CN204234956U - The welding conduction device of steel construction dock welding - Google Patents

The welding conduction device of steel construction dock welding Download PDF

Info

Publication number
CN204234956U
CN204234956U CN201420506782.1U CN201420506782U CN204234956U CN 204234956 U CN204234956 U CN 204234956U CN 201420506782 U CN201420506782 U CN 201420506782U CN 204234956 U CN204234956 U CN 204234956U
Authority
CN
China
Prior art keywords
welding
groove
conduction device
steel construction
curved surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420506782.1U
Other languages
Chinese (zh)
Inventor
雒正良
李小强
童永刚
胡杰超
湛宣科
朱绒利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Wind Power Co Ltd Of China Water Investment Group
Original Assignee
Xi'an Wind Power Co Ltd Of China Water Investment Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Wind Power Co Ltd Of China Water Investment Group filed Critical Xi'an Wind Power Co Ltd Of China Water Investment Group
Priority to CN201420506782.1U priority Critical patent/CN204234956U/en
Application granted granted Critical
Publication of CN204234956U publication Critical patent/CN204234956U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The utility model discloses the welding conduction device of a kind of steel construction dock welding, it is for the groove end of welded two welded parts of dock that are arranged on steel skeleton structure body, weld at groove in order to guide, the welding conduction device of described steel construction dock welding comprises: one leads welding block and is arranged on and leads welding block one end for being arranged on a fixed part of welded part or a backer board, leading welding block has for the abutment face of closing at two welded parts, be arranged on the first concave arc curved surface that abutment face also corresponds to groove end, the area of the first concave arc curved surface is greater than the area of groove end.So can set out optimal electric current, voltage and weldering speed, and preferably wlding surface can be obtained, and do not need to carry out again to cut, grinding etc. repairs processing, reach and promote welding quality and simplify the benefits such as welding sequence.

Description

The welding conduction device of steel construction dock welding
Technical field
The utility model relates to the welding conduction device of a kind of steel construction dock welding, is espespecially applied in the groove two ends of two welded parts of dock welding in steel skeleton structure, can form preferably wlding surface, and guarantee the welding conduction device of welding quality after making welding.
Background technology
General steel skeleton structure body often implements Welding Structure, and existing beam all can use docking (Butt joint) formula welding structure to beam or plate to the welding pattern of plate, in order to ensure its welding degree and welding quality, inclined plane shape or curved groove (Groove face) and root face (Root face) to be processed, to form the groove of trapezoidal, V-arrangement (equilateral triangle or right angled triangle), U-shaped together, K shape or other geometries in the plate face of welded part.Then, before welding, can arrange the backer board that a slice width exceedes at the back side of two welded part grooves, and arrange a leader block respectively at the groove two ends of welded part, by the gap closing of backer board by root face, and leader block is by groove closed at both ends.Then, use the gradation of electric weld handle solder to insert to form most welding beads in groove, and then two welded parts are welded together, thereafter, complete welding and remove leader block again, and cut away unnecessary backer board.
But, the electric welding field of general steel skeleton structure body, carried out as mode with hand by welder, therefore electric current when it plays weldering, voltage and weldering speed are often not easy to control to arrive stable, the relative welding quality having influence on welding area, thus there is the not good and stress in welding bead surface and the problem such as to concentrate, and also must use the repairing method processing welding bead surfaces such as cutting, grinding after being welded, the situation such as therefore cause welding sequence complexity and quality is bad.In addition, use leader block to carry out leading the technology of weldering although have, the welding bead that leader block institute moulds out, still can form the concentrated situation of stress at corner, rock once earthquake and split from the corner of welding bead.In addition, existing welding with leader block adopt ceramic material to form, can not reuse, therefore use once and later just to go out of use, cause welding cost not reduce, and the problem such as the wasting of resources and inadequate environmental protection.
Utility model content
Technical problem to be solved in the utility model is: provide the welding conduction device that a kind of steel construction dock is welded, it is by leading welding block structural design for what be arranged on two dock welded part groove ends, enable to lead welding block is arranged on two welded parts groove end when welding, weld job is easily carried out, and the quality of welding bead can be promoted.
For solving the problems of the technologies described above, the technical solution of the utility model is:
A kind of welding conduction device of steel construction dock welding, it is for the groove end of welded two welded parts of dock that are arranged on steel skeleton structure body, weld at groove in order to guide, the welding conduction device of wherein said steel construction dock welding comprises: one leads welding block and is arranged on and leads welding block one end for being arranged on a fixed part of welded part or a backer board, leading welding block has for the abutment face of closing at two welded parts, be arranged on the first concave arc curved surface that abutment face also corresponds to groove end, the area of the first concave arc curved surface is greater than the area of groove end.
Compared with prior art, the utility model beneficial effect is as follows: the welding conduction device design of steel construction dock welding of the present utility model, welding block can will be led and be arranged on a backer board at the welded part back side by fixed part, the first concave arc curved surface correspondence is made to be covered in the end of groove, the closed at both ends of groove is formed a spatial accommodation, from leading weldering welding block when providing welding, so can set out optimal electric current, voltage and weldering speed, and preferably wlding surface can be obtained, and do not need to cut again, processing is repaired in grindings etc., reach and promote welding quality and simplify the benefits such as welding sequence.
The utility model further improves as follows:
Further, described in lead welding block relative two sides be respectively equipped with abutment face, each abutment face is provided with the first concave arc curved surface; The two ends of leading welding block are respectively equipped with the fixed part for being arranged on welded part or backer board.
Further, described first concave arc curved surface is connected to the formation one second concave arc curved surface of abutment face; The contrary another side that first concave arc curved surface is connected to abutment face forms one the 3rd concave arc curved surface.
Further, the edge of described first concave arc curved surface is correspond to groove trapezoidal.
Further, the edge of described first concave arc curved surface is the triangle corresponding to groove.
Further, the edge of described first concave arc curved surface is the U-shaped corresponding to groove.
Further, the acid bronze alloy block that welding block is rectangle is led described in.
Further, described fixed part is the groove for being set in a backer board.
Further, described fixed part comprises the screw that is communicated to groove, and one is locked together in fixation kit in screw.
Accompanying drawing explanation
Fig. 1 is the stereogram of the utility model welding conduction device first embodiment.
Fig. 2 is the front view of the utility model welding conduction device first embodiment.
Fig. 3 is the stereogram of the utility model welding conduction device second embodiment.
Fig. 4 is the front view of the utility model welding conduction device second embodiment.
Fig. 5 is the using state stereogram of the utility model welding conduction device embodiment.
Fig. 6 is the using state profile of the utility model welding conduction device embodiment.
Fig. 7 is the welded condition stereogram of the utility model welding conduction device embodiment.
Fig. 8 is the welded condition profile of the utility model welding conduction device embodiment.
Wherein: 1. lead welding block, 12. first concave arc curved surfaces, 13. fixed parts, 131. grooves, 132. screws, 133. fixation kits, 10. welded part, 101. grooves, 20. backer boards, 30. wldings.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated.
As shown in Figure 5, the welding conduction device of the utility model steel construction dock welding, for groove 101 end of welded two welded parts 10 of a kind of dock for being arranged on building or Inaedificatio steel skeleton structure body, carry out weld job in order to guide at groove 101.
As shown in Figures 1 and 2, the utility model welding conduction device preferred embodiment, it comprises: one leads welding block 1, lead rectangular blocks or other shapes that welding block 1 forms for acid bronze alloy, have for the abutment face 11 of closing at two welded parts 10 in the one side leading welding block 1, and be arranged at the one first concave arc curved surface 12 that abutment face 11 also corresponds to groove 101 end shape.Abutment face 11 is plane, make abutment face 11 can closely closing on two welded parts 10; And the area of the first concave arc curved surface 12 is greater than the area of groove 101 end, the curvature of its curved surface can change according to actual demand, and first the edge shape of concave arc curved surface 12 can be formed as corresponding to trapezoidal, triangle, U-shaped or other geometries of groove 101, depending on the shape of groove 101, therefore make the first concave arc curved surface 12 can cover the end of groove 101 completely, and then formation one weld space for having implemented leading of weldering.In addition, one end that the utility model leads welding block 1 can be provided with the fixed part 13 for being arranged on welded part 10 or backer board 20 (as shown in Figure 5), fixed part 13 specific embodiment is the groove 131 for being set on backer board 20, fixed part 13 can also be provided with the screw 132 that is communicated to groove 131, and one is locked together in fixation kit 133 in screw 132, fixation kit 133 preferred embodiment is general bolt or turns bolt soon, by forming the welding conduction device of the utility model steel construction dock welding like this.
Again as shown in Figures 3 and 4, in order to reach the object that recycling is led welding block 1 or is suitable for different groove 101 shape, the utility model is led the relative two sides of welding block 1 and is formed with an abutment face 11 respectively, and the first concave arc curved surface 12 that each abutment face 11 is provided with on above-mentioned the first concave arc curved surface 12, two abutment faces 11 can be identical shape or difformity.And the two ends of leading welding block 1 are respectively equipped with the fixed part 13 for being arranged on welded part 10 or backer board 20, the structure of fixed part 13 is same as described above.
As shown in Figures 5 and 6, when the utility model is used in the dock Welding Structure of steel skeleton structure body, can be set on a backer board 20 by the groove 131 of the fixed part 13 of leading welding block 1, the plate that root face is closed by groove 101 back side that backer board 20 is arranged on two welded parts 10, therefore make to lead groove 101 two ends that welding block 1 is arranged on welded part 10, make the first concave arc curved surface 12 of leading welding block 1 be covered in groove 101 end, by the closed at both ends of groove 101 and formed one lead weldering space.Meanwhile, the utility model can utilize the mode of the assembly 133 of being locked (general bolt or turn bolt soon), makes fixation kit 133 end be resisted against backer board 20, loosens depart to prevent from leading welding block 1 in weld job.
By like this, as shown in Figures 7 and 8, when carrying out weld job, opened by the first concave arc curved surface 12 of leading welding block 1 and made weldering, set out optimal electric current, voltage and weldering speed in this adjustment, then successively weld at groove 101, so can obtain preferably wlding 30 surface at groove 101 two ends, and do not need to carry out again to cut, grinding etc. repairs processing, reach and promote welding quality and simplify the effects such as welding sequence.In addition, the utility model is led welding block 1 and is adopted acid bronze alloy material to form, copper and steel can not weld together substantially, and the heat resistance of acid bronze alloy material is higher than steel, as long as after therefore completing welding, just can unclamp fixation kit 133 (general bolt or turn bolt soon) and welding block 1 will be led pull down, leave the structure of wlding 30 excellent surface quality, and can reuse pulled down lead welding block 1, reach and economize on resources and the benefit of environmental protection.
In addition, owing to being finally formed in wlding 30 surface contiguous at groove 101 two ends in the position of welded part 10, the angle that stress is concentrated may be there is, split from angle when earthquake may be caused to occur, for this reason, the utility model more can the first concave arc curved surface 12 be connected to abutment face 11 while formed one second concave arc curved surface, and the contrary another side that the first concave arc curved surface 12 is connected to abutment face 11 forms one the 3rd concave arc curved surface, by such structural design, make first, the section of second and third concave arc curved surface forms similar W character form structure, therefore when be used for leading be soldered into time, the structure of second and third concave arc curved surface can be utilized, the both sides of wlding 30 corner is originally caused to be formed with filling part respectively, stress in order to eliminate corner concentrates existing picture, the situations such as prevention wlding 30 splits, and welded firm effect can be promoted.
The utility model is not limited to above-mentioned concrete embodiment, and those of ordinary skill in the art is from above-mentioned design, and without performing creative labour, done all conversion, all drop within protection domain of the present utility model.

Claims (8)

1. the welding conduction device of a steel construction dock welding, it is for the groove end of welded two welded parts of dock that are arranged on steel skeleton structure body, weld at groove in order to guide, it is characterized in that, the welding conduction device of described steel construction dock welding comprises: one leads welding block and is arranged on and leads welding block one end for being arranged on a fixed part of welded part or a backer board, leading welding block has for the abutment face of closing at two welded parts, be arranged on the first concave arc curved surface that abutment face also corresponds to groove end, the area of the first concave arc curved surface is greater than the area of groove end.
2. the welding conduction device of steel construction dock welding as claimed in claim 1, is characterized in that: described in lead welding block relative two sides be respectively equipped with abutment face, each abutment face is provided with the first concave arc curved surface; The two ends of leading welding block are respectively equipped with the fixed part for being arranged on welded part or backer board.
3. the welding conduction device of steel construction dock welding as claimed in claim 1, is characterized in that: the edge of described first concave arc curved surface is correspond to groove trapezoidal.
4. the welding conduction device of steel construction dock welding as claimed in claim 1, is characterized in that: the edge of described first concave arc curved surface is the triangle corresponding to groove.
5. the welding conduction device of steel construction dock welding as claimed in claim 1, is characterized in that: the edge of described first concave arc curved surface is the U-shaped corresponding to groove.
6. the welding conduction device of steel construction dock welding as claimed in claim 1, is characterized in that: described in lead the acid bronze alloy block that welding block is rectangle.
7. the welding conduction device of steel construction dock welding as claimed in claim 1, is characterized in that: described fixed part is the groove for being set in a backer board.
8. the welding conduction device of steel construction dock welding as claimed in claim 7, is characterized in that: described fixed part comprises the screw that is communicated to groove, and one is locked together in fixation kit in screw.
CN201420506782.1U 2014-09-03 2014-09-03 The welding conduction device of steel construction dock welding Expired - Fee Related CN204234956U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420506782.1U CN204234956U (en) 2014-09-03 2014-09-03 The welding conduction device of steel construction dock welding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420506782.1U CN204234956U (en) 2014-09-03 2014-09-03 The welding conduction device of steel construction dock welding

Publications (1)

Publication Number Publication Date
CN204234956U true CN204234956U (en) 2015-04-01

Family

ID=52764508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420506782.1U Expired - Fee Related CN204234956U (en) 2014-09-03 2014-09-03 The welding conduction device of steel construction dock welding

Country Status (1)

Country Link
CN (1) CN204234956U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049303A (en) * 2020-08-26 2020-12-08 中国核电工程有限公司 Steel plate assembly at bottom of floor slab, construction method of steel plate assembly, floor slab and construction method of floor slab

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049303A (en) * 2020-08-26 2020-12-08 中国核电工程有限公司 Steel plate assembly at bottom of floor slab, construction method of steel plate assembly, floor slab and construction method of floor slab

Similar Documents

Publication Publication Date Title
CN102009255B (en) Downward and butt welding process for high strength steel for ship structure
CN103949769A (en) Stirring head for friction stir welding used for welding parts with different thicknesses and welding method
CN102029457B (en) Vertical butt welding process of high-strength steel for ship structures
CN111545871B (en) Sheet segmented large group seam welding process
CN104690402B (en) A kind of buttcover plate submerged-arc welding method exempting from back chipping
CN104646803B (en) Low alloy steel plate and the welding method of ship plate
CN104339066B (en) Cut deal butt seam welding connected components and welding method based on ceramic striking liner
CN101767245A (en) Horizontal position welding method
CN104985285B (en) It is a kind of to cross corner cut penetration welding method
CN101817113A (en) Suspended welding process of thick plate
CN104625391A (en) Method for repairing defect on surface of workpiece
MX2019005863A (en) Gouging-less complete penetration welding method, and welded joint.
JP2014155963A5 (en)
CN105689886A (en) Lateral extrusion tool used for stirring friction butt welding of plate
CN204234956U (en) The welding conduction device of steel construction dock welding
CN103080384A (en) Electrochemical anodes having friction stir welded joints and methods of manufacturing such anodes
CN204234946U (en) Based on the cut deal butt seam welding connected components of ceramic striking liner
CN107876941B (en) Submerged arc welding method for steel plate
CN104511682A (en) Method of single-gun single-wire vertical electrogas welding
JP2016007620A (en) Welding method and welding structure
CN109822251A (en) A kind of skeleton welding procedure of built-in subway passenger door
CN106826087B (en) A kind of Large Container Ship crack arrest steel construction method
CN207672801U (en) A kind of splicing construction of steel plate shear force wall
CN104439737A (en) U rib plate unit welding method
CN108326481A (en) A kind of automatic welding track support device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150401

Termination date: 20150903

EXPY Termination of patent right or utility model