CN204153324U - Code is hung in the multi-functional installation of a kind of central air-conditioner - Google Patents

Code is hung in the multi-functional installation of a kind of central air-conditioner Download PDF

Info

Publication number
CN204153324U
CN204153324U CN201420416130.9U CN201420416130U CN204153324U CN 204153324 U CN204153324 U CN 204153324U CN 201420416130 U CN201420416130 U CN 201420416130U CN 204153324 U CN204153324 U CN 204153324U
Authority
CN
China
Prior art keywords
yard
hang
faceplate
hanging
code
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420416130.9U
Other languages
Chinese (zh)
Inventor
李朝阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420416130.9U priority Critical patent/CN204153324U/en
Application granted granted Critical
Publication of CN204153324U publication Critical patent/CN204153324U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Air Filters, Heat-Exchange Apparatuses, And Housings Of Air-Conditioning Units (AREA)

Abstract

The utility model discloses the multi-functional installation of a kind of central air-conditioner and hang code, comprise hanging yard faceplate and being sticked in the padlock hung on yard faceplate opening with opening, hanging yard faceplate is with certain thickness hollow semicircular structure, hang yard faceplate two sides to be respectively equipped with and to hang yard connecting head and band femalely hangs a yard connecting base with externally threaded, hang a yard connecting base and be provided with line card.By arranging hanging yard faceplate and being sticked in the padlock hung in yard faceplate of upper end open, making to hang when code connects does not need to fix with primary screw, and connected more easily by padlock form, both save cost, shorten again the time of installing half nearly when to hang yard.And by yard faceplate being provided with hanging yard connecting head and hanging a yard connecting base of screw thread hanging, make to hang yard adjustment difference and can use engagement thread free adjustment, the threadedly more flexible and accurate algebraic difference between adjacent gradients regulating condensing water conduit, reach and more accurately and efficiently install, this hangs code and eliminates ugly and be with the binder polluted.

Description

Code is hung in the multi-functional installation of a kind of central air-conditioner
Technical field
The utility model belongs to central air-conditioner mounting technique field, relates to the multi-functional installation of a kind of central air-conditioner and hangs code.
Background technique
Current central air-conditioner mostly adopts when installing and hangs code and install, but present hanging when code is installed has following shortcoming: one has certain gap for hanging code contact, is unfavorable for saving the ceiling void; Two for central air-conditioner is installed, to hang yard construction process loaded down with trivial details, and unit labor cost efficiency is not high; Three falling-risings being unfavorable for too greatly the gradient for hanging yard adjustment difference; Four is many thus cause the complexity of buying for hanging yard material category, and hang code and generally adopt the material of the thin iron of 0.5mm to be that skin is made, and this material is unstable for service life by surrounding environment influence; Five must be full of binder for thermal insulation pipe by place, affect outward appearance, and binder composition is formed containing harmful components, and cause polluting, flameproof effect is poor, and meanwhile, chartered plane band and thermal insulation pipe are fitted and tightlier affected heat insulation effect; Six need to fix and adjusted position with tiny screw for hanging between code, are unfavorable for the installation of installer, make claim for eot.
Model utility content
The utility model is in order to solve the problems of the technologies described above, provide and a kind ofly can arbitrarily regulate the multi-functional installation of the central air-conditioner of algebraic difference between adjacent gradients to hang code, this hangs code and eliminates ugly and be with the binder polluted, and gap, joint is little, save the ceiling void, and air-conditioning install to hang yard time, simplify mounting process, improve unit labor cost efficiency.
The utility model is achieved through the following technical solutions:
Code is hung in the multi-functional installation of a kind of central air-conditioner, comprise hanging yard faceplate and being sticked in the padlock hung on yard faceplate opening with opening, described yard faceplate of hanging is with certain thickness hollow semicircular structure, hang yard faceplate two sides are respectively arranged with and hang yard connecting head and band is female hangs a yard connecting base with externally threaded, described hanging on yard connecting base is provided with line card.
The opening hanging yard faceplate is provided with snap fit, and padlock is provided with the draw-in groove snapped in for snap fit, snap fit snaps in draw-in groove.
Described hang a yard faceplate, hang a yard connecting head, hang yard connecting base and line card and adopt that UPVC material is one-body molded to be made.
Hang yard faceplate two sides to be vertically installed with respectively and to hang yard connecting head and band femalely hangs a yard connecting base with externally threaded, wherein, hang yard connecting head and hang a yard connecting base and be located along the same line.
Compared with prior art, the utility model has following useful technique effect:
Code is hung in the multi-functional installation of the central air-conditioner that the utility model provides, by arranging hanging yard faceplate and being sticked in the padlock hung in yard faceplate of upper end open, the Placement of hanging code is made not need to fix with primary screw, and connected more easily by padlock form, namely save cost, shorten again the time of installing and hanging yard link nearly half.And by yard faceplate being provided with hanging yard connecting head and hanging a yard connecting base of screw thread hanging, make to hang yard adjustment difference and can use engagement thread free adjustment, the threadedly more flexible and accurate algebraic difference between adjacent gradients regulating condensing water conduit, reach and more accurately and efficiently install, this hangs code according to different type of machines independent assortment, and can arbitrarily increase and decrease the quantity of hanging code according to the actual requirements.Meanwhile, this hangs after code is threaded connection, and eliminate ugly and band pollutes binder, and gap, joint is little, has saved the ceiling void of finishing, therefore this hangs code when installing an air-conditioner, and simplifies mounting process, improves unit labor cost efficiency.
Further, this hangs, and code is unified to be produced, and can make the most reasonably change to adapt to installation requirements according to field condition, adopt UPVC material to make, not only corrosion resistance is strong, and mechanical strength is high, health is nontoxic, and the light installation of quality is convenient, and material is single thus reduce cost of material.
Originally hang that only need between yard all parts just can well regulating effect by simple Placement.And be threaded connection, make the flexibility of parts be able to better raising, improve on-the-spot operating efficiency, save the about half installation time.
Accompanying drawing explanation
The another structural representation of code is hung in the multi-functional installation of central air-conditioner that Fig. 1 provides for the utility model.
Wherein: 1 for hanging a yard faceplate; 2 is padlock; 3 for hanging a yard connecting head; 4 for hanging a yard connecting base; 5 is line card.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail:
See Fig. 1, code is hung in the multi-functional installation of a kind of central air-conditioner, comprise hanging yard faceplate 1 and being sticked in the padlock 2 hung on yard faceplate 1 opening with opening, described yard faceplate 1 of hanging is with certain thickness hollow semicircular structure, hang yard faceplate 1 two sides are vertically installed with respectively and hang yard connecting head 3 and band is female hangs yard connecting base 4 with externally threaded, wherein, hang yard connecting head 3 and hang yard connecting base 4 and be located along the same line, described hanging on yard connecting base 4 is provided with line card 5.
Concrete, the opening hanging yard faceplate 1 is provided with snap fit, and padlock 2 is provided with the draw-in groove snapped in for snap fit, snap fit snaps in draw-in groove.
Described hang yard faceplate 1, hang yard connecting head 3, hang yard connecting base 4 and line card 5 and adopt that UPVC material is one-body molded to be made, therefore material is light, intensity height transport and install convenient and swift.
Installation method of the present utility model:
Expandable nail is beaten on the wall of furred ceiling, then yard connecting head that hangs hanging code is installed on expandable nail, just will hang code and be fixed up, pipeline is sticked in and hangs in yard faceplate, be fixed up by pipeline with snap close, be fixed to by line on line card, what just achieve pipeline and line is fixing.In addition when needs continue pipe laying, yard connecting head that hangs another being hung code is installed to and hangs on yard connecting base, and then is sticked in by pipeline and hangs in yard faceplate, is fixed up by pipeline with snap close, be fixed to by line on line card, what just achieve multiple pipeline and line is fixing.
Originally hang that only need between yard all parts just can well regulating effect by simple Placement.Meanwhile, use the flexibility of threaded connection element to be able to better raising, improve on-the-spot operating efficiency, save the about half installation time.
More than show and describe basic principle of the present utility model and major character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; what describe in above-described embodiment and specification just illustrates principle of the present utility model; under the prerequisite not departing from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (4)

1. code is hung in the multi-functional installation of central air-conditioner, it is characterized in that, comprise hanging a yard faceplate (1) and being sticked in the padlock (2) hung on a yard faceplate (1) opening with opening, a described yard faceplate (1) of hanging is with certain thickness hollow semicircular structure, hang yard faceplate (1) two side is respectively arranged with and hang a yard connecting head (3) and band is female hangs a yard connecting base (4) with externally threaded, described hanging on a yard connecting base (4) is provided with line card (5).
2. code is hung in the multi-functional installation of central air-conditioner according to claim 1, it is characterized in that, the opening hanging a yard faceplate (1) is provided with snap fit, and padlock (2) is provided with the draw-in groove snapped in for snap fit, snap fit snaps in draw-in groove.
3. code is hung in the multi-functional installation of central air-conditioner according to claim 1, it is characterized in that, described hang a yard faceplate (1), hang a yard connecting head (3), hang a yard connecting base (4) and line card (5) and adopt that UPVC material is one-body molded to be made.
4. code is hung in the multi-functional installation of central air-conditioner according to claim 1, it is characterized in that, hang yard faceplate (1) two side to be vertically installed with respectively and to hang a yard connecting head (3) and band femalely hangs a yard connecting base (4) with externally threaded, wherein, hang a yard connecting head (3) and hang a yard connecting base (4) and be located along the same line.
CN201420416130.9U 2014-07-25 2014-07-25 Code is hung in the multi-functional installation of a kind of central air-conditioner Withdrawn - After Issue CN204153324U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420416130.9U CN204153324U (en) 2014-07-25 2014-07-25 Code is hung in the multi-functional installation of a kind of central air-conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420416130.9U CN204153324U (en) 2014-07-25 2014-07-25 Code is hung in the multi-functional installation of a kind of central air-conditioner

Publications (1)

Publication Number Publication Date
CN204153324U true CN204153324U (en) 2015-02-11

Family

ID=52511439

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420416130.9U Withdrawn - After Issue CN204153324U (en) 2014-07-25 2014-07-25 Code is hung in the multi-functional installation of a kind of central air-conditioner

Country Status (1)

Country Link
CN (1) CN204153324U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104132191A (en) * 2014-07-25 2014-11-05 李朝阳 Multifunctional installation hanger for central air conditioner
CN106255620A (en) * 2015-03-11 2016-12-21 翰昂汽车零部件有限公司 For fixing tube and the device of electric wire

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104132191A (en) * 2014-07-25 2014-11-05 李朝阳 Multifunctional installation hanger for central air conditioner
CN104132191B (en) * 2014-07-25 2016-08-24 李朝阳 Code is hung in a kind of multi-functional installation of central air-conditioning
CN106255620A (en) * 2015-03-11 2016-12-21 翰昂汽车零部件有限公司 For fixing tube and the device of electric wire
CN106255620B (en) * 2015-03-11 2019-06-25 翰昂汽车零部件有限公司 Device for fixing tube and electric wire

Similar Documents

Publication Publication Date Title
CN104132191B (en) Code is hung in a kind of multi-functional installation of central air-conditioning
CN204153324U (en) Code is hung in the multi-functional installation of a kind of central air-conditioner
CN203501308U (en) Skirting line heating radiator
CN208633347U (en) A kind of furred ceiling for being easily installed and dismantling
CN204114349U (en) One hangs code
CN204006342U (en) A kind of mounting structure of radiant panel
CN204573749U (en) A kind of panel light
CN204883220U (en) Control by temperature change panel with hang and detain mounting structure
CN210440631U (en) Flow self-balancing valve for Internet of things
CN104196136A (en) Inner wall heat preservation board having automatic temperature control function
CN204633176U (en) A kind of power equipment casing of adjustable heat radiation degree
CN208540369U (en) A kind of terminal box ventilation device
CN204301255U (en) A kind of switch connector and indoor apparatus of air conditioner
CN205251341U (en) Magnetic knife stand
CN204163211U (en) A kind of temperature automatically controlled heat insulating inner wall plate
CN209876624U (en) LED maintenance lamp for central air conditioner
CN204730133U (en) A kind of Down lamp mounting bracket
CN204202049U (en) A kind of idle call cage structure and air-conditioning
CN204593260U (en) A kind of mounting structure of aluminium Tri-proof light
CN204629886U (en) A kind of combined type card article of capillary network
CN204005596U (en) The luminous T-shaped keel structure of a kind of LED
CN204213557U (en) Be applied to the heat insulation hanger device of refrigerant pipe
CN214198953U (en) Outer quick-witted mount of air conditioner
CN218269537U (en) Heating and ventilation air conditioner is positioning erection equipment for drainage convenient to installation
CN203704269U (en) Round line-outlet sheath of air conditioner

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150211

Effective date of abandoning: 20160824

C25 Abandonment of patent right or utility model to avoid double patenting