CN204254249U - A kind of multi-functional filling equipment of gas phase pressure break equipment - Google Patents
A kind of multi-functional filling equipment of gas phase pressure break equipment Download PDFInfo
- Publication number
- CN204254249U CN204254249U CN201420648734.6U CN201420648734U CN204254249U CN 204254249 U CN204254249 U CN 204254249U CN 201420648734 U CN201420648734 U CN 201420648734U CN 204254249 U CN204254249 U CN 204254249U
- Authority
- CN
- China
- Prior art keywords
- gas
- pressure break
- cylinder
- valve
- gas phase
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The utility model relate to a kind of multi-functional filling equipment of gas phase pressure break equipment, and when this equipment is mainly gas phase pressure break, pressure break bar fills gas and uses.By cylinder, clamp holder, suction booster, gas cylinder, gas collecting box, fill mouth, regulating lever, suction valve, outlet valve, support form, described suction booster and cylinder with the pressurized gas in gas cylinder for power, clamp holder can realize being fixed by pressure break bar quickly and efficiently and unclamping, fill mouth regulating lever pressure break bar is fixed to realize fast aeration, cylinder, clamp holder, fill mouth, regulating lever, suction valve, outlet valve and be all integrated on support, there is structure simple, easy processing, portable safety, fill fast, fill the advantage that gas purity is high.
Description
Technical field
The utility model relates to a kind of multi-functional filling equipment of gas phase pressure break equipment, belongs to technical field of coal exploitation.
Background technique
In order to reduce gas accident in coal mining, realize safety in production, gas pumping must be carried out before relevant department is defined in high methane colliery coal mining, in order to improve coal bed gas extraction rate, the anti-reflection technology of existing a kind of gas phase pressure break, and the pressure break bar that this new process uses fills in chamber by gas filling to pressure break bar, then implements fracturing work.Gas is filled with narrow and small chamber, need air compressor to provide power in original equipment, need power supply narrow limitation large, during air compressor work, noise is also larger, at the end of filling, also remain a large amount of pressurized gas in gas cylinder but cannot continue to fill use, grasp the principle that saving is not wasted, need to develop a kind of safety, fast, save, portable, efficient gas phase pressure break filling equipment.
Model utility content
The utility model provides a kind of multi-functional filling equipment of gas phase pressure break equipment, and it comprises cylinder, clamp holder, suction booster, gas cylinder, fill mouth, regulating lever, suction valve, outlet valve and support, it is characterized in that, described clamp holder and described cylinders, can realize being fixed by pressure break bar quickly and efficiently and unclamping, one end of described suction booster can be connected with the air outlet of described gas cylinder fast, and the other end is connected with the suction valve filling head, described suction valve one end is connected with suction booster, the other end through threeway respectively with fill mouth and be connected with outlet valve, described in fill mouth described regulating lever and pressure break bar is fixed realize fast aeration, described cylinder, clamp holder, fill mouth, regulating lever, suction valve, outlet valve is all on the bracket integrated, and described suction booster is slidably arranged on the side of described support, and described clamp holder and described cylinder are arranged on the medium position place of the opposite side of described support, described suction valve, outlet valve and regulating lever are arranged on the top of described support, and described suction valve and described outlet valve are arranged on the both sides of described cantilever tip, described suction valve, outlet valve becomes tee T to arrange with described regulating lever.
Further, as preferably, the pressurized gas that described suction booster provides with described gas cylinder are for power.
Further, as preferably, also gas collecting box is comprised, described gas cylinder is two, and the air outlet of one of them gas cylinder is directly connected with described suction booster, and the air outlet of another gas cylinder directly connects gas collecting box, described gas collecting box is connected with described suction booster, improves the power needed for suction booster and cylinder with this.
Further, as preferably, the fast plug device of two terminations of described suction booster.
Further, as preferably, described regulating lever is T-shaped.
Further, as preferably, described clamp holder is that power realizes stepping up, unclamping action with cylinder.
Further, as preferably, the pressurized gas that described cylinder provides with gas cylinder are for power.
Further, as preferably, described clamp holder is chuck structure.
Further, as preferably, described clamp holder is three/four jaw chuck structure.
The beneficial effect of the multi-functional filling equipment of a kind of gas phase pressure break equipment that the utility model provides is:
1), the utility model equipment can realize pressure break bar pneumatic head Quick fastening, the effect of fast aeration;
2), the utility model equipment do not need power supply, and narrow limitation is little and economize on resources;
3), the utility model equipment easily processes, and easily assemble, portable convenient, gas purity is high.
Accompanying drawing explanation
Fig. 1 is the multi-functional filling equipment schematic diagram of the utility model gas phase pressure break;
Fig. 2 is pneumatic head schematic diagram.
In figure: 1. suction booster, 2. suction valve, 3. outlet valve, 4. regulating lever, 5. fill mouth, 6. cylinder, 7. clamp holder, 8. gas cylinder, 9. support, 10. gas collecting box.
Embodiment
As shown in Figure 1-2, the utility model provides a kind of multi-functional filling equipment of gas phase pressure break equipment, and it comprises cylinder 6, clamp holder 7, suction booster 1, gas cylinder 8, fill mouth 5, regulating lever 4, suction valve 2, outlet valve 3 and support 9, clamp holder 7 is connected with cylinder 6, can realize quickly and efficiently pressure break bar being fixed and unclamping, one end of suction booster 1 can be connected with the air outlet of gas cylinder 8 fast, the other end is connected with the suction valve 2 filling head, and suction valve 2 one end is connected with suction booster 1, the other end through threeway respectively with fill mouth 5 and be connected with outlet valve 3, fill mouth 5 regulating lever 4 pressure break bar is fixed to realize fast aeration, cylinder 6, clamp holder 7, fill mouth 5, regulating lever 4, suction valve 2, outlet valve 3 is all integrated on support 9, and suction booster 1 is slidably arranged on the side of support 9, and clamp holder 7 and cylinder 6 are arranged on the medium position place of the opposite side of support, suction valve 2, outlet valve 3 and regulating lever 4 are arranged on the top of support 9, and suction valve 2 and outlet valve 3 are arranged on the both sides on support 9 top, suction valve 2, outlet valve 3 is arranged with regulating lever 4 one-tenth tee T.
The pressurized gas that suction booster 1 provides with gas cylinder 8 are for power, the multi-functional filling equipment of this gas phase pressure break also comprises gas collecting box 10, gas cylinder 8 is two, the air outlet of one of them gas cylinder is directly connected with described suction booster 1, the air outlet of another gas cylinder directly connects gas collecting box 10, gas collecting box 10 is connected with described suction booster, improves the power needed for suction booster and cylinder with this, the fast plug device of two terminations of suction booster.Wherein, regulating lever 4 is T-shaped, and clamp holder 7 is that power realizes stepping up, unclamping action with cylinder; The pressurized gas that cylinder 6 provides with gas cylinder are for power; Clamp holder 7 is chuck structure; Clamp holder 7 is three/four jaw chuck structure.
When the multi-functional filling equipment of this gas phase pressure break of use, first check whether the valve of air cylinder, suction booster 1, pneumatic head charging system is in closed condition, Close All before formal operation.
Put into by pressure break bar and accommodate device 7, open the switch of cylinder 6, pressure break bar cramp is tight, and then use spanner that the two ends of pressure break bar are tightened, the switch of shifter cylinder 6 unloads fracturing bar.
Open the valve of gas cylinder 8 and gas collecting box 10, open each valve of inflation power system.
Spanner is used suction booster suction tude and gas cylinder copper mouth to be connected firmly.
Preparation fills, and treats that pressurising is split pipe gas charging valve and is upwards vertically placed on inflating machine operating table, pressure break bar suction port with fill mouth 5 and aim at, with regulating lever 4 by gas charging valve fixation, close suction valve 2, open outlet valve 3, use valve instrument slowly to be turned on by pressure break tube valve.
Air-discharging, closes outlet valve 3, slowly opens gas cylinder valve, check that pipeline is with or without gas leak phenomenon (pressure break bar and cylinder interface), slowly opens suction valve 2, about inflating 5 ~ 10 seconds kinds, close suction valve 2, open outlet valve 3, close outlet valve 3 until gas in pressure break bar after getting rid of completely.
Fill, close outlet valve 3 in order, open gas charging valve 2, open charging valve counterclockwise, start to fill gas, after opening charging valve, gas cylinder pressure itself is inflated, after pressure balance to be achieved to pressure break pipe, open suction booster 1 again, quit work to suction booster 1, represent and be full of.After gassy, first close pressure break bar charging valve in order clockwise, close suction booster 1 valve, close suction valve 2, open outlet valve 3 and discharge pipeline pressure, take off pressure break bar.
The multi-functional filling equipment of a kind of gas phase pressure break equipment that the utility model provides can realize pressure break bar pneumatic head Quick fastening, the effect of fast aeration; And equipment of the present utility model does not need power supply, narrow limitation is little and economize on resources; Easy processing, easily assembles, portable convenient, and gas purity is high.
Above mode of execution is only for illustration of the utility model; and be not limitation of the utility model; the those of ordinary skill of relevant technical field; when not departing from spirit and scope of the present utility model; can also make a variety of changes and modification; therefore all equivalent technological schemes also belong to category of the present utility model, and scope of patent protection of the present utility model should be defined by the claims.
Claims (9)
1. a multi-functional filling equipment for gas phase pressure break equipment, it comprises cylinder, clamp holder, suction booster, gas cylinder, fill mouth, regulating lever, suction valve, outlet valve and support, it is characterized in that, described clamp holder and described cylinders, can realize being fixed by pressure break bar quickly and efficiently and unclamping, one end of described suction booster can be connected with the air outlet of described gas cylinder fast, and the other end is connected with the suction valve filling head, described suction valve one end is connected with suction booster, the other end through threeway respectively with fill mouth and be connected with outlet valve, described in fill mouth described regulating lever and pressure break bar is fixed realize fast aeration, described cylinder, clamp holder, fill mouth, regulating lever, suction valve, outlet valve is all on the bracket integrated, and described suction booster is slidably arranged on the side of described support, and described clamp holder and described cylinder are arranged on the medium position place of the opposite side of described support, described suction valve, outlet valve and regulating lever are arranged on the top of described support, and described suction valve and described outlet valve are arranged on the both sides of described cantilever tip, described suction valve, outlet valve becomes tee T to arrange with described regulating lever.
2. the multi-functional filling equipment of a kind of gas phase pressure break equipment according to claim 1, is characterized in that, the pressurized gas that described suction booster provides with described gas cylinder are for power.
3. the multi-functional filling equipment of a kind of gas phase pressure break equipment according to claim 1, it is characterized in that, also comprise gas collecting box, described gas cylinder is two, the air outlet of one of them gas cylinder is directly connected with described suction booster, the air outlet of another gas cylinder directly connects gas collecting box, and described gas collecting box is connected with described suction booster, improves the power needed for suction booster and cylinder with this.
4. the multi-functional filling equipment of a kind of gas phase pressure break equipment according to claim 1, is characterized in that, the fast plug device of two terminations of described suction booster.
5. the multi-functional filling equipment of a kind of gas phase pressure break equipment according to claim 4, is characterized in that, described regulating lever is T-shaped.
6. the multi-functional filling equipment of a kind of gas phase pressure break equipment according to claim 1, is characterized in that, described clamp holder is that power realizes stepping up, unclamping action with cylinder.
7. the multi-functional filling equipment of a kind of gas phase pressure break equipment according to claim 6, is characterized in that, the pressurized gas that described cylinder provides with gas cylinder are for power.
8. the multi-functional filling equipment of a kind of gas phase pressure break equipment according to claim 1, it is characterized in that, described clamp holder is chuck structure.
9. the multi-functional filling equipment of a kind of gas phase pressure break equipment according to claim 8, it is characterized in that, described clamp holder is three/four jaw chuck structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420648734.6U CN204254249U (en) | 2014-10-31 | 2014-10-31 | A kind of multi-functional filling equipment of gas phase pressure break equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420648734.6U CN204254249U (en) | 2014-10-31 | 2014-10-31 | A kind of multi-functional filling equipment of gas phase pressure break equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204254249U true CN204254249U (en) | 2015-04-08 |
Family
ID=52958553
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420648734.6U Active CN204254249U (en) | 2014-10-31 | 2014-10-31 | A kind of multi-functional filling equipment of gas phase pressure break equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204254249U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104390130A (en) * | 2014-10-31 | 2015-03-04 | 河南神华能源工程有限公司 | Multifunctional filling device for gas-phase fracturing equipment |
-
2014
- 2014-10-31 CN CN201420648734.6U patent/CN204254249U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104390130A (en) * | 2014-10-31 | 2015-03-04 | 河南神华能源工程有限公司 | Multifunctional filling device for gas-phase fracturing equipment |
CN104390130B (en) * | 2014-10-31 | 2018-03-09 | 河南神华能源工程有限公司 | A kind of multi-functional filling equipment of gas phase pressure break equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204254249U (en) | A kind of multi-functional filling equipment of gas phase pressure break equipment | |
CN202793693U (en) | Housing detection gas recovery device | |
CN201884934U (en) | Rare gas exhaust recovery device | |
CN103738909A (en) | Working substance filling and recycling device and method for organic Rankine cycle waste heat generator set | |
CN202442904U (en) | Portable vacuum sampling device | |
CN206354417U (en) | A kind of new confession colloid system of cigarette machine | |
CN202210013U (en) | Bend pipe airtightness testing machine | |
CN203322734U (en) | Prying device for standby natural gas sources | |
CN104389767A (en) | Air compressor | |
CN204403774U (en) | A kind of vertical type multifunctional filling equipment of gas phase fracturing unit | |
CN2628843Y (en) | Pipe fast expansion plug | |
CN201535439U (en) | Carbon dioxide gas supercharging device | |
CN104390130B (en) | A kind of multi-functional filling equipment of gas phase pressure break equipment | |
CN208107634U (en) | A kind of automatic evacuation filling machine | |
CN202708584U (en) | Gas filling system of fuel gas vehicle | |
CN204459758U (en) | Without station gas storage system piston type compressed natural gas standard station | |
CN203628253U (en) | Liquefied natural gas adding device with power gas source storage tank | |
CN204386844U (en) | A kind of air compressor | |
CN202691594U (en) | Vacuumizing interface device of vacuum insulated low-temperature gas cylinder | |
CN203963503U (en) | High pressure helium recycle and reuse device in a kind of leak-testing | |
CN209480426U (en) | A kind of pressure fan oil gas tank dropping equipment | |
CN215569742U (en) | Pneumatic quick gas cylinder fills dress anchor clamps | |
CN104390131A (en) | Vertical multifunctional filling device of gas-phase fracturing equipment | |
CN203681989U (en) | Automatic drying agent stuffing machine | |
CN204523411U (en) | A kind of pin enters formula glue-injection machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |