CN204199318U - 多用途铁塔基础地脚螺栓定位模板装置 - Google Patents
多用途铁塔基础地脚螺栓定位模板装置 Download PDFInfo
- Publication number
- CN204199318U CN204199318U CN201420121717.7U CN201420121717U CN204199318U CN 204199318 U CN204199318 U CN 204199318U CN 201420121717 U CN201420121717 U CN 201420121717U CN 204199318 U CN204199318 U CN 204199318U
- Authority
- CN
- China
- Prior art keywords
- iron tower
- bracket
- bolt
- internal bore
- tower base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 title claims abstract description 64
- 229910052742 iron Inorganic materials 0.000 title claims abstract description 32
- 230000008901 benefit Effects 0.000 abstract description 3
- 238000009434 installation Methods 0.000 abstract description 3
- 230000005540 biological transmission Effects 0.000 abstract description 2
- 230000007774 longterm Effects 0.000 abstract description 2
- 239000004575 stone Substances 0.000 description 7
- 238000010276 construction Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Abstract
本实用新型涉及一种用于66及220千伏电压等级输电线路铁塔中的多用途铁塔基础地脚螺栓定位模板装置。包括X形模板托架(1),托架(1)四角分别设有内孔槽,内孔槽内安装有滑块(2)并通过安装在托架(1)侧面对应位置的固定螺栓(4)进行定位紧固,其特征在于该装置还包括有多种型号尺寸的螺栓调节环(6),托架(1)上内孔槽位置设置有刻度尺(3)。本实用新型投入少,成本低,可实现对多套不同尺寸与型式模板的替代,一次投入,长期受益,从而大大节约制作多套模板的成本,而且可以有效提高铁塔基础地脚螺栓的安装精度,适合电力系统广泛推广使用。
Description
技术领域
本实用新型涉及电力系统中钢体结构安装领域,尤其涉及一种用于66及220千伏电压等级输电线路铁塔中的多用途铁塔基础地脚螺栓定位模板装置。
背景技术
以往在66千伏及220千伏铁塔基础施工过程中,因为每基铁塔的基础形式不同,因此铁塔基础的地脚螺栓的尺寸、规格与型号也不相同,一般铁塔基础地脚螺栓的规格从M20—M72不等,这样施工人员在进行铁塔基础混凝土浇制的过程中,因为铁塔地脚螺栓规格的不同而要准备多套不同规格的模板来固定4根地脚螺栓,材质有木质的与金属的等等,这样施工人员在对不同型式的铁塔基础进行施工时,要备用多套不同的型号的地脚螺栓固定模板,而且因长期使用而造成磨损而废弃,这样一来,不但给施工人员施工带来诸多不便,而且还造成不必要的浪费,为了减少施工人员在铁塔基础浇制过程中所准备的模板数量,并可以多次重复使用,特研制此多用途铁塔基础地脚螺栓定位模板装置。
实用新型内容
未解决上述现有技术中的不足,本实用新型公开了一种多用途铁塔基础地脚螺栓定位模板装置,目的在于解决固定模板型号过多,工作人员容易选错且携带不便等问题导致延误施工,资源浪费。
本实用新型是通过一下技术手段实现的:
多用途铁塔基础地脚螺栓定位模板装置,包括X形模板托架,托架四角分别设有内孔槽,内孔槽内安装有滑块并通过安装在托架侧面对应位置的固定螺栓进行定位紧固,该装置还包括有多种型号尺寸的螺栓调节环,托架上内孔槽位置设置有刻度尺。
所述X形模板托架中心交叉位置上表面还安装有水准泡。
本实用新型的优点及有益效果为:在66及220千伏线路铁塔现浇基础的混凝土浇制中应用这种多用途铁塔基础地脚螺栓定位模板装置,投入少,成本低,可实现对多套不同尺寸与型式模板的替代,一次投入,长期受益,从而大大节约制作多套模板的成本,而且可以有效提高铁塔基础地脚螺栓的安装精度,适合电力系统广泛推广使用。
附图说明
图1为本实用新型定位装置结构图;
图2为本实用新型定位装置安装示意图;
图中:1、托架,2、滑块,3、刻度尺,4、固定螺栓,5、水准泡,6、螺栓调节环,7、地脚螺栓,8、铁塔基础立柱盒板。
具体实施方式
实施例1
如图1所示,多用途铁塔基础地脚螺栓定位模板装置,包括X形模板托架1,托架1四角分别设有内孔槽,内孔槽内安装有滑块2并通过安装在托架1侧面对应位置的固定螺栓4进行定位紧固,其特征在于该装置还包括有多种型号尺寸的螺栓调节环6,托架1上内孔槽位置设置有刻度尺3,托架1中心交叉位置上表面还安装有水准泡5。
施工时,将此多用途铁塔基础地脚螺栓定位模板装置安装在如图2所标示的位置,即在不同类型的现浇铁塔基础施工过程中,在混凝土浇制到立柱时,将这种多用途铁塔基础地脚螺栓定位模板装置放置到铁塔基础立柱盒板8的上沿,根据图纸所查本基铁塔基础的地脚螺栓7的型号与尺寸,选出适合本基铁塔基础的地脚螺栓调节环6放到此模板装置的滑块内2,并根据图纸所标示的该塔型基础地脚螺栓7对角长度用刻度尺3量出后,用固定螺栓4将滑块2固定,然后将此定位模板装置用卡子或铁线固定在铁塔基础立柱盒板8的上沿,再将此基铁塔基础地脚螺栓7装入此装置的地脚螺栓调节环6内,带上螺丝,就可以继续进行混凝土浇制了。
Claims (2)
1.多用途铁塔基础地脚螺栓定位模板装置,包括X形模板托架(1),托架(1)四角分别设有内孔槽,内孔槽内安装有滑块(2)并通过安装在托架(1)侧面对应位置的固定螺栓(4)进行定位紧固,其特征在于该装置还包括有多种型号尺寸的螺栓调节环(6),托架(1)上内孔槽位置设置有刻度尺(3)。
2.根据权利要求1所述多用途铁塔基础地脚螺栓定位模板装置,其特征在于所述X形模板托架(1)中心交叉位置上表面还安装有水准泡(5)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420121717.7U CN204199318U (zh) | 2014-03-18 | 2014-03-18 | 多用途铁塔基础地脚螺栓定位模板装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420121717.7U CN204199318U (zh) | 2014-03-18 | 2014-03-18 | 多用途铁塔基础地脚螺栓定位模板装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204199318U true CN204199318U (zh) | 2015-03-11 |
Family
ID=52657293
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420121717.7U Expired - Lifetime CN204199318U (zh) | 2014-03-18 | 2014-03-18 | 多用途铁塔基础地脚螺栓定位模板装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204199318U (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103850266A (zh) * | 2014-03-18 | 2014-06-11 | 国家电网公司 | 多用途铁塔基础地脚螺栓定位模板装置及定位方法 |
CN108019421A (zh) * | 2017-11-24 | 2018-05-11 | 佛山市因诺威特科技有限公司 | 一种基于十字花型多功能安装座 |
CN110080276A (zh) * | 2019-05-23 | 2019-08-02 | 河南海鹏送变电工程有限公司 | 一种塔基地脚螺栓定位模板装置 |
WO2021126305A1 (en) * | 2019-12-18 | 2021-06-24 | Sugden Michael D | Anchor bolt mounting |
-
2014
- 2014-03-18 CN CN201420121717.7U patent/CN204199318U/zh not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103850266A (zh) * | 2014-03-18 | 2014-06-11 | 国家电网公司 | 多用途铁塔基础地脚螺栓定位模板装置及定位方法 |
CN108019421A (zh) * | 2017-11-24 | 2018-05-11 | 佛山市因诺威特科技有限公司 | 一种基于十字花型多功能安装座 |
CN110080276A (zh) * | 2019-05-23 | 2019-08-02 | 河南海鹏送变电工程有限公司 | 一种塔基地脚螺栓定位模板装置 |
WO2021126305A1 (en) * | 2019-12-18 | 2021-06-24 | Sugden Michael D | Anchor bolt mounting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204199318U (zh) | 多用途铁塔基础地脚螺栓定位模板装置 | |
CN204248687U (zh) | 一种c型夹具 | |
CN103850266A (zh) | 多用途铁塔基础地脚螺栓定位模板装置及定位方法 | |
CN103485533B (zh) | 线盒安装模具及利用该模具在砌体墙上安装线盒的方法 | |
CN205134701U (zh) | 带标尺定位点的石膏板 | |
CN208643834U (zh) | 一种控制电缆抱箍模具 | |
CN204023791U (zh) | 地脚螺栓预埋装置 | |
CN206289819U (zh) | 可自由变化角度的拉索幕墙拉索端部连接系统 | |
CN203245654U (zh) | 下料定位器 | |
CN104532870B (zh) | 一种预埋螺栓定位装置 | |
CN204946645U (zh) | 一种双杆变压器台架 | |
CN204624225U (zh) | 建筑工程用管道件整理架 | |
CN204849812U (zh) | 地脚螺栓组进行混凝土一次浇灌所用的定位装置 | |
CN204270860U (zh) | 一种固定装置 | |
CN207420027U (zh) | 一种用于固定混凝土翻边模板的装置 | |
CN204326095U (zh) | 一种预埋螺栓定位装置 | |
CN206806318U (zh) | 一种结构优化的三极管固定装置 | |
US20140252199A1 (en) | Concrete Pier Foundation Anchor Bolt Support and Chamfer Form | |
CN207161117U (zh) | 一种隧道预埋滑槽安装固定器 | |
CN105458681A (zh) | 一种快速打螺丝工装 | |
CN104589116A (zh) | 新型数控机床固定夹具 | |
CN206084775U (zh) | 砂轮修理工具 | |
CN206205457U (zh) | 一种钢筋笼辅助绑扎架 | |
CN204524932U (zh) | 新型数控机床固定夹具 | |
CN204524098U (zh) | 一种钢筋弯曲机专用夹持座 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20150311 |
|
CX01 | Expiry of patent term |