CN204156613U - Secondary equipment in power system parameter configuration management system - Google Patents

Secondary equipment in power system parameter configuration management system Download PDF

Info

Publication number
CN204156613U
CN204156613U CN201420685943.8U CN201420685943U CN204156613U CN 204156613 U CN204156613 U CN 204156613U CN 201420685943 U CN201420685943 U CN 201420685943U CN 204156613 U CN204156613 U CN 204156613U
Authority
CN
China
Prior art keywords
parameter
network system
management host
system management
work station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420685943.8U
Other languages
Chinese (zh)
Inventor
侯艾君
黄曙
李波
汪溢
曹丽娟
马凯
张晓悦
余南华
何杰
刘振华
杨占杰
胡春潮
张清松
杨桂盛
冯善强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Power Technology Co Ltd
Original Assignee
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority to CN201420685943.8U priority Critical patent/CN204156613U/en
Application granted granted Critical
Publication of CN204156613U publication Critical patent/CN204156613U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/124Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses

Abstract

The utility model discloses a kind of secondary equipment in power system parameter configuration management system, comprising: network system management host, device parameter patrol and examine work station, alarm module and with the communication server for monitoring corresponding secondary device; Device parameter is patrolled and examined work station and is connected with described network system management host by Ethernet, and described device parameter is patrolled and examined work station and is connected with described alarm module; Described network system management host is connected with the described communication server by Ethernet.Network system management host is connected with the described communication server by Ethernet, make network system management host can the on-line operation parameter of secondary device of received communication monitoring server, device parameter patrols and examines work station by being connected with network system management host, device parameter is patrolled and examined check results that work station can obtain the on-line operation parameter of secondary device, thus control described alarm module and give the alarm, reduce the power system operation accident that secondary device brings.

Description

Secondary equipment in power system parameter configuration management system
[technical field]
The utility model relates to electric and electronic technical field, particularly relates to a kind of secondary equipment in power system parameter configuration management system.
[background technology]
In electric power system, except the primary equipments such as generator, transformer, circuit breaker, isolating switch, bus, power cable and transmission line, also comprise a large amount of secondary devices.Described secondary device refers to the equipment controlling the work of primary equipment, protect, supervise and measure, as measuring instrument, relay, console switch, button, automatic control equipment, computer, signalling arrangement, control cables and some electric supply installations (as storage battery, silicon rectifier etc.) providing these equipment energy.Because secondary device complexity is various, usually need to be configured the parameter of secondary device, can normally work to make secondary device.
Configuration at present for the parameter of secondary device is all the mode adopting off-line arrangement, again by manually checking the parameter of described secondary device after having configured, staff cannot the parameter of real time on-line monitoring secondary device, thus cause cannot Timeliness coverage from the potential safety hazard in the middle of secondary device running, be difficult to reduce the power system operation accident brought of secondary device.
[utility model content]
Based on this, be necessary, for cannot the problem of parameter of real time on-line monitoring secondary device, to provide a kind of secondary equipment in power system parameter configuration management system, can the parameter of Real-Time Monitoring secondary device.
A kind of secondary equipment in power system parameter configuration management system, comprising:
Network system management host, device parameter patrol and examine work station, alarm module and with the communication server for monitoring corresponding secondary device;
Described device parameter is patrolled and examined work station and is connected with described network system management host by Ethernet, and described device parameter is patrolled and examined work station and is connected with described alarm module; Described network system management host is connected with the described communication server by Ethernet.
In the utility model, network system management host is connected with the described communication server by Ethernet, make network system management host can the on-line operation parameter of secondary device of received communication monitoring server, device parameter is patrolled and examined work station and is connected with described network system management host by Ethernet, device parameter is patrolled and examined check results that work station can obtain the on-line operation parameter of secondary device, thus control described alarm module and give the alarm.Therefore, the utility model can remind staff to process this secondary device by alarm module, reduce the potential safety hazard that on-line operation Parameter and the electronic parameter list of secondary device are inconsistent caused, thus the power system operation accident that minimizing secondary device brings.
[accompanying drawing explanation]
Fig. 1 is the structured flowchart of a kind of embodiment of the utility model secondary equipment in power system parameter configuration management system;
Fig. 2 is the structured flowchart of the another kind of embodiment of the utility model secondary equipment in power system parameter configuration management system.
[embodiment]
In order to make the purpose of this utility model, technical scheme and advantage clearly, below in conjunction with accompanying drawing, the utility model is described in further detail.
Refer to Fig. 1, it is the structured flowchart of a kind of embodiment of the utility model secondary equipment in power system parameter configuration management system.
A kind of secondary equipment in power system parameter configuration management system, comprising:
Device parameter patrol and examine work station 101, network system management host 102, alarm module 107 and with the communication server for monitoring corresponding secondary device; The described communication server can comprise following one or more: IEC61850 (International Electrical Commission 61850, international electrotechnical commission 61850 agreement) devices communicating server, network 103 (IEC870-5-103:International ElectricalCommission870-5-103, International Electrotechnical Commission 103 standard traffic stipulations) devices communicating server and Communication server; Preferably, in the present embodiment, the described communication server comprises IEC61850 devices communicating server 109, network 103 devices communicating takes device 104 and Communication server 105.
Wherein, described IEC61850 devices communicating server 109 is connected with corresponding monitored secondary device respectively by Ethernet with network 103 devices communicating server;
Described Communication server 105 is connected with monitored secondary device by serial communication.
Described device parameter is patrolled and examined work station 101 and is connected with described network system management host 102 by Ethernet, and described device parameter is patrolled and examined work station 101 and is connected with described alarm module 107; Described network system management host 102 is connected with the described communication server by Ethernet.
In the utility model, network system management host 102 is connected with the described communication server by Ethernet, make network system management host 102 can the on-line operation parameter of secondary device of received communication monitoring server, device parameter is patrolled and examined work station 101 and is connected with described network system management host by Ethernet, device parameter is patrolled and examined check results that work station 101 can obtain the on-line operation parameter of secondary device, thus control described alarm module 107 and give the alarm.Therefore, the utility model can remind staff to process this secondary device by alarm module, reduce the potential safety hazard that on-line operation Parameter and the electronic parameter list of secondary device are inconsistent caused, thus the power system operation accident that minimizing secondary device brings.
The utility model can be patrolled and examined secondary device in real time, and can give the alarm, staff is reminded to process this secondary device, reduce the potential safety hazard that on-line operation parameter and the electronic parameter list of secondary device are inconsistent caused, thus the power system operation accident that minimizing secondary device brings.
Refer to Fig. 2, it is the structured flowchart of the another kind of embodiment of the utility model secondary equipment in power system parameter configuration management system.
In a preferred embodiment, described secondary equipment in power system parameter configuration management system also comprises: device parameter unifies configuration station 106; Described device parameter is unified configuration station 106 and is connected with described network system management host 102 by Ethernet.
Described device parameter unifies configuration station 106 by being connected with described network system management host 102, device parameter is unified configuration station 106 can issue parameter configuration from secondary device to described network system management host 102 and memory command.
Device parameter unifies configuration station 106 can issue parameter configuration from secondary device to described network system management host 102 and memory command, can change the parameter of secondary device according to the actual requirement of the actual demand of electrical network or control centre in real time.In addition, network system management host 102 receives and after resolving described parameter configuration, generates electronic device parameter list, can realize the data sharing of multiple secondary device parameter configuration, thus promote the operating efficiency of whole electrical network operation maintenance personnel.
The above embodiment only have expressed several execution mode of the present utility model, and it describes comparatively concrete and detailed, but therefore can not be interpreted as the restriction to the utility model the scope of the claims.It should be pointed out that for the person of ordinary skill of the art, without departing from the concept of the premise utility, can also make some distortion and improvement, these all belong to protection range of the present utility model.Therefore, the protection range of the utility model patent should be as the criterion with claims.

Claims (3)

1. a secondary equipment in power system parameter configuration management system, is characterized in that, comprising:
Network system management host, device parameter patrol and examine work station, alarm module and with the communication server for monitoring corresponding secondary device, wherein, described network system management host comprises the data storage device for store electrons parameter list;
Described device parameter is patrolled and examined work station and is connected with described network system management host by Ethernet, and described device parameter is patrolled and examined work station and is connected with described alarm module; Described network system management host is connected with the described communication server by Ethernet.
2. secondary equipment in power system parameter configuration management system according to claim 1, it is characterized in that, the described communication server comprises following one or more: IEC61850 devices communicating server, network 103 devices communicating server and Communication server;
Wherein, described IEC61850 devices communicating server is connected with corresponding monitored secondary device respectively by Ethernet with network 103 devices communicating server;
Described Communication server is connected with monitored secondary device by serial communication.
3. secondary equipment in power system parameter configuration management system according to claim 1, is characterized in that, also comprise: device parameter unifies configuration station; Described device parameter is unified configuration station and is connected with described network system management host by Ethernet.
CN201420685943.8U 2014-11-14 2014-11-14 Secondary equipment in power system parameter configuration management system Active CN204156613U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420685943.8U CN204156613U (en) 2014-11-14 2014-11-14 Secondary equipment in power system parameter configuration management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420685943.8U CN204156613U (en) 2014-11-14 2014-11-14 Secondary equipment in power system parameter configuration management system

Publications (1)

Publication Number Publication Date
CN204156613U true CN204156613U (en) 2015-02-11

Family

ID=52514701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420685943.8U Active CN204156613U (en) 2014-11-14 2014-11-14 Secondary equipment in power system parameter configuration management system

Country Status (1)

Country Link
CN (1) CN204156613U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105958642A (en) * 2016-05-20 2016-09-21 中山市厚源电子科技有限公司 Transformer substation automatic system real-time simulation device and test system thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105958642A (en) * 2016-05-20 2016-09-21 中山市厚源电子科技有限公司 Transformer substation automatic system real-time simulation device and test system thereof
CN105958642B (en) * 2016-05-20 2018-10-12 中山市厚源电子科技有限公司 A kind of electric substation automation system real-time simulation apparatus and test system

Similar Documents

Publication Publication Date Title
CN102255393B (en) Ground wire hanging anti-error blocking system and method thereof
CN203261128U (en) Load-balancing control system for measuring power demand
CN105048303A (en) Intelligent control distribution box system capable of remotely early warning
CN207832923U (en) A kind of distributing monitoring system
CN103887882B (en) A kind of prefabricated cover half blocking secondary device system for transformer station
CN104967216B (en) A kind of substation and its monitoring system and its monitoring method
CN207408826U (en) Mining electric power monitoring system
CN108199477B (en) Remote intelligent monitoring method and equipment for faults of AC/DC system of transformer substation
CN204156613U (en) Secondary equipment in power system parameter configuration management system
CN108896864B (en) Drop-out fuse on-line monitoring system
CN203588057U (en) Wind power monitoring device
CN105119384A (en) High risk and important client remote monitoring system
CN105071337A (en) Self-feedback intelligent earth leakage protection controlling device and method
CN104009547A (en) Motoring device for breaker remote operation function and transformer substation remote operation system
CN203871927U (en) Breaker remote operation function monitoring device
CN204290503U (en) Integral intelligent AC power case
CN102508101A (en) Power cable operation fault monitoring terminal and system for detecting short circuit
CN203911498U (en) Distributed photovoltaic grid-connected protective equipment
CN103972925B (en) The grid-connected proterctive equipment of distributed photovoltaic
CN203965973U (en) Constant temperature and humidity type distribution automation on-pole switch cabinet
CN203951264U (en) A kind of prefabricated cover half blocking secondary device system for transformer station
CN207542881U (en) Substation's ac and dc systems fault remote monitoring device
CN202486229U (en) Lightning arrester on-line monitoring system
CN105186700A (en) Safety monitoring system for building power consumption
CN204905833U (en) Earth -leakage protector and residual current circuit breaker centralized control device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210305

Address after: Room 501-503, annex building, Huaye building, No.1-3 Chuimao new street, Xihua Road, Yuexiu District, Guangzhou City, Guangdong Province 510000

Patentee after: China Southern Power Grid Power Technology Co.,Ltd.

Address before: 510080 water Donggang 8, Dongfeng East Road, Yuexiu District, Guangzhou, Guangdong.

Patentee before: Electric Power Research Institute of Guangdong Power Grid Co.,Ltd.

TR01 Transfer of patent right