CN204250301U - A kind of integral type anchor platform - Google Patents

A kind of integral type anchor platform Download PDF

Info

Publication number
CN204250301U
CN204250301U CN201420382707.9U CN201420382707U CN204250301U CN 204250301 U CN204250301 U CN 204250301U CN 201420382707 U CN201420382707 U CN 201420382707U CN 204250301 U CN204250301 U CN 204250301U
Authority
CN
China
Prior art keywords
bracket
panel
setting angle
described panel
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420382707.9U
Other languages
Chinese (zh)
Inventor
殷长亮
周港
蔡霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Wenchong Shipyard Co Ltd
Original Assignee
Guangzhou Wenchong Shipyard Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Wenchong Shipyard Co Ltd filed Critical Guangzhou Wenchong Shipyard Co Ltd
Priority to CN201420382707.9U priority Critical patent/CN204250301U/en
Application granted granted Critical
Publication of CN204250301U publication Critical patent/CN204250301U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Standing Axle, Rod, Or Tube Structures Coupled By Welding, Adhesion, Or Deposition (AREA)

Abstract

The utility model provides a kind of integral type anchor platform, and it comprises panel, bracket, circular connector, coaming plate, little sections hawse pipe, anchor lip; Described panel has the perforate communicated with described trifle hawse pipe; The excircle of described circular connector is evenly distributed with some draw-in grooves for installing described bracket; Described bracket is vertical each other with described circular connector, and is welded and fixed with certain setting angle and described panel; Described little sections hawse pipe can penetrate along the circular hole of described circular connector, and is welded and fixed with certain setting angle and described panel; Described coaming plate is welded and fixed around the outer rim head and the tail of described panel and bracket; The another side of described anchor lip described little sections hawse pipe relative to described panel coincide and is welded and fixed.Adopt the utility model, before bow complete cross section carries, just the assemblies such as anchor platform, anchor lip and hawse pipe can be realized disposable integral and install, eliminate the structure of traditional anchor platform combination in bulk after bow complete cross section carries.

Description

A kind of integral type anchor platform
Technical field
The utility model relates to the construction engineering in shipbuilding industry, particularly relates to a kind of integral type anchor platform.
Background technology
At present, the bracket of anchor deck plate and half is prefabricated on ground, but precision is very poor, finally all will take welding equipment again apart.Remaining anchor platform coaming plate, remaining half bracket and anchor lip, after bow complete cross section carries, (closing on Xia Shui) is just in bulk, and in work progress, often there are the following problems: (1) operating environment is complicated, operation is intersected many, and potential safety hazard is large; (2) time in bulk, the reasons such as positioning datum difficulty is looked for, assembly difficulty is large, crane resources is nervous cause welding equipment many for man-hour, and welding equipment precision is difficult to ensure, cause drawing anchor to test often not smooth; (3) close on lower water node, all kinds of construction period causes crane resources nervous, and the assembling of anchor platform anchor lip will to take the crane time long; (4) anchor platform anchor lip welding equipment is complete about needs 3 days, causes time on building berth necessarily to increase.This technique can not adapt to current shipbuilding needs.
Summary of the invention
Technical problem to be solved in the utility model is, a kind of integral type anchor platform is provided, before bow complete cross section carries, just the assemblies such as anchor platform, anchor lip and hawse pipe can be realized disposable integral to install, eliminate the structure of traditional anchor platform combination in bulk after bow complete cross section carries.
In order to solve the problems of the technologies described above, the utility model provides a kind of integral type anchor platform, and it comprises panel, bracket, circular connector, coaming plate, little sections hawse pipe, anchor lip; Described panel has the perforate communicated with described trifle hawse pipe; The excircle of described circular connector is evenly distributed with some draw-in grooves for installing described bracket; Described bracket is vertical each other with described circular connector, and is welded and fixed with certain setting angle and described panel; Described little sections hawse pipe can penetrate along the circular hole of described circular connector, and is welded and fixed with certain setting angle and described panel; Described coaming plate is welded and fixed around the outer rim head and the tail of described panel and bracket; The another side of described anchor lip described little sections hawse pipe relative to described panel coincide and is welded and fixed.
As the improvement of technique scheme, also comprise benefit plate, be welded and fixed by described benefit plate between described bracket and little sections hawse pipe.
As the improvement of technique scheme, described bracket is provided with 8, to be uniformly distributed towards described panel clockwise direction, be followed successively by the upper bracket perpendicular to described panel, the upper right bracket of described panel is favoured with the first setting angle, the right bracket of described panel is favoured with the second setting angle, the bottom right bracket of described panel is favoured with the 3rd setting angle, perpendicular to the lower bracket of described panel, the lower-left bracket of described panel is favoured with the 3rd setting angle, the left bracket of described panel is favoured with the second setting angle, the upper left bracket of described panel is favoured with the first setting angle.
As the improvement of technique scheme, described first setting angle is 64.8 degree; Described second setting angle is 53 degree; Described 3rd setting angle is 64.8 degree.
As the improvement of technique scheme, described circular connector is provided with 2, and two described circular connectors be arranged in parallel with certain spacing.
A kind of integral type anchor platform of the present utility model, compared with prior art, there is following beneficial effect: pass through integral design, before bow complete cross section carries, just the assemblies such as anchor platform, anchor lip and hawse pipe can be realized disposable integral to install, eliminate the structure of traditional anchor platform combination in bulk after bow complete cross section carries, thus substantially improve the operating environment of the field fabrication of anchor platform, installation, be conducive to the welding of each unit construction node, decrease aloft work, be conducive to personal safety; Simultaneously, also pass through circular connector, special angle location can be carried out rapidly to each bracket and point of hock hawse pipe, more easily the hookup wire of top panel is fixed, when avoiding that in existing technique, bracket welds with hawse pipe, the problems such as welding precision is poor, welding capacity is large, improve production efficiency and welding quality.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme of the utility model embodiment, be briefly described to the accompanying drawing of embodiment below.
Fig. 1 is the structural representation that the utility model provides an a kind of embodiment of integral type anchor platform;
Fig. 2 be in Fig. 1 embodiment E to schematic diagram;
Fig. 3 be in Fig. 2 embodiment A-A to schematic diagram;
Fig. 4 be in Fig. 2 embodiment B-B to schematic diagram;
Fig. 5 be in Fig. 2 embodiment C-C to schematic diagram;
Fig. 6 be in Fig. 2 embodiment D-D to schematic diagram;
Fig. 7 is the structural representation of circular connector.
Detailed description of the invention
Detailed description of the invention of the present utility model is further described below in conjunction with accompanying drawing.
In conjunction with see shown in Fig. 1-7, an embodiment of the present utility model, a kind of integral type anchor platform comprises panel 1, bracket 2, circular connector 3, coaming plate 4, little sections hawse pipe 5, anchor lip 6; Described panel 1 has the perforate 11 communicated with described trifle hawse pipe 5; The excircle of described circular connector 3 is evenly distributed with some draw-in grooves 31 for installing described bracket 2; Described bracket 2 is vertical each other with described circular connector 3, and is welded and fixed with certain setting angle and described panel 1; Described little sections hawse pipe 5 can penetrate along the circular hole 32 of described circular connector 3, and is welded and fixed with certain setting angle and described panel 1; Described coaming plate 4 is welded and fixed around the outer rim head and the tail of described panel 1 and bracket 2; The another side of described anchor lip 6 described little sections hawse pipe 5 relative to described panel 1 coincide and is welded and fixed.Also it should be noted that, because bracket 2 and little sections hawse pipe 5 separate by circular connector 3, make the weld seam between it comparatively large and can not directly weld, therefore, needing to add between bracket 2 and little sections hawse pipe 5 to mend plate 7, so that be welded and fixed.
In an embodiment, described bracket 2 preferably arranges 8, to be uniformly distributed towards described panel 1 clockwise direction, be followed successively by the upper bracket 21 perpendicular to described panel 1, the upper right bracket 22 of described panel 1 is favoured with the first setting angle, the right bracket 23 of described panel 1 is favoured with the second setting angle, the bottom right bracket 24 of described panel 1 is favoured with the 3rd setting angle, perpendicular to the lower bracket 25 of described panel 1, the lower-left bracket 26 of described panel 1 is favoured with the 3rd setting angle, the left bracket 27 of described panel 1 is favoured with the second setting angle, the upper left bracket 28 of described panel 1 is favoured with the first setting angle.Wherein, described first setting angle is 64.8 degree; Described second setting angle is 53 degree; Described 3rd setting angle is 64.8 degree.Certain bracket 2 setting angle is not limited thereto, and it is determined according to the setting angle of little sections hawse pipe 5 and the number of bracket 2, and in an embodiment, the setting angle of described little sections hawse pipe 5 on described panel 1 is 53 degree.
More preferably, described circular connector 3 is provided with 2, two described circular connectors 3 be arranged in parallel with certain spacing, effectively can position each bracket 2 like this and fix, connection structure between bracket 2 and circular connector 3 is not easily fallen apart, thus interferes when avoiding follow-up trifle hawse pipe 5 installation location and between bracket 2 and cause the problem that positioning datum difficulty is looked for.
Its installation steps are as follows:
(1) with described panel 1 on basal plane is arranged on horizontal moulding bed, panel marks the hookup wire 12 of bracket 1;
(2) with the hookup wire 12 of described bracket 2 for benchmark, assembling bracket 2 and circular connector 3 assembly, is arranged on bracket 2 on the draw-in groove 31 of circular connector 3 excircle, makes bracket 2 vertical each other with circular connector 3 and carry out spot welding to be connected;
(3) along the circular hole 32 of circular connector 3, little sections hawse pipe 5 is installed, after angle sample inspection panel 1 and the angle of little sections hawse pipe 5 and the angle of bracket 2 and panel 1, then carries out spot welding connection;
(4) coaming plate 4 is installed in the outer rim splicing round panel 1 and bracket 2, after coaming plate 4 and the match condition of bracket 2 are qualified, only pull down coaming plate 4, then the weld seam carried out between panel 4, bracket 2, little sections hawse pipe 5 welds and checks, then reinstall coaming plate 4 and complete coaming plate 4 head and the tail between, welding between coaming plate 4 with panel 1;
(6) after coaming plate 4 has welded, anchor platform stood up and adds support, making panel 1 upward, then on the another side of the relatively little sections hawse pipe 5 of panel 1, anchor lip 6 being installed, after qualified with the angle of little sections hawse pipe 5 with angle sample inspection anchor lip 6, then weld anchor lip 6;
(7) to lie on one's side anchor platform, with the docking port of little sections hawse pipe 5 for basal plane docks remaining hawse pipe;
(8) above-mentioned prefabricated an organic whole is carried out on the outside plate 8 of body section structure lifting location; The perforate of hawse pipe from outside plate 8 penetrated, pass from the perforate of fore castle deck 9, then the weld seam carried out between coaming plate 4 with outside plate 8, between hawse pipe 5 with outside plate 8 welds, and completes anchor platform and installs.
Visible, implement a kind of integral type anchor platform of the present utility model, compared with prior art, it is by integral design, just the assemblies such as anchor platform, anchor lip and hawse pipe can be realized disposable integral and install, eliminate the structure of traditional anchor platform combination in bulk after bow complete cross section carries before bow complete cross section carries, thus substantially improve the operating environment of the field fabrication of anchor platform, installation, be conducive to the welding of each unit construction node, decrease aloft work, be conducive to personal safety; Simultaneously, also pass through circular connector, special angle location can be carried out rapidly to each bracket and point of hock hawse pipe, more easily the hookup wire of top panel is fixed, when avoiding that in existing technique, bracket welds with hawse pipe, the problems such as welding precision is poor, welding capacity is large, improve production efficiency and welding quality.
Above disclosedly be only preferred embodiment of the present utility model, certainly can not limit the interest field of the utility model with this, therefore according to the equivalent variations that the utility model claim is done, still belong to the scope that the utility model is contained.

Claims (5)

1. an integral type anchor platform, is characterized in that, comprises panel, bracket, circular connector, coaming plate, little sections hawse pipe, anchor lip;
Described panel has the perforate communicated with described trifle hawse pipe;
The excircle of described circular connector is evenly distributed with some draw-in grooves for installing described bracket;
Described bracket is vertical each other with described circular connector, and is welded and fixed with certain setting angle and described panel;
Described little sections hawse pipe can penetrate along the circular hole of described circular connector, and is welded and fixed with certain setting angle and described panel;
Described coaming plate is welded and fixed around the outer rim head and the tail of described panel and bracket;
The another side of described anchor lip described little sections hawse pipe relative to described panel coincide and is welded and fixed.
2. a kind of integral type anchor platform as claimed in claim 1, be is characterized in that, also comprise benefit plate, be welded and fixed between described bracket and little sections hawse pipe by described benefit plate.
3. a kind of integral type anchor platform as claimed in claim 1, it is characterized in that, described bracket is provided with 8, to be uniformly distributed towards described panel clockwise direction, be followed successively by the upper bracket perpendicular to described panel, the upper right bracket of described panel is favoured with the first setting angle, the right bracket of described panel is favoured with the second setting angle, the bottom right bracket of described panel is favoured with the 3rd setting angle, perpendicular to the lower bracket of described panel, the lower-left bracket of described panel is favoured with the 3rd setting angle, the left bracket of described panel is favoured with the second setting angle, the upper left bracket of described panel is favoured with the first setting angle.
4. a kind of integral type anchor platform as claimed in claim 3, it is characterized in that, described first setting angle is 64.8 degree; Described second setting angle is 53 degree; Described 3rd setting angle is 64.8 degree.
5. a kind of integral type anchor platform as claimed in claim 1, it is characterized in that, described circular connector is provided with 2, and two described circular connectors be arranged in parallel with certain spacing.
CN201420382707.9U 2014-07-11 2014-07-11 A kind of integral type anchor platform Expired - Lifetime CN204250301U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420382707.9U CN204250301U (en) 2014-07-11 2014-07-11 A kind of integral type anchor platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420382707.9U CN204250301U (en) 2014-07-11 2014-07-11 A kind of integral type anchor platform

Publications (1)

Publication Number Publication Date
CN204250301U true CN204250301U (en) 2015-04-08

Family

ID=52954633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420382707.9U Expired - Lifetime CN204250301U (en) 2014-07-11 2014-07-11 A kind of integral type anchor platform

Country Status (1)

Country Link
CN (1) CN204250301U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105366003A (en) * 2015-10-26 2016-03-02 江苏科技大学 Anchor mouth and profile generation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105366003A (en) * 2015-10-26 2016-03-02 江苏科技大学 Anchor mouth and profile generation method thereof

Similar Documents

Publication Publication Date Title
CN104071300B (en) The installation method that anchor station anchor lip ground is integral prefabricated
CN109850066B (en) Ship assembly carrying method
CN102336250B (en) Method for installing rudder horn
CN103661807B (en) The localization method of the side sectional folding of pressure guide rail bracket is installed in advance
CN107235117B (en) A kind of fabrication and installation method of anchor recess
CN103350735A (en) Rudder horn and stern part segmentation installation process
CN104527923B (en) Cabin entering mounting method used for main push motor and adopting auxiliary mounting bracket
CN204250301U (en) A kind of integral type anchor platform
CN105236263A (en) Installation method for flexible leg of gantry crane
CN206188198U (en) Can dismantle hanging beam
CN105501391B (en) A kind of all-direction propeller is installed to the installation method of bottom of ship from building berth
CN204199830U (en) Combined type electric pole
CN203939485U (en) The guide frame of installing for underwater structure piecemeal
CN202670054U (en) Adjustable connection structure of liftable diving platform of ship
CN204642133U (en) A kind of separation type marine main engine pedestal up and down
CN205381375U (en) Supporting mechanism is always organized in segmentation of super large vessel stern portion
CN209479898U (en) A kind of antenna base with railing integrative installation technology
CN204726404U (en) A kind of blowout prevention service rig special transport vehicle tail support device
CN202703846U (en) Fixation compound plate
CN202610781U (en) Single-leg simple platform at sea
CN105696539A (en) Top-demountable cylinder-type lifting device and method for demounting and mounting lifting cylinders
CN204079326U (en) Marine platform crane pedestal
CN203947455U (en) A kind of Deep Water Steel structure bridging constructional device
CN204211355U (en) A kind of gusset plate interconnection system flexible leg
CN203680147U (en) Installation tool for propeller shaft bracket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant