CN204251728U - A kind of aluminum cell opening, stop front of the slot part flow arrangement - Google Patents

A kind of aluminum cell opening, stop front of the slot part flow arrangement Download PDF

Info

Publication number
CN204251728U
CN204251728U CN201420650664.8U CN201420650664U CN204251728U CN 204251728 U CN204251728 U CN 204251728U CN 201420650664 U CN201420650664 U CN 201420650664U CN 204251728 U CN204251728 U CN 204251728U
Authority
CN
China
Prior art keywords
aluminium sheet
web member
passing parts
sai
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420650664.8U
Other languages
Chinese (zh)
Inventor
吴智明
徐卫东
张恒成
赵双狮
边韩国
刘志山
闫太网
吕伟光
郭少红
张国坚
柴建民
高三平
李芳块
刘云云
董文立
王永健
范恒军
张建平
范辽宏
景翠林
邵鼎华
穆旭平
王寨
贺惠
韩玉娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANXI HUASHENG ALUMINUM INDUSTRY Co Ltd
Original Assignee
SHANXI HUASHENG ALUMINUM INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI HUASHENG ALUMINUM INDUSTRY Co Ltd filed Critical SHANXI HUASHENG ALUMINUM INDUSTRY Co Ltd
Priority to CN201420650664.8U priority Critical patent/CN204251728U/en
Application granted granted Critical
Publication of CN204251728U publication Critical patent/CN204251728U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electrolytic Production Of Metals (AREA)
  • Arc Welding In General (AREA)

Abstract

The utility model relates to field of aluminum electrolysis, specifically a kind of aluminum cell opening, stop front of the slot part flow arrangement, solve the problems such as current splitter size is long, weight is large, dismounting is inconvenient, replacement charge is large, the cycle is long, comprise by-passing parts, web member I, web member II and Sai Er switch, by-passing parts two ends are connected to Sai Er switch both sides by web member I, web member II, web member II is set up and freely dismantles short circuit insulcrete, by-passing parts is made up of some groups of steel bands and the explosion block that is welded on steel band two ends; Web member I is formed by horizontal aluminium sheet I and vertical aluminium sheet I vertical position welding; Web member II is made up of horizontal aluminium sheet II, vertical aluminium sheet II and being flexible coupling of being connected with horizontal aluminium sheet II.This part flow arrangement is to the shunting of electrolyzer start-stop groove, and the features such as have roasting current distributing even, roasting time is short, and power savings is obvious, simple to operation, easy installation and removal, and maintenance cost of manufacture is low, practical, have larger promotional value and use value.

Description

A kind of aluminum cell opening, stop front of the slot part flow arrangement
Technical field
The utility model relates to field of aluminum electrolysis, specifically a kind of aluminum cell opening, stop front of the slot part flow arrangement.
Background technology
Current electrolysis groove fluting energising shunting selects steel band to make splitter, adopt steel jig splitter crimping to be fixed on energising groove horizontal bus and leave from office groove riser bus bar to shunt, work area end trough shunting employing is welded between anode steel jaw and cathode steel bar at current output terminal steel disc shunts.This splitter longer dimension, weight are bigger than normal, under influence of magnetic field fill, tear open very inconvenient, need to spend more human and material resources, time, and shunting roasting time is longer, splitter deforms after use for several times, the easy rubescent fusing in local of shunting steel band, and when changing, need again entirety to make, expense is large, the cycle is long.
Summary of the invention
The utility model in order to solve current aluminum cell opening, stop groove splitter used and have that size is long, weight is large, dismounting is inconvenient, need again entirety to carry out making when changing to there is the problems such as expense is large, the cycle is long, a kind of aluminum cell opening is provided, stops front of the slot part flow arrangement.
The utility model adopts following technical scheme to realize: a kind of aluminum cell opening, stop front of the slot part flow arrangement, comprise by-passing parts, web member I, web member II and Sai Er switch, by-passing parts two ends are connected to Sai Er switch both sides by web member I, web member II, web member II is set up and freely dismantles short circuit insulcrete, described by-passing parts is made up of some groups of steel bands and the explosion block that is welded on steel band two ends; Described web member I is formed by horizontal aluminium sheet I and vertical aluminium sheet I vertical position welding, and horizontal aluminium sheet I is connected with the explosion block of by-passing parts, and vertical aluminium sheet I lower end and the Sai Er switch face that is flexible coupling is connected; Described web member II is made up of horizontal aluminium sheet II, vertical aluminium sheet II and being flexible coupling of being connected with horizontal aluminium sheet II, the other end that is flexible coupling is connected with the explosion block of by-passing parts, vertical aluminium sheet II lower end and the Sai Er switch face that is flexible coupling is connected, and horizontal aluminium sheet II and vertical aluminium sheet II adopt vertical position welding structure.
Described be flexible coupling to be made up of aluminium strip and the aluminium sheet that is welded on aluminium strip two ends, wherein one block of aluminium sheet is connected with the explosion block of by-passing parts, and another block aluminium sheet is connected with horizontal aluminium sheet II.Be flexible coupling and mainly play a part to be convenient for changing by-passing parts.
The utility model by with electrolyzer not power-off device (Sai Er switch) coordinate and realize electrolyzer and slot, shunt in electrolyzer front end, roasting homogeneous current distribution, moment, power transmission surge voltage was at about 3.2V, after power transmission, bath voltage slowly continued at 10 minutes to rise to most HI high impact voltage about 3.8V, just start afterwards to decline gradually, after 4 hours, voltage drops to about 3.0V, just can start to remove part flow arrangement one by one, torn all part flow arrangements open after 6 hours, electrolyzer enters total current firing stage.When this device is less than the former part flow arrangement minimizing roasting used time about 2, can effectively reduce calcination power consumption, the more efficiently problem being this device and solving the inconvenience in installation, unloading process of other part flow arrangement.This part flow arrangement is directly installed on Sai Er switch, is lifted on short circuit mouth for electrolytic bath together with Sai Er switch, when the rubescent fusing of shunting steel band, only need the by-passing parts in the middle of changing, maintenance cost, cycle reduce greatly, and this part flow arrangement is shunted electrolyzer start-stop groove, there is roasting current distributing even, roasting time is short, and power savings is obvious, simple to operation, easy installation and removal, maintenance cost of manufacture is low, practical, has larger promotional value and use value.
Accompanying drawing explanation
Fig. 1 is by-passing parts structural representation described in the utility model;
Fig. 2 is web member I structural representation described in the utility model;
Fig. 3 is the side-view of Fig. 2;
Fig. 4 is web member II structural representation described in the utility model;
Fig. 5 is the side-view of Fig. 4;
Fig. 6 is by-passing parts described in the utility model, web member I, web member II and Sai Er switch installing structure schematic diagram;
Fig. 7 is short circuit panel structure schematic diagram described in the utility model;
In figure: 1-Sai Er switch; 2-freely dismantles short circuit insulcrete; 3-steel band; 4-explosion block; The horizontal aluminium sheet I of 5-; The vertical aluminium sheet I of 6-; 7-Sai Er switch is flexible coupling face I; The horizontal aluminium sheet II of 8-; The vertical aluminium sheet II of 9-; 10-aluminium strip; 11-aluminium sheet; 12-Sai Er switch is flexible coupling face II.
Embodiment
A kind of aluminum cell opening, stop front of the slot part flow arrangement, as shown in Figure 6, comprise by-passing parts, web member I, web member II and Sai Er switch 1, by-passing parts two ends are connected to Sai Er switch both sides by web member I, web member II, as shown in Figure 7, web member II is set up and freely dismantles short circuit insulcrete 2, as shown in Figure 1, described by-passing parts is made up of some groups of steel bands 3 and the explosion block 4 that is welded on steel band two ends; As shown in Figure 2,3, described web member I is formed by horizontal aluminium sheet I 5 and vertical aluminium sheet I 6 vertical position welding, and horizontal aluminium sheet I is connected with the explosion block of by-passing parts, and vertical aluminium sheet I lower end and the Sai Er switch face I 7 that is flexible coupling is connected; As shown in Figure 4,5, described web member II is made up of horizontal aluminium sheet II 8, vertical aluminium sheet II 9 and being flexible coupling of being connected with horizontal aluminium sheet II, the other end that is flexible coupling is connected with the explosion block of by-passing parts, vertical aluminium sheet II 9 lower end and the Sai Er switch face II 12 that is flexible coupling is connected, and horizontal aluminium sheet II and vertical aluminium sheet II adopt vertical position welding structure.Be flexible coupling and be made up of aluminium strip 10 and the aluminium sheet 11 that is welded on aluminium strip two ends, wherein one block of aluminium sheet is connected with the explosion block 4 of by-passing parts, and another block aluminium sheet is connected with horizontal aluminium sheet II 8.
In said structure, by-passing parts is that, 200mm wide strip thick by array 1mm is welded on two groups of explosion blocks and forms, and can decide the group number of steel band according to fractional flow size.For ease of timely repair and replacement by-passing parts, be equipped with connecting hole in by-passing parts explosion block surrounding; Web member I is formed by two pieces of aluminium sheet vertical position weldings, and its one end is fixed on Sai Er switch and is flexible coupling face, and the other end is connected with by-passing parts, mainly plays a part part flow arrangement to be connected to Sai Er switch; Web member II is connected to form by two pieces of aluminium sheet vertical position weldings and being flexible coupling, and its aluminium sheet one end is fixed on Sai Er switch and is flexible coupling face, and the one end that is flexible coupling is connected with by-passing parts, mainly plays a part by-passing parts to be connected to Sai Er switch.Wherein be flexible coupling and be welded by aluminium sheet and aluminium strip, mainly work being convenient for changing part flow arrangement effect.
When carrying out the operation of electrolyzer fluting, by-passing parts is arranged on Sai Er switch both sides by web member I, web member II, lifting Sai Er switch is to short circuit mouth for electrolytic bath, take out when freely dismantling short circuit insulcrete, when short circuit mouth for electrolytic bath disconnects, short-circuit opening riser bus bar one part of current can be flexible coupling by Sai Er switch and reach short-circuit opening bus through short-circuit opening part flow arrangement, realizes short-circuit opening shunting.When carrying out electrolyzer and stopping groove operation, being arranged on web member II by freely dismantling short circuit insulcrete, directly carrying out stopping groove with Sai Er switch.

Claims (2)

1. an aluminum cell opening, stop front of the slot part flow arrangement, it is characterized in that comprising by-passing parts, web member I, web member II and Sai Er switch (1), by-passing parts two ends are connected to Sai Er switch both sides by web member I, web member II, web member II is set up and freely dismantles short circuit insulcrete (2), described by-passing parts is made up of some groups of steel bands (3) and the explosion block (4) that is welded on steel band two ends; Described web member I is formed by horizontal aluminium sheet I (5) and vertical aluminium sheet I (6) vertical position welding, and horizontal aluminium sheet I is connected with the explosion block of by-passing parts, and vertical aluminium sheet I lower end and the Sai Er switch face I (7) that is flexible coupling is connected; Described web member II is made up of horizontal aluminium sheet II (8), vertical aluminium sheet II (9) and being flexible coupling of being connected with horizontal aluminium sheet II, the other end that is flexible coupling is connected with the explosion block of by-passing parts, vertical aluminium sheet II (9) lower end and the Sai Er switch face II (12) that is flexible coupling is connected, and horizontal aluminium sheet II and vertical aluminium sheet II adopt vertical position welding structure.
2. a kind of aluminum cell opening according to claim 1, stop front of the slot part flow arrangement, be flexible coupling described in it is characterized in that and be made up of aluminium strip (10) and the aluminium sheet (11) that is welded on aluminium strip two ends, wherein one block of aluminium sheet is connected with the explosion block (4) of by-passing parts, and another block aluminium sheet is connected with horizontal aluminium sheet II (8).
CN201420650664.8U 2014-11-04 2014-11-04 A kind of aluminum cell opening, stop front of the slot part flow arrangement Active CN204251728U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420650664.8U CN204251728U (en) 2014-11-04 2014-11-04 A kind of aluminum cell opening, stop front of the slot part flow arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420650664.8U CN204251728U (en) 2014-11-04 2014-11-04 A kind of aluminum cell opening, stop front of the slot part flow arrangement

Publications (1)

Publication Number Publication Date
CN204251728U true CN204251728U (en) 2015-04-08

Family

ID=52956053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420650664.8U Active CN204251728U (en) 2014-11-04 2014-11-04 A kind of aluminum cell opening, stop front of the slot part flow arrangement

Country Status (1)

Country Link
CN (1) CN204251728U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104874972A (en) * 2015-04-30 2015-09-02 山西华圣铝业有限公司 Method for repairing buses at short-circuit openings of aluminum electrolytic tanks in live manner

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104874972A (en) * 2015-04-30 2015-09-02 山西华圣铝业有限公司 Method for repairing buses at short-circuit openings of aluminum electrolytic tanks in live manner

Similar Documents

Publication Publication Date Title
CN204625806U (en) A kind of aluminium cell is met an urgent need part flow arrangement
CN204251728U (en) A kind of aluminum cell opening, stop front of the slot part flow arrangement
CN203466744U (en) Direct-current input circuit of photovoltaic inverter
CN104514015B (en) A kind of aluminium cell preheating device in parallel and method
CN202571551U (en) No-load power saver with delay control function for electric welding machine
CN203362434U (en) Photovoltaic water pump of drainage system
CN203229576U (en) Composite steel claw for aluminum electrolysis
CN102423835A (en) Electric welding system of aluminum electrolyzer cathode steel bar based on C/S (Client/Server) mode
CN204012730U (en) A kind of high-efficient movable capacitor compensation cabinet
CN205798673U (en) Repair a die the electrode cap erecting device of more exchange device
CN201296795Y (en) A temporary buss of an aluminum electrobath series event
CN204130724U (en) The T-shaped wire clamp of dock
CN103683489A (en) Direct-current power source screen
CN204064393U (en) A kind of electric pole type point position monitoring level gauge
CN202332330U (en) Structure of copper bar
CN201367483Y (en) Electrolytic aluminum factory rectifier unit allocation structure
CN203148977U (en) Pressure spring type fault indicator live puller
CN204289621U (en) A kind of module combined cylindrical lithium battery
CN203522507U (en) Main loop of frequency converter
CN204055416U (en) A kind of intelligent electric motor-car lithium cell parallel arrangement
CN202772169U (en) Amorphous silicon film solar cell reverse voltage restoration device controlled by independent power supply subarea
CN105337265A (en) Discharge protection circuit and control method thereof
CN203951058U (en) A kind of removable feeder pillar
CN203508212U (en) Check ring for preventing cathode lines of electric precipitators from being broken
CN102694475A (en) Automatic current-sharing DC ice melting device with parallelly-connected rectifier bridges

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant