CN204237844U - One effectively utilizes the remaining temperature of steam to improve sintering mixing dosage hot water adding set - Google Patents

One effectively utilizes the remaining temperature of steam to improve sintering mixing dosage hot water adding set Download PDF

Info

Publication number
CN204237844U
CN204237844U CN201420684904.6U CN201420684904U CN204237844U CN 204237844 U CN204237844 U CN 204237844U CN 201420684904 U CN201420684904 U CN 201420684904U CN 204237844 U CN204237844 U CN 204237844U
Authority
CN
China
Prior art keywords
steam
hot water
water tank
adding set
effectively utilizes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420684904.6U
Other languages
Chinese (zh)
Inventor
陈胜涛
宋家兵
朱国华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Group Kunming Iron and Steel Co Ltd
Original Assignee
Wuhan Iron and Steel Group Kunming Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Group Kunming Iron and Steel Co Ltd filed Critical Wuhan Iron and Steel Group Kunming Iron and Steel Co Ltd
Priority to CN201420684904.6U priority Critical patent/CN204237844U/en
Application granted granted Critical
Publication of CN204237844U publication Critical patent/CN204237844U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Paper (AREA)

Abstract

The utility model discloses one effectively utilizes the remaining temperature of steam to improve sintering mixing dosage hot water adding set, comprise steam heat water tank, a mixer and burnt lime digester, a described mixer and the waterworks of burnt lime digester add steam heat water tank, the water-supply pipe water side of described steam heat water tank arranges strainer and force (forcing) pump, and the steam heating pipe of described steam heat water tank connects waste heat vapor collection pipe.The utility model is by utilizing afterheat steam to after steam heat heating water tanks, hot water is added to a mixer and burnt lime digester simultaneously, the effect of lime binding agent obtains and gives full play to, and one mixed in mineral aggregate owing to also with the addition of hot water, there is certain temperature, avoid and cause dry wet inequality because wetting ability differs greatly, enhance mixed effect, and due to the airborne dust effectively reduced in work that supplies water simultaneously.The utility model structure is simple, is easy to implement, save energy, reduces costs, improves economic benefit.

Description

One effectively utilizes the remaining temperature of steam to improve sintering mixing dosage hot water adding set
Technical field
The utility model belongs to metallurgy sintered equipment technical field, belongs to metallurgy sintered Compounders technical field further, is specifically related to a kind of structure simply, the hot water adding set being easy to implement, saving energy and reduce the cost.
Background technology
In prior art, unslaked lime, as the basic flux of sintering, plays considerable effect to balance sinter basicity in SINTERING PRODUCTION.The content of unslaked lime not only calcium is high, ingredient stability and also bounding force extremely strong, in sintered compound process, improve the balling ratio (balling ratio improves about 15%) of compound, thus improve the ventilation property in sintering process.In current Technology, the general cold water that uses directly adds, but can only play simple digestion, and digestion effect, about 40%, cannot meet the needs of production.And be also generally use cold water directly to add in mixing one, such meeting produces heat after expanding after there is unslaked lime chance water, to cause dry wet uneven because wetting ability differs greatly with normal temperature ore, can better be in conjunction with, have a strong impact on the quality of production of product.If increase separately boiler to be used for manufacture hot water's the adding water of and digestive organ mixed to simultaneously, cost increases.For this reason, develop a kind of structure simple, be easy to implement, save energy, what reduce costs effectively utilizes the remaining temperature of enterprises steam to improve sintering mixing dosage hot water adding set to be very important.
Utility model content
It is simple that the purpose of this utility model is to provide a kind of structure, and the remaining temperature of steam that effectively utilizes be easy to implement improves sintering mixing dosage hot water adding set.
The purpose of this utility model realizes like this, comprise steam heat water tank, a mixer and burnt lime digester, a described mixer and the waterworks of burnt lime digester add steam heat water tank, the water-supply pipe water side of described steam heat water tank arranges strainer and force (forcing) pump, and the steam heating pipe of described steam heat water tank connects waste heat vapor collection pipe.
The utility model is by utilizing afterheat steam to after steam heat heating water tanks, hot water is added to a mixer and burnt lime digester simultaneously, before entering one and be mixed, unslaked lime generates pasty state after adding water and stirring, fully carry out dissolving digestion, the effect of lime binding agent obtains and gives full play to, and one mixed in mineral aggregate owing to also with the addition of hot water, there is certain temperature, avoid and cause dry wet inequality because wetting ability differs greatly, enhance mixed effect, enhance pelletizing, having improved breathability of sinter bed, Sintering Yield improves, and due to the airborne dust effectively reduced in work that supplies water simultaneously, water-supply pipe increases strainer, prevent equipment in use from blocking, use heat-resisting force (forcing) pump, the then work-ing life of effective extension device, lagging material is installed, then effectively ensure that effective utilization of hot steam.The utility model structure is simple, is easy to implement, save energy, reduces costs, improves economic benefit.
Accompanying drawing explanation
Fig. 1 is the utility model one-piece construction schematic diagram;
In figure: 1-steam heat water tank, 2-mixer, 3-burnt lime digester, 4-steam heating pipe, 5-water inlet pipe, 6-blow-off pipe, 7-water-supply pipe, 8-force (forcing) pump, 9-strainer, 10-electromagnetic turnover liquidometer.
Embodiment
Be further described the utility model below in conjunction with accompanying drawing, but limited the utility model never in any form, any conversion done based on the utility model training centre or improvement, all fall into protection domain of the present utility model.
As shown in Figure 1, the utility model comprises steam heat water tank 1, mixer 2 and burnt lime digester 3, a described mixer 2 and the waterworks of burnt lime digester 3 add steam heat water tank 1, water-supply pipe 7 water side of described steam heat water tank 1 arranges strainer 9 and force (forcing) pump 8, the steam heating pipe 4 of described steam heat water tank 1 connects waste heat vapor collection pipe, water-supply pipe 7 arrange strainer 9 filtered water impurity, prevent from blocking, steam heating pipe 4 connects the recycling that afterheat steam collection tube can realize waste heat in production.
The water inlet pipe 5 of described steam heat water tank 1 arranges repid cut-off valve, and is electrically connected with the electromagnetic turnover liquidometer 10 that steam heat water tank 1 is arranged, and can realize the control to hotwell level.
The bottom of described steam heat water tank 1 is micro-to one end inclines, and lowest part arranges blow-off pipe 6, is convenient to realize blowdown.
The steam heating pipe 4 of described steam heat water tank 1, water-supply pipe 7 and steam heat water tank 1 tank wall all need to install lagging material.
Affixed steam jet bottom described steam heat water tank 1, reliably withstand voltage 1.3 ~ 1.8MPa, be preferably 1.6MPa.
Described force (forcing) pump 8 is heat-resisting force (forcing) pump, can work-ing life of effective extension device.
Described force (forcing) pump 8 is electrically connected PLC system and controls.The manual of force (forcing) pump and remote activation two kinds of control modes can be realized.
Described water-supply pipe 7, blow-off pipe 6 are provided with regulating and controlling valve and antiseptic wearable coat.
Described regulating and controlling valve is the one in pneumatic, hydraulic pressure or solenoid electric valve.
Described water-supply pipe 7 is high thermal conductivity structure, improves heat exchange efficiency.
Principle of work of the present utility model and working process:
The utility model, by being arranged on mixer and the synchronous interpolation adding steam heat water tank in burnt lime digester water-adding system and realize hot water in working process, enhancing mixed effect, enhances pelletizing, improve output and the quality of agglomerate.
During work, in former waterworks, add steam heat water tank, steam heating pipe connects afterheat steam collection tube and directly heats water, water-supply pipe arrange metre filter water impurity, prevent from blocking, steam heating pipe connect afterheat steam collection tube can realize producing in the recycling of waste heat.Water inlet pipe arranges repid cut-off valve, and be electrically connected with the electromagnetic turnover liquidometer that steam heat water tank is arranged, the control to hotwell level can be realized, steam heating pipe, water-supply pipe and steam heat water tank tank wall all need to install lagging material, prevent distributing of thermo-efficiency, force (forcing) pump is heat-resisting force (forcing) pump, can work-ing life of effective extension device, and force (forcing) pump electrical connection PLC system controls.The manual of force (forcing) pump and remote activation two kinds of control modes can be realized.By using, after burnt lime digester, mixing machine use hot water, compound material temperature improves, and the material temperature particularly going out mixing machine improves comparatively obvious.After using hot water, sintering machine distributing platform actual measurement compound material temperature mean value about 67 DEG C, a little more than dew-point temperature 65 DEG C, there is obvious promoter action to reducing over wet layer.Compound granularity aspect, be less than 3mm grade and obviously reduce, 3 ~ 5mm grade obviously increases, and the change of > 5mm grade is not obvious.Compound size composition improves, and size-grade distribution is more even, has active effect to improving bed permeability.Fuel ratio decreases 0.4% simultaneously; The steam resource that while output obtains certain lifting, inside is more than needed obtains effective utilization.

Claims (11)

1. one kind effectively utilizes the remaining temperature of steam to improve sintering mixing dosage hot water adding set, comprise steam heat water tank (1), a mixer (2) and burnt lime digester (3), it is characterized in that: a described mixer (2) and the waterworks of burnt lime digester (3) add steam heat water tank (1), water-supply pipe (7) water side of described steam heat water tank (1) arranges strainer (9) and force (forcing) pump (8), and the steam heating pipe (4) of described steam heat water tank (1) connects afterheat steam collection tube.
2. the remaining temperature of steam that effectively utilizes according to claim 1 improves sintering mixing dosage hot water adding set, it is characterized in that: the water inlet pipe (5) of described steam heat water tank (1) arranges repid cut-off valve, and be electrically connected with the upper electromagnetic turnover liquidometer (10) arranged of steam heat water tank (1).
3. the remaining temperature of steam that effectively utilizes according to claim 1 and 2 improves sintering mixing dosage hot water adding set, it is characterized in that: the bottom of described steam heat water tank (1) is micro-to one end inclines, and lowest part arranges blow-off pipe (6).
4. the remaining temperature of steam that effectively utilizes according to claim 1 and 2 improves sintering mixing dosage hot water adding set, it is characterized in that: the steam heating pipe (4) of described steam heat water tank (1), water-supply pipe (7) and steam heat water tank (1) tank wall all need to install lagging material.
5. the remaining temperature of steam that effectively utilizes according to claim 1 improves sintering mixing dosage hot water adding set, it is characterized in that: described steam heat water tank (1) bottom affixed steam jet, reliably withstand voltage 1.3 ~ 1.8MPa.
6. the remaining temperature of steam that effectively utilizes according to claim 1 improves sintering mixing dosage hot water adding set, it is characterized in that: described force (forcing) pump (8) is heat-resisting force (forcing) pump.
7. the temperature more than steam that effectively utilizes according to claim 1 or 6 improves sintering mixing dosage hot water adding set, it is characterized in that: described force (forcing) pump (8) electrical connection PLC system controls.
8. the remaining temperature of steam that effectively utilizes according to claim 1 improves sintering mixing dosage hot water adding set, it is characterized in that: described water-supply pipe (7) is provided with regulating and controlling valve and antiseptic wearable coat.
9. the remaining temperature of steam that effectively utilizes according to claim 3 improves sintering mixing dosage hot water adding set, it is characterized in that: described blow-off pipe (6) is provided with regulating and controlling valve and antiseptic wearable coat.
10. the remaining temperature of steam that effectively utilizes according to claim 8 improves sintering mixing dosage hot water adding set, it is characterized in that: described regulating and controlling valve is the one in pneumatic, hydraulic pressure or solenoid electric valve.
The 11. remaining temperature of steam that effectively utilize according to claim 1 improve sintering mixing dosage hot water adding set, it is characterized in that: described water-supply pipe (7) is high thermal conductivity structure.
CN201420684904.6U 2014-11-17 2014-11-17 One effectively utilizes the remaining temperature of steam to improve sintering mixing dosage hot water adding set Expired - Fee Related CN204237844U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420684904.6U CN204237844U (en) 2014-11-17 2014-11-17 One effectively utilizes the remaining temperature of steam to improve sintering mixing dosage hot water adding set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420684904.6U CN204237844U (en) 2014-11-17 2014-11-17 One effectively utilizes the remaining temperature of steam to improve sintering mixing dosage hot water adding set

Publications (1)

Publication Number Publication Date
CN204237844U true CN204237844U (en) 2015-04-01

Family

ID=52767360

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420684904.6U Expired - Fee Related CN204237844U (en) 2014-11-17 2014-11-17 One effectively utilizes the remaining temperature of steam to improve sintering mixing dosage hot water adding set

Country Status (1)

Country Link
CN (1) CN204237844U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104990419A (en) * 2015-06-17 2015-10-21 深圳市九峰新材料有限公司 Digestion system utilizing waste heat and temperature control method thereof
CN105233737A (en) * 2015-10-15 2016-01-13 湖州佳宁印刷有限公司 Printing ink mixing blender
CN110616314A (en) * 2019-10-15 2019-12-27 云南德胜钢铁有限公司 High-temperature sintering method for schreyerite mixture

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104990419A (en) * 2015-06-17 2015-10-21 深圳市九峰新材料有限公司 Digestion system utilizing waste heat and temperature control method thereof
CN105233737A (en) * 2015-10-15 2016-01-13 湖州佳宁印刷有限公司 Printing ink mixing blender
CN110616314A (en) * 2019-10-15 2019-12-27 云南德胜钢铁有限公司 High-temperature sintering method for schreyerite mixture

Similar Documents

Publication Publication Date Title
CN204237844U (en) One effectively utilizes the remaining temperature of steam to improve sintering mixing dosage hot water adding set
CN102924003B (en) Fine grain tailing low-cost solidification disposal method
CN103265189B (en) Method for improving stability of steel slag and maintaining high gelation activity
CN204369837U (en) Waste lubricating oil distillation and clay-filtered merging device
CN101818086A (en) Production process and production equipment of sludge and garbage carbonized slurry fuel
CN105693156A (en) Innovative preparation method of heat-resistant baking-free brick
CN105712640B (en) A kind of sintering burnt lime slaking device and method
CN101724746A (en) Internal-combustion ferro-coke pellets/lump ores and method for manufacturing same
CN103993109A (en) Blast furnace slag waste heat recovery system and recovering control method for blast furnace slag waste heat recovery system
CN101392178A (en) Method for preparing and conveying coal slurry
CN103910609B (en) A kind of synthetic method of cresols
CN103055691A (en) Method and device for continuously preparing desulfurizer by self-heating hydration of magnesium slag and fly ash
CN205287693U (en) Pearl liquid draw pot
CN204214136U (en) Heat conducting oil boiler waste heat recovery device
CN206572800U (en) A kind of coal gasification CO2 carrier gas energy conserving systems
CN203960236U (en) Blast furnace slag residual neat recovering system
CN207632857U (en) A kind of device for promoting sinter mixture temperature
CN203478402U (en) Direct-connection water-mixing heat supply system for high-rise and low-rise buildings
CN203957122U (en) The confession water injection system of ceramics by dry powder process
CN207415614U (en) A kind of construction material manufacture device based on flyash
CN205603462U (en) Feedwater mud and sewage sludge haydite preparation system
CN104843716A (en) Method for preparing white carbon black with polyaluminum ferric sulfate as byproduct from fly ash
CN204509205U (en) A kind of emulsified bitumen soap lye system
CN203478925U (en) Drying bed and evaporated cooling system for water beams of shaft furnace wind-guiding wall
CN202951441U (en) Device for adding hot water to mixing machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150401

Termination date: 20191117

CF01 Termination of patent right due to non-payment of annual fee