CN204203649U - A kind of intelligent building equipment monitoring system - Google Patents
A kind of intelligent building equipment monitoring system Download PDFInfo
- Publication number
- CN204203649U CN204203649U CN201420657675.9U CN201420657675U CN204203649U CN 204203649 U CN204203649 U CN 204203649U CN 201420657675 U CN201420657675 U CN 201420657675U CN 204203649 U CN204203649 U CN 204203649U
- Authority
- CN
- China
- Prior art keywords
- converter
- monitoring system
- control system
- topworks
- measurement data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Selective Calling Equipment (AREA)
- Arrangements For Transmission Of Measured Signals (AREA)
Abstract
The utility model discloses a kind of intelligent building equipment monitoring system, comprise center system, field control system and field apparatus; Measurement data is sent to described center system by described field apparatus, and the steering order sent according to measurement data is sent to described field control system by described center system.The intelligent building equipment monitoring system that the utility model provides, adopt automatic technology, independently can monitor relevant field devices, when breaking down in field apparatus, the performance of other equipment can not be affected, for device systems carries out centralized watch, distributes control and management, improve the reliability of supervisory system, simultaneously for the resident family in building provide comfortable, safe, serve easily, can application be widelyd popularize.
Description
Technical field
The utility model relates to building automatic, is specifically related to a kind of intelligent building equipment monitoring system.
Background technology
Along with improving constantly and social development of people's life, modern various building construction inside is all provided with a large amount of electromechanical equipments, as distribution equipment, light fixture, air-conditioning equipment, ventilation equipment, plumbing equipment and elevator etc., there is between these electromechanical equipments complicated interaction relation, and need the crowd different with service according to the functional localization of building.Traditional building monitoring system be in computer technology and mechanics of communication basis, adopt loose collection technology and control technology regulate various building construction and manage, but these technology is that building construction normally runs, management maintenance brings great difficulty.
Utility model content
Goal of the invention: for the deficiencies in the prior art, in order to improve the high reliability of building monitoring system, the invention provides a kind of intelligent building equipment monitoring system is that device systems carries out centralized watch, distributes control and management.
Technical scheme: for achieving the above object, the technical solution adopted in the utility model is:
A kind of intelligent building equipment monitoring system, comprises center system, field control system and field apparatus; Measurement data is sent to described center system by described field apparatus, and the steering order sent according to measurement data is sent to described field control system by described center system.
Further, described center system comprises central monitoring system, communication Protocol Conversion system and uninterruptible power system; Communication bus after conversion is linked into described central monitoring system by described communication Protocol Conversion system.
Further, described field apparatus comprises Temperature Humidity Sensor, pressure transducer, water flow sensor, liquid level sensor, gateway, relay and topworks.
Further, described gateway passes to described center system the measurement data after conversion.
Further, described field control system comprises direct digital control system and rack; Described direct digital control system comprises multi-channel sampling device, A/D converter, computer microprocessor and D/A converter, and sampled data is passed to described computer microprocessor by described A/D converter by described sampling thief.
Further, described D/A converter is connected with described topworks, sampled data after analyzing stored is passed to described topworks by described D/A converter by described computer microprocessor, and described topworks is responsible for the control signal after by conversion and passes to governor motion.
Further, described governor motion adopts air-conditioning system.
Beneficial effect: the intelligent building equipment monitoring system that the utility model provides, adopt automatic technology, independently can monitor relevant field devices, when breaking down in field apparatus, the performance of other equipment can not be affected, for device systems carries out centralized watch, distributes control and management, improve the reliability of supervisory system, simultaneously for the resident family in building provide comfortable, safe, serve easily, can application be widelyd popularize.
Accompanying drawing explanation
Fig. 1 is the theory diagram of intelligent building supervisory system;
Fig. 2 is single loop closed loop thermal control system block diagram.
Embodiment
Below in conjunction with accompanying drawing, the utility model is further described.
Intelligent building supervisory system as shown in Figure 1, comprises center system, field control system and field apparatus; Measurement data is sent to described center system by described field apparatus, and the steering order sent according to measurement data is sent to described field control system by described center system.
Described center system comprises central monitoring system, communication Protocol Conversion system and uninterruptible power system; Communication bus after conversion is linked into described central monitoring system by described communication Protocol Conversion system.
Described field apparatus comprises Temperature Humidity Sensor, pressure transducer, water flow sensor, liquid level sensor, gateway, relay and topworks.Described gateway passes to described center system the measurement data after conversion.
Described field control system comprises direct digital control system and rack; Described direct digital control system comprises multi-channel sampling device, A/D converter, computer microprocessor and D/A converter, and sampled data is passed to described computer microprocessor by described A/D converter by described sampling thief.
Described D/A converter is connected with described topworks, and the sampled data after analyzing stored is passed to described topworks by described D/A converter by described computer microprocessor, and described topworks is responsible for the control signal after by conversion and passes to governor motion.
Described governor motion adopts air-conditioning system.
In the present embodiment, by being further described the present invention the collection of temperature data, single loop closed loop thermal control system as shown in Figure 2, comprising temperature sensor, central monitoring system, topworks and an air-conditioning system; The temperature of serviceability temperature sensor to indoor and outdoor, airduct and water pipe is measured, measurement data enters after comparing element compares with the temperature value that presets, enter central monitoring system, deviation according to setting value and actual measuring tempeature value sends steering order according to certain rule, topworks control signal is converted to angular displacement or straight-line displacement exports, change temperature value by air-conditioning system, reach the object of control temperature parameter.
The above is only preferred implementation of the present utility model; be noted that for those skilled in the art; under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.
Claims (2)
1. an intelligent building equipment monitoring system, comprise center system, field control system and field apparatus, measurement data is sent to described center system by described field apparatus, the steering order sent according to measurement data is sent to described field control system by described center system, it is characterized in that: described field apparatus comprises Temperature Humidity Sensor, pressure transducer, water flow sensor, liquid level sensor, gateway, relay and topworks, described gateway passes to described center system the measurement data after conversion; Described center system comprises central monitoring system, communication Protocol Conversion system and uninterruptible power system, and the communication bus after conversion is linked into described central monitoring system by described communication Protocol Conversion system; Described field control system comprises direct digital control system and rack, described direct digital control system comprises multi-channel sampling device, A/D converter, computer microprocessor and D/A converter, sampled data is passed to described computer microprocessor by described A/D converter by described multi-channel sampling device, described D/A converter is connected with described topworks, sampled data after analyzing stored is passed to described topworks by described D/A converter by described computer microprocessor, and described topworks is responsible for the control signal after by conversion and passes to governor motion.
2. intelligent building equipment monitoring system according to claim 1, is characterized in that: described governor motion adopts air-conditioning system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420657675.9U CN204203649U (en) | 2014-11-05 | 2014-11-05 | A kind of intelligent building equipment monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420657675.9U CN204203649U (en) | 2014-11-05 | 2014-11-05 | A kind of intelligent building equipment monitoring system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204203649U true CN204203649U (en) | 2015-03-11 |
Family
ID=52661590
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420657675.9U Expired - Fee Related CN204203649U (en) | 2014-11-05 | 2014-11-05 | A kind of intelligent building equipment monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204203649U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110347075A (en) * | 2019-05-22 | 2019-10-18 | 上海博昂电气有限公司 | Building equipment control system |
-
2014
- 2014-11-05 CN CN201420657675.9U patent/CN204203649U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110347075A (en) * | 2019-05-22 | 2019-10-18 | 上海博昂电气有限公司 | Building equipment control system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203748358U (en) | Accurate irrigation device based on internet of things | |
CN204203649U (en) | A kind of intelligent building equipment monitoring system | |
CN207780633U (en) | For the temperature and cooling water flow number measure and control device inside mass concrete | |
CN203799462U (en) | Automatic fire alarm management system | |
CN104317201A (en) | Intelligent building device monitoring system | |
CN104848402A (en) | Concentrated control system for district heating | |
CN204115762U (en) | Non-negative pressure water-supply installation switch board comprehensive detection device | |
CN204563406U (en) | Fire hydrant water pressure monitoring equipment | |
CN103630169A (en) | Temperature and humidity detecting and control system based on RF (radio frequency) wireless communication | |
CN204884047U (en) | Indoor digital monitoring management system | |
CN204202093U (en) | The inner multiple-parameter air quality monitoring system of civil buildings | |
CN104503379A (en) | Environmental protection stealing discharge and discharge volume remote energy consumption monitoring device and management system | |
CN104208963A (en) | PM2.5 adaptive air purifier and working method of PM2.5 adaptive air purifier | |
CN204695030U (en) | A kind of precision drilling corning machine with drill bit heat sink | |
CN107290999A (en) | A kind of substation equipment monitoring system based on Internet of Things | |
CN203276523U (en) | Singlechip-based warehouse environment monitoring system | |
CN203202738U (en) | Lighting device for indoor fire hydrant | |
CN202634068U (en) | Intelligent operation system of distribution transformer | |
CN202333990U (en) | Intelligent multimedia monitoring system | |
CN202353323U (en) | Direct current monitoring system for transformer substations | |
CN204129466U (en) | A kind of dynamic environment monitoring device | |
CN209388167U (en) | A kind of novel monitoring drainage pipeline networks hydrographic data intelligent hardware devices | |
CN204229275U (en) | A kind of intelligent flower stand temperature and humidity control system | |
CN204807138U (en) | Humiture intelligence alarm device based on SCADA | |
CN203849245U (en) | Regional concentration alarm linkage exhaust device for oxygen station building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150311 Termination date: 20201105 |