CN204238636U - Novel tent braced structures - Google Patents
Novel tent braced structures Download PDFInfo
- Publication number
- CN204238636U CN204238636U CN201420732708.1U CN201420732708U CN204238636U CN 204238636 U CN204238636 U CN 204238636U CN 201420732708 U CN201420732708 U CN 201420732708U CN 204238636 U CN204238636 U CN 204238636U
- Authority
- CN
- China
- Prior art keywords
- sleeve pipe
- drag link
- column
- respectively arranged
- horizontal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Tents Or Canopies (AREA)
Abstract
The utility model provides a kind of Novel tent braced structures, belongs to a kind of tent member, comprises column, drag link and herringbone beam, and described column is provided with sleeve pipe, and described drag link is removably connected by sleeve pipe and column.Described sleeve pipe comprises the first sleeve pipe being arranged at column upper end, described first sleeve pipe comprises an inclination joint and two horizontal joints be oppositely arranged, the dead in line of two horizontal joints, inclination joint and herringbone beam removably connect, and horizontal joint removably connects with the drag link being arranged at column upper end.The utility model structure is simple, and reasonable in design, column and drag link are removably connected by sleeve pipe, do not adopt screw or bolt, fast easy for installation, Stability Analysis of Structures, and tent is pushed up in the formation that can combine more, has good practicality.
Description
Technical field
The utility model relates to tent member field, in particular to a kind of Novel tent braced structures.
Background technology
Tent is that the one that usually can use during people work and live is lived instrument temporarily; it is generally made up of braced structures and the tarpaulin covered on the support structure; the braced structures of existing tent comprises column, drag link and herringbone beam; its column and drag link adopt screw or bolt to be connected; install and bother very much, efficiency is low, and structural instability after connecting; often there is relative movement in junction, braced structures entirety is easily collapsed.If screw or bolt have dropped and just can not install, the braced structures of existing tent can only form single tent in addition, can not be combined to form and push up tent more.
Utility model content
The purpose of this utility model is to provide a kind of Novel tent braced structures, structure is simple, reasonable in design, column and drag link are removably connected by sleeve pipe, do not adopt screw or bolt, fast easy for installation, Stability Analysis of Structures, and can combine to be formed and push up tent more, there is good practicality.
The utility model is achieved in that a kind of Novel tent braced structures, comprises column, drag link and herringbone beam, and described column is provided with sleeve pipe, and described drag link is removably connected by sleeve pipe and column.
The utility model adopts sleeve pipe to connect column and drag link, fast easy for installation, need not adopt screw or bolt, install rear Stability Analysis of Structures, not easily collapse.
Further, described sleeve pipe comprises the first sleeve pipe being arranged at column upper end, described first sleeve pipe comprises an inclination joint and two horizontal joints be oppositely arranged, the dead in line of two horizontal joints, inclination joint and herringbone beam removably connect, and horizontal joint removably connects with the drag link being arranged at column upper end.
By arranging two relative horizontal joints, left and right two drag links can be connected, thus can be combined to form and push up tent more, very convenient.
Further, described sleeve pipe also comprises the second sleeve pipe being arranged at column lower end, described second sleeve pipe comprises a horizontal joint, the axes normal of the horizontal joint of this horizontal joint and the first sleeve pipe, and this horizontal joint removably connects with the drag link being arranged at column lower end.
Second sleeve pipe makes column lower end also can connect drag link, further enhancing the stability of braced structures entirety.
Further, the two ends of described drag link have been threaded screw rod respectively, two horizontal joints of the first sleeve pipe and the horizontal joint of the second sleeve pipe are respectively arranged with the screwed hole coordinated with screw rod, the two ends of described drag link and screw rod are respectively arranged with location-plate.
During use, be first connected on drag link by screw rod, then the screwed hole screwed in by drag link in horizontal joint can complete the connection of drag link and column, fast very convenient, Stability Analysis of Structures after connecting, not easily collapses.When location-plate conveniently connects, location, makes both connections more firm.
Further, the two ends of described drag link are respectively arranged with some spring card beads, described spring card bead is arranged along drag link circumference, two horizontal joints of the first sleeve pipe and the horizontal joint of the second sleeve pipe are respectively arranged with the hole clipping coordinated with spring card bead, and the two ends of described drag link are respectively arranged with location-plate.
During use, stretched in horizontal joint the end of drag link, and suitably adjust, spring card bead is snapped in corresponding hole clipping, can complete the connection of drag link and column, fast very convenient, Stability Analysis of Structures after connecting, not easily collapses.When location-plate conveniently connects, location, makes both connections more firm.
Further, the two ends of described drag link are respectively arranged with two card columns, two card columns are symmetrical arranged, two horizontal joints of the first sleeve pipe and the horizontal joint of the second sleeve pipe are respectively arranged with the L shape bayonet socket coordinated with card column, be respectively arranged with spring in two horizontal joints of the first sleeve pipe and the horizontal joint of the second sleeve pipe, the two ends of described drag link are respectively arranged with location-plate.
Horizontal joint is arranged L shape bayonet socket, form the structure of similar mouth hanging tube face, during use, the end of drag link to be stretched in horizontal joint and to rotate, two card columns are snapped in the L shape bayonet socket of horizontal joint both sides respectively, the connection of drag link and column can be completed, fast very convenient, Stability Analysis of Structures after connecting, not easily collapses.When location-plate conveniently connects, location, makes both connections more firm.
Further, the two ends of described drag link are respectively arranged with two L shape bayonet sockets, two L shape bayonet sockets are symmetrical arranged, two horizontal joints of the first sleeve pipe and the horizontal joint of the second sleeve pipe are respectively arranged with the card column with L shape bayonet fittings, the inside, two ends of drag link is respectively arranged with spring, and two horizontal joints of the first sleeve pipe and the horizontal joint of the second sleeve pipe are respectively arranged with location-plate.
Drag link is arranged L shape bayonet socket, form the structure of similar mouth hanging tube face, during use, the end sleeve of drag link is rotated in horizontal joint, two card columns are snapped in the L shape bayonet socket of drag link both sides respectively, the connection of drag link and column can be completed, fast very convenient, Stability Analysis of Structures after connecting, not easily collapses.When location-plate conveniently connects, location, makes both connections more firm.
Further, described sleeve pipe, column and drag link all adopt metal material to make, and described Socket welding is connected on column.
Socket welding is connected on column, is connected firmly, and further increases the stability of braced structures entirety.
Further, described column and drag link form by least two sections of pole being threaded connection.
Adopt the column of multistage pole composition and drag link to facilitate transport to carry, and the length of column and drag link can be adjusted by the quantity increasing or reduce pole.
Further, described column is expansion link, and described drag link is formed by least two sections of pole being threaded connection.
Column adopts expansion link, can adjust length easily, can be adjusted the length of drag link in addition by the quantity increasing or reduce pole.
The utility model structure is simple, and reasonable in design, column and drag link are removably connected by sleeve pipe, and do not adopt screw or bolt, cost of production is low, fast easy for installation, and Stability Analysis of Structures is reliable, and long service life, not easily collapses.And can combine to be formed and push up tent more, meet the multiple demand of user, the scope of application is wide, has good practicality.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme of the utility model embodiment, be briefly described to the accompanying drawing used required in embodiment below, be to be understood that, the following drawings illustrate only some embodiment of the present utility model, therefore the restriction to scope should be counted as, for those of ordinary skill in the art, under the prerequisite not paying creative work, other relevant accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of the utility model entirety;
Fig. 2 is the structural representation of the utility model embodiment 1 column;
Fig. 3 is the structural representation of the utility model embodiment 1 drag link;
Fig. 4 is the structural representation of the utility model embodiment 2 column;
Fig. 5 is the structural representation of the utility model embodiment 2 drag link;
Fig. 6 is the structural representation of the utility model embodiment 3 column;
Fig. 7 is the structural representation of the utility model embodiment 3 drag link;
Fig. 8 is the structural representation of the utility model embodiment 4 column;
Fig. 9 is the structural representation of the utility model embodiment 4 drag link;
Figure 10 is the schematic diagram of the utility model composition fly tent braced structures;
Figure 11 is the schematic diagram of the utility model composition three top tent supporting structure.
In figure:
101, column; 102, drag link; 103, herringbone beam; 104, the first sleeve pipe; 105, the second sleeve pipe; 106, location-plate; 107, screw rod; 108, hole clipping; 109, spring card bead; 110, card column; 111, L shape bayonet socket; 112, spring.
Detailed description of the invention
The braced structures of existing tent generally comprises four root posts, some with drag link and herringbone beam, its column and drag link all adopt screw or bolt to be connected, install and bother very much, efficiency is low, and structure is insecure after connecting, if screw or bolt have dropped and just can not install, the braced structures of existing tent can only form single tent in addition, can not be combined to form and push up tent more.
For the problems referred to above, the utility model provides a kind of Novel tent braced structures, sleeve pipe is adopted to connect column 101 and drag link 102, fast easy for installation, need not adopt screw or bolt, Stability Analysis of Structures after installing, and the drag link 102 of adjacent two braced structuress can be connected together by sleeve pipe, thus tent is pushed up in formation more, significantly improves the problems referred to above.
For making the object of the utility model embodiment, technical scheme and advantage clearly, below in conjunction with the accompanying drawing in the utility model embodiment, technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is the utility model part embodiment, instead of whole embodiments.The assembly of the utility model embodiment describing and illustrate in usual accompanying drawing herein can be arranged with various different configuration and design.
Therefore, below to the detailed description of the embodiment of the present utility model provided in the accompanying drawings and the claimed scope of the present utility model of not intended to be limiting, but selected embodiment of the present utility model is only represented.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
It should be noted that: represent similar terms in similar label and letter accompanying drawing below, therefore, once be defined in an a certain Xiang Yi accompanying drawing, then do not need to define further it and explain in accompanying drawing subsequently.
In description of the present utility model, it should be noted that, term " " center ", " on ", D score, " left side ", " right side ", " vertically ", " level ", " interior ", orientation or the position relationship of the instruction such as " outward " are based on orientation shown in the drawings or position relationship, or this utility model product orientation of usually putting or position relationship when using, only the utility model and simplified characterization for convenience of description, instead of indicate or imply that the device of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore can not be interpreted as restriction of the present utility model.In addition, term " first ", " second ", " the 3rd " etc. only for distinguishing description, and can not be interpreted as instruction or hint relative importance.
In description of the present utility model, also it should be noted that, unless otherwise clearly defined and limited, term " setting ", " installation ", " being connected ", " connection " should be interpreted broadly, and such as, can be fixedly connected with, also can be removably connect, or connect integratedly; Can be mechanical connection, also can be electrical connection; Can be directly be connected, also indirectly can be connected by intermediary, can be the connection of two element internals.For the ordinary skill in the art, concrete condition the concrete meaning of above-mentioned term in the utility model can be understood.
Embodiment 1, referring to figs. 1 through Fig. 3, a kind of Novel tent braced structures, comprises column 101, drag link 102 and herringbone beam 103, and this herringbone beam 103 and existing tent herringbone beam similar, described column 101 and drag link 102 are cylindrical.In the present embodiment, described column 101 is four, can certainly adopt other quantity, as long as support tent that can be stable.Described column 101 is provided with sleeve pipe, and described drag link 102 is removably connected by sleeve pipe and column 101.
In the present embodiment, as preferably, described sleeve pipe comprises the first sleeve pipe 104 being arranged at column 101 upper end, described first sleeve pipe 104 comprises an inclination joint and two horizontal joints be oppositely arranged, inclination joint and herringbone beam 103 removably connect, concrete connected mode is, the free end of herringbone beam 103 inserts this inclination joint, and be threaded connection, the mode such as clamping connects.The angle of inclination of this inclination joint is determined by the angle of inclination of herringbone beam, can select according to actual needs.The dead in line of two horizontal joints, horizontal joint removably connects with the drag link 102 being arranged at column 101 upper end.By arranging two relative horizontal joints, make first sleeve pipe 104 left and right sides can connect a drag link 102 respectively, thus the two top tents, three that multiple tent supporting structure can be connected to form side by side push up tents or push up tent more, as shown in Figure 10 and Figure 11, meet the multiple demand of user, the scope of application is wide.
In the present embodiment, described first sleeve pipe 104 only comprises three joints, when forming the braced structures of single top tent, on two columns be arranged in parallel 101, two horizontal joints in opposite directions connect the two ends of drag link 102 respectively, other two horizontal joints of two the first sleeve pipes 104 are in free state, are not connected with drag link 102.Between the column 101 that two other be arranged in parallel, a same connection drag link 102, two parallel drag links 102 form the braced structures of column upper end.If the stability of braced structures will be improved further, the quantity of horizontal joint can be increased, such as increase by one with the horizontal joint of the first two horizontal joint axes normal, the upper end of such root post 101 just can connect two orthogonal drag links 102, firm stable more.
Only arranging drag link 102 in column 101 upper end can the intensity of basic guarantee tent supporting structure, in order to improve stability of the present utility model further, in the present embodiment, described column 101 lower end is provided with the second sleeve pipe 105, described second sleeve pipe 105 comprises a horizontal joint, the axes normal of the horizontal joint of this horizontal joint and the first sleeve pipe 104, this horizontal joint removably connects with the drag link 102 being arranged at column 101 lower end.Adopt such structure, also can connect drag link 102 between two root post 101 lower ends, this drag link 102 is mutually vertical with the projection of the drag link 102 of column 101 upper end, substantially increases intensity of the present utility model.In the present embodiment, this second sleeve pipe 105 only comprises a horizontal joint, same, also the quantity of horizontal joint can be increased, such as increase by one with the horizontal joint of this horizontal joint axes normal, the lower end of such root post 101 just can connect two orthogonal drag links 102, firm stable more.
According to different environment for use needs, described column 101 has multiple choices with the size of drag link 102, and in the present embodiment, provide a kind of preferred dimensions that can adapt to most of environment and use, the length of described drag link 102 is 300cm, and diameter is 16cm.The length of described column 101 is 200cm, and diameter is 20cm.The bond diameter of described sleeve pipe is 20cm.
The connected mode of sleeve pipe and column 101 is varied, in the present embodiment, described first sleeve pipe 104, second sleeve pipe 105, column 101 and drag link 102 all adopt metal material to make, described first sleeve pipe 104 and the second sleeve pipe 105 are welded on column 101 respectively, after installing, the origin of force of whole Peng Ding has just been transferred on column 101, and be connected firmly, intensity is high.Can certainly adopt other connected modes, such as column 101 and sleeve pipe adopt integrally moulded making.
The concrete connected mode of sleeve pipe and drag link 102 has multiple choices, adopt to be threaded in the present embodiment, concrete, the two ends of described drag link 102 have been threaded screw rod 107 respectively, namely the two ends of drag link 102 are respectively arranged with the screwed hole mated with screw rod 107, screw rod 107 is threadedly connected in this screwed hole, two horizontal joints of the first sleeve pipe 104 and the horizontal joint of the second sleeve pipe 105 are respectively arranged with the screwed hole coordinated with screw rod 107, this screwed hole can directly be processed to form in horizontal joint end, also can be formed at horizontal joint welding edges nut.
During installation, first screw rod 107 is connected on drag link 102, then the screwed hole screwed in horizontal joint can complete the connection of drag link 102 and column 101 by drag link 102, fast very convenient, need not adopt bolt or screw, Stability Analysis of Structures after connecting, not easily collapses.The two ends of described drag link 102 and screw rod 107 are respectively arranged with location-plate 106.Location-plate 106 plays the effect of location when connecting, and makes both connections more firm, and can not produce displacement after can ensureing to connect, very convenient and practical.Certainly, also structure screw rod 107 being welded on drag link 102 end can be adopted, or directly process the externally threaded structure of mating with the screwed hole of horizontal joint in drag link 102 end, or screw rod 107 is welded on column 101, sleeve pipe is arranged on the structure on drag link 102, or other screw connection structures, as long as can realize making column 101 be threaded with drag link 102 by sleeve pipe.
In the present embodiment, as preferably, described column 101 and drag link 102 form by two sections of pole being threaded connection.Wherein the end of one section of pole is provided with external screw thread, and the end of another section of pole is provided with the screwed hole mated with external screw thread.The pole of other quantity can certainly be selected, such as three sections, four sections etc.Adopt the column 101 of multistage pole composition and drag link 102 to facilitate transport to carry, and the length of column 101 and drag link 102 can be adjusted by the quantity increasing or reduce pole.In addition, described column 101 also can be designed to expansion link, can adjust its length by stretching equally like this, and then adjusts the size of whole tent supporting structure.As preferably, this expansion link is provided with locking device, fixing after facilitating its adjustment length.
Embodiment 2, with reference to Fig. 4 and Fig. 5, the present embodiment and the difference of embodiment 1 are that the concrete connected mode of sleeve pipe and drag link 102 is different, in the present embodiment, the two ends of described drag link 102 are symmetrically arranged with two spring card beads 109 respectively, described spring card bead 109 is prior art, and when being subject to external force, spring card bead 109 is pressed in drag link 102, after external force disappears, under the action of the spring, spring card bead 109 ejects, and gets back to initial position.Described spring card bead 109 also can select other quantity, such as 3,4 or multiple, and described some spring card beads 109 are arranged along drag link 102 circumference.Certainly, spring card bead 109 also only can adopt one, but the less stable connected like this.Two horizontal joints of the first sleeve pipe 104 and the horizontal joint of the second sleeve pipe 105 are respectively arranged with the hole clipping 108 coordinated with spring card bead 109, and the quantity of hole clipping 108 is consistent with the quantity of spring card bead 109.
During use, the end of drag link 102 is stretched in horizontal joint, and suitably adjusts, spring card bead 109 is snapped in corresponding hole clipping 108 and ejects, the connection of drag link 102 and column 101 can be completed, fast very convenient, Stability Analysis of Structures after connecting, not easily collapses.
All the other structures of the present embodiment are identical with embodiment 1, do not repeat them here.
Embodiment 3, with reference to Fig. 6 and Fig. 7, the present embodiment and the difference of embodiment 1 are that the concrete connected mode of sleeve pipe and drag link 102 is different, in the present embodiment, the two ends of described drag link 102 are respectively arranged with two card columns, 110, two card columns 110 and are symmetrical arranged, as preferably, described card column 110 is welded with drag link 102, can certainly adopt other connected modes, as long as card column 110 can be made to be fixed on drag link 102.Two horizontal joints of the first sleeve pipe 104 and the horizontal joint of the second sleeve pipe 105 are respectively arranged with the L shape bayonet socket 111 coordinated with card column 110, horizontal joint is arranged L shape bayonet socket 111, form the structure of similar mouth hanging tube face, spring 112 is respectively arranged with in two horizontal joints of the first sleeve pipe 104 and the horizontal joint of the second sleeve pipe 105, spring 112 is in free state time flat, when card column 110 snaps in L shape bayonet socket 111, pressuring spring 112 makes it be in compressive state, card column 110 is firmly fixed in L shape bayonet socket 111 by the elastic force of spring 112 simultaneously, make both connections more firm.
During use, the end of drag link 102 to be stretched in horizontal joint and to rotate, making two card columns 110 snap in the L shape bayonet socket 111 of horizontal joint both sides respectively, the connection of drag link 102 and column 101 can be completed, fast very convenient, Stability Analysis of Structures after connecting, not easily collapses.
All the other structures of the present embodiment are identical with embodiment 1, do not repeat them here.
Embodiment 4, with reference to Fig. 8 and Fig. 9, the difference of the present embodiment and embodiment 3 is card column 110, the setting position of L shape bayonet socket 111 and location-plate 106 is different, in the present embodiment, the two ends of described drag link 102 are respectively arranged with two L shape bayonet sockets 111, two L shape bayonet sockets 111 are symmetrical arranged, two horizontal joints of the first sleeve pipe 104 and the horizontal joint of the second sleeve pipe 105 are respectively arranged with the card column 110 coordinated with L shape bayonet socket 111, the inside, two ends of drag link 102 is respectively arranged with spring 112, two horizontal joints of the first sleeve pipe 104 and the horizontal joint of the second sleeve pipe 105 are respectively arranged with location-plate 106.
All the other structures of the present embodiment are identical with embodiment 3, and mounting means is similar to Example 3, does not repeat them here.
The foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, for a person skilled in the art, the utility model can have various modifications and variations.All within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Claims (10)
1. a Novel tent braced structures, is characterized in that, comprises column, drag link and herringbone beam, and described column is provided with sleeve pipe, and described drag link is removably connected by sleeve pipe and column.
2. Novel tent braced structures according to claim 1, it is characterized in that, described sleeve pipe comprises the first sleeve pipe being arranged at column upper end, described first sleeve pipe comprises an inclination joint and two horizontal joints be oppositely arranged, the dead in line of two horizontal joints, inclination joint and herringbone beam removably connect, and horizontal joint removably connects with the drag link being arranged at column upper end.
3. Novel tent braced structures according to claim 2, it is characterized in that, described sleeve pipe also comprises the second sleeve pipe being arranged at column lower end, described second sleeve pipe comprises a horizontal joint, the axes normal of the horizontal joint of this horizontal joint and the first sleeve pipe, this horizontal joint removably connects with the drag link being arranged at column lower end.
4. Novel tent braced structures according to claim 3, it is characterized in that, the two ends of described drag link have been threaded screw rod respectively, two horizontal joints of the first sleeve pipe and the horizontal joint of the second sleeve pipe are respectively arranged with the screwed hole coordinated with screw rod, the two ends of described drag link and screw rod are respectively arranged with location-plate.
5. Novel tent braced structures according to claim 3, it is characterized in that, the two ends of described drag link are respectively arranged with some spring card beads, described spring card bead is arranged along drag link circumference, two horizontal joints of the first sleeve pipe and the horizontal joint of the second sleeve pipe are respectively arranged with the hole clipping coordinated with spring card bead, and the two ends of described drag link are respectively arranged with location-plate.
6. Novel tent braced structures according to claim 3, it is characterized in that, the two ends of described drag link are respectively arranged with two card columns, two card columns are symmetrical arranged, two horizontal joints of the first sleeve pipe and the horizontal joint of the second sleeve pipe are respectively arranged with the L shape bayonet socket coordinated with card column, be respectively arranged with spring in two horizontal joints of the first sleeve pipe and the horizontal joint of the second sleeve pipe, the two ends of described drag link are respectively arranged with location-plate.
7. Novel tent braced structures according to claim 3, it is characterized in that, the two ends of described drag link are respectively arranged with two L shape bayonet sockets, two L shape bayonet sockets are symmetrical arranged, two horizontal joints of the first sleeve pipe and the horizontal joint of the second sleeve pipe are respectively arranged with the card column with L shape bayonet fittings, the inside, two ends of drag link is respectively arranged with spring, and two horizontal joints of the first sleeve pipe and the horizontal joint of the second sleeve pipe are respectively arranged with location-plate.
8. the Novel tent braced structures according to any one of claim 1-7, is characterized in that, described sleeve pipe, column and drag link all adopt metal material to make, and described Socket welding is connected on column.
9. the Novel tent braced structures according to any one of claim 1-7, is characterized in that, described column and drag link form by least two sections of pole being threaded connection.
10. the Novel tent braced structures according to any one of claim 1-7, is characterized in that, described column is expansion link, and described drag link is formed by least two sections of pole being threaded connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420732708.1U CN204238636U (en) | 2014-11-26 | 2014-11-26 | Novel tent braced structures |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420732708.1U CN204238636U (en) | 2014-11-26 | 2014-11-26 | Novel tent braced structures |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204238636U true CN204238636U (en) | 2015-04-01 |
Family
ID=52768149
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420732708.1U Expired - Fee Related CN204238636U (en) | 2014-11-26 | 2014-11-26 | Novel tent braced structures |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204238636U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105804488A (en) * | 2016-04-30 | 2016-07-27 | 浙江万来旅游工艺品有限公司 | Crank arm type awning |
CN106894675A (en) * | 2017-04-19 | 2017-06-27 | 浙江正特股份有限公司 | A kind of awning |
WO2021042727A1 (en) * | 2019-09-05 | 2021-03-11 | 浙江永强集团股份有限公司 | Multi-directional infinite extension spliced tent |
-
2014
- 2014-11-26 CN CN201420732708.1U patent/CN204238636U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105804488A (en) * | 2016-04-30 | 2016-07-27 | 浙江万来旅游工艺品有限公司 | Crank arm type awning |
CN105804488B (en) * | 2016-04-30 | 2024-02-09 | 浙江万来旅游工艺品有限公司 | Crank arm type awning |
CN106894675A (en) * | 2017-04-19 | 2017-06-27 | 浙江正特股份有限公司 | A kind of awning |
WO2021042727A1 (en) * | 2019-09-05 | 2021-03-11 | 浙江永强集团股份有限公司 | Multi-directional infinite extension spliced tent |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204238636U (en) | Novel tent braced structures | |
CN205370102U (en) | Tent support frame and have tent of this tent support frame | |
CN206667730U (en) | A kind of scalable suspension scaffold of socket joint type disk button | |
CN209196292U (en) | A kind of water pipeline support frame for hydraulic engineering | |
CN206573848U (en) | Projection screen component and the optical projection system with it | |
CN207714760U (en) | A kind of quick access frame that stability easy to disassemble is strong | |
CN203113651U (en) | Assembled type angle-adjusting guardrail | |
CN204590560U (en) | Scaffold supporting device for building | |
CN203232884U (en) | Position adjustable photovoltaic support | |
CN204001965U (en) | Hexagon simple portable tent | |
CN205531614U (en) | Support is corrected to pole | |
CN205488464U (en) | Antenna support | |
CN205245050U (en) | Take adjusting device's integrated solar street lamp | |
CN205158857U (en) | Movable flagpole base | |
CN210563755U (en) | Safety device is used in multi-use architecture construction | |
CN207999124U (en) | It is a kind of to facilitate Combined type power fence | |
CN207796281U (en) | Pipeline support device | |
CN211450200U (en) | Stable supporting device for data acquisition equipment | |
CN211475863U (en) | Support component and mounting bracket for street lamp | |
CN204759931U (en) | Outdoor display screen installation frame | |
CN205348950U (en) | Novel tent structure | |
CN203587942U (en) | Photography unipod | |
CN104100127A (en) | Vertical-rod type tent with cross rod | |
CN209876701U (en) | Novel garden street lamp device | |
CN216201154U (en) | Steady pipe mechanism of long distance pipeline construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150401 Termination date: 20151126 |