CN204163609U - A kind of installation hanging ladder of highrise building outdoor rain bucket - Google Patents
A kind of installation hanging ladder of highrise building outdoor rain bucket Download PDFInfo
- Publication number
- CN204163609U CN204163609U CN201420300465.4U CN201420300465U CN204163609U CN 204163609 U CN204163609 U CN 204163609U CN 201420300465 U CN201420300465 U CN 201420300465U CN 204163609 U CN204163609 U CN 204163609U
- Authority
- CN
- China
- Prior art keywords
- ladder
- pedal
- hanging ladder
- highrise building
- outdoor rain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a kind of installation hanging ladder of highrise building outdoor rain bucket, comprise ladder body (2), it is characterized in that: described ladder body (2) is provided with hook (1), leg (3), waist circle (4), pedal shelf (5); Described pedal shelf (5) is equipped with pedal (6).This instrument is mainly used in solving the high-altitude working safety problem faced when highrise building outdoor rain bucket is installed.During operation, hanging ladder is fastened on roofing pillar by use safety rope; The hook of hanging ladder is hung on parapet of roofing, and two legs of rag prop up on the wall, reserve the operating space of installing roof drain; Operating personnel fasten seat belts, hard hat required at all times, and along hanging ladder to pedal, the waist of waist circle lock operation personnel, can start to install roof drain; Installation, removes hanging ladder and safety rope.Be proven, install a roof drain, only need 8 minutes, hang hanging basket than conventional method, use slide plate, safer, efficiency is high, and cost is low.
Description
Technical field
The utility model relates to a kind of building operations ladder, particularly relates to a kind of installation hanging ladder of highrise building outdoor rain bucket.
Background technology
In highrise building, the installation of roof drain is the common but work that operational hazards coefficient is larger.The installation way of tradition roof drain mainly contains two kinds, and one is hang hanging basket, but the usage charges of hanging basket and construction cost are very high, and current open market valency is hung hanging basket expense and is about 2600 yuan/month, moving hanging basket expense about 200 yuan/time, time-intensive, expensive; Two is with slide plate, and about 350 yuan/people * day of operating expenses, this construction method danger coefficient is large, and can not ensure construction quality.Therefore be badly in need of the erecting device of a kind of safety of design, roof drain that cost is low.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of building operations ladder, a kind of installation hanging ladder of highrise building outdoor rain bucket is especially provided, the shortcoming that when solving installation of high-building outdoor rain bucket, operational hazards is large, cost is high, reduce the danger of work high above the ground, reduce installation cost, save the set-up time.
Technical problem to be solved in the utility model is achieved through the following technical solutions:
An installation hanging ladder for highrise building outdoor rain bucket, comprises ladder body, and described ladder body is provided with hook, leg, Yao Quan, pedal shelf; Described pedal shelf upper berth is provided with pedal.
Described pedal shelf is order font pedal shelf.
Steady brace is connected with between described ladder body and pedal shelf.
Described hook is located at top two side position at the ladder body back side.
Described leg is located at centre two side position at the ladder body back side.
2/5 to 4/5 position, place in ladder body front is located at by described waist circle.
Described hook is connected on the top at the ladder body back side.
Described leg is welded on the centre at the ladder body back side, and described leg is provided with protection rag.
Described waist lap welding is connected on 3/5 position, place in ladder body front, in semicircle shape.
Described order font pedal shelf is welded on the bottom in ladder body front, and described pedal iron wire is fixed on order font pedal shelf.
Roof drain of the present invention is installed hanging ladder and is had the following advantages compared with existing instrument:
Hanging ladder installed by roof drain of the present invention, is mainly used in highrise building outdoor rain bucket and installs, and solves the high-altitude working safety problem faced when highrise building outdoor rain bucket is installed.During operation, hanging ladder is fastened on roofing pillar by use safety rope; The hook of hanging ladder is hung on parapet of roofing, and two legs of rag prop up on the wall, reserve the operating space of installing roof drain; Operating personnel fasten seat belts, hard hat required at all times, along hanging ladder to pedal, when waist circle is positioned at the waist of operating personnel, can start to install roof drain; Installation, removes hanging ladder and safety rope.Be proven, install a roof drain, only need 8 minutes, hang hanging basket than conventional method, use slide plate, safer, efficiency is high, and cost is low.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation
Fig. 2 is two dimensional model figure
Fig. 3 is the utility model structure elevation
In figure: 1-links up with, 2-ladder body, 3-leg, 4-waist circle, 5-order font pedal shelf, 6-pedal, 7-steady brace, 8-leg rag
Detailed description of the invention
Embodiment
Suppose two workman A, B compounding practices.Fasten on roofing concrete pillar by safety rope one, other end is fastened on the hook 1 of hanging ladder body 2, ensures that safety rope bolt is lashed tightly; Hung over by hook on parapet of roofing, two legs 3 push up on the wall, and to reserve the operating space of installing roof drain, the rag 8 on leg ensures that angle steel leg does not hurt insulating layer of external wall and top coat layer; A fastens seat belts, hard hat required at all times, and is tethered on roofing concrete pillar by the safety rope on safety belt, and carry roof drain and operation tool along hanging ladder to pedal 6, waist circle 4 is positioned at the waist of operating personnel, can start to install roof drain; In the process, B Main Function is: when installing hanging ladder under roof drain workman, slowly putting down the safety rope of A, ensureing simultaneously in its installation process, not allowing others near hanging ladder and safety rope; After roof drain installation, A has illustrated, B slowly receives the safety rope of A, and after A arrives roofing along hanging ladder, B removes the safety rope of A, then takes off hanging ladder, removes the safety rope on hanging ladder.
This device hook 1 adopts diameter ф 16mm round steel, ladder body 2 adopts 40*4mm angle steel, and leg 3 adopts 40*4mm angle steel, end rag 8, waist circle 4 adopts 50*5mm galvanized flat steel, 5 order font pedal shelfs adopt 580*400mm, L40*4mm angle steel, and under pedal, rectangle establishes two to strengthen angle steel, pedal 6 adopts square template 560*380mm, steady brace 7 adopts ф 16mm round steel, and also need 8 two, rag, tied silk is some.
Apparatus of the present invention can repeatedly use, conveniently moving, can widely popularize.
Claims (8)
1. the installation hanging ladder of a highrise building outdoor rain bucket, comprise ladder body (2), described ladder body (2) is provided with hook (1) and middle welding leg (3) at described ladder body (2) back side, it is characterized in that: described ladder body (2) is also provided with waist circle (4), pedal shelf (5); Described pedal shelf (5) is equipped with pedal (6), between described ladder body (2) and pedal shelf (5), is connected with steady brace (7); On described leg, (3) are provided with protection rag (8).
2. the installation hanging ladder of highrise building outdoor rain bucket according to claim 1, is characterized in that: described pedal shelf (5) is order font pedal shelf.
3. the installation hanging ladder of highrise building outdoor rain bucket according to claim 1, is characterized in that: described hook (1) is located at top two side position at ladder body (2) back side.
4. the installation hanging ladder of highrise building outdoor rain bucket according to claim 1, is characterized in that: described leg (3) is located at centre two side position at ladder body (2) back side.
5. the installation hanging ladder of highrise building outdoor rain bucket according to claim 1, is characterized in that: described waist circle (4) is located at 2/5 to 4/5 position, place in ladder body (2) front.
6. hanging ladder installed by highrise building outdoor rain bucket according to claim 1, it is characterized in that: described hook (1) is welded on the top at ladder body (2) back side.
7. hanging ladder installed by highrise building outdoor rain bucket according to claim 1, it is characterized in that: described waist circle (4) is welded on 3/5 position, place in ladder body (2) front, in semicircle shape.
8. hanging ladder installed by highrise building outdoor rain bucket according to claim 1, it is characterized in that: described order font pedal shelf (5) is welded on the bottom in ladder body (2) front, described pedal (6) iron wire is fixed on order font pedal shelf (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420300465.4U CN204163609U (en) | 2014-06-06 | 2014-06-06 | A kind of installation hanging ladder of highrise building outdoor rain bucket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420300465.4U CN204163609U (en) | 2014-06-06 | 2014-06-06 | A kind of installation hanging ladder of highrise building outdoor rain bucket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204163609U true CN204163609U (en) | 2015-02-18 |
Family
ID=52537308
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420300465.4U Expired - Fee Related CN204163609U (en) | 2014-06-06 | 2014-06-06 | A kind of installation hanging ladder of highrise building outdoor rain bucket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204163609U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105370198A (en) * | 2015-12-06 | 2016-03-02 | 王本 | Hanging ladder |
CN109339689A (en) * | 2018-08-17 | 2019-02-15 | 施继良 | A kind of adjustable suspension ladder |
-
2014
- 2014-06-06 CN CN201420300465.4U patent/CN204163609U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105370198A (en) * | 2015-12-06 | 2016-03-02 | 王本 | Hanging ladder |
CN109339689A (en) * | 2018-08-17 | 2019-02-15 | 施继良 | A kind of adjustable suspension ladder |
CN110905391A (en) * | 2018-08-17 | 2020-03-24 | 施继良 | Suspension ladder adjusting control method suitable for different wall surfaces |
CN110905391B (en) * | 2018-08-17 | 2020-11-24 | 温州国军机械有限公司 | Suspension ladder adjusting control method suitable for different wall surfaces |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204163609U (en) | A kind of installation hanging ladder of highrise building outdoor rain bucket | |
CN205323048U (en) | Urgent locking formula of safe type rope of being under construction perpendicularly | |
CN204988807U (en) | Automobile exhaust analysis appearance thief rod | |
CN204645570U (en) | One can have enough to meet the need elevator shaft protective platform | |
CN204476233U (en) | Construction safety hanging ladder | |
CN203081472U (en) | Device for installing anchoring agent in anchor drill hole | |
CN203674618U (en) | Dedicated ladder facilitating operation of 220 KV/ 66 KV in-and-out wire | |
CN205857670U (en) | A kind of external wall construction hanging basket is encorbelmented device | |
CN203989723U (en) | A kind of electric pole climbing aid | |
CN103541557A (en) | Simple device for vertical steel pipe | |
CN204002518U (en) | A kind of roofing maintenance folding climbing ladder | |
CN203976254U (en) | A kind of emergency first-aid repair nacelle device | |
CN205545078U (en) | Novel distributed roof photovoltaic support | |
CN205668130U (en) | A kind of anti-fall frock of weld job in hawse-pipe | |
CN205145441U (en) | Safety belt high altitude hanger | |
CN207296436U (en) | One kind is used for C-type steel purlin lifting clamping mechanism in construction | |
CN204202135U (en) | The pre-buried air conditoner support of construction wall | |
CN203487805U (en) | Rapid purline/steel beam clamping support with safety rope | |
CN202997372U (en) | Multipurpose maintenance ladder | |
CN204050726U (en) | Fixed connector between framework and safety belt during work high above the ground | |
CN203583900U (en) | Simple device for erecting steel pipe | |
CN203367863U (en) | Single hook for horizontal insulating ladder | |
CN207588325U (en) | Highly adjustable anti-fall aerial work platform | |
CN202190023U (en) | Wire bracing device for overhead wire | |
CN202930821U (en) | Auxiliary support for stockbridge damper installation on power transmission line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150218 Termination date: 20160606 |