CN204252517U - The also pipe device of construction scaffolding - Google Patents
The also pipe device of construction scaffolding Download PDFInfo
- Publication number
- CN204252517U CN204252517U CN201420741466.2U CN201420741466U CN204252517U CN 204252517 U CN204252517 U CN 204252517U CN 201420741466 U CN201420741466 U CN 201420741466U CN 204252517 U CN204252517 U CN 204252517U
- Authority
- CN
- China
- Prior art keywords
- hole
- locking
- folder hook
- hook
- fixture block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of also pipe device of construction scaffolding, the also pipe device of described construction scaffolding comprises one first folder hook and a pair second folder hooks, and the first described folder hook presss from both sides hook with described second rotationally and is connected.Construction scaffolding of the present utility model and pipe device utilizes the first folder hook and the second folder fastener to live the steel pipe of adjacent scaffold, and rotate locking screw rod make the first folder hook and the second folder hook lock tight, complete scaffold and pipe operation, simple and convenient, simple operation.The also pipe apparatus structure of this construction scaffolding is simple, fixation, and good reliability is practical.
Description
Technical field
The utility model relates to a kind of apparatus for building, or rather, is a kind of construction scaffolding and pipe device.
Background technology
Scaffold is a kind of common building appurtenance, in the higher place that cannot directly construct of floor height, needs to scaffold erecting.In order to multiple scaffold is connected, need the steel pipe of adjacent scaffold to carry out and pipe connection.Existing method utilizes a pair beam barrel, executes man-hour requirement and be first enclosed within respectively in beam barrel by steel pipe, complex operation, and the steel pipe that can only be suitable for fixed dimension, restricted application.
Utility model content
The utility model mainly solves the technical problem existing for prior art, thus provides a kind of also pipe device of construction scaffolding.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals:
A kind of also pipe device of construction scaffolding, the also pipe device of described construction scaffolding comprises one first folder hook and a pair second folder hooks, the first described folder hook presss from both sides hook with described second rotationally and is connected, the head of the first described folder hook is provided with one first coupler body, the middle part of the first described folder hook is provided with one first connecting through hole, the afterbody of the first described folder hook is provided with a pair first flange connectors, the first described flange connector is respectively equipped with one first locking through hole, the head of the second described folder hook is provided with one second coupler body, the middle part of the second described folder hook is provided with one second connecting through hole, the afterbody of the second described folder hook is provided with one second locking through hole, the first described connecting through hole and the second connecting through hole pass through rivet interlacement, one first lock post is provided with between the first described locking through hole, the first described lock post is provided with one first locking post holes, a locking screw rod is provided with in the first described locking post holes, the top of described locking screw rod is provided with a fixing column cap, described fixing column cap is provided with separable first fixture block and one second fixture block, the first described fixture block is provided with one first circular hole and one first Locking arc groove, the corner of the first described Locking arc groove is respectively equipped with one first arc groove through hole, the corner of the second described fixture block is respectively equipped with one second arc groove through hole, four lock bolts run through the second described arc groove through hole and the first arc groove through hole respectively, a movable pin rod is provided with in the first described circular hole, described movable pin rod runs through the second described locking through hole respectively.
As the utility model preferred embodiment, the first described fixture block and the second fixture block are stainless steel and make.
Construction scaffolding of the present utility model and pipe device utilizes the first folder hook and the second folder fastener to live the steel pipe of adjacent scaffold, and rotate locking screw rod make the first folder hook and the second folder hook lock tight, complete scaffold and pipe operation, simple and convenient, simple operation.Owing to adopting open snap-in structure, the steel pipe of various different size can be adapted to, applied widely.The also pipe apparatus structure of this construction scaffolding is simple, fixation, and good reliability is practical.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the perspective view of the also pipe device of construction scaffolding of the present utility model;
Fig. 2 be construction scaffolding in Fig. 1 and the stereochemical structure decomposing schematic representation of pipe device;
Fig. 3 be construction scaffolding in Fig. 2 and the further stereochemical structure decomposing schematic representation of pipe device;
Fig. 4 be construction scaffolding in Fig. 3 and the details enlarged diagram of the a-quadrant of pipe device;
Wherein,
1, the also pipe device of construction scaffolding; 2, the first folder hook; 20, the first coupler body; 21, the first connecting through hole; 22, the first flange connector; 23, the first locking through hole; 3, the second folder hook; 30, the second coupler body; 31, the second connecting through hole; 32, the second locking through hole; 4, locking screw rod; 41, fixing column cap; 5, the first lock post; 51, the first locking post holes; 6, the first fixture block; 61, the first circular hole; 62, the first Locking arc groove; 63, the first arc groove through hole; 7, the second fixture block; 71, the second arc groove through hole; 8, movable pin rod; 9, lock bolt.
Detailed description of the invention
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is described in detail, to make advantage of the present utility model and feature can be easier to be readily appreciated by one skilled in the art, thus more explicit defining is made to protection domain of the present utility model.
The utility model provides a kind of also pipe device of construction scaffolding.
As shown in Figures 1 to 4, the also pipe device 1 of construction scaffolding of the present utility model comprises one first folder hook 2 and a pair second folder hooks 3, this the first folder hook 2 second presss from both sides hook 3 with this and is connected rotationally, the head of this first folder hook 2 is provided with one first coupler body 20, the middle part of this first folder hook 2 is provided with one first connecting through hole 21, the afterbody of this first folder hook 2 is provided with a pair first flange connectors 22, this first flange connector 22 is respectively equipped with one first locking through hole 23, the head of this second folder hook 3 is provided with one second coupler body 30, the middle part of this second folder hook 3 is provided with one second connecting through hole 31, the afterbody of this second folder hook 3 is provided with one second locking through hole 32, this first connecting through hole 21 and the second connecting through hole 31 pass through rivet interlacement, one first lock post 5 is provided with between this first locking through hole 23, this first lock post 5 is provided with one first locking post holes 51, a locking screw rod 4 is provided with in this first locking post holes 51, the top of this locking screw rod 4 is provided with a fixing column cap 41, this fixing column cap 41 is provided with separable first fixture block 6 and one second fixture block 7, this first fixture block 6 is provided with one first circular hole 61 and one first Locking arc groove 62, the corner of this first Locking arc groove 62 is respectively equipped with one first arc groove through hole 63, the corner of this second fixture block 7 is respectively equipped with one second arc groove through hole 71, four lock bolts 9 run through this second arc groove through hole 71 and the first arc groove through hole 63 respectively, a movable pin rod 8 is provided with in this first circular hole 61, this movable pin rod 8 runs through this second locking through hole 32 respectively.
This first fixture block 6 and the second fixture block 7 are stainless steel and make.
When deployed, user only needs the steel pipe the first folder hook 2 and the second folder hook 3 being fastened adjacent scaffold, and rotates locking screw rod 4 first folder hook 2 and the second folder hook 3 are locked, complete scaffold and pipe operation, simple and convenient, simple operation.
The construction scaffolding of this utility model and pipe device utilizes the first folder hook and the second folder fastener to live the steel pipe of adjacent scaffold, and rotate locking screw rod make the first folder hook and the second folder hook lock tight, complete scaffold and pipe operation, simple and convenient, simple operation.Owing to adopting open snap-in structure, the steel pipe of various different size can be adapted to, applied widely.The also pipe apparatus structure of this construction scaffolding is simple, fixation, and good reliability is practical.
The above, be only detailed description of the invention of the present utility model, but protection domain of the present utility model is not limited thereto, and any change of expecting without creative work or replacement, all should be encompassed within protection domain of the present utility model.Therefore, the protection domain that protection domain of the present utility model should limit with claims is as the criterion.
Claims (2)
1. the also pipe device of a construction scaffolding, it is characterized in that, the also pipe device (1) of described construction scaffolding comprises one first folder hook (2) and a pair second folders hook (3), the first described folder hook (2) presss from both sides hook (3) rotationally and is connected with described second, the head of the first described folder hook (2) is provided with one first coupler body (20), the middle part of the first described folder hook (2) is provided with one first connecting through hole (21), the afterbody of the first described folder hook (2) is provided with a pair first flange connectors (22), described the first flange connector (22) is respectively equipped with one first locking through hole (23), the head of the second described folder hook (3) is provided with one second coupler body (30), the middle part of the second described folder hook (3) is provided with one second connecting through hole (31), the afterbody of the second described folder hook (3) is provided with one second locking through hole (32), described the first connecting through hole (21) and the second connecting through hole (31) pass through rivet interlacement, one first lock post (5) is provided with between the first described locking through hole (23), described the first lock post (5) is provided with one first locking post holes (51), a locking screw rod (4) is provided with in the first described locking post holes (51), the top of described locking screw rod (4) is provided with a fixing column cap (41), described fixing column cap (41) is provided with separable first fixture block (6) and one second fixture block (7), described the first fixture block (6) is provided with one first circular hole (61) and one first Locking arc groove (62), the corner of the first described Locking arc groove (62) is respectively equipped with one first arc groove through hole (63), the corner of described the second fixture block (7) is respectively equipped with one second arc groove through hole (71), four lock bolts (9) run through the second described arc groove through hole (71) and the first arc groove through hole (63) respectively, a movable pin rod (8) is provided with in described the first circular hole (61), described movable pin rod (8) runs through the second described locking through hole (32) respectively.
2. the also pipe device of construction scaffolding according to claim 1, it is characterized in that, described the first fixture block (6) and the second fixture block (7) are stainless steel and make.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420741466.2U CN204252517U (en) | 2014-12-02 | 2014-12-02 | The also pipe device of construction scaffolding |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420741466.2U CN204252517U (en) | 2014-12-02 | 2014-12-02 | The also pipe device of construction scaffolding |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204252517U true CN204252517U (en) | 2015-04-08 |
Family
ID=52956840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420741466.2U Active CN204252517U (en) | 2014-12-02 | 2014-12-02 | The also pipe device of construction scaffolding |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204252517U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111502237A (en) * | 2020-05-16 | 2020-08-07 | 鲁伟 | Scaffold gangplank fixing device for building construction |
-
2014
- 2014-12-02 CN CN201420741466.2U patent/CN204252517U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111502237A (en) * | 2020-05-16 | 2020-08-07 | 鲁伟 | Scaffold gangplank fixing device for building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204252517U (en) | The also pipe device of construction scaffolding | |
CN104131693A (en) | Base used for supporting scaffold | |
CN204793913U (en) | Multi -purpose cable equipment fixing device | |
CN204113832U (en) | A kind of pin pipe telescopic locking structure | |
CN204174902U (en) | Scaffold | |
CN203289029U (en) | Self-expansion fixed-type conjunction box | |
CN204112704U (en) | A kind of scaffold high speed fastener | |
CN206128827U (en) | Quick locking structure of tent pole | |
CN204112265U (en) | Speedway wirerope isolated column fastening devices | |
CN208884975U (en) | A kind of disk node applied to scaffold | |
CN204076427U (en) | Tongue and groove machine seesaw manual lock locking apparatus | |
CN204754180U (en) | Steel pipe scaffold safety connecting device | |
CN204386097U (en) | A kind of structural sheeting structure | |
CN108966580A (en) | A kind of cabinet framework convenient for assembling | |
CN204343940U (en) | A kind of burglary-resisting window | |
CN203603441U (en) | Embedded rack | |
CN103586805A (en) | Tool for assembling retractable stretcher | |
CN103255912B (en) | A kind of attachment structure of treadle of false work and crossbeam | |
CN203939226U (en) | A kind of wall-connecting piece device for scaffold | |
CN203684645U (en) | Scaffold connecting device for civil engineering | |
CN207212853U (en) | Bonded block, connection component and apply its attachment structure | |
CN104372940A (en) | Scaffold | |
CN203477601U (en) | Rapid-connection hasp for communication engineering | |
CN205116982U (en) | A connecting rod lock for ATM | |
CN205100553U (en) | Civil engineering is with multi -purpose anchor clamps of pouring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |