CN204214279U - Continuous smelting furnace - Google Patents
Continuous smelting furnace Download PDFInfo
- Publication number
- CN204214279U CN204214279U CN201420687889.0U CN201420687889U CN204214279U CN 204214279 U CN204214279 U CN 204214279U CN 201420687889 U CN201420687889 U CN 201420687889U CN 204214279 U CN204214279 U CN 204214279U
- Authority
- CN
- China
- Prior art keywords
- wire netting
- transmission block
- smelting furnace
- melting
- slag device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Manufacture And Refinement Of Metals (AREA)
Abstract
A kind of continuous smelting furnace, comprise two melting ponds (2), each melting pond (2) respectively there are two agitators (1), it is characterized in that, each melting pond (2) upper surface is equipped with wire netting (3), between agitator (1) and wire netting (3), hair-dryer (6) is equipped with in top, and transmission block (4) is equipped with in wire netting (3) connection, and transmission block (4) connects to be equipped with contains slag device (5).Transmission block (4) and Sheng slag device (5) are positioned at melting pond (2) side.Because the fusing point of aluminium and steel is respectively 660 degrees Celsius and 1300 degrees Celsius, in order to prevent fusing, wire netting (3) is steel net, and lower with steel product cost.Waste residue can be blown to wire netting (3) and deliver to Sheng slag device (5) through transmission block (4) by hair-dryer (6).The laborsaving safety again of the utility model.
Description
Technical field
The utility model relates to continuous smelting furnace, belongs to aluminium Die Casting Industry.
Background technology
In aluminium Die Casting Industry, continuous smelting furnace is used for smelting aluminum, current continuous smelting furnace, generally there are two melting ponds, each melting pond there are two agitators, after smelting aluminum, melting pond upper surface is floating has a lot of waste residue to need cleaning, and present cleaning waste slag mainly relies on artificial net to pull out, not only painstaking but also dangerous.
Summary of the invention
The technical problems to be solved in the utility model is the continuous smelting furnace providing a kind of laborsaving safety again.
The scheme that the utility model solve the technical problem is:
A kind of continuous smelting furnace, comprise two melting ponds (2), each melting pond (2) respectively there are two agitators (1), it is characterized in that, each melting pond (2) upper surface is equipped with wire netting (3), between agitator (1) and wire netting (3), hair-dryer (6) is equipped with in top, and transmission block (4) is equipped with in wire netting (3) connection, and transmission block (4) connects to be equipped with contains slag device (5).Transmission block (4) and Sheng slag device (5) are positioned at melting pond (2) side.Because the fusing point of aluminium and steel is respectively 660 degrees Celsius and 1300 degrees Celsius, in order to prevent fusing, wire netting (3) is preferably steel net, and lower with steel product cost.Waste residue can be blown to wire netting (3) by hair-dryer (6), and through transmission block, (4 deliver to Sheng slag device (5).
The laborsaving safety again of the utility model.
Accompanying drawing explanation
Fig. 1 is the utility model schematic front view.
Detailed description of the invention
A kind of continuous smelting furnace, comprise two melting ponds (2), each melting pond (2) respectively there are two agitators (1), it is characterized in that, each melting pond (2) upper surface is equipped with wire netting (3), between agitator (1) and wire netting (3), hair-dryer (6) is equipped with in top, and transmission block (4) is equipped with in wire netting (3) connection, and transmission block (4) connects to be equipped with contains slag device (5).Transmission block (4) and Sheng slag device (5) are positioned at melting pond (2) side.Because the fusing point of aluminium and steel is respectively 660 degrees Celsius and 1300 degrees Celsius, in order to prevent fusing, wire netting (3) is steel net, and lower with steel product cost.Waste residue can be blown to wire netting (3) by hair-dryer (6), and through transmission block, (4 deliver to Sheng slag device (5).
Claims (3)
1. a continuous smelting furnace, comprise two melting ponds (2), each melting pond (2) respectively there are two agitators (1), it is characterized in that, each melting pond (2) upper surface is equipped with wire netting (3), between agitator (1) and wire netting (3), hair-dryer (6) is equipped with in top, and transmission block (4) is equipped with in wire netting (3) connection, and transmission block (4) connects to be equipped with contains slag device (5).
2. a kind of continuous smelting furnace according to claim 1, is characterized in that, described transmission block (4) and Sheng slag device (5) are positioned at melting pond (2) side.
3. a kind of continuous smelting furnace according to claim 1, is characterized in that, described wire netting (3) is steel net.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420687889.0U CN204214279U (en) | 2014-11-18 | 2014-11-18 | Continuous smelting furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420687889.0U CN204214279U (en) | 2014-11-18 | 2014-11-18 | Continuous smelting furnace |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204214279U true CN204214279U (en) | 2015-03-18 |
Family
ID=52982944
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420687889.0U Active CN204214279U (en) | 2014-11-18 | 2014-11-18 | Continuous smelting furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204214279U (en) |
-
2014
- 2014-11-18 CN CN201420687889.0U patent/CN204214279U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204214279U (en) | Continuous smelting furnace | |
CN204108309U (en) | The cold steel extractor of steel ladle opening improved | |
CN203428574U (en) | Coke sieving hopper device | |
CN204039469U (en) | A kind of crystallizer for electroslag furnace discloses slag device | |
CN204381355U (en) | A kind of stopper tundish botting cone | |
CN203956311U (en) | A kind of electric torch | |
CN203269112U (en) | Automatic material receiving device for thermal treatment furnace | |
CN202626012U (en) | Guard brick | |
CN202915717U (en) | Calcining furnace discharging device | |
CN204225099U (en) | Utensil transferred by hole digging pile reinforcing bar | |
CN203683615U (en) | Device of pusher-type heating furnace for preventing steel collapse | |
CN204384122U (en) | A kind of iron and steel production hopper | |
CN204346101U (en) | Crucible | |
CN203124660U (en) | Deep well type tin bar casting equipment | |
CN204747469U (en) | Die casting cinder ladle remove device | |
CN202741542U (en) | Automatic rim charge removing device of automobile mould | |
CN207417694U (en) | A kind of artificial carrying has just cast the frock of lead pig | |
CN202955982U (en) | Furnace nozzle brick | |
CN202619783U (en) | Integrated stone-taking mesh basket | |
IN2015KN00703A (en) | ||
CN204247634U (en) | A kind of device removing feed pipe sizing material | |
CN204321121U (en) | A kind of fixture of dore casting crucible | |
CN204097519U (en) | Vacuum oil quenching turnover furnaceman dress | |
CN204224060U (en) | The self-closing weight of elevator door | |
CN203944804U (en) | A kind of for copper bar production line chute filter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170401 Address after: 321100 Lanxi City, Zhejiang Province Economic Development Zone, Deng Sheng Road Patentee after: Zhejiang Xinghui Aluminum Wheel Co., Ltd. Address before: 321100 Lanxi City, Zhejiang Province Economic Development Zone, Sheng Road, No. 7, No. Patentee before: Hu Hongjian |
|
TR01 | Transfer of patent right |