CN204238440U - Steel building brace summer - Google Patents

Steel building brace summer Download PDF

Info

Publication number
CN204238440U
CN204238440U CN201420588212.1U CN201420588212U CN204238440U CN 204238440 U CN204238440 U CN 204238440U CN 201420588212 U CN201420588212 U CN 201420588212U CN 204238440 U CN204238440 U CN 204238440U
Authority
CN
China
Prior art keywords
hole
plate body
plate
plate bodys
iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420588212.1U
Other languages
Chinese (zh)
Inventor
杨云泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gang Gou Co., Ltd is shared in Hainan
Original Assignee
杨云泉
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 杨云泉 filed Critical 杨云泉
Priority to CN201420588212.1U priority Critical patent/CN204238440U/en
Application granted granted Critical
Publication of CN204238440U publication Critical patent/CN204238440U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of steel building brace summer, it comprises an i iron and two channel-section steels, described i iron comprises two the first plate bodys paralleled and the second plate body be vertically connected between two the first plate bodys, described each channel-section steel includes the 3rd plate body and is vertically connected on two the 4th plate bodys at the 3rd plate body two ends respectively, the outside of belly of two the 3rd plate bodys is provided with the arc fin of the some articles of extensions of the length directions along the 3rd plate body, the position being positioned at the second plate body both sides of i iron forms a rectangular recess respectively, two channel-section steels are separately positioned in two rectangular recess, four the 4th plate bodys are respectively arranged with one first through hole, two the first plate bodys are provided with altogether the ladder hole that four difference, four the first through hole one_to_one corresponding are arranged.Higher and the i iron surfacing of the utility model intensity.

Description

Steel building brace summer
Technical field
The utility model relates to a kind of steel building brace summer.
Background technology
Steel building is promoted fast and rapidly with its easy construction, brace summer intensity used in steel building in prior art is lower, easy distortion, and current brace summer generally comprises an i iron and two channel-section steels, i iron and channel-section steel are fixed by bolt, bolt protrudes from i iron surface, makes i iron surface irregularity, thus affects the use of this brace summer.
Utility model content
Technical problem to be solved in the utility model is, provides intensity higher and the steel building brace summer of i iron surfacing.
For solving the problems of the technologies described above, the steel building brace summer that the utility model provides, it comprises an i iron and two channel-section steels, described i iron comprises two the first plate bodys paralleled and the second plate body be vertically connected between two the first plate bodys, described each channel-section steel includes the 3rd plate body and is vertically connected on two the 4th plate bodys at the 3rd plate body two ends respectively, the outside of belly of two the 3rd plate bodys is provided with the arc fin of the some articles of extensions of the length directions along the 3rd plate body, the position being positioned at the second plate body both sides of i iron forms a rectangular recess respectively, two channel-section steels are separately positioned in two rectangular recess, the back side of two the 3rd plate bodys fits with two surfaces of the second plate body respectively, the back side of four the 4th plate bodys fits with the inner surface of the first corresponding plate body respectively, four the 4th plate bodys are respectively arranged with one first through hole, two the first plate bodys are provided with altogether the ladder hole that four difference, four the first through hole one_to_one corresponding are arranged, each ladder hole includes and is connected and larger the second through hole of a diameter of coaxial line and the less third through-hole of a diameter, being connected of all equal with the first corresponding through-hole diameter and the coaxial line of third through-hole in each ladder hole.
As preferably, the external surface of two described the first plate bodys is provided with a zinc coat.
After adopting above structure, the utility model compared with prior art, has following advantage:
In the utility model, first plate body arranges ladder hole, when bolt is located in after in ladder hole and corresponding first through hole, the head of bolt is placed in the second through hole, so just makes the head of bolt concordant with the surface of the first plate body, makes i iron surfacing, and, 3rd plate body is provided with arc fin, and arc fin plays the effect of reinforcing rib, makes this brace summer intensity higher.
Accompanying drawing explanation
Fig. 1 is the cross sectional representation of the utility model steel building brace summer.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in more detail.
As shown in Figure 1, the utility model steel building brace summer comprises an i iron and two channel-section steels, described i iron comprises two the first plate bodys 1 paralleled and the second plate body 2 be vertically connected between two the first plate bodys 1, described each channel-section steel includes the 3rd plate body 3 and is vertically connected on two the 4th plate bodys 4 at the 3rd plate body 3 two ends respectively, the outside of belly of two the 3rd plate bodys 3 is provided with the arc fin 7 of the some articles of extensions of the length directions along the 3rd plate body 3, the position being positioned at the second plate body 2 both sides of i iron forms a rectangular recess 5 respectively, two channel-section steels are separately positioned in two rectangular recess 5, the back side of two the 3rd plate bodys 3 fits with two surfaces of the second plate body 2 respectively, the back side of four the 4th plate bodys 4 fits with the inner surface of the first corresponding plate body 1 respectively, four the 4th plate bodys 4 are respectively arranged with one first through hole 401, two the first plate bodys 1 are provided with altogether the ladder hole that four difference, four the first through hole 401 one_to_one corresponding are arranged, each ladder hole includes and is connected and larger the second through hole 601 of a diameter of coaxial line and the less third through-hole 602 of a diameter, third through-hole 602 in each ladder hole is all with the first corresponding through hole 401 equal diameters and being connected of coaxial line, in the present embodiment, first plate body 1 arranges ladder hole, when bolt is located in after in ladder hole and corresponding first through hole 401, the head of bolt is placed in the second through hole 601, so just make the head of bolt concordant with the surface of the first plate body 1, make i iron surfacing, and, 3rd plate body 3 is provided with arc fin 7, arc fin 7 plays the effect of reinforcing rib, make this brace summer intensity higher.
The external surface of two described the first plate bodys 1 is provided with a zinc coat, and zinc coat plays corrosion-resisting function, makes the utility model be not easy be corroded and damage, makes application life longer.
Below only apply preferably example with regard to the utility model and made explanation, but can not be interpreted as it is limitations on claims, structure of the present utility model can have other to change, and is not limited to said structure.In a word, all various changes done in the protection domain of independent claims of the present utility model are all in protection domain of the present utility model.

Claims (2)

1. a steel building brace summer, is characterized in that:
It comprises an i iron and two channel-section steels, described i iron comprises two the first plate bodys (1) paralleled and the second plate body (2) be vertically connected between two the first plate bodys (1), described each channel-section steel includes the 3rd plate body (3) and is vertically connected on two the 4th plate bodys (4) at the 3rd plate body (3) two ends respectively, the outside of belly of two the 3rd plate bodys (3) is provided with the arc fin (7) of the some articles of extensions of the length directions along the 3rd plate body (3), the position being positioned at the second plate body (2) both sides of i iron forms a rectangular recess (5) respectively, two channel-section steels are separately positioned in two rectangular recess (5), the back side of two the 3rd plate bodys (3) fits with two surfaces of the second plate body (2) respectively, the back side of four the 4th plate bodys (4) fits with the inner surface of corresponding the first plate body (1) respectively, four the 4th plate bodys (4) are respectively arranged with one first through hole (401), two the first plate bodys (1) are provided with altogether the ladder hole that four difference, four the first through hole (401) one_to_one corresponding are arranged, each ladder hole includes and is connected and larger the second through hole (601) of a diameter of coaxial line and the less third through-hole (602) of a diameter, third through-hole (602) in each ladder hole is all with corresponding the first through hole (401) equal diameters and being connected of coaxial line.
2. steel building brace summer according to claim 1, is characterized in that:
The external surface of two described the first plate bodys (1) is provided with a zinc coat.
CN201420588212.1U 2014-10-13 2014-10-13 Steel building brace summer Expired - Fee Related CN204238440U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420588212.1U CN204238440U (en) 2014-10-13 2014-10-13 Steel building brace summer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420588212.1U CN204238440U (en) 2014-10-13 2014-10-13 Steel building brace summer

Publications (1)

Publication Number Publication Date
CN204238440U true CN204238440U (en) 2015-04-01

Family

ID=52767953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420588212.1U Expired - Fee Related CN204238440U (en) 2014-10-13 2014-10-13 Steel building brace summer

Country Status (1)

Country Link
CN (1) CN204238440U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107338722A (en) * 2017-07-12 2017-11-10 中铁第四勘察设计院集团有限公司 The anti-fall girder construction of assembled, anti-fall girder apparatus and bridge
CN112713681A (en) * 2019-10-25 2021-04-27 中车株洲电力机车研究所有限公司 Motor rotor and built-in rotor permanent magnet motor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107338722A (en) * 2017-07-12 2017-11-10 中铁第四勘察设计院集团有限公司 The anti-fall girder construction of assembled, anti-fall girder apparatus and bridge
CN112713681A (en) * 2019-10-25 2021-04-27 中车株洲电力机车研究所有限公司 Motor rotor and built-in rotor permanent magnet motor

Similar Documents

Publication Publication Date Title
CN204238440U (en) Steel building brace summer
CN204225356U (en) A kind of brace summer for steel building
CN204225357U (en) A kind of steel building brace summer
CN204225355U (en) For the brace summer of steel building
CN204261738U (en) A kind of catalase hammer
CN204225361U (en) Steel structure column for building
CN204163386U (en) A kind of convenient disc type scaffold installed
CN203115158U (en) Direct-burial type double-spreading ball valve
CN203297241U (en) Corrosion-proof bolt
CN204225358U (en) For the crossbeam of steel building
CN204238444U (en) For the column of steel building
CN204458971U (en) A kind of automobile shock pad
CN204298266U (en) One is anticorrosion boils black steel fiber
CN204238445U (en) Steel building column
CN203532967U (en) Brake hose support
CN202944168U (en) Motor vehicle stabilizer bar lining structure
CN204584603U (en) Cluster engine fixture for welding muffler bracket
CN204571158U (en) A kind of inner corner trim external corner fixture
CN204694566U (en) A kind of power station top cover with pipeline water pressure testing hole
CN204226848U (en) Wire harness pipe clamp type buckle
CN204664231U (en) High strength steel backing
CN204538591U (en) A kind of trough type bridge frame
CN204316030U (en) The shutoff of cable testing bridge lateral wall
CN204358426U (en) Angle bar is reinforced in a kind of industry for multimedia equipment
CN204668856U (en) A kind of pellet type crane span structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HAINAN KOCEL STEEL CO., LTD.

Free format text: FORMER OWNER: YANG YUNQUAN

Effective date: 20150507

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Feng Eryun

Inventor after: Meng Xin

Inventor before: Yang Yunquan

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 311103 HANGZHOU, ZHEJIANG PROVINCE TO: 571199 HAIKOU, HAINAN PROVINCE

Free format text: CORRECT: INVENTOR; FROM: YANG YUNQUAN TO: FENG ERYUN MENG XIN

TR01 Transfer of patent right

Effective date of registration: 20150507

Address after: Qiongshan district town of Southeast Hainan province Haikou City Bridge Village 571199

Patentee after: Gang Gou Co., Ltd is shared in Hainan

Address before: 311103 Zhejiang City, Yuhang province canal town, Shuangqiao Village, the second group of 9 pairs of dam No. 125

Patentee before: Yang Yunquan

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150401

Termination date: 20161013