CN204200179U - A kind of shale gas well gas testing gas producing device - Google Patents

A kind of shale gas well gas testing gas producing device Download PDF

Info

Publication number
CN204200179U
CN204200179U CN201420497793.8U CN201420497793U CN204200179U CN 204200179 U CN204200179 U CN 204200179U CN 201420497793 U CN201420497793 U CN 201420497793U CN 204200179 U CN204200179 U CN 204200179U
Authority
CN
China
Prior art keywords
gas
testing
gas testing
eliminator
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420497793.8U
Other languages
Chinese (zh)
Inventor
刘乔平
刘培厚
王振兴
喻建川
李鹏
杨宗桂
高东伟
张怀力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Chongqing Fuling Shale Gas Exploration and Development Co Ltd
Original Assignee
Sinopec Chongqing Fuling Shale Gas Exploration and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Chongqing Fuling Shale Gas Exploration and Development Co Ltd filed Critical Sinopec Chongqing Fuling Shale Gas Exploration and Development Co Ltd
Priority to CN201420497793.8U priority Critical patent/CN204200179U/en
Application granted granted Critical
Publication of CN204200179U publication Critical patent/CN204200179U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of shale gas well gas testing gas producing device, comprise christmas tree, flow line, gas testing pipeline and relief line, described flow line and christmas tree removably connect; Described gas testing pipeline is in turn connected to form by heat interchanger and gas testing eliminator, choke valve group is provided with between described heat interchanger and gas testing eliminator, the outlet line of described gas testing eliminator is connected with manual platform gate valve and blow-down pipe in turn, described blow-down pipe is provided with pressure regulator valve, and the blowdown pipeline of described gas testing eliminator is connected with manual platform gate valve; Described relief line is connected with christmas tree, and described relief line is provided with control valve group.Natural gas will be tested and access gas production flow process, shorten the natural gas vent time, reduce natural gas vent amount, energy conservation, flow process safety of strengthening, raising gas metering precision.

Description

A kind of shale gas well gas testing gas producing device
Technical field
The utility model relates to shale gas production technique field, concrete a kind of shale gas well gas testing gas producing device.
Background technology
At present; natural gas is extensive use; and shale gas is a main source of natural gas; at the mining phase of shale gas, because testing process is incomplete in gas testing initial stage gas testing process, usually carry out emptying combustion testing; every mouthful of well test process generally continues 2-3 days; need more than emptying gas-firing 300,000 side, cause natural gas resource to waste on the one hand, be unfavorable for environmental protection on the other hand.Critical speed flowmeters needs downstream pressure ratio to reach more than 2 times simultaneously, otherwise error in dipping is larger.Therefore, the device designing a kind of novel shale gas well gas testing gas production flow process and correspondence is necessary, to economize on resources and protection of the environment.
Utility model content
A kind of shale gas well gas testing gas producing device that the utility model proposes and flow process, decrease the emptying amount of shale gas, energy conservation, reduce shale gas development cost, be also beneficial to environmental protection simultaneously.
The technical solution of the utility model is achieved in that a kind of shale gas well gas testing gas producing device, comprises christmas tree, flow line, gas testing pipeline and relief line,
Described flow line and christmas tree removably connect;
Described gas testing pipeline is in turn connected to form by heat interchanger and gas testing eliminator, choke valve group is provided with between described heat interchanger and gas testing eliminator, the outlet line of described gas testing eliminator is connected with manual platform gate valve and blow-down pipe in turn, described blow-down pipe is provided with pressure regulator valve, and the blowdown pipeline of described gas testing eliminator is connected with manual platform gate valve;
Described relief line is connected with christmas tree, and described relief line is provided with control valve group.
Further, the outlet line of described gas testing eliminator is also provided with flow meter, and described flow meter is located between manual flat valve and pressure regulator valve.
Further, described flow meter adopts valve-type orifice-plate flow meter.
Further, be provided with tube connector between the outlet line of described flow line and gas testing eliminator, described tube connector one end is located between outlet line flow meter and pressure regulator valve, and the other end is connected with flow line.
The beneficial effects of the utility model are: a kind of shale gas well gas testing gas producing device of the present utility model compared with prior art, obtains following technique effect:
(1) reduce natural gas vent amount, energy conservation, reduce environment pollution.Connect gas testing flow process before gas testing, flow line is connected to gas production wellhead simultaneously, but is not communicated with christmas tree, and test line connects branch line to flow line, will test natural gas access gas production flow process, and reduce natural gas vent time and emptying amount.
(2) flow process safety is strengthened.Gas testing pipeline increases pressure regulator valve, and pressure regulator valve release pressure arranges 5.5MPa, controls gas testing process pressure in 5.5MPa, ensures gas testing flow process safety.By the valve-type orifice-plate flow meter in gas testing flow process, simplify gas production computational methods and improve measuring accuracy.
(3) remarkable in economical benefits.Shorten the natural gas vent time, decrease natural gas vent amount, thus gas production improves, and then increase economic efficiency.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of the utility model embodiment.
In figure: 1, christmas tree; 2, heat interchanger; 3, choke valve group; 4, gas testing eliminator; 5, manual platform gate valve; 6, valve-type orifice-plate flow meter; 7, pressure regulator valve; 8, control valve group; 9, blow-down pipe; 10, flow line; 11, relief line.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
The technical solution of the utility model is as shown in Figure 1 achieved in that a kind of shale gas well gas testing gas producing device, comprises christmas tree, flow line, gas testing pipeline and relief line,
Described flow line and christmas tree removably connect;
Described gas testing pipeline is in turn connected to form by heat interchanger and gas testing eliminator, choke valve group is provided with between described heat interchanger and gas testing eliminator, the outlet line of described gas testing eliminator is connected with manual platform gate valve and blow-down pipe in turn, described blow-down pipe is provided with pressure regulator valve, and the blowdown pipeline of described gas testing eliminator is connected with manual platform gate valve;
Described relief line is connected with christmas tree, and described relief line is provided with control valve group.
The outlet line of described gas testing eliminator is also provided with flow meter, and described flow meter is located between manual flat valve and pressure regulator valve.
Described flow meter adopts valve-type orifice-plate flow meter.Be provided with tube connector between the outlet line of described flow line and gas testing eliminator, described tube connector one end is located between outlet line flow meter and pressure regulator valve, and the other end is connected with flow line.
Before gas testing, flow line is connected to gas production wellhead, but is not communicated with christmas tree, gas testing pipeline branch line and flow line are connected, and will test natural gas access gas production flow process, and reduce natural gas vent time and emptying amount.
Pressure regulator valve on blow-down pipe, pressure regulator valve release pressure arranges 5.5MPa, controls the pressure of gas testing flow process within 5.5MPa, ensures the safety of gas testing flow process.
Valve-type orifice-plate flow meter is conveniently used for technology gas production.
The utility model, when reality uses, can reduce emptying time 2 days, saves emptying natural gas 600,000 side.Applicant builds plan Brought-in Gas Wells 253 mouthfuls at product, and the later stage still has 227 implication wells, saves 600,000 sides calculate with every implication well, accumulative saving natural gas 1.362 hundred million side, wound effect 400,000,000 yuan, remarkable in economical benefits.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (4)

1. a shale gas well gas testing gas producing device, is characterized in that: comprise christmas tree, flow line, gas testing pipeline and relief line,
Described flow line and christmas tree removably connect;
Described gas testing pipeline is in turn connected to form by heat interchanger and gas testing eliminator, choke valve group is provided with between described heat interchanger and gas testing eliminator, the outlet line of described gas testing eliminator is connected with manual platform gate valve and blow-down pipe in turn, described blow-down pipe is provided with pressure regulator valve, and the blowdown pipeline of described gas testing eliminator is connected with manual platform gate valve;
Described relief line is connected with christmas tree, and described relief line is provided with control valve group.
2. a kind of shale gas well gas testing gas producing device according to claim 1, is characterized in that: the outlet line of described gas testing eliminator is also provided with flow meter, and described flow meter is located between manual flat valve and blow-down pipe.
3. a kind of shale gas well gas testing gas producing device according to claim 2, is characterized in that: described flow meter adopts valve-type orifice-plate flow meter.
4. a kind of shale gas well gas testing gas producing device according to claim 1, it is characterized in that: between the outlet line of described flow line and gas testing eliminator, be provided with tube connector, described tube connector one end is located between outlet line flow meter and pressure regulator valve, and the other end is connected with flow line.
CN201420497793.8U 2014-08-30 2014-08-30 A kind of shale gas well gas testing gas producing device Expired - Fee Related CN204200179U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420497793.8U CN204200179U (en) 2014-08-30 2014-08-30 A kind of shale gas well gas testing gas producing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420497793.8U CN204200179U (en) 2014-08-30 2014-08-30 A kind of shale gas well gas testing gas producing device

Publications (1)

Publication Number Publication Date
CN204200179U true CN204200179U (en) 2015-03-11

Family

ID=52658147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420497793.8U Expired - Fee Related CN204200179U (en) 2014-08-30 2014-08-30 A kind of shale gas well gas testing gas producing device

Country Status (1)

Country Link
CN (1) CN204200179U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105257253A (en) * 2015-10-13 2016-01-20 中国石油化工股份有限公司 Environment-friendly and energy-saving gas testing method
CN105370248A (en) * 2014-08-30 2016-03-02 中石化重庆涪陵页岩气勘探开发有限公司 Shale gas well gas testing and production device and flow
CN111946330A (en) * 2020-08-05 2020-11-17 中石化石油工程技术服务有限公司 Shale gas advances station superpressure and promptly handles sled
CN114607322A (en) * 2022-03-29 2022-06-10 重庆非常规油气研究院有限公司 High-pressure shale gas well trial production integrated mining and transportation method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370248A (en) * 2014-08-30 2016-03-02 中石化重庆涪陵页岩气勘探开发有限公司 Shale gas well gas testing and production device and flow
CN105257253A (en) * 2015-10-13 2016-01-20 中国石油化工股份有限公司 Environment-friendly and energy-saving gas testing method
CN111946330A (en) * 2020-08-05 2020-11-17 中石化石油工程技术服务有限公司 Shale gas advances station superpressure and promptly handles sled
CN111946330B (en) * 2020-08-05 2023-12-01 中石化石油工程技术服务有限公司 Shale gas station-entering overpressure emergency treatment pry
CN114607322A (en) * 2022-03-29 2022-06-10 重庆非常规油气研究院有限公司 High-pressure shale gas well trial production integrated mining and transportation method

Similar Documents

Publication Publication Date Title
CN105370248A (en) Shale gas well gas testing and production device and flow
CN204200179U (en) A kind of shale gas well gas testing gas producing device
CN203965113U (en) A kind of pipeline pressure testing device
CN203420706U (en) Simulation experiment set of variable angle horizontal well
CN203271673U (en) Automatically-controlled multiple branch choke manifold
CN205135587U (en) Composite regulation of many wells of polymer partial pressure integration sled dress device
CN202084243U (en) Training device of multi-functional oil-gas gathering and transportation skill
CN205271986U (en) Large -scale return bend scribed circle ruler
CN202338775U (en) Online blow-down apparatus for high-pressure natural gas pipeline
CN204283373U (en) A kind of hydraulic jet perforation choke manifold
CN104405346A (en) Hydraulic sand jet perforation choke manifold
CN203322734U (en) Prying device for standby natural gas sources
CN203155194U (en) Aerosol generator
CN202867927U (en) Parataxis-type spilled oil bypass reduced pressure device for testing water pressure
CN203585814U (en) Integrated skid-mounted device
CN203925432U (en) A kind of production tree device
CN204588681U (en) The automatic transport of TGA and mercaptopropionic acid and gauging device
CN203731083U (en) Valve detecting device for liquefied natural gas cylinder
CN204475429U (en) A kind of backwash constant pressure water supply case
CN203812487U (en) Extraction, injection, transportation oil field ground engineering analogue simulation system
CN204457655U (en) The retracting device of casing gas
CN201318291Y (en) Skidded special sulfonate screw pump system
CN106644818B (en) Shale gas well yield simulation tester under slippery water effect
CN204457736U (en) A kind of oil well output mixes transportation metering device
CN204371298U (en) A kind of horizontal shale gas metering system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150311