with wireless 3G (12), described wireless 3G (12) is connected with monitor (11), and described monitor (11) is connected with client (10); Described master controller (1) is connected with electric supply installation (15).
2. a kind of supervisory control system for transmission line according to claim 1, is characterized in that: described client (10) comprises pc client, smart mobile phone client, user's multimedia message receive client.
3. a kind of supervisory control system for transmission line according to claim 1, it is characterized in that: described electric supply installation (15) is specially solar panel (14), described solar panel (14) is connected with described battery (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420814635.0U CN204258982U (en) | 2014-12-18 | 2014-12-18 | A kind of supervisory control system for transmission line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420814635.0U CN204258982U (en) | 2014-12-18 | 2014-12-18 | A kind of supervisory control system for transmission line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204258982U true CN204258982U (en) | 2015-04-08 |
Family
ID=52963242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420814635.0U Expired - Fee Related CN204258982U (en) | 2014-12-18 | 2014-12-18 | A kind of supervisory control system for transmission line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204258982U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105791746A (en) * | 2014-12-18 | 2016-07-20 | 国网甘肃省电力公司定西供电公司 | Monitoring system for transmission line |
CN108710128A (en) * | 2018-05-25 | 2018-10-26 | 国网山西省电力公司电力科学研究院 | Transmission line of electricity external force damage monitoring system based on radar and method |
-
2014
- 2014-12-18 CN CN201420814635.0U patent/CN204258982U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105791746A (en) * | 2014-12-18 | 2016-07-20 | 国网甘肃省电力公司定西供电公司 | Monitoring system for transmission line |
CN108710128A (en) * | 2018-05-25 | 2018-10-26 | 国网山西省电力公司电力科学研究院 | Transmission line of electricity external force damage monitoring system based on radar and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104537788A (en) | High voltage electric transmission line external damage-proof intelligent image pre-warning system and method | |
CN105791746A (en) | Monitoring system for transmission line | |
CN205158556U (en) | Transmission line prevents external damage and early warning system based on video analysis | |
CN102967401B (en) | Real-time overload security monitoring and alarming system for old structure | |
WO2012167578A1 (en) | Method and system for protecting power transmission tower | |
CN108767715A (en) | A kind of transformer substation grounding wire intelligent error preventing operates active management control system and control method | |
CN201387654Y (en) | Anti-theft monitoring device of distribution transformer of low-voltage electricity transmission line | |
CN202871052U (en) | Comprehensive monitoring alarm system used for 10kV outdoor power distribution network transformer | |
CN201725394U (en) | Intelligent fence alarm system | |
CN204788363U (en) | Scaffold slope monitoring alarm device based on zigbee | |
CN103656950A (en) | Fire hydrant monitoring system | |
CN204258982U (en) | A kind of supervisory control system for transmission line | |
CN203691539U (en) | Field portable type all-wireless security monitoring machine | |
CN103280042A (en) | Cable antitheft monitoring system | |
CN205644880U (en) | Simple structure's high tension transmission line prevents outer broken warning system | |
CN202352037U (en) | Safety alarm system based on technology of Internet of things | |
CN202795611U (en) | Electric power iron tower anti-theft anti-destroy monitoring alarm system | |
CN104751612A (en) | Intelligent monitoring, early warning and controlling system for high-voltage line | |
CN202632468U (en) | Novel intelligent monitoring system for preventing damage on electric power circuit by external force | |
CN203849431U (en) | Overhead cable monitoring and alarming device | |
CN202524163U (en) | Intelligent monitoring system for low-voltage power distribution | |
CN203260152U (en) | Safety voice warning device for electric power facilities | |
CN203562059U (en) | Intelligent electronic guardrail system | |
CN202058273U (en) | Railway construction intelligent protective device | |
CN203012910U (en) | Real-time safety monitoring and alarming system for overload of old structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150408 Termination date: 20151218 |
|
EXPY | Termination of patent right or utility model |