CN204174255U - A kind of metallurgical electric furnace deathnium bell - Google Patents

A kind of metallurgical electric furnace deathnium bell Download PDF

Info

Publication number
CN204174255U
CN204174255U CN201420650596.5U CN201420650596U CN204174255U CN 204174255 U CN204174255 U CN 204174255U CN 201420650596 U CN201420650596 U CN 201420650596U CN 204174255 U CN204174255 U CN 204174255U
Authority
CN
China
Prior art keywords
bell
layer
electric furnace
effectively
deathnium
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420650596.5U
Other languages
Chinese (zh)
Inventor
闫风英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CN201420650596.5U priority Critical patent/CN204174255U/en
Application granted granted Critical
Publication of CN204174255U publication Critical patent/CN204174255U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The utility model relates to field of metallurgy, specifically a kind of metallurgical electric furnace deathnium bell.This center bell entirety becomes circular platform type structure, and major part upwards, has three electrode holes run through from top to bottom, is divided into thermal insulation layer, cooling layer, dross layer from top to bottom successively.The utility model, owing to effectively achieving dedusting in electrosmelting process, heat insulation function, effectively can prevent electrode from contacting with water-cooled steel pipe and cause electric discharge; Can effectively prevent furnace door oxygen lance oxygen blast from causing the high-temperature molten steel splash of immediate vicinity, make center of electric furnace bell refractory materials work-ing life comparatively primary structure increase by more than 4 times; Effectively can reduce center bell and change number of times, improving operating rate can 10%, saves spare part expense, repair time simultaneously, ensures effectively to improve Business Economic Benefit by the stable smooth operation that furnace equipment is produced.

Description

A kind of metallurgical electric furnace deathnium bell
Technical field
The utility model relates to field of metallurgy, specifically a kind of metallurgical electric furnace deathnium bell.
Background technology
The large bell of modern metallurgical electric furnace is all generally water cooled cover, in order to ensure dust removing effects, preventing electrode from contacting with water-cooled steel pipe simultaneously and causing electric discharge, have a fire proofed wood feed ring being called the belt electrode hole of center bell at bell center.
Centered by cause, bell is immediately below electrode, when electrode power transmission is smelted, be subject to the hyperthermia radiation that electrode produces, when stopping power transmission, when particularly bell produces furnace charge, center bell enters the atmospheric environment of normal temperature, quick cooling, its internal surface thermal stresses changes greatly, and cracks more and more, peels off gradually.Modern electric furnace is typically equipped with oxygen blowing device, no matter be fire door oxygen blast or furnace wall gun oxygen blast, the air-flow that capital has oxidizing atmosphere dense contacts with center bell internal surface, and can produce and damage the oxidation chemistry of center bell internal surface, furnace high-temperature environment also can aggravate this damage.The general capacity of modern electric furnace is all comparatively large, and because the dirt tolerance produced in stove is comparatively large, the dedusting fan power of outfit is also comparatively large, and gas stream in the stove flow velocity is also comparatively large, and the scouring force of air-flow to center bell is corresponding also larger.Under many-sided unfavorable factor effects such as thermal stresses change, oxidizing atmosphere, hot gas flow wash away, refractory materials center bell is very short for work-ing life, generally at 100-150 stove.
Frequent more switching center9's bell causes production cost to increase.Because operating environment is harsh, refractory materials must select costly refractory materials.The more necessary blowing out of switching center9's bell, reduces the production time, reduces equipment operation rate, directly affect the economic benefit of electric furnace.More switching center9's bell personnel are in high-temperature service, and labor strength is comparatively large, and changing the resistance to material of residual center bell rolled off the production line cannot recycle, and simultaneously as non-degradable thing, are difficult to process.Be generally treatment process be as roadbed material after fragmentation.
Summary of the invention
Technical problem to be solved in the utility model is: how to solve very short problem in metallurgical electric furnace center bell work-ing life.
The technical scheme that the utility model adopts: a kind of metallurgical electric furnace deathnium bell, this center bell entirety becomes circular platform type structure, and major part upwards, has three electrode holes run through from top to bottom, is divided into thermal insulation layer, cooling layer, dross layer from top to bottom successively.This programme is lowered the temperature to electrode and dross layer by adopting cooling layer; effectively improve the work-ing life of lagging material; thus improve the metallurgical electric furnace center bell life-span; simultaneously by dross layer; make slag can be splashed to dross layer to be formed on dross layer and spatter flux shielding layer, effectively improve the metallurgical electric furnace center bell life-span.
As a kind of optimal way: described cooling layer comprises upper and lower two-layer water cooling tube, described water cooling tube is around three electrode holes.Two-layer water cooling tube is lowered the temperature to metallurgical electric furnace center bell, the electrode that first the first layer divides with temperature highest portion and the high dross layer of temperature are lowered the temperature, then by the second layer, the electrode of lowering the temperature and the first layer water cooling tube are lowered the temperature, improve cooling efficiency, effectively improve the metallurgical electric furnace center bell life-span.
As a kind of optimal way: there is the bar construction being welded on lower floor's water cooling tube described dross layer inside, and heat insulating material filling is full of the internal space of bar construction except electrode hole.The bar construction of dross layer inside is as the similar in reinforced concrete; serve the effect of stable internal insulation material; part lagging material drops simultaneously does not affect the bell use of metallurgical electric furnace center; and metallurgical electric furnace in use spatters slag formation and spatters flux shielding layer, effectively improves the metallurgical electric furnace center bell life-span.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation;
Fig. 2 is that the A of Fig. 1 is to schematic diagram;
Fig. 3 is the B-B schematic cross-section of Fig. 1;
Wherein, 1, thermal insulation layer, 2, cooling layer, 3, dross layer, 4, electrode hole, 5, water cooling tube.
Embodiment
As depicted in figs. 1 and 2, the utility model metallurgical electric furnace deathnium bell is installed on the large bell of metallurgical electric furnace, and this center bell entirety becomes circular platform type structure, and major part upwards, there are three electrode holes run through from top to bottom, are divided into thermal insulation layer, cooling layer, dross layer from top to bottom successively.Each electrode hole lagging material spreads upon on the wall of electrode hole, for placing three electrodes of three-phase alternating current.As shown in Figure 3, the cooling layer of the present embodiment comprises upper and lower two-layer water cooling tube, described water cooling tube is around three electrode holes, two-layer water cooling tube is identical around structure, the water-cooled tube wall of middle reserved electrode hole polishes with nonconducting lagging material, prevents the too high damage water cooling tube of temperature from directly contacting with water cooling tube with electrode.There is the bar construction (with the similar of reinforced concrete, play fixing lagging material, do not require special construction) being welded on lower floor's water cooling tube dross layer inside, and heat insulating material filling is full of the internal space of bar construction except electrode hole.
The utility model, owing to effectively achieving dedusting in electrosmelting process, heat insulation function, effectively can prevent electrode from contacting with water-cooled steel pipe and cause electric discharge; Can effectively prevent furnace door oxygen lance oxygen blast from causing the high-temperature molten steel splash of immediate vicinity, make center of electric furnace bell refractory materials work-ing life comparatively primary structure increase by more than 4 times; Effectively can reduce center bell and change number of times, improving operating rate can 10%, saves spare part expense, repair time simultaneously, ensures effectively to improve Business Economic Benefit by the stable smooth operation that furnace equipment is produced.

Claims (3)

1. a metallurgical electric furnace deathnium bell, is characterized in that: this center bell entirety becomes circular platform type structure, and major part upwards, has three electrode holes run through from top to bottom, is divided into thermal insulation layer, cooling layer, dross layer from top to bottom successively.
2. a kind of metallurgical electric furnace deathnium bell according to claim 1, it is characterized in that: described cooling layer comprises upper and lower two-layer water cooling tube, described water cooling tube is around three electrode holes.
3. a kind of metallurgical electric furnace deathnium bell according to claim 2, is characterized in that: there is the bar construction being welded on lower floor's water cooling tube described dross layer inside, and heat insulating material filling is full of the internal space of bar construction except electrode hole.
CN201420650596.5U 2014-11-04 2014-11-04 A kind of metallurgical electric furnace deathnium bell Active CN204174255U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420650596.5U CN204174255U (en) 2014-11-04 2014-11-04 A kind of metallurgical electric furnace deathnium bell

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420650596.5U CN204174255U (en) 2014-11-04 2014-11-04 A kind of metallurgical electric furnace deathnium bell

Publications (1)

Publication Number Publication Date
CN204174255U true CN204174255U (en) 2015-02-25

Family

ID=52563079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420650596.5U Active CN204174255U (en) 2014-11-04 2014-11-04 A kind of metallurgical electric furnace deathnium bell

Country Status (1)

Country Link
CN (1) CN204174255U (en)

Similar Documents

Publication Publication Date Title
JP5726614B2 (en) Refractory brick cooling structure and method for converter
CN102140585A (en) Method for smelting nickel ore concentrate by using smelting furnace
CN2859418Y (en) A direct current arc inductive stove
CN204174255U (en) A kind of metallurgical electric furnace deathnium bell
CN106702072B (en) A kind of Blowing Converter method that full stove labour bottom rifle is visual
JP6476971B2 (en) How to operate an arc bottom electric furnace
KR101242575B1 (en) The melting furnace which comprises a cooling equipment for slag discharging hole
JP5445744B2 (en) Three-phase AC electrode type circular electric furnace and its cooling method
CN211233948U (en) Argon blowing type electric furnace cover
CN201740367U (en) Small furnace cover for electric arc furnace
CN109338031A (en) Converter movable hood
JP4912758B2 (en) Three-phase AC electrode type circular electric furnace and its cooling method
CN210916131U (en) Novel composite iron notch structure
JP2016114317A (en) Electric furnace for melting and processing steel making slug
CN100451514C (en) DC arc induction furnace
CN209399761U (en) A kind of electric furnace arrangement for producing steel copper sheet small furnace cover
CN202658178U (en) Water cooling center furnace cover ring of electric furnace
KR101129245B1 (en) Dust collecting duct for crack prevention
KR101159969B1 (en) lance apparatus of electric furnace
KR100950365B1 (en) An Electric Furnace Having Multi-Stage Roofs
CN105755193B (en) A kind of blast furnace throat steel brick structure and construction method
CN217764458U (en) Slag-off opening cooling device of vertical melting furnace
CN204718416U (en) A kind of anode fire door and floss hole molten steel cover
CN202808868U (en) RH vacuum refined hot-bent pipe
CN218238376U (en) Furnace lining of submerged arc furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant