CN204225063U - For the arrangement of hydroelectric project water inlet section - Google Patents

For the arrangement of hydroelectric project water inlet section Download PDF

Info

Publication number
CN204225063U
CN204225063U CN201420689789.1U CN201420689789U CN204225063U CN 204225063 U CN204225063 U CN 204225063U CN 201420689789 U CN201420689789 U CN 201420689789U CN 204225063 U CN204225063 U CN 204225063U
Authority
CN
China
Prior art keywords
water inlet
pier
arrangement
trashrack
inlet section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420689789.1U
Other languages
Chinese (zh)
Inventor
祖威
蒲晓峰
唐碧华
李艺
宋慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201420689789.1U priority Critical patent/CN204225063U/en
Application granted granted Critical
Publication of CN204225063U publication Critical patent/CN204225063U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The utility model discloses a kind of arrangement, especially disclose a kind of arrangement for hydroelectric project water inlet section, belong to water conservancy project and build thing design-build technical field.A kind of arrangement for hydroelectric project water inlet section that effectively can improve water inlet section gate pier underlying strength is provided.Described arrangement comprises trashrack pier and is positioned at the water inlet gate pier of described trashrack pier back side side, described arrangement also comprises connection reinforcement supporting component, is connected as a whole between described trashrack pier and described water inlet gate pier by described connection reinforcement supporting component.

Description

For the arrangement of hydroelectric project water inlet section
Technical field
The utility model relates to a kind of arrangement, especially relates to a kind of arrangement for hydroelectric project water inlet section, belongs to water conservancy project and builds thing design-build technical field.
Background technology
The large medium-size station of current centralized exploitation, water inlet more employing bank is tower or tower.Water inlet is generally divided into trashrack section and water inlet lockage chamber, adopts vertical support to connect, to strengthen the shock resistance of trashrack section therebetween.
Trashrack section great majority adopt frame construction, and water inlet lockage chamber adopts concrete in mass mostly, and rigidity difference in front and back is comparatively large, and anti-seismic performance is poor, can produce destruction under the effect of high earthquake Earthquakes operating mode.In order to strengthen the anti-seismic performance of tower body, between trashrack section and water inlet lockage chamber, the vertical support of normal employing connects, and increases the overall shock resistance of tower body.Fence frame is generally the high structures of tens of meters, needs emptying reservoir to overhaul, will produce larger economic impact to power station once destroy.Therefore the safety of fence frame plays most important effect to powerplant intakes safe operation.Fence frame is under the effect of earthquake operating mode, and the design of vertical support is one of emphasis in fence frame design.
The vertical support of water inlet of the prior art is arranged for low earthquake areas, and under earthquake operating mode, vertical support place is lower by the level flowing to tensile stress downstream, and Reinforcement Design can meet code requirement substantially.But for high earthquake zone, under earthquake operating mode, there is following problem in above-mentioned arrangement:
1. vertical support place is higher by Parallel to the flow direction tensile stress level, is difficult to meet Reinforcement Design requirement;
2. each when carrying out vertical support and building, all will shuttering again, waste time and energy, constructional difficulties;
3. under earthquake operating mode, quantity of reinforcement is comparatively large, and rebar spacing is arranged closeer, is unfavorable for that concrete vibrating is constructed.
Utility model content
Technical problem to be solved in the utility model is: provide a kind of arrangement for hydroelectric project water inlet section that effectively can improve water inlet section gate pier underlying strength.
For solving the problems of the technologies described above adopted technical scheme be: a kind of arrangement for hydroelectric project water inlet section, comprise trashrack pier and the water inlet gate pier being positioned at described trashrack pier back side side, described arrangement also comprises connection reinforcement supporting component, is connected as a whole between described trashrack pier and described water inlet gate pier by described connection reinforcement supporting component.
The beneficial effects of the utility model are: by arranging a connection reinforcement supporting component between described trashrack pier and described water inlet gate pier, be connected as a whole by described trashrack pier with described water inlet gate pier.Thus change in prior art and carry out the simple structure connected by means of only being vertically upwards furnished with several horizontal support member, like this, make described arrangement not only play the effect of connection, but also effective booster action can be played.Ensure that described water inlet section gate pier basis normally works under going for the earthquake operating mode of high earthquake zone.
Be further, described connection reinforcement supporting component comprises the vertical support in bottom, the vertical support in middle part and the vertical partition wall in top, the bottom of described trashrack pier, middle part and top, indulge support respectively by described bottom, bottom that support and the vertical partition wall in top and described water inlet gate pier are indulged in middle part, middle part and top be connected as a whole.
The preferred embodiment of such scheme is, the vertical integral partition in formation middle and upper part that support and the described vertical partition wall in top are integrative-structure is indulged at described middle part.
Further, the bottom of described water inlet gate pier is provided with water inlet, between the trashrack pier of the vertical integral partition in described middle and upper part on described water inlet and water inlet gate pier.
Further, described trashrack pier is installed framed bent by trashrack and is formed.
Further, framed bent installed by described trashrack is reinfored concrete line frame.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the utility model for the arrangement of hydroelectric project water inlet section;
Fig. 2 is the A-A sectional view of Fig. 1
Fig. 3 is the schematic diagram of the another kind of arrangement that the utility model relates to.
Be labeled as in figure: trashrack pier 1, water inlet gate pier 2, connection reinforcement supporting component 3, support 4 is indulged in bottom, support 5 is indulged at middle part, the vertical partition wall in top 6, the vertical integral partition 7 in middle and upper part, water inlet 8.
Detailed description of the invention
A kind of arrangement for hydroelectric project water inlet section that effectively can improve water inlet section gate pier underlying strength that the utility model provides as shown in Figure 1 and Figure 2.Described arrangement, comprise trashrack pier 1 and the water inlet gate pier 2 being positioned at described trashrack pier 1 back side side, it is characterized in that: described arrangement also comprises connection reinforcement supporting component 3, be connected as a whole by described connection reinforcement supporting component 3 between described trashrack pier 1 and described water inlet gate pier 2.By arranging a connection reinforcement supporting component 3 between described trashrack pier 1 and described water inlet gate pier 2, described trashrack pier 1 is connected as a whole with described water inlet gate pier 2.Thus change the structure of carrying out simple connection in prior art by means of only several horizontal support member of vertically upwards arranging, like this, make described arrangement not only play the effect of connection, but also effective booster action can be played.Ensure that described water inlet basis normally works under going for the earthquake operating mode of high earthquake zone.
In above-mentioned embodiment, in order to the structure of described connection reinforcement supporting component 3 can be simplified, may arrange according to different operating modes again, reach the intensity both ensureing described water inlet basis arrangement, can reduce to greatest extent again and be built into, described connection reinforcement supporting component 3 comprises bottom and indulges support 4, the vertical support 5 in middle part and the vertical partition wall 6 in top, the bottom of described trashrack pier 1, middle part and top, support 4 is indulged respectively by described bottom, the bottom of the vertical support 5 in middle part and the vertical partition wall in top 6 and described water inlet gate pier 2, middle part is connected as a whole with top.
In high earthquake intensity generating region, in order to ensure the intensity of described water inlet section gate pier basis arrangement to greatest extent, as shown in Figure 3, described middle part can be indulged support 5 and the formation middle and upper part vertical integral partition 7 of the vertical partition wall in described top 6 in integrative-structure.And, in order to not affect flow velocity and the flow direction of water, the bottom being combined in described water inlet gate pier 2 is provided with the feature of water inlet 8, the bottom of described water inlet gate pier 2 is provided with water inlet 8, between the trashrack pier 1 of the vertical integral partition in described middle and upper part 7 on described water inlet 8 and water inlet gate pier 2.
The trashrack pier 1 involved by water inlet section gate pier arrangement of the application mainly for be the Ji Ba that trashrack is installed framed bent and formed, and especially for be the Ji Ba of reinforced concrete bent structure middle.

Claims (6)

1. the arrangement for hydroelectric project water inlet section, comprise trashrack pier (1) and be positioned at the water inlet gate pier (2) of described trashrack pier (1) back side side, it is characterized in that: described arrangement also comprises connection reinforcement supporting component (3), be connected as a whole by described connection reinforcement supporting component (3) between described trashrack pier (1) and described water inlet gate pier (2).
2. the arrangement for hydroelectric project water inlet section according to claim 1, it is characterized in that: described connection reinforcement supporting component (3) comprises the vertical support (4) in bottom, middle part vertical support (5) and the vertical partition wall in top (6), the bottom of described trashrack pier (1), middle part and top, be connected as a whole respectively by the bottom of the vertical support (4) in described bottom, the vertical support (5) in middle part and the vertical partition wall in top (6) and described water inlet gate pier (2), middle part and top.
3. the arrangement for hydroelectric project water inlet section according to claim 2, is characterized in that: the vertical support (5) in described middle part and the formation middle and upper part vertical integral partition (7) of the vertical partition wall in described top (6) in integrative-structure.
4. the arrangement for hydroelectric project water inlet section according to claim 3, it is characterized in that: the bottom of described water inlet gate pier (2) is provided with water inlet (8), the vertical integral partition in described middle and upper part (7) is positioned at the trashrack pier (1) on described water inlet (8) and intakes between gate pier (2).
5. the arrangement for hydroelectric project water inlet section according to any one of Claims 1 to 4, is characterized in that: described trashrack pier (1) is installed framed bent by trashrack and formed.
6. the arrangement for hydroelectric project water inlet section according to claim 5, is characterized in that: framed bent installed by described trashrack is reinfored concrete line frame.
CN201420689789.1U 2014-11-17 2014-11-17 For the arrangement of hydroelectric project water inlet section Active CN204225063U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420689789.1U CN204225063U (en) 2014-11-17 2014-11-17 For the arrangement of hydroelectric project water inlet section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420689789.1U CN204225063U (en) 2014-11-17 2014-11-17 For the arrangement of hydroelectric project water inlet section

Publications (1)

Publication Number Publication Date
CN204225063U true CN204225063U (en) 2015-03-25

Family

ID=52923179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420689789.1U Active CN204225063U (en) 2014-11-17 2014-11-17 For the arrangement of hydroelectric project water inlet section

Country Status (1)

Country Link
CN (1) CN204225063U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951575A (en) * 2018-07-25 2018-12-07 中国电建集团华东勘测设计研究院有限公司 Improve the intake tower of trash rack section and the longitudinally connected intensity of gate well section

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951575A (en) * 2018-07-25 2018-12-07 中国电建集团华东勘测设计研究院有限公司 Improve the intake tower of trash rack section and the longitudinally connected intensity of gate well section

Similar Documents

Publication Publication Date Title
CN203925895U (en) For wind power generation stepped crab-bolt Changable type basis
CN103603313B (en) Rectifier wall structure of making flow by deep water, and construction method thereof
CN201722776U (en) Beam column nodal point suitable for square steel pipe column
CN103967166A (en) Low-yield-point steel plate shear wall with two connected edges
CN204825914U (en) A reinforced concrete roof beam and fish belly sill combined supporting structure for complicated plane foundation ditch
CN202731104U (en) Novel reinforcing mesh sheet support structure
CN207211419U (en) A kind of replaceable H, U-shaped mild steel combination of dampings device
CN204225063U (en) For the arrangement of hydroelectric project water inlet section
CN201474361U (en) Ground self-supporting steel surge tower
CN204491883U (en) A kind of assembling energy consumption steel plate shear wall
CN203782544U (en) Combined bracket for river-crossing section of elevated bridge
CN202519813U (en) Concealed bracing energy-intensive low shear wall structure system with built-in steel plates and steel bars
CN203821630U (en) Two-sided connection type low yield point steel plate shear wall
CN205576872U (en) Tower water inlet structure of power station bank convenient to construction
CN100567651C (en) Non-uniform flexible anchoring baffle pond inverted arch bottom plate structure
CN203530921U (en) Water-permeable pile foundation spur dike
CN207419779U (en) The more steel plate concrete shear wall structures of nuclear power plant
CN205934994U (en) Retaining pile combines guan liang's underground structure's anti structure of floating
CN204662396U (en) A kind of tilting for high slope blocks dirty drift structure
CN201746823U (en) Water inlet eddy eliminating structure
CN202370736U (en) Water energy generator set
CN203846506U (en) Angle bracing structure for foundation pit supporting
CN203846494U (en) Breast beam soil anchor rod segmented connection structure
CN204225062U (en) The inner gallery structure of bulb turbine hydropower station factory building
CN203701104U (en) Connection structure for prefabricated open column and foundation pit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant