CN204224359U - Steel Plant's oiliness sewage treatment equipment - Google Patents

Steel Plant's oiliness sewage treatment equipment Download PDF

Info

Publication number
CN204224359U
CN204224359U CN201420635710.7U CN201420635710U CN204224359U CN 204224359 U CN204224359 U CN 204224359U CN 201420635710 U CN201420635710 U CN 201420635710U CN 204224359 U CN204224359 U CN 204224359U
Authority
CN
China
Prior art keywords
water
steel plant
waste
tank
oily
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420635710.7U
Other languages
Chinese (zh)
Inventor
温玉友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420635710.7U priority Critical patent/CN204224359U/en
Application granted granted Critical
Publication of CN204224359U publication Critical patent/CN204224359U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of Steel Plant oiliness sewage treatment equipment, comprise wastewater storage tank, grease removal tank, except chromium groove, the first neutralization tank, the second neutralization tank, flocculation basin, settling tank, concentration basin, storage basin, press filtration pond, backflow pool, the 3rd neutralization tank and filter vat.Grease removal tank is also provided with flat flow dissolved gas floatator.Above-mentioned Steel Plant oiliness sewage treatment equipment is by being provided with except grease removal tank, except chromium pond, three grades of neutralization tanks, flocculation basin, settling tank, filter vat, concentration basin and press filtration ponds, oil, contents of many kinds of heavy metal ion, fluorion and sulfate ion can be removed simultaneously, the Steel Plant's oily(waste)water produced in the current producing stainless steel process of effective solution, recycle after bed mud directly can being carried out nature mummification simultaneously, thus decrease secondary environmental pollution.

Description

Steel Plant's oiliness sewage treatment equipment
Technical field
The utility model relates to Steel Plant's oiliness sewage treatment field, particularly relates to a kind of Steel Plant oiliness sewage treatment equipment.
Background technology
Along with the development of stainless steel industry, the waste water containing heavy metal produced in its process of manufacture and the impact of solid waste on surrounding soil and surface water environment also manifest day by day.In the complete processings such as stainless steel annealing, normalizing, quenching, normalizing, welding, forging, stainless steel surface can produce iron scale, its main component is FeO, Fe 2o 3, NiO 2, Cr 2o 3, Fe 3o 4, FeOCr 2o 3, NiFe 2o 3, FeOCr 2o 3fe 2o 3deng dense form oxide compound.The basic strong adhesion of these oxide compounds, at employing ball blast, in the treatment process of the combination procesies such as high temperature alkaline etching, fused salt electrolysis, nitration mixture pickling, multistage rinsing, inevitably discharge the multichannel pickling waste waterss such as neutral salt waste liquid, mixed acid waste liquor, fluoride waste, poaching wastewater.And these stainless-steel cold-rolling waste component and generation operation difference time are very large, there is complicated component, the acidity major part features such as harmful substance contents exceeds standard, environmental hazard is large.
At present, the domestic process to stainless-steel cold-rolling waste water mainly contains: (1) utilizes neutralizing device fully to neutralize; (2) burning facility is utilized fully to burn; (3) utilize the miscellaneous equipments such as ion-exchange unit to carry out regeneration to reclaim.But these method Problems existing mainly easily cause secondary pollution or high in cost of production.
Such as, chromium, nickel salt extracting method in Chinese patent 200710069398.4 1 kinds of stainless steel acid cleaning waste waters, disclose a kind for the treatment of process of acid waste water, refers in particular to the extracting method of chromium, nickel salt in a kind of stainless steel acid waste water.The present invention is by removing objectionable impurities in acid waste water stage by stage, added calcium salt before this, and control pH is 2.0 ~ 4.0, removes fluoride ion, add highly basic or soda ash again, control pH is 7.0 ~ 8.0, after filtration, can effectively realize qualified discharge liquid, again the filter residue acid solution after filtration is carried out acidifying oxidizing reaction, control pH is 1.0 ~ 4.0, filters the iron ion removed wherein, is precious metal chromium, the nickel salt of extraction in remaining filtrate.Advantage of the present invention is, can reduce the add-on of calcium salt, highly basic or soda ash, can realize the qualified discharge of liquid, and can not cause the situation of heavy metal secondary pollution, recycles chromium, nickel salt, effectively increases economic efficiency.The present invention can be widely used in wastewater treatment and the similar enterprises of various stainless steel manufacturing concern.
Chinese patent 201110262416.7 stainless steel acid waste water reduces Cr 6+treatment process, this invention be stainless steel acid waste water reduce Cr 6+treatment process, its step comprises: stainless steel nitration mixture waste water and sulfuric acid wastewater containing sent in reduction pond; In reduction pond, add reductive agent and stir, making Cr in waste water 6+be converted into Cr 3+, reach the water outlet inflow neutralization tank that ORP requires; To neutralization tank feeding lime, and drum oxygen aeration, by Fe in waste water 2+be oxidized to Fe 3+, form Cr (OH) 3, CaF 2, Fe (OH) 3, CaSO 4precipitation; The water outlet of neutralization tank enters flocculation basin; Add PAM to flocculation basin and form large alumen ustum, dosage is 2 ~ 5mg/L, and the water outlet of flocculation basin flows in settling tank; The water outlet of flocculation basin after settling tank precipitation, water outlet to subsequent disposal facility, this water outlet Cr 6+should emission request be met, then the mud in settling tank regularly be transported outward.The present invention can meet environmental requirement, and is beneficial to subsequent biochemical process.
But above-mentioned disclosed patent still cannot provide a kind for the treatment of facility that can process the comprehensive treating process of all kinds of waste water that stainless-steel cold-rolling process produces.
Utility model content
Based on this, be necessary to provide a kind of low cost, high-level efficiency, the Steel Plant's oiliness sewage treatment equipment produced in producing stainless steel process can be processed.
A kind of Steel Plant oiliness sewage treatment equipment, comprise wastewater storage tank, grease removal tank, except chromium groove, the first neutralization tank, the second neutralization tank, flocculation basin, settling tank, concentration basin, storage basin, press filtration pond, backflow pool, the 3rd neutralization tank and filter vat;
Described wastewater storage tank is communicated with described grease removal tank, described grease removal tank is communicated with the described chromium groove that removes, described first neutralization tank is communicated with the described chromium groove that removes, described second neutralization tank is communicated with described first neutralization tank, described flocculation basin is communicated with described second neutralization tank, described settling tank is communicated with described flocculation basin and described concentration basin respectively, described storage basin is communicated with described concentration basin, described press filtration pond is communicated with described storage basin, described backflow pool is communicated with described press filtration pond and described settling tank respectively, described 3rd neutralization tank is communicated with described settling tank, described filter vat is communicated with described 3rd neutralization tank,
Described grease removal tank is also provided with flat flow dissolved gas floatator.
Wherein in an embodiment, in described wastewater storage tank, be also provided with grid.
Wherein in an embodiment, described grid is provided with two filter grids.
Wherein in an embodiment, two described filter grids are arranged in parallel.
Wherein in an embodiment, described removing in chromium groove is provided with whipping device.
Wherein in an embodiment, in described concentration basin, be provided with central transmission concentrator.
Wherein in an embodiment, in described press filtration pond, be provided with plate-and-frame filter press.
Above-mentioned Steel Plant oiliness sewage treatment equipment is by arranging grease removal tank, except chromium pond, three grades of neutralization tanks, flocculation basin, settling tank, filter vat, concentration basin and press filtration ponds, oil, contents of many kinds of heavy metal ion, fluorion and sulfate ion can be removed simultaneously, the Steel Plant's oily(waste)water produced in the current producing stainless steel process of effective solution, simultaneously due to the bed mud water content lower (being less than 35%) after process, recycle after bed mud directly can being carried out nature mummification, thus decrease secondary environmental pollution, improve resource recycling.
Accompanying drawing explanation
Fig. 1 is the structural representation of Steel Plant's oiliness sewage treatment equipment of an embodiment.
Embodiment
For enabling above-mentioned purpose of the present utility model, feature and advantage become apparent more, are described in detail embodiment of the present utility model below in conjunction with accompanying drawing.Set forth a lot of detail in the following description so that fully understand the utility model.But the utility model can be much different from alternate manner described here to implement, those skilled in the art can when doing similar improvement without prejudice to when the utility model intension, and therefore the utility model is by the restriction of following public concrete enforcement.
Steel Plant's oily wastewater treatment method of one embodiment comprises the steps:
S110: after Steel Plant's oily(waste)water slagging-off, leave standstill 2h ~ 3h, at 40 DEG C ~ 50 DEG C, remove the oil slick on described Steel Plant's oily(waste)water surface, then remove the oil in water emulsion in described Steel Plant oily(waste)water by dissolved air flotation process.
By carrying out Steel Plant's oily(waste)water, except Slag treatment, foreign material larger for volume in Steel Plant's oily(waste)water to be removed, avoiding pipeline and occurring to block the problems such as stuck, being conducive to Steel Plant's oily(waste)water and entering subsequent processing device swimmingly.
Steel Plant's oily(waste)water after slagging-off is passed into grease removal tank, such as, by Steel Plant's oily(waste)water after leave standstill 2h ~ 3h after grease removal tank, make the oil slick in Steel Plant's oily(waste)water and the larger oil in water emulsion of particle rise to surface, collect surperficial oil reservoir and reach the object removing oil slick.
And for example, Steel Plant's oily(waste)water is passed into flat flow dissolved gas floatator, by dissolved air flotation process, like this, the oil in water emulsion in Steel Plant's oily(waste)water can be removed.
In order to be removed by the oil of Steel Plant's oily(waste)water to a greater degree, such as, can control temperature in grease removal tank is 40 DEG C ~ 50 DEG C, like this, can improve efficiency of deoiling, and promotes deoil rate.
S120: the first pre-treatment Steel Plant oily(waste)water is carried out reduction treatment, obtains the second pre-treatment Steel Plant oily(waste)water.
Such as, in the first pre-treatment Steel Plant oily(waste)water, add concentration is 0.05-5% sulfuric acid, after regulating pH to 2.5 ~ 3.0, adding concentration toward it is again 2%wt ~ 10%wt (massfraction) S-WAT or V-Brite B, make the ORP value of chrome-bearing steel ironworks oily(waste)water for 250mV ~ 300mV, after abundant stirring, the hexavalent chrome reduction in the first pre-treatment Steel Plant oily(waste)water is made to become trivalent chromium.
S130: after the second pre-treatment Steel Plant oily(waste)water is carried out one-level aeration neutralizing treatment, obtain the 3rd pre-treatment Steel Plant oily(waste)water.
Add alkaline matter toward the second pre-treatment Steel Plant oily(waste)water, and give Air Exposure, by pH regulator to 3.5 ~ 4.0 of the second pre-treatment cold rolling wastewater, obtain the 3rd pre-treatment Steel Plant oily(waste)water.
In traditional technology, some difficulties are usually produced owing to adopting Wingdale neutralizing treatment Steel Plant oily(waste)water, such as, the calcium sulfate produced in neutralization reaction covers the carrying out that limestone surfaces can hinder neutralization reaction, therefore, with Steel Plant's oily(waste)water in generally adopting price slaked lime costly.
And in order to reduce reagent cost, such as, in the present embodiment, use aeration means, e.g., aeration intensity is: 0.5m 3~ 5m 3(air)/m 3(the second pre-treatment Steel Plant oily(waste)water) h, adopt cheap Wingdale that the second pre-treatment Steel Plant oily(waste)water is neutralized to slightly acidic, due to aeration can guarantee limestone particle can not cover by the calcium sulfate precipitation that generates in reaction process, thus ensure that continuing of reacting carries out, and, the carbon dioxide that Air Exposure can also effectively produce in stripping reaction process, reduce input amount and the body refuse growing amount of alkali in secondary N-process, like this, the cost of medicament can be reduced further.
S140: the 3rd pre-treatment Steel Plant oily(waste)water carried out in secondary and after Air Exposure, obtain the 4th pre-treatment Steel Plant oily(waste)water.
Alkaline matter is added in the 3rd pre-treatment Steel Plant oily(waste)water, if concentration is the milk of lime of 5%, and continue aeration, along with the lasting dropping of milk of lime, the throw out of the 3rd pre-treatment Steel Plant oily(waste)water continues to increase and becomes reddish-brown, behind pH regulator to 8.5 ~ 9.5 of the 3rd pre-treatment Steel Plant oily(waste)water, continues aeration 5 ~ 10 minutes, as, aeration intensity is: 1m 3~ 10m 3(air)/m 3(the 3rd pre-treatment Steel Plant oily(waste)water) h, makes the Fe in the 3rd pre-treatment Steel Plant oily(waste)water 2+fe is oxidized under the effect of oxygen 3+, and form CaF 2, Fe (OH) 3, Ni (OH) 2, Cr (OH) 3and CaSO 4throw out, obtains the 4th pre-treatment Steel Plant oily(waste)water.
S150: after being carried out by the 4th pre-treatment Steel Plant oily(waste)water flocculating and precipitate, obtain the 5th pre-treatment Steel Plant oily(waste)water and the first pre-treatment bed mud.
4th pre-treatment Steel Plant oily(waste)water is carried out flocculation treatment, such as, in the 4th Steel Plant's oily(waste)water, add polymerize aluminum chloride (PAC) is flocculation agent, dosage is 1 ‰ ~ 5 ‰ (thousandths) of the 4th pre-treatment Steel Plant oily(waste)water volume, after stirring 15min, adding polyacrylamide (PAM) is coagulant aids, and its dosage is 0.1 ‰ of the 4th pre-treatment Steel Plant oily(waste)water volume.After flocculation, the 4th pre-treatment Steel Plant oily(waste)water is carried out deposition and leave standstill, heavy metal ion is precipitated completely with the form of oxyhydroxide.Such as, the 4th pre-treatment Steel Plant oily(waste)water after flocculation is passed into sedimentation tank, and heavy metal ion in the basic conditions, is deposited into the bottom of settling bath with the form of oxyhydroxide.In order to make heavy metal precipitate completely, and avoid carrying it into subsequent technique process, such as, time of repose is 1h ~ 2h, like this, heavy metal can be made to deposit completely, solid-liquid is separated completely.
S160: by the 5th pre-treatment Steel Plant oily(waste)water through three grades of neutralizations and after filtering, outer row.
In the 5th pre-treatment Steel Plant oily(waste)water, add acid, regulate pH to 6.5 ~ 7.2, and filter, by suspended substance removal, reduce its turbidity, make to reach emission standard.
S170: after the first pre-treatment bed mud being carried out concentrated and press filtration, obtain the 6th pre-treatment Steel Plant oily(waste)water and the second pre-treatment bed mud.
The first pre-treatment bed mud that step S150 produces being concentrated to concentration basin by sludge pump positive delivery, in order to improve sludge condensation and dehydrating effect, such as, in the first pre-treatment bed mud, adding PAM with auxiliary mud-water separation.By the first pre-treatment bed mud extracting being carried out pressure rate to pressure filter with pump, the 6th pre-treatment Steel Plant oily(waste)water obtained flows out under gravity, and the water ratio of the second pre-treatment bed mud after press filtration is less than 35%.
S180: by the 6th pre-treatment Steel Plant oily(waste)water after precipitation, three grades of neutralizations and filtration, outer row.
The 6th pre-treatment Steel Plant oily(waste)water in step S170 after press filtration is back to settling tank and carries out precipitation process, be appreciated that, 6th pre-treatment Steel Plant oily(waste)water is owing to have passed through in second and Air Exposure and in alkalescence, be back to settling tank, the input amount of precipitation process process neutral and alkali material can be reduced, reduce reagent cost.
In the 6th pre-treatment Steel Plant oily(waste)water after precipitation process, add acid, regulate pH to 6.5 ~ 7.2, and filter, by suspended substance removal, reduce its turbidity, guarantee to reach emission standard.
The treatment process of above-mentioned Steel Plant oily(waste)water, by removing the gred to Steel Plant's oily(waste)water, oil removing, except steps such as chromium, neutralization, flocculation, precipitation and filtrations, oil, contents of many kinds of heavy metal ion, fluorion and sulfate ion can be removed simultaneously, the Steel Plant's oily(waste)water produced in the current producing stainless steel process of effective solution, simultaneously due to the bed mud water content lower (being less than 35%) after process, recycle after bed mud directly can being carried out nature mummification, thus decrease secondary environmental pollution, improve resource recycling.
In order to introduce Steel Plant of the present utility model oily wastewater treatment method further, such as, a kind of Steel Plant oiliness sewage treatment equipment is also provided.
As shown in Figure 1, it is the structural representation of Steel Plant's oiliness sewage treatment equipment 10 of an embodiment.
Refer to Fig. 1, Steel Plant's oiliness sewage treatment equipment 10 comprise wastewater storage tank 100, grease removal tank 200, except chromium groove 300, first neutralization tank 400, second neutralization tank 500, flocculation basin 600, settling tank 700, concentration basin 800, storage basin 900, press filtration pond 900a, backflow pool 900b, the 3rd neutralization tank 900c and filter vat 900d.
Refer to Fig. 1, be provided with grid 110 in wastewater storage tank 100, grid 110 is for removing the larger foreign material of volume in sewage, so that waste water is smooth and easy enter rear portion treatment facility.
Such as, grid 110 is " H " character form structure, and grid 110 is provided with two filter grids, and two described filter grids can be used alone or are arranged in parallel, and filter grid is made up of stainless steel.
Refer to Fig. 1, wastewater storage tank 100 is communicated with grease removal tank 200, and the Steel Plant's oily(waste)water being stored in wastewater storage tank 100 passes into grease removal tank 200, in grease removal tank 200, the oil in Steel Plant's oily(waste)water can be made to remove.
Such as, by Steel Plant's oily(waste)water after leave standstill 2h ~ 3h after grease removal tank, make the oil slick in Steel Plant's oily(waste)water and the larger oil in water emulsion of particle rise to surface, collect surperficial oil reservoir and reach the object removing oil slick.And for example, grease removal tank 200 is also provided with flat flow dissolved gas floatator, and Steel Plant's oily(waste)water is passed into flat flow dissolved gas floatator, by dissolved air flotation process, like this, can remove the oil in water emulsion in Steel Plant's oily(waste)water.
In order to a greater degree the oil of Steel Plant's oily(waste)water be removed, such as, grease removal tank 200 is provided with at least one vapour pipe 210, each vapour pipe 210 all has an opening, and described opening surface is arranged to going out oil sump 200, to make temperature in grease removal tank 200 control at 40 DEG C ~ 50 DEG C, like this, can efficiency of deoiling be improved, promote deoil rate.And for example, described grease removal tank is provided with at least one vapour pipe, and vapour pipe described in each all has an opening, and the opening surface of described vapour pipe to described go out oil sump opening arrange, for heating the oil reservoir on described grease removal tank surface.
Refer to Fig. 1, grease removal tank 200 is communicated with except chromium groove 300, the first pre-treatment Steel Plant oily(waste)water after grease removal tank 200 processes passes into except in chromium groove 300, in the first pre-treatment Steel Plant oily(waste)water, add concentration is 0.05-5% sulfuric acid, after regulating pH to 2.5 ~ 3.0, adding concentration toward it is again 2%wt ~ 10%wt S-WAT or V-Brite B, make the ORP value of the first pre-treatment Steel Plant oily(waste)water for 250mV ~ 300mV, after abundant stirring, the hexavalent chrome reduction in the oily(waste)water of chrome-bearing steel ironworks is made to become trivalent chromium.
Because needs drop into a certain amount of medicine toward in chromium groove 300, as sulfuric acid, S-WAT and sodium hydroxide etc., except being provided with charging opening in chromium groove 300, adding of medicine can be facilitated like this.
In order to improve the speed of reaction except chromium groove 300, such as, being provided with whipping device except in chromium groove 300, accelerating the speed of reaction of hexavalent chrome reduction, improve processing efficiency.
Refer to Fig. 1, the first neutralization tank 400 is communicated with except chromium groove 300.Pass into the first neutralization tank by through the second pre-treatment Steel Plant oily(waste)water except chromium groove 300, in the first neutralization tank 300, add alkaline matter, and give Air Exposure, by pH regulator to 3.5 ~ 4.0 of the second pre-treatment cold rolling wastewater.
And in order to reduce reagent cost, such as, in the present embodiment, use aeration means, e.g., aeration intensity is: 0.5m 3~ 5m 3(air)/m 3(the second pre-treatment Steel Plant oily(waste)water) h, adopt cheap Wingdale that the second pre-treatment Steel Plant oily(waste)water is neutralized to slightly acidic, due to aeration can guarantee limestone particle can not cover by the calcium sulfate precipitation that generates in reaction process, thus ensure that continuing of reacting carries out, and, the carbon dioxide that Air Exposure can also effectively produce in stripping reaction process, reduce input amount and the body refuse growing amount of alkali in secondary N-process, like this, the cost of medicament can be reduced further.
Refer to Fig. 1, the second neutralization tank 500 is communicated with the first neutralization tank 400.Alkaline matter is added in the 3rd pre-treatment Steel Plant oily(waste)water, if concentration is the milk of lime of 5%, and continue aeration, along with the lasting dropping of milk of lime, the throw out of the 3rd pre-treatment Steel Plant oily(waste)water continues to increase and becomes reddish-brown, behind pH regulator to 8.5 ~ 9.5 of the 3rd pre-treatment Steel Plant oily(waste)water, continues aeration 5 ~ 10 minutes, as, aeration intensity is: 1m 3~ 10m 3(air)/m 3(the 3rd pre-treatment Steel Plant oily(waste)water) h, makes the Fe in the 3rd pre-treatment Steel Plant oily(waste)water 2+fe is oxidized under the effect of oxygen 3+, and form CaF 2, Fe (OH) 3, Ni (OH) 2, Cr (OH) 3and CaSO 4throw out.
Refer to Fig. 1, flocculation basin 600 is communicated with the second neutralization tank 500, the 4th pre-treatment cold rolling wastewater of the second neutralization tank 500 is passed into flocculation basin 600 and carries out flocculation treatment.
Such as, in the 4th Steel Plant's oily(waste)water, add polymerize aluminum chloride (PAC) is flocculation agent, dosage is 1 ‰ ~ 5 ‰ (thousandths) of the 4th pre-treatment Steel Plant oily(waste)water volume, after stirring 15min, adding polyacrylamide (PAM) is coagulant aids, and its dosage is 0.1 ‰ of the 4th pre-treatment Steel Plant oily(waste)water volume.After flocculation, the 4th pre-treatment Steel Plant oily(waste)water is carried out deposition and leave standstill, heavy metal ion is precipitated completely with the form of oxyhydroxide.Such as, the 4th pre-treatment Steel Plant oily(waste)water after flocculation is passed into sedimentation tank, and heavy metal ion in the basic conditions, is deposited into the bottom of settling bath with the form of oxyhydroxide.In order to make heavy metal precipitate completely, and avoid carrying it into subsequent technique process, such as, time of repose is 1h ~ 2h, like this, heavy metal can be made to deposit completely, solid-liquid is separated completely.
Because needs drop into a certain amount of medicine in flocculation basin 600, as PAC and PAM etc., in flocculation basin 600, be provided with charging opening, adding of medicine can be facilitated like this.
In order to improve the flocculation rate of flocculation basin 600, such as, in flocculation basin 600, be provided with whipping device, Steel Plant's oily(waste)water is fully mixed with flocculation agent etc., improve flocculation efficiency.
Refer to Fig. 1, settling tank 700 is communicated with flocculation basin 600, flocculation basin 600 is carried out the importing of the treatment solution after flocculation treatment settling tank 700 and carries out precipitation process.
In order to prevent heavy metal precipitation to be mixed into subsequent processes, such as, settling tank 700 is tube settler, that is, the radius bottom settling tank 700 is less than the radius on its top, like this, heavy metal precipitation thing can be made to be not easy to enter subsequent processes.
Refer to Fig. 1, concentration basin 800 is communicated with settling tank 700, and the first pre-treatment bed mud produced in settling tank 700 is carried out concentration by sludge pump positive delivery to concentration basin 800.
Concentrating and dehydrating effect to improve the first pre-treatment bed mud, such as, in concentration basin 800, adding PAM with auxiliary mud-water separation, the concentrated of the first pre-treatment bed mud and dehydrating effect can be improved like this.And for example, in concentration basin 800, be provided with central transmission concentrator, improve the concentrated of the first pre-treatment bed mud and dehydrating effect.
In order to reduce costs, such as, the top of concentration basin 800 is communicated with the bottom of settling tank 700, can reduce the running cost of sludge pump.
Refer to Fig. 1, storage basin 900 is communicated with concentration basin 800, and press filtration pond 900a is communicated with storage basin 900, and backflow pool 900b is communicated with press filtration pond 900a.Storage basin 900 is entered by the first pre-treatment bed mud after concentration basin 800 processes, by the pump in storage basin, the first pre-treatment bed mud extracting is carried out pressure rate to press filtration pond 900a, the 6th pre-treatment Steel Plant oily(waste)water obtained flows into backflow pool 900b under gravity, and the water ratio of the second pre-treatment bed mud after the 900a process of press filtration pond is less than 35%.
Be provided with plate-and-frame filter press in the 900a of press filtration pond, be used for sloughing the water in the first pre-treatment bed mud further.For preventing the filter cloth in plate-and-frame filter press from blocking, such as, arranging backwash high pressure water pump and carrying out routine cleaning, back flushing draining flows into backflow pool 900b under gravity together with filtrate after press filtration.
Refer to Fig. 1, backflow pool 900b is communicated with settling tank 700, and the 6th pre-treatment Steel Plant oily(waste)water being stored in backflow pool 900b enters settling tank 700 by high-pressure pump and carries out further precipitation process.
Can to understand, the 6th pre-treatment Steel Plant oily(waste)water, owing to have passed through in second and Air Exposure and in alkalescence, be back to settling tank 700b, can reduce the input amount of precipitation process process neutral and alkali material, reduces reagent cost.
Refer to Fig. 1, the 3rd neutralization tank 900c is communicated with settling tank 700, and filter vat 900d is communicated with the 3rd settling tank 900c.
Owing to entering the waste water of the 3rd neutralization tank in alkalescence, can't emission standard be reached, by adding acid, as HCl, regulate pH to 6.5 ~ 7.2, making it reach emission standard.
After the 3rd neutralization tank 900c process, imported filtering basin further, by suspended substance removal, reduce its turbidity, make to reach emission standard.
Above-mentioned Steel Plant oiliness sewage treatment equipment 10 is by arranging grease removal tank, except chromium pond, three grades of neutralization tanks, flocculation basin, settling tank, filter vat, concentration basin and press filtration ponds, oil, contents of many kinds of heavy metal ion, fluorion and sulfate ion can be removed simultaneously, the Steel Plant's oily(waste)water produced in the current producing stainless steel process of effective solution, simultaneously due to the bed mud water content lower (being less than 35%) after process, recycle after bed mud directly can being carried out nature mummification, thus decrease secondary environmental pollution, improve resource recycling.
Be specific embodiment part below.
Embodiment 1:
The process of Steel Plant's oily(waste)water of certain stainless steel factory, day quantity discharged be 1000 tons.Wherein, the water quality situation of Steel Plant's oily(waste)water of this stainless steel factory is as table 1.
Table 1
Now as follows Steel Plant's oily(waste)water of this electroplating facility is processed:
After Steel Plant's oily(waste)water slagging-off and oil removing, obtain the first pre-treatment Steel Plant oily(waste)water.
By carrying out Steel Plant's oily(waste)water, except Slag treatment, foreign material larger for volume in Steel Plant's oily(waste)water being removed.
Steel Plant's oily(waste)water after slagging-off is passed into grease removal tank, by Steel Plant's oily(waste)water after leave standstill 3h after grease removal tank, controlling temperature in grease removal tank is 50 DEG C, the oil slick in Steel Plant's oily(waste)water and the larger oil in water emulsion of particle is made to rise to surface, after collecting surperficial oil reservoir, Steel Plant's oily(waste)water is passed into air flotation pool, by dissolved air flotation process, the oil in water emulsion in removing Steel Plant oily(waste)water.
First pre-treatment Steel Plant oily(waste)water is carried out reduction treatment, obtains the second pre-treatment Steel Plant oily(waste)water.
In the first pre-treatment Steel Plant oily(waste)water, add concentration is 0.05-5% sulfuric acid, after regulating pH to 3.0, adding concentration toward it is again 2%wt ~ 10%wt (massfraction) S-WAT, make the ORP value of chrome-bearing steel ironworks oily(waste)water for 280mV, 30min after abundant stirring, makes hexavalent chrome reduction become trivalent chromium.
After second pre-treatment Steel Plant oily(waste)water is carried out one-level aeration neutralizing treatment, obtain the 3rd pre-treatment Steel Plant oily(waste)water.
Adding particle diameter toward the second pre-treatment Steel Plant oily(waste)water is 0.5mm ~ 3mm limestone particle, and gives Air Exposure, and aeration intensity is: 2m 3(air)/m 3(the second pre-treatment Steel Plant oily(waste)water) h, by pH regulator to 3.5 ~ 4.0 of the second pre-treatment cold rolling wastewater, obtains the 3rd pre-treatment Steel Plant oily(waste)water.
3rd pre-treatment Steel Plant oily(waste)water carried out in secondary and after Air Exposure, obtain the 4th pre-treatment Steel Plant oily(waste)water.
The milk of lime that concentration is 5% is added in the 3rd pre-treatment Steel Plant oily(waste)water, and continue aeration, along with the lasting dropping of milk of lime, the throw out of the 3rd pre-treatment Steel Plant oily(waste)water continues to increase and becomes reddish-brown, behind pH regulator to 8.5 ~ 9.5 of the 3rd pre-treatment Steel Plant oily(waste)water, continue aeration 10 minutes, e.g., aeration intensity is 5m 3(air)/m 3(the 3rd pre-treatment Steel Plant oily(waste)water) h, makes the Fe in the 3rd pre-treatment Steel Plant oily(waste)water 2+fe is oxidized under the effect of oxygen 3+, and form CaF 2, Fe (OH) 3, Ni (OH) 2, Cr (OH) 3and CaSO 4throw out, obtains the 4th pre-treatment Steel Plant oily(waste)water.
After being carried out by 4th pre-treatment Steel Plant oily(waste)water flocculating and precipitate, obtain the 5th pre-treatment Steel Plant oily(waste)water and the first pre-treatment bed mud.
In the 4th Steel Plant's oily(waste)water, add polymerize aluminum chloride (PAC) is flocculation agent, dosage is 1 ‰ ~ 5 ‰ (thousandths) of the 4th pre-treatment Steel Plant oily(waste)water volume, after stirring 15min, adding polyacrylamide (PAM) is coagulant aids, and its dosage is 0.1 ‰ of the 4th pre-treatment Steel Plant oily(waste)water volume.After flocculation, the 4th pre-treatment Steel Plant oily(waste)water is carried out deposition and leave standstill, heavy metal ion is precipitated completely with the form of oxyhydroxide.Such as, the 4th pre-treatment Steel Plant oily(waste)water after flocculation is passed into sedimentation tank, and heavy metal ion in the basic conditions, is deposited into the bottom of settling bath with the form of oxyhydroxide.Time of repose is 1h ~ 2h.
By the 5th pre-treatment Steel Plant oily(waste)water through three grades of neutralizations and after filtering, outer row.
In the 5th pre-treatment Steel Plant oily(waste)water, add acid, regulate pH to 6.5 ~ 7.2, and filter, by suspended substance removal, reduce its turbidity, make to reach emission standard.
After first pre-treatment bed mud being carried out concentrated and press filtration, obtain the 6th pre-treatment Steel Plant oily(waste)water and the second pre-treatment bed mud.
The the first pre-treatment bed mud produced is concentrated to concentration basin by sludge pump positive delivery, in the first pre-treatment bed mud, adds PAM with auxiliary mud-water separation.By the first pre-treatment bed mud extracting being carried out pressure rate to pressure filter with pump, the 6th pre-treatment Steel Plant oily(waste)water obtained flows out under gravity, and the water ratio of the second pre-treatment bed mud after press filtration is less than 35%.
By the 6th pre-treatment Steel Plant oily(waste)water after precipitation, three grades of neutralizations and filtration, outer row.
The 6th pre-treatment Steel Plant oily(waste)water after press filtration is back to settling tank and carries out precipitation process, acid is added in the 6th pre-treatment Steel Plant oily(waste)water after precipitation process, regulate pH to 6.5 ~ 7.2, and filter, by suspended substance removal, reduce its turbidity, guarantee to reach emission standard.
After above-mentioned treatment step, the discharge water obtained after testing after, water quality the results are shown in Table 2.
Table 2
Embodiment 2:
The process of Steel Plant's oily(waste)water of certain stainless steel factory, day quantity discharged be 500 tons.Wherein, the water quality situation of Steel Plant's oily(waste)water of this stainless steel factory is as table 3.
Table 3
Now as follows Steel Plant's oily(waste)water of this electroplating facility is processed:
After Steel Plant's oily(waste)water slagging-off and oil removing, obtain the first pre-treatment Steel Plant oily(waste)water.
By carrying out Steel Plant's oily(waste)water, except Slag treatment, foreign material larger for volume in Steel Plant's oily(waste)water being removed.
Steel Plant's oily(waste)water after slagging-off is passed into grease removal tank, by Steel Plant's oily(waste)water after leave standstill 3h after grease removal tank, controlling temperature in grease removal tank is 40 DEG C, the oil slick in Steel Plant's oily(waste)water and the larger oil in water emulsion of particle is made to rise to surface, after collecting surperficial oil reservoir, Steel Plant's oily(waste)water is passed into air flotation pool, by dissolved air flotation process, the oil in water emulsion in removing Steel Plant oily(waste)water.
First pre-treatment Steel Plant oily(waste)water is carried out reduction treatment, obtains the second pre-treatment Steel Plant oily(waste)water.
In the first pre-treatment Steel Plant oily(waste)water, add concentration is 0.05-5% sulfuric acid, after regulating pH to 3.0, adding concentration toward it is again 10%wt (massfraction) S-WAT, make the ORP value of chrome-bearing steel ironworks oily(waste)water for 280mV, 30min after abundant stirring, makes hexavalent chrome reduction become trivalent chromium.
After second pre-treatment Steel Plant oily(waste)water is carried out one-level aeration neutralizing treatment, obtain the 3rd pre-treatment Steel Plant oily(waste)water.
Adding particle diameter toward the second pre-treatment Steel Plant oily(waste)water is 0.5mm ~ 3mm limestone particle, and gives Air Exposure, and aeration intensity is: 2m 3(air)/m 3(the second pre-treatment Steel Plant oily(waste)water) h, by the pH regulator to 4.0 of the second pre-treatment cold rolling wastewater, obtains the 3rd pre-treatment Steel Plant oily(waste)water.
3rd pre-treatment Steel Plant oily(waste)water carried out in secondary and after Air Exposure, obtain the 4th pre-treatment Steel Plant oily(waste)water.
The milk of lime that concentration is 5% is added in the 3rd pre-treatment Steel Plant oily(waste)water, and continue aeration, along with the lasting dropping of milk of lime, the throw out of the 3rd pre-treatment Steel Plant oily(waste)water continues to increase and becomes reddish-brown, after the pH regulator to 9.5 of the 3rd pre-treatment Steel Plant oily(waste)water, continue aeration 10 minutes, e.g., aeration intensity is 8m 3(air)/m 3(the 3rd pre-treatment Steel Plant oily(waste)water) h, makes the Fe in the 3rd pre-treatment Steel Plant oily(waste)water 2+fe is oxidized under the effect of oxygen 3+, and form CaF 2, Fe (OH) 3, Ni (OH) 2, Cr (OH) 3and CaSO 4throw out, obtains the 4th pre-treatment Steel Plant oily(waste)water.
After being carried out by 4th pre-treatment Steel Plant oily(waste)water flocculating and precipitate, obtain the 5th pre-treatment Steel Plant oily(waste)water and the first pre-treatment bed mud.
In the 4th Steel Plant's oily(waste)water, add polymerize aluminum chloride (PAC) is flocculation agent, dosage is 1 ‰ ~ 5 ‰ (thousandths) of the 4th pre-treatment Steel Plant oily(waste)water volume, after stirring 15min, adding polyacrylamide (PAM) is coagulant aids, and its dosage is 0.1 ‰ of the 4th pre-treatment Steel Plant oily(waste)water volume.After flocculation, the 4th pre-treatment Steel Plant oily(waste)water is carried out deposition and leave standstill, heavy metal ion is precipitated completely with the form of oxyhydroxide.Such as, the 4th pre-treatment Steel Plant oily(waste)water after flocculation is passed into sedimentation tank, and heavy metal ion in the basic conditions, is deposited into the bottom of settling bath with the form of oxyhydroxide.Time of repose is 1h ~ 2h.
By the 5th pre-treatment Steel Plant oily(waste)water through three grades of neutralizations and after filtering, outer row.
In the 5th pre-treatment Steel Plant oily(waste)water, add acid, regulate pH to 6.5 ~ 7.2, and filter, by suspended substance removal, reduce its turbidity, make to reach emission standard.
After first pre-treatment bed mud being carried out concentrated and press filtration, obtain the 6th pre-treatment Steel Plant oily(waste)water and the second pre-treatment bed mud.
The the first pre-treatment bed mud produced is concentrated to concentration basin by sludge pump positive delivery, in the first pre-treatment bed mud, adds PAM with auxiliary mud-water separation.By the first pre-treatment bed mud extracting being carried out pressure rate to pressure filter with pump, the 6th pre-treatment Steel Plant oily(waste)water obtained flows out under gravity, and the water ratio of the second pre-treatment bed mud after press filtration is less than 35%.
By the 6th pre-treatment Steel Plant oily(waste)water after precipitation, three grades of neutralizations and filtration, outer row.
The 6th pre-treatment Steel Plant oily(waste)water after press filtration is back to settling tank and carries out precipitation process, acid is added in the 6th pre-treatment Steel Plant oily(waste)water after precipitation process, regulate pH to 6.5 ~ 7.2, and filter, by suspended substance removal, reduce its turbidity, guarantee to reach emission standard.
After above-mentioned treatment step, the discharge water obtained after testing after, water quality the results are shown in Table 4.
Table 4
Embodiment 3:
The process of Steel Plant's oily(waste)water of certain stainless steel factory, day quantity discharged be 5000 tons.Wherein, the water quality situation of Steel Plant's oily(waste)water of this stainless steel factory is as table 5.
Table 5
Now as follows Steel Plant's oily(waste)water of this electroplating facility is processed:
After Steel Plant's oily(waste)water slagging-off and oil removing, obtain the first pre-treatment Steel Plant oily(waste)water.
By carrying out Steel Plant's oily(waste)water, except Slag treatment, foreign material larger for volume in Steel Plant's oily(waste)water being removed.
Steel Plant's oily(waste)water after slagging-off is passed into grease removal tank, by Steel Plant's oily(waste)water after leave standstill 3h after grease removal tank, controlling temperature in grease removal tank is 40 DEG C, the oil slick in Steel Plant's oily(waste)water and the larger oil in water emulsion of particle is made to rise to surface, after collecting surperficial oil reservoir, Steel Plant's oily(waste)water is passed into air flotation pool, by dissolved air flotation process, the oil in water emulsion in removing Steel Plant oily(waste)water.
First pre-treatment Steel Plant oily(waste)water is carried out reduction treatment, obtains the second pre-treatment Steel Plant oily(waste)water.
In the first pre-treatment Steel Plant oily(waste)water, add concentration is 0.05-5% sulfuric acid, after regulating pH to 3.0, adding concentration toward it is again 10%wt (massfraction) S-WAT, make the ORP value of chrome-bearing steel ironworks oily(waste)water for 280mV, 30min after abundant stirring, makes hexavalent chrome reduction become trivalent chromium.
After second pre-treatment Steel Plant oily(waste)water is carried out one-level aeration neutralizing treatment, obtain the 3rd pre-treatment Steel Plant oily(waste)water.
Adding particle diameter toward the second pre-treatment Steel Plant oily(waste)water is 0.5mm ~ 3mm limestone particle, and gives Air Exposure, and aeration intensity is: 2m 3(air)/m 3(the second pre-treatment Steel Plant oily(waste)water) h, by the pH regulator to 4.0 of the second pre-treatment cold rolling wastewater, obtains the 3rd pre-treatment Steel Plant oily(waste)water.
3rd pre-treatment Steel Plant oily(waste)water carried out in secondary and after Air Exposure, obtain the 4th pre-treatment Steel Plant oily(waste)water.
The milk of lime that concentration is 5% is added in the 3rd pre-treatment Steel Plant oily(waste)water, and continue aeration, along with the lasting dropping of milk of lime, the throw out of the 3rd pre-treatment Steel Plant oily(waste)water continues to increase and becomes reddish-brown, after the pH regulator to 9.5 of the 3rd pre-treatment Steel Plant oily(waste)water, continue aeration 10 minutes, e.g., aeration intensity is 8m 3(air)/m 3(the 3rd pre-treatment Steel Plant oily(waste)water) h, makes the Fe in the 3rd pre-treatment Steel Plant oily(waste)water 2+fe is oxidized under the effect of oxygen 3+, and form CaF 2, Fe (OH) 3, Ni (OH) 2, Cr (OH) 3and CaSO 4throw out, obtains the 4th pre-treatment Steel Plant oily(waste)water.
After being carried out by 4th pre-treatment Steel Plant oily(waste)water flocculating and precipitate, obtain the 5th pre-treatment Steel Plant oily(waste)water and the first pre-treatment bed mud.
In the 4th Steel Plant's oily(waste)water, add polymerize aluminum chloride (PAC) is flocculation agent, dosage is 1 ‰ ~ 5 ‰ (thousandths) of the 4th pre-treatment Steel Plant oily(waste)water volume, after stirring 15min, adding polyacrylamide (PAM) is coagulant aids, and its dosage is 0.1 ‰ of the 4th pre-treatment Steel Plant oily(waste)water volume.After flocculation, the 4th pre-treatment Steel Plant oily(waste)water is carried out deposition and leave standstill, heavy metal ion is precipitated completely with the form of oxyhydroxide.Such as, the 4th pre-treatment Steel Plant oily(waste)water after flocculation is passed into sedimentation tank, and heavy metal ion in the basic conditions, is deposited into the bottom of settling bath with the form of oxyhydroxide.Time of repose is 1h ~ 2h.
By the 5th pre-treatment Steel Plant oily(waste)water through three grades of neutralizations and after filtering, outer row.
In the 5th pre-treatment Steel Plant oily(waste)water, add acid, regulate pH to 6.5 ~ 7.2, and filter, by suspended substance removal, reduce its turbidity, make to reach emission standard.
After first pre-treatment bed mud being carried out concentrated and press filtration, obtain the 6th pre-treatment Steel Plant oily(waste)water and the second pre-treatment bed mud.
The the first pre-treatment bed mud produced is concentrated to concentration basin by sludge pump positive delivery, in the first pre-treatment bed mud, adds PAM with auxiliary mud-water separation.By the first pre-treatment bed mud extracting being carried out pressure rate to pressure filter with pump, the 6th pre-treatment Steel Plant oily(waste)water obtained flows out under gravity, and the water ratio of the second pre-treatment bed mud after press filtration is less than 35%.
By the 6th pre-treatment Steel Plant oily(waste)water after precipitation, three grades of neutralizations and filtration, outer row.
The 6th pre-treatment Steel Plant oily(waste)water after press filtration is back to settling tank and carries out precipitation process, acid is added in the 6th pre-treatment Steel Plant oily(waste)water after precipitation process, regulate pH to 6.5 ~ 7.2, and filter, by suspended substance removal, reduce its turbidity, guarantee to reach emission standard.
After above-mentioned treatment step, the discharge water obtained after testing after, water quality the results are shown in Table 6.
Table 6
The above embodiment only have expressed several embodiment of the present utility model, and it describes comparatively concrete and detailed, but therefore can not be interpreted as the restriction to the utility model the scope of the claims.It should be pointed out that for the person of ordinary skill of the art, without departing from the concept of the premise utility, can also make some distortion and improvement, these all belong to protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be as the criterion with claims.

Claims (7)

1. Steel Plant's oiliness sewage treatment equipment, it is characterized in that, comprise wastewater storage tank, grease removal tank, except chromium groove, the first neutralization tank, the second neutralization tank, flocculation basin, settling tank, concentration basin, storage basin, press filtration pond, backflow pool, the 3rd neutralization tank and filter vat;
Described wastewater storage tank is communicated with described grease removal tank, described grease removal tank is communicated with the described chromium groove that removes, described first neutralization tank is communicated with the described chromium groove that removes, described second neutralization tank is communicated with described first neutralization tank, described flocculation basin is communicated with described second neutralization tank, described settling tank is communicated with described flocculation basin and described concentration basin respectively, described storage basin is communicated with described concentration basin, described press filtration pond is communicated with described storage basin, described backflow pool is communicated with described press filtration pond and described settling tank respectively, described 3rd neutralization tank is communicated with described settling tank, described filter vat is communicated with described 3rd neutralization tank,
Described grease removal tank is also provided with flat flow dissolved gas floatator.
2. Steel Plant according to claim 1 oiliness sewage treatment equipment, is characterized in that, be also provided with grid in described wastewater storage tank.
3. Steel Plant according to claim 1 oiliness sewage treatment equipment, is characterized in that, described grid is provided with two filter grids.
4. Steel Plant according to claim 3 oiliness sewage treatment equipment, is characterized in that, two described filter grids are arranged in parallel.
5. Steel Plant according to claim 1 oiliness sewage treatment equipment, is characterized in that, described removing in chromium groove is provided with whipping device.
6. Steel Plant according to claim 1 oiliness sewage treatment equipment, is characterized in that, be provided with central transmission concentrator in described concentration basin.
7. Steel Plant according to claim 1 oiliness sewage treatment equipment, is characterized in that, is provided with plate-and-frame filter press in described press filtration pond.
CN201420635710.7U 2014-10-28 2014-10-28 Steel Plant's oiliness sewage treatment equipment Expired - Fee Related CN204224359U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420635710.7U CN204224359U (en) 2014-10-28 2014-10-28 Steel Plant's oiliness sewage treatment equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420635710.7U CN204224359U (en) 2014-10-28 2014-10-28 Steel Plant's oiliness sewage treatment equipment

Publications (1)

Publication Number Publication Date
CN204224359U true CN204224359U (en) 2015-03-25

Family

ID=52922477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420635710.7U Expired - Fee Related CN204224359U (en) 2014-10-28 2014-10-28 Steel Plant's oiliness sewage treatment equipment

Country Status (1)

Country Link
CN (1) CN204224359U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109453550A (en) * 2018-12-28 2019-03-12 启明星宇节能科技股份有限公司 Press filteration system for denitration desulfurization and dedusting product

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109453550A (en) * 2018-12-28 2019-03-12 启明星宇节能科技股份有限公司 Press filteration system for denitration desulfurization and dedusting product

Similar Documents

Publication Publication Date Title
CN101811792B (en) Processing method of stainless steel cold rolling pickling wastewater
CN102603097B (en) Advanced treatment and recycling process for wastewater containing heavy metal ions
CN101811793B (en) Pretreatment process of chromium-containing wastewater
CN103819023B (en) Treatment and recycling method of industrial wastewater containing a plurality of heavy metal ions
CN101481165B (en) Process for treating chrome wastewater
CN104176857B (en) The treatment process of Mn-bearing waste water in wet method electrolysis manganese production process
CN101269889A (en) Processing method for stainless steel acid cleaning waste water and liquid
CN101993158A (en) Method for treating stainless steel cold rolling pickling waste water
CN101830583A (en) Method for treating waste acid by gypsum sedimentation, arsenic oxidizing sedimentation and iron salt neutralization and co-precipitation
CN103951114B (en) A kind of heavy metal wastewater thereby tertiary treatment and deep purifying reuse technology
CN204224358U (en) Stainless-steel cold-rolling acid waste water treatment unit
CN103626322A (en) Double-alkali neutralization treatment method of heavy metal-containing acidic wastewater
CN106380016A (en) Steel pickling wastewater treatment and reuse method and device
CN106219806A (en) A kind of processing method of heavy metal wastewater thereby
CN102167478B (en) Recycle method of recycled water
CN109368857A (en) A kind of harmless treatment device and technique of iron and steel pickling waste liquid
CN103043834A (en) Rear earth smelting wastewater treatment process
CN104310650B (en) Chromium stainless steel cold rolling wastewater processing method
CN204224359U (en) Steel Plant's oiliness sewage treatment equipment
CN204224357U (en) Oil-containing stainless-steel cold-rolling wastewater treatment equipment
CN204224360U (en) Steel Plant's chromate waste water treatment facility
CN204079640U (en) Acid-washing stainless steel line generalization Waste Water Treatment
CN208869412U (en) The processing system of chromate waste water
CN104310651B (en) Oil-containing stainless-steel cold-rolling wastewater treatment equipment and processing method
CN105384286A (en) Treatment method for cyclic recovery and utilization of industrial wastewater

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150325

Termination date: 20151028

EXPY Termination of patent right or utility model