CN204252922U - The anti-crown drill device of earth drilling process blowout prevention - Google Patents

The anti-crown drill device of earth drilling process blowout prevention Download PDF

Info

Publication number
CN204252922U
CN204252922U CN201420633247.2U CN201420633247U CN204252922U CN 204252922 U CN204252922 U CN 204252922U CN 201420633247 U CN201420633247 U CN 201420633247U CN 204252922 U CN204252922 U CN 204252922U
Authority
CN
China
Prior art keywords
flange
blowout prevention
steel bushing
pipe clamp
clamping steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420633247.2U
Other languages
Chinese (zh)
Inventor
苏天明
张铁柱
张艳鸽
丁小平
周万福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGXIA HIGHWAY CONSTRUCTION AND ADMINISTRATION BUREAU
Research Institute of Highway Ministry of Transport
Original Assignee
NINGXIA HIGHWAY CONSTRUCTION AND ADMINISTRATION BUREAU
Research Institute of Highway Ministry of Transport
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA HIGHWAY CONSTRUCTION AND ADMINISTRATION BUREAU, Research Institute of Highway Ministry of Transport filed Critical NINGXIA HIGHWAY CONSTRUCTION AND ADMINISTRATION BUREAU
Priority to CN201420633247.2U priority Critical patent/CN204252922U/en
Application granted granted Critical
Publication of CN204252922U publication Critical patent/CN204252922U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The anti-crown drill device of a kind of earth drilling process blowout prevention, whole apparatus structure comprises drill pipe clamp, flange, orifice sleeve, flange bolt, flange nut, blowout prevention anti-top illiteracy plate, drill pipe clamp can firmly be buckled on drilling rod, flange and orifice sleeve are by being welded to connect, and flange and blowout prevention be anti-is pushed up and cover plate and be connected by flange stud and nut flange.If there is the phenomenon of crown drill, prominent water burst during drilling construction, when artesian water promotion drilling tool portals, plate is covered on the anti-top of blowout prevention can block drill pipe clamp, thus effectively stops drilling tool and water to be gone out.

Description

The anti-crown drill device of earth drilling process blowout prevention
Technical field
The utility model relates to the anti-crown drill device of a kind of earth drilling process blowout prevention, belongs to the category of the underground construction artesian water detection equipment such as tunnel, mine.
Background technology
Before carrying out the underground construction Rock And Soil digging excavation such as tunnel, mine, to detect the property of water-bearing of pre-driving section rock mass, to ensure the safety of constructing.Probing is mode comparatively conventional at present, and the implementation process of probing, for laying several spy water hole in pre-driving section, through detection section, judges the moisture situation of the section of driving in advance by the water outlet situation of boring.
Underground construction is generally positioned at below natural water level, and the water in layer position residing for driving section rock mass is artesian water.High for present position water level, moisture abundant rock-soil layer, when disclosing water-bearing section when holing, huge hydraulic pressure can act on suddenly on drilling tool, produces huge surge, and crown drill occurs to drill bit, whole drilling tool is gone out boring rapidly, also can face the situation of the prominent water burst of boring simultaneously.
Summary of the invention
In order to overcome, underground construction bore detecting water level is high, moisture abundant rock-soil layer time there is the phenomenon of crown drill, prominent water burst, the utility model provides one to be specifically designed to the anti-crown drill device of earth drilling process blowout prevention, and this principle of device is simple, easy for operation.
The utility model solves the technical scheme that its technical problem adopts: earth drilling process blowout prevention anti-crown drill device mainly comprises drill pipe clamp, plate is covered on flange, orifice sleeve, flange bolt, flange nut, the anti-top of blowout prevention, and the orifice sleeve specification of wherein installing in flange and boring is identical, flange is welded in orifice sleeve; Drill pipe clamp comprises clamping steel bushing and pretension bolt, pre-load nut, clamping steel bushing there is the perforation of pretension bolt, clamping steel bushing two panels altogether, top is round table-like, by the effect of pretension bolt, pre-load nut make clamping steel bushing firm be buckled on drilling rod, the external diameter of the drill pipe clamp after installation is less than the internal diameter of orifice sleeve; It is short cylinder shape that slab integral is covered on the anti-top of blowout prevention, form-factor is corresponding with flange, and blowout prevention anti-top masking-out central hollow section is round table-like, and specification is coincide with the round platform at clamping steel bushing top, the end face diameter of round platform slightly larger than the external diameter of drilling rod, and is less than in drill pipe clamp the external diameter clamping steel bushing; Flange and blowout prevention be anti-is pushed up to cover between plate and is connected by 8 root flange bolts and 8 flange nuts.
Be divided into following four steps when this device specifically uses sequentially: 1. flange is welded in orifice sleeve, firm for orifice tube being installed on is constructed in the boring of certain depth; 2. lowering drill pipes stops to about 0.2m at the bottom of hole, by pretension bolt and pre-load nut, firm for drill pipe clamp is arranged on drilling rod, then drilling rod is transferred at the bottom of hole; 3. utilize the anti-top of blowout prevention to cover the middle through hole of plate, sleeve-board is covered on drilling rod in anti-for blowout prevention top; 4. by orifice sleeve and flange bolt, plate and flange compact siro spinning technology are covered in anti-for blowout prevention top.Thus, if there is the phenomenon of crown drill, prominent water burst during drilling construction, when artesian water promotion drilling tool portals, plate is covered on the anti-top of blowout prevention can block drill pipe clamp, thus stops drilling tool and water to be gone out.
The beneficial effects of the utility model are, can realize the prevention to high artesian crown drill and prominent water burst, and this apparatus structure is simple, easy to operate.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is the elevation of clamping steel bushing.
Fig. 2 is the elevation that plate is covered on the anti-top of blowout prevention.
Fig. 3 is longitudinal sectional view of the present utility model
Fig. 4 is the I--I sectional view of Fig. 3.
In figure: 1. clamp steel bushing, 2. drilling rod, 3. orifice sleeve, 4. flange, 5. plate, 6. flange bolt, 7. flange nut, 8. pretension bolt, 9. pre-load nut are covered in the anti-top of blowout prevention.
Detailed description of the invention
In FIG, clamping steel bushing (1) adopts high strength steel to process, and clamping steel bushing (1) is two panels altogether, can symmetry be buckled on drilling rod (2), top is round table-like, clamping steel bushing (1) has the perforation of pretension bolt (8).
In fig. 2, the anti-top of blowout prevention is covered plate (5) and is adopted high strength steel to be made, in short cylinder shape, blowout prevention anti-top masking-out (5) central hollow section is round table-like, specification is coincide with the round platform at clamping steel bushing (1) top, the end face diameter of round platform slightly larger than the external diameter of drilling rod (2), and is less than in drill pipe clamp the external diameter clamping steel bushing (1).
In Fig. 3, Fig. 4, flange (4) and orifice sleeve (3) specification are coincide, and adopt the mode of welding to connect; Flange (4) and blowout prevention be anti-is pushed up and covers plate (5) and be connected by 8 root flange bolts (6) and 8 flange nuts (7); Clamping steel bushing (1) is buckled on drilling rod (2) by pretension bolt (8) and pre-load nut (9); The specification of blowout prevention anti-top masking-out (5) central hollow round platform is coincide with the round platform at clamping steel bushing (1) top; If there is the phenomenon of crown drill, prominent water burst during drilling construction, when artesian water promotion drilling tool portals, plate (5) is covered on the anti-top of blowout prevention can block drill pipe clamp, thus stops drilling tool and water to be gone out.

Claims (3)

1. the anti-crown drill device of earth drilling process blowout prevention, whole apparatus structure comprises drill pipe clamp, flange, orifice sleeve, flange bolt, flange nut, blowout prevention anti-top illiteracy plate, it is characterized in that: drill pipe clamp can firmly be buckled on drilling rod, flange and orifice sleeve are by being welded to connect, and flange and blowout prevention be anti-is pushed up and cover plate and be connected by flange stud and nut flange.
2. the anti-crown drill device of earth drilling process according to claim 1 blowout prevention, it is characterized in that: drill pipe clamp comprises clamping steel bushing and pretension bolt, pre-load nut, clamping steel bushing there is the perforation of pretension bolt, clamping steel bushing two panels altogether, top is round table-like, makes firm being buckled on drilling rod of clamping steel bushing by the effect of pretension bolt, pre-load nut.
3. the anti-crown drill device of earth drilling process according to claim 1 blowout prevention, it is characterized in that: it is short cylinder shape that slab integral is covered on the anti-top of blowout prevention, form-factor is corresponding with flange, it is round table-like that plate central hollow section is covered on the anti-top of blowout prevention, specification is coincide with the round platform at clamping steel bushing top, the end face diameter of round platform slightly larger than the external diameter of drilling rod, and is less than in drill pipe clamp the external diameter clamping steel bushing.
CN201420633247.2U 2014-10-28 2014-10-28 The anti-crown drill device of earth drilling process blowout prevention Expired - Fee Related CN204252922U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420633247.2U CN204252922U (en) 2014-10-28 2014-10-28 The anti-crown drill device of earth drilling process blowout prevention

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420633247.2U CN204252922U (en) 2014-10-28 2014-10-28 The anti-crown drill device of earth drilling process blowout prevention

Publications (1)

Publication Number Publication Date
CN204252922U true CN204252922U (en) 2015-04-08

Family

ID=52957242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420633247.2U Expired - Fee Related CN204252922U (en) 2014-10-28 2014-10-28 The anti-crown drill device of earth drilling process blowout prevention

Country Status (1)

Country Link
CN (1) CN204252922U (en)

Similar Documents

Publication Publication Date Title
CN201757686U (en) Hydraulic fracturing crustal stress measuring apparatus
CN110374540B (en) Mine advanced water detection orifice anti-bursting and anti-blowout combined water control device and water control process
CN104763368A (en) Orifice seal device for large-diameter downhole hammer and reverse circulation construction technology for orifice seal device
CN103161405B (en) Mine underground visits the casing off stratum crushing band method of putting high pressure karst water drilling construction
CN1982651A (en) Method for mining ultra-long roofbolt slip casting with top plate large-area and long-time exposed under mining well
CN102434192A (en) Device and method for enhancing coal seam fracturing effect
CN202451094U (en) Water pressure type pipe cutter
CN104264679B (en) A kind of electric power pylon basis heavy caliber Underwater pile construction method
CN202348210U (en) Orifice blowout preventer for drilling
CN204252922U (en) The anti-crown drill device of earth drilling process blowout prevention
CN201635074U (en) Ground anchor
CN204040966U (en) A kind of drilling sampling device
CN203248074U (en) Sidetracking well casing windowing whipstock
CN103541711B (en) Xuan Ding small-bore, coal-face termination hydraulic fracture control method
CN108533223A (en) A kind of underground goaf residual coal bed gas methane drainage and utilization project system
CN203961863U (en) Prevent the device of high artesian crown drill
CN204877304U (en) Disposable drill bit and joint
CN109098754B (en) Method for preventing coal mine underground strong weakening roof from impacting mine pressure
CN203685288U (en) Underground coal mine water exploration drilling water control device
CN204457782U (en) Remove the high-pressure water injection device of fracture slide type rockburst risk
CN203879448U (en) Casing protected gas injection packer for CO2 injection well
CN204024609U (en) Play long well section perforation gun apparatus
CN202249922U (en) Device for sealing high-pressure slip casting open hole deep hole with preposed expand tube
CN210087250U (en) Water stop sleeve for drilling machine
CN203570206U (en) End pressure-bearing type rock bolt reamer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150408

Termination date: 20211028