CN204225488U - Massif formwork erection servicing unit - Google Patents

Massif formwork erection servicing unit Download PDF

Info

Publication number
CN204225488U
CN204225488U CN201420671296.5U CN201420671296U CN204225488U CN 204225488 U CN204225488 U CN 204225488U CN 201420671296 U CN201420671296 U CN 201420671296U CN 204225488 U CN204225488 U CN 204225488U
Authority
CN
China
Prior art keywords
swaging clamp
massif
casing
detector bar
servicing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420671296.5U
Other languages
Chinese (zh)
Inventor
郝光前
姜相洪
窦炳臣
孙娟
张荣敏
宋印胜
程龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Institute of Geophysical and Geochemical Exploration
Original Assignee
Shandong Institute of Geophysical and Geochemical Exploration
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Institute of Geophysical and Geochemical Exploration filed Critical Shandong Institute of Geophysical and Geochemical Exploration
Priority to CN201420671296.5U priority Critical patent/CN204225488U/en
Application granted granted Critical
Publication of CN204225488U publication Critical patent/CN204225488U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • A Measuring Device Byusing Mechanical Method (AREA)

Abstract

The utility model relates to a kind of massif formwork erection servicing unit, comprising: casing, and casing upper surface and soffit are respectively arranged with row of horizontal top box hole arranged in a straight line and nowel hole; Top box hole and nowel hole correspondence are arranged; Exploring block, comprises detector bar and elastic joint part; Two panels swaging clamp, swaging clamp is a laminated structure, two panels swaging clamp to be in same plane and to be arranged in casing, swaging clamp slides along swaging clamp movement slots, the adjacent dual-side of two panels swaging clamp be arranged in parallel, detector bar, through the gap the adjacent dual-side of swaging clamp, realizes the fastening or lax of detector bar by regulating the size in gap; Swaging clamp fastening devices, realizes the fixing of two panels swaging clamp relative position.The utility model can provide reference for preparing massif template, thus prepares the template meeting massif proterties, so that the carrying out smoothly of concreting step.

Description

Massif formwork erection servicing unit
Technical field
The utility model relates to a kind of massif formwork erection servicing unit, belongs to building implements technical field.
Background technology
When construction work adopts concreting post, beam, wall, floor, be use building formwork for placing to piece together to build mould, by filling concrete build in mould shaping.Therefore, build mould and require higher to sealing performance, thus can prevent concrete mortar from flowing out.
As Chinese patent literature CN202000664U (application number CN201120103924.6) discloses a kind of fastening devices of building formwork for placing split and connecting, comprise support, movable handle, what make of spring steel has a left side, the elastic clip of right clamping part, support has hook portion and is provided with the horizontal extension of the slot for retraining elastic clip, the end of movable handle one end is that fulcrum and support are hinged, the other end is force, emphasis and elastic clip upper end thereof is established between fulcrum and force, elastic clip passes from the slot support, slot longitudinally leaves the degree of freedom of elastic clip displacement, a left side for described elastic clip, right clamping part bottom is interior curved in opposite directions bending, left during free state, right clamping part bottom is opened, its distance of opening is greater than the width of the slot on support, left, right clamping part top contacts with the long limit of slot.
But at present involved building under mould is only limitted to normal operating conditions uses, and for the massif of surface irregularity, above-mentioned casting moulds cannot be suitable for.This is mainly due to massif air spots, and cast template base and massif surface cannot fit tightly, and when causing fluid concrete, mortar flows out from gap, thus greatly adds the difficulty of cast grouting works.
Summary of the invention
The utility model, for the deficiencies in the prior art, provides a kind of massif formwork erection servicing unit.
The technical solution of the utility model is as follows:
A kind of massif formwork erection servicing unit, comprising:
Casing, casing is the through hollow tubular structures in both sides; Casing upper surface and soffit are respectively arranged with row of horizontal top box hole arranged in a straight line and nowel hole; Top box hole and nowel hole correspondence are arranged;
Exploring block, comprises detector bar and elastic joint part, and detector bar runs through casing through the top box hole of casing and nowel hole, and two adjacent detector bars are flexible coupling by elastic joint part, linearly arrange between detector bar;
Two panels swaging clamp, swaging clamp is a laminated structure, two panels swaging clamp to be in same plane and to be arranged in casing, swaging clamp slides along swaging clamp movement slots, the adjacent dual-side of two panels swaging clamp be arranged in parallel, detector bar, through the gap the adjacent dual-side of swaging clamp, realizes the fastening or lax of detector bar by regulating the size in gap;
Swaging clamp fastening devices, is positioned at casing both sides, realizes the fixing of two panels swaging clamp relative position.
Preferred according to the utility model, described casing is a cuboid tubular structure.
Preferred according to the utility model, the spacing between described two adjacent top box holes or two adjacent nowel holes is 43 ~ 48mm, and aperture is 8 ~ 12mm.
Preferred according to the utility model, described elastic joint part is elastic caoutchouc.
Preferred according to the utility model, described detector bar top is provided with anti-skidding flake, and detector bar is 18 ~ 30, and the distance between adjacent detector rod is 45 ~ 50mm.
Preferred according to the utility model, described elastic joint part is positioned at the bottom of detector bar.
Preferred according to the utility model, the barred body of described detector bar is provided with swaging clamp draw-in groove, the spacing 1 ~ 2mm of adjacent swaging clamp draw-in groove; Detector bar is the iron staff of diameter 6 ~ 10mm, long 0.8 ~ 1.2m.
Preferred according to the utility model, described swaging clamp fastening devices comprises four back-moving springs, four swaging clamp handles and two swaging clamp stationary magazine creels, swaging clamp handle one end is fixedly connected with swaging clamp, described swaging clamp stationary magazine creel is a hollow cylindrical structure, the side that swaging clamp stationary magazine creel is positioned at casing is provided with two swaging clamp movement slots, swaging clamp reciprocatingly slides in swaging clamp movement slots, two back-moving springs are set in swaging clamp stationary magazine creel, on the front side wall that casing is fixed in one end of back-moving spring or rear wall, the other end is fixedly connected with swaging clamp handle one end or swaging clamp, the swaging clamp handle other end is arranged at outside swaging clamp stationary magazine creel through swaging clamp stationary magazine creel.This structure is pulled by swaging clamp handle, thus back-moving spring is shortened, and swaging clamp handle pressing two panels swaging clamp moves round about, thus reaches the object regulating gap width between swaging clamp.
Preferred according to the utility model, described swaging clamp fastening devices comprises adjusting knob, adjusting gear and adjusting gear rack, described adjusting gear rack is fixed on swaging clamp perpendicular on the side in gap, and adjusting gear and adjusting gear rack are connected with a joggle, and adjusting knob is fixedly connected with adjusting gear.This structure by rotation of adjustment knob, thus makes adjusting gear rotate, and then the motion of promotion adjusting gear rack reaches the object driving swaging clamp motion, regulate gap size between two panels swaging clamp.
Beneficial effect
1, the utility model can provide reference for preparing massif template, thus prepares the template meeting massif shape, so that the carrying out smoothly of concreting step;
2, apparatus design described in the utility model is reasonable, and structure is simple, easily carries, and easy to use.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment 1 massif formwork erection servicing unit;
Fig. 2 is the swaging clamp fixture structure schematic diagram of the utility model embodiment 1 massif formwork erection servicing unit;
Fig. 3 is the structural representation of the utility model embodiment 1 when using;
Fig. 4 is the swaging clamp fixture structure schematic diagram of the utility model embodiment 2 massif formwork erection servicing unit;
In figure: 1, casing, 2, top box hole, 3, nowel hole, 4, swaging clamp movement slots, 5, exploring block, 6, detector bar, 7, elastic joint part, 8, swaging clamp, 9, gap, 10, swaging clamp fastening devices, 11, back-moving spring, 12, swaging clamp handle, 13, anti-skidding flake, 14, swaging clamp draw-in groove, 15, massif, 16, adjusting knob, 17, adjusting gear, 18, adjusting gear rack, 19, swaging clamp stationary magazine creel.
Detailed description of the invention
Below in conjunction with Figure of description and embodiment, the technical solution of the utility model is described further, but the utility model institute protection domain is not limited thereto.
Embodiment 1
A massif formwork erection servicing unit as shown in Figure 1-2, comprising:
Casing 1, casing 1 is the through hollow tubular structures in both sides; Casing 1 upper surface and soffit are respectively arranged with row of horizontal top box hole 2 arranged in a straight line and nowel hole 3; Top box hole 2 and nowel hole 3 correspondence are arranged, and the spacing between adjacent two top box holes 2 or adjacent two nowel holes 3 is 43mm, and aperture is 10mm;
Exploring block 5, comprises detector bar 6 and elastic joint part 7, and detector bar 6 runs through casing 1 through the top box hole 2 of casing 1 and nowel hole 3, and two adjacent detector bars 6 are flexible coupling by elastic joint part 7, linearly arrange between detector bar 6; Described elastic joint part 7 is elastic caoutchouc, and elastic joint part 7 is positioned at the bottom of detector bar 6; Described detector bar 6 top is provided with anti-skidding flake 13, and detector bar is 20, and the distance between adjacent detector rod is 45mm; The barred body of described detector bar 6 is provided with swaging clamp draw-in groove 14, the spacing 1mm of adjacent swaging clamp draw-in groove; Detector bar 6 is the iron staff of diameter 8mm, long 1m, swaging clamp draw-in groove spacing 2mm;
Two panels swaging clamp 8, swaging clamp 8 is a laminated structure, two panels swaging clamp 8 to be in same plane and to be arranged in casing 1, swaging clamp 8 slides along swaging clamp movement slots 4, the adjacent dual-side of two panels swaging clamp 8 be arranged in parallel, detector bar 6, through the gap 9 the adjacent dual-side of swaging clamp 8, realizes the fastening or lax of detector bar 6 by regulating the size in gap 9;
Described swaging clamp fastening devices 10 comprises four back-moving springs 11, four swaging clamp handles 12 and two swaging clamp stationary magazine creels 19, swaging clamp handle 12 one end is fixedly connected with swaging clamp 8, described swaging clamp stationary magazine creel 19 is a hollow cylindrical structure, the side that swaging clamp stationary magazine creel 19 is positioned at casing is provided with two swaging clamp movement slots 4, swaging clamp 8 reciprocatingly slides in swaging clamp movement slots 4, two back-moving springs 11 are set in swaging clamp stationary magazine creel 19, on the front side wall that casing 1 is fixed in one end of back-moving spring 11 or rear wall, the other end is fixedly connected with swaging clamp handle 12 one end or swaging clamp 8, swaging clamp handle 12 other end is arranged at swaging clamp stationary magazine creel 19 away from outside casing side through swaging clamp stationary magazine creel 19.
The using method of above-mentioned massif formwork erection servicing unit, as shown in Figure 3:
Detector bar 6 bottom of massif formwork erection servicing unit is placed in massif 15 place needing to place template, pressing swaging clamp handle 12, depress pressing of swaging clamp handle 12, back-moving spring 11 is compressed, two panels swaging clamp 8 slides round about, thus gap 9 width between swaging clamp 8 is increased, massif surface is withstood in detector bar 6 bottom under the effect of self gravitation, make the bottom height of the detector bar 6 of diverse location different, unclamp swaging clamp handle 12, back-moving spring 11 resets, swaging clamp 8 resets and sticks into the swaging clamp draw-in groove 14 on the barred body of detector bar 6, template is made according to the position relationship between detector bar 6.
Embodiment 2
A massif formwork erection servicing unit as shown in Figure 4, comprising:
Casing 1, casing 1 is the through hollow cuboid tubular structures in both sides; Casing 1 upper surface and soffit are respectively arranged with row of horizontal top box hole 2 arranged in a straight line and nowel hole 3; Top box hole 2 and nowel hole 3 correspondence are arranged, and the spacing between adjacent two top box holes 2 or adjacent two nowel holes 3 is 43mm, and aperture is 10mm; Casing 1 internal fixtion has swaging clamp movement slots 4;
Exploring block 5, comprises detector bar 6 and elastic joint part 7, and detector bar 6 runs through casing 1 through the top box hole 2 of casing 1 and nowel hole 3, and two adjacent detector bars 6 are flexible coupling by elastic joint part 7, linearly arrange between detector bar 6; Described elastic joint part 7 is elastic caoutchouc, and elastic joint part 7 is positioned at the bottom of detector bar 6; Described detector bar 6 top is provided with anti-skidding flake 13, and detector bar is 22, and the distance between adjacent detector rod is 45mm; The barred body of described detector bar 6 is provided with swaging clamp draw-in groove 14, the spacing 2mm of adjacent swaging clamp draw-in groove 14; Detector bar 6 is diameter 8mm, the iron staff of long 1m, swaging clamp draw-in groove spacing 2mm;
Two panels swaging clamp 8, swaging clamp 8 is a laminated structure, two panels swaging clamp 8 to be in same plane and to be arranged in casing 1, swaging clamp 8 slides along swaging clamp movement slots 4, the adjacent dual-side of two panels swaging clamp 8 be arranged in parallel, detector bar 6, through the gap 9 the adjacent dual-side of swaging clamp 8, realizes the fastening or lax of detector bar 6 by regulating the size in gap 9;
Swaging clamp fastening devices 10, described swaging clamp fastening devices 10 comprises adjusting knob 16, adjusting gear 17 and adjusting gear rack 18, described adjusting gear rack 18 is fixed on the side of swaging clamp 8 perpendicular to gap 9, adjusting gear 17 and adjusting gear rack 18 are connected with a joggle, and adjusting knob 16 is fixedly connected with adjusting gear 17.
The using method of above-mentioned massif formwork erection servicing unit is as follows:
Detector bar 6 bottom of massif formwork erection servicing unit is placed in massif 15 place needing to place template, rotation of adjustment knob 16, adjusting knob 16 drives adjusting gear 17 to rotate, adjusting gear 17 drive adjusting gear rack 17 and the swaging clamp 8 that is fixedly connected with adjusting gear rack 17 along the counter motion of swaging clamp 8 movement slots, thus gap 9 width between swaging clamp 8 is increased, massif surface is withstood in detector bar 6 bottom under the effect of self gravitation, make the bottom height of the detector bar 6 of diverse location different, reversely rotate adjusting knob 16, adjusting knob 16 drives adjusting gear 17 to rotate, adjusting gear 17 drive adjusting gear rack 18 and the swaging clamp 8 that is fixedly connected with adjusting gear rack 18 along swaging clamp movement slots 4 move toward one another, swaging clamp 8 sticks into the swaging clamp draw-in groove 14 on the barred body of detector bar 6, template is made according to the position relationship between detector bar 6.

Claims (9)

1. a massif formwork erection servicing unit, is characterized in that, comprising:
Casing, casing is the through hollow tubular structures in both sides; Casing upper surface and soffit are respectively arranged with row of horizontal top box hole arranged in a straight line and nowel hole; Top box hole and nowel hole correspondence are arranged;
Exploring block, comprises detector bar and elastic joint part, and detector bar runs through casing through the top box hole of casing and nowel hole, and two adjacent detector bars are flexible coupling by elastic joint part, linearly arrange between detector bar;
Two panels swaging clamp, swaging clamp is a laminated structure, two panels swaging clamp to be in same plane and to be arranged in casing, swaging clamp slides along swaging clamp movement slots, the adjacent dual-side of two panels swaging clamp be arranged in parallel, detector bar, through the gap the adjacent dual-side of swaging clamp, realizes the fastening or lax of detector bar by regulating the size in gap;
Swaging clamp fastening devices, realizes the fixing of two panels swaging clamp relative position.
2. massif formwork erection servicing unit as claimed in claim 1, it is characterized in that, described casing is a cuboid tubular structure.
3. massif formwork erection servicing unit as claimed in claim 1, is characterized in that, the spacing between described adjacent two top box holes or adjacent two nowel holes is 43 ~ 48mm, and aperture is 8 ~ 12mm.
4. massif formwork erection servicing unit as claimed in claim 1, it is characterized in that, described elastic joint part is elastic caoutchouc.
5. massif formwork erection servicing unit as claimed in claim 1, it is characterized in that, described detector bar top is provided with anti-skidding flake, and detector bar is 18 ~ 30, and the distance between adjacent detector rod is 45 ~ 50mm.
6. massif formwork erection servicing unit as claimed in claim 1, it is characterized in that, described elastic joint part is positioned at the bottom of detector bar.
7. massif formwork erection servicing unit as claimed in claim 1, is characterized in that, the barred body of described detector bar is provided with swaging clamp draw-in groove, the spacing 1 ~ 2mm of adjacent swaging clamp draw-in groove; Detector bar is the iron staff of diameter 6 ~ 10mm, long 0.8 ~ 1.2m.
8. massif formwork erection servicing unit as claimed in claim 1, it is characterized in that, described swaging clamp fastening devices comprises four back-moving springs, four swaging clamp handles and two swaging clamp stationary magazine creels, swaging clamp handle one end is fixedly connected with swaging clamp, described swaging clamp stationary magazine creel is a hollow cylindrical structure, the side that swaging clamp stationary magazine creel is positioned at casing is provided with two swaging clamp movement slots, swaging clamp reciprocatingly slides in swaging clamp movement slots, two back-moving springs are set in swaging clamp stationary magazine creel, on the front side wall that casing is fixed in one end of back-moving spring or rear wall, the other end is fixedly connected with swaging clamp handle one end or swaging clamp, the swaging clamp handle other end is arranged at outside swaging clamp stationary magazine creel through swaging clamp stationary magazine creel.
9. massif formwork erection servicing unit as claimed in claim 1, it is characterized in that, described swaging clamp fastening devices comprises adjusting knob, adjusting gear and adjusting gear rack, described adjusting gear rack is fixed on swaging clamp perpendicular on the side in gap, adjusting gear and adjusting gear rack are connected with a joggle, and adjusting knob is fixedly connected with adjusting gear.
CN201420671296.5U 2014-11-11 2014-11-11 Massif formwork erection servicing unit Withdrawn - After Issue CN204225488U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420671296.5U CN204225488U (en) 2014-11-11 2014-11-11 Massif formwork erection servicing unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420671296.5U CN204225488U (en) 2014-11-11 2014-11-11 Massif formwork erection servicing unit

Publications (1)

Publication Number Publication Date
CN204225488U true CN204225488U (en) 2015-03-25

Family

ID=52923601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420671296.5U Withdrawn - After Issue CN204225488U (en) 2014-11-11 2014-11-11 Massif formwork erection servicing unit

Country Status (1)

Country Link
CN (1) CN204225488U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328915A (en) * 2014-11-11 2015-02-04 山东省物化探勘查院 Mountain formwork support auxiliary device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328915A (en) * 2014-11-11 2015-02-04 山东省物化探勘查院 Mountain formwork support auxiliary device
CN104328915B (en) * 2014-11-11 2016-06-29 山东省物化探勘查院 Massif formwork erection auxiliary device

Similar Documents

Publication Publication Date Title
CN203344007U (en) Auxiliary nailing device
CN204225488U (en) Massif formwork erection servicing unit
CN209849594U (en) Novel numerical control bender for wooden case processing
CN207211747U (en) A kind of civil engineering building template link
CN203265308U (en) Bending adjusting device
CN202607758U (en) Evanescent mode fixed type evanescent mode foam cutting device
CN104328915B (en) Massif formwork erection auxiliary device
CN204585571U (en) Multifunctional wall drilling equipment
CN203678963U (en) Hydraulic pipe bending device
CN211257078U (en) Utility tunnel template reinforcing apparatus
CN203995327U (en) Curve piece, cam profile curve plotter
CN203129578U (en) Building template
CN202781376U (en) Square cement flue molding equipment
CN203891910U (en) Laser orientation instrument installation frame
CN206859682U (en) A kind of building template quick-gripping device
CN210288456U (en) Assembled steel mould for foundation bearing platform of house building engineering
CN203343384U (en) Locking mechanism for lower core box of core making machine
CN204997989U (en) Cold contraction cable accessory expands machine
CN203778542U (en) Adjustable propping device for cold bending machine
CN217422687U (en) Building electromechanical installation device
CN202416861U (en) Construction formwork supporter
CN204418681U (en) The overall advance and retreat mold mechanism of a kind of band inner corner trim wall form
CN214169935U (en) Concrete film removing device
CN209289252U (en) High efficiency line-plotting device used in a kind of architectural engineering
CN214497612U (en) Novel low strain force stick hammer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150325

Effective date of abandoning: 20160629

AV01 Patent right actively abandoned

Granted publication date: 20150325

Effective date of abandoning: 20160629

C25 Abandonment of patent right or utility model to avoid double patenting