CN204142898U - A kind of oil gas testing transformer complete equipment - Google Patents
A kind of oil gas testing transformer complete equipment Download PDFInfo
- Publication number
- CN204142898U CN204142898U CN201420537531.XU CN201420537531U CN204142898U CN 204142898 U CN204142898 U CN 204142898U CN 201420537531 U CN201420537531 U CN 201420537531U CN 204142898 U CN204142898 U CN 204142898U
- Authority
- CN
- China
- Prior art keywords
- test
- testing transformer
- oil
- test cabin
- cabin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 98
- 230000008878 coupling Effects 0.000 claims abstract description 17
- 238000010168 coupling process Methods 0.000 claims abstract description 17
- 238000005859 coupling reaction Methods 0.000 claims abstract description 17
- 238000000034 method Methods 0.000 abstract description 3
- 238000011056 performance test Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
Landscapes
- Housings And Mounting Of Transformers (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
- Testing Relating To Insulation (AREA)
Abstract
A kind of oil gas testing transformer complete equipment, be provided with oil immersed type testing transformer, capacitive divider, oil immersed type test voltage divider has isolated impedance, is connected with coupling condenser, is provided with test cabin between capacitive divider and coupling condenser after capacitive divider.By the equipment such as capacitive divider and coupling condenser is placed in bus pipe, improve the antijamming capability of testing transformer device, do not need to prepare shielding house in addition when re-using testing transformer equipment, reduce the cost of test, gas density relay is provided with in bus pipe, the pressure in bus pipe can be paid close attention to the moment, find that dangerous situation can control in time and process.
Description
Technical field
The utility model relates to a kind of testing transformer equipment, is specifically related to a kind of oil gas testing transformer complete equipment.
Background technology
Cable accessory needed to carry out a large amount of tests before production, need to use testing transformer equipment in the process of cable accessory test, these testing transformer equipment can the partial discharge quantity of test cable annex, a lot of testing transformer equipment volume is larger at present, environmental requirement for test is strict, need special outfit shielding house just can test, cause the increase of experimentation cost, the time of partial discharge quantity test is longer, the performance test of a lot of testing transformer equipment is shorter, because testing transformer equipment is thicker, heat radiation can not be very fast, the time of performance test is caused to be merely able to maintain about 20 minutes, disposable test can not be completed, reduce the work efficiency of test, part test equipment is also had to be difficult to controls local discharge capacity in OK range, cause the employing overseas equipment that oil gas testing transformer device is more, the cost that partial discharge quantity is tested is higher, test figure can not be drawn easily and fast, larger impact is caused to the test of cable accessory.
Summary of the invention
It is simple that the purpose of this utility model is to provide a kind of structure, a kind of oil gas testing transformer complete equipment of longevity of service.
The technical solution of the utility model is: a kind of oil gas testing transformer complete equipment, be provided with oil immersed type testing transformer (1), capacitive divider (2), oil immersed type test voltage divider (1) has isolated impedance (3), be connected with coupling condenser (4) after capacitive divider (2), between capacitive divider (2) and coupling condenser (4), be provided with test cabin (5).
Described test cabin (5) is cone tubbiness, described test cabin (5) is divided into a test cabin, No. two test cabins and No. three test cabins, evenly distributed between described test cabin (5), No. two described test cabins are positioned in the middle of a test cabin and No. three test cabins, the top of No. two described test cabins and a test cabin and No. three test cabin afterbodys arrange in the same direction, and the number of described test cabin (5) can increase according to need of work or reduce.
Described coupling condenser (4) side is provided with square wave means for correcting (6), described square wave means for correcting (6) controls manually, described square wave means for correcting (6) is provided with manual guide rod, and described manual guide rod controls the position that square wave corrects.
Connected by oil-gas casing (7) between described oil immersed type testing transformer (1) and isolated impedance (3), bus pipe (8) is connected with after described oil-gas casing (7), isolated impedance (3), coupling condenser (4), test cabin (5), capacitive divider (2) and square wave means for correcting (6) are placed in pipe by described bus pipe (8), be provided with gas density relay (9) in described bus pipe (8), this device of action control of described gas density relay (9) stops or starting working.
The utility model has the advantages that: by the equipment such as capacitive divider and coupling condenser is placed in bus pipe, improve the antijamming capability of testing transformer device, do not need to prepare shielding house in addition when re-using testing transformer equipment, reduce the cost of test, gas density relay is provided with in bus pipe, the pressure in bus pipe can be paid close attention to the moment, find that dangerous situation can control in time and process, protect the safety of testing transformer device, test cabin can increase according to need of work or reduce, facilitate the demand of client, client can carry out according to the needs of oneself quantity selecting corresponding test cabin, save the cost using this testing transformer.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1 is oil immersed type test voltage divider, and 2 is capacitive divider, and 3 is isolated impedance, and 4 is coupling condenser, and 5 is test cabin, and 6 is square wave means for correcting, and 7 is oil-gas casing, and 8 is bus pipe, and 9 is gas density relay.
Embodiment
Below in conjunction with accompanying drawing, the utility model is further illustrated.
A kind of oil gas testing transformer complete equipment, be provided with oil immersed type testing transformer (1), capacitive divider (2), oil immersed type test voltage divider (1) has isolated impedance (3), coupling condenser (4) is connected with after capacitive divider (2), test cabin (5) is provided with between capacitive divider (2) and coupling condenser (4), test cabin (5) is cone tubbiness, described test cabin (5) is divided into a test cabin, No. two test cabins and No. three test cabins, evenly distributed between test cabin (5), No. two test cabins are positioned in the middle of a test cabin and No. three test cabins, the top of No. two test cabins and a test cabin and No. three test cabin afterbodys arrange in the same direction, the number of test cabin (5) can increase according to need of work or reduce, coupling condenser (4) side is provided with square wave means for correcting (6), square wave means for correcting (6) controls manually, square wave means for correcting (6) is provided with manual guide rod, manual guide rod controls the position that square wave corrects, connected by oil-gas casing (7) between oil immersed type testing transformer (1) and isolated impedance (3), bus pipe (8) is connected with after oil-gas casing (7), bus pipe (8) is by isolated impedance (3), coupling condenser (4), test cabin (5), capacitive divider (2) and square wave means for correcting (6) are placed in pipe, gas density relay (9) is provided with in bus pipe (8), this device of action control of gas density relay (9) stops or starting working.
Claims (4)
1. oil gas testing transformer complete equipment, be provided with oil immersed type testing transformer (1), capacitive divider (2), oil immersed type test voltage divider (1) has isolated impedance (3), be connected with coupling condenser (4) after capacitive divider (2), between capacitive divider (2) and coupling condenser (4), be provided with test cabin (5).
2. a kind of oil gas testing transformer complete equipment according to claim 1, it is characterized in that: described test cabin (5) is cone tubbiness, described test cabin (5) is divided into a test cabin, No. two test cabins and No. three test cabins, evenly distributed between described test cabin (5), No. two described test cabins are positioned in the middle of a test cabin and No. three test cabins, the top of No. two described test cabins and a test cabin and No. three test cabin afterbodys arrange in the same direction, and the number of described test cabin (5) can increase according to need of work or reduce.
3. a kind of oil gas testing transformer complete equipment according to claim 1, it is characterized in that: described coupling condenser (4) side is provided with square wave means for correcting (6), described square wave means for correcting (6) controls manually, described square wave means for correcting (6) is provided with manual guide rod, and described manual guide rod controls the position that square wave corrects.
4. a kind of oil gas testing transformer complete equipment according to claim 1, it is characterized in that: connected by oil-gas casing (7) between described oil immersed type testing transformer (1) and isolated impedance (3), bus pipe (8) is connected with after described oil-gas casing (7), described bus pipe (8) is by isolated impedance (3), coupling condenser (4), test cabin (5), capacitive divider (2) and square wave means for correcting (6) are placed in pipe, gas density relay (9) is provided with in described bus pipe (8), this device of action control of described gas density relay (9) stops or starting working.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420537531.XU CN204142898U (en) | 2014-09-18 | 2014-09-18 | A kind of oil gas testing transformer complete equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420537531.XU CN204142898U (en) | 2014-09-18 | 2014-09-18 | A kind of oil gas testing transformer complete equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204142898U true CN204142898U (en) | 2015-02-04 |
Family
ID=52419578
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420537531.XU Expired - Fee Related CN204142898U (en) | 2014-09-18 | 2014-09-18 | A kind of oil gas testing transformer complete equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204142898U (en) |
-
2014
- 2014-09-18 CN CN201420537531.XU patent/CN204142898U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NZ592458A (en) | Spar hull arrangement including adjustable buoyancy device rigidly connected to centerwell by shear plates | |
CN204142898U (en) | A kind of oil gas testing transformer complete equipment | |
CN203076249U (en) | Electrified insulating cleaning device of ultra-high-voltage transmission line | |
CN204269430U (en) | The online gas harvester of transformer | |
CN204116543U (en) | Electrode cup for measuring breakdown characteristic of transformer oil-paper composite system | |
CN204067597U (en) | A kind of Low ESR combination ground connection is dull and stereotyped | |
CN105486986A (en) | Oil gas test transformer package device | |
CN203606458U (en) | Novel partial discharge test platform | |
CN203350275U (en) | Insulating rod for measuring mutual inductor outdoors | |
CN204086464U (en) | Partial discharge-free test transformer complete device for cable accessory test | |
CN205700650U (en) | A kind of test tube apparatus for placing | |
CN203659342U (en) | High pressure cleaning simulation demonstration apparatus | |
WO2016041987A3 (en) | Flywheel energy storage systems | |
Bonisoli et al. | A hierarchy of balanced graph-designs | |
CN104880583A (en) | Convenient and fast lightning arrester leakage current extraction clamp | |
CN204441762U (en) | A kind of electric power overhaul folding platform | |
CN204767165U (en) | Automatic transfer device of heavy dumbbell | |
CN204304226U (en) | The breaker mounting plate of DAG-12 formal dress switch cubicle band line function | |
CN204145431U (en) | A kind of transformer Medium frequency induction withstand voltage test filter apparatus | |
CN204374317U (en) | Main-transformer on-the-spot test all-around test stand | |
CN204647797U (en) | A kind of portable Lubricators fast | |
CN202159933U (en) | Installation structure of electric lead in extensible rod | |
CN203504417U (en) | High-low frequency conversion circuit system | |
CN203871708U (en) | Anti-maloperation locking cover special for secondary pressure plate of protection apparatus | |
CN203883524U (en) | Charger casing with block bar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 225200 Industrial Park, Wu Jian Town, Jiangdu District, Yangzhou, Jiangsu Patentee after: Yangzhou Xinyuan Electric Co.,Ltd. Address before: 225200 Industrial Park, Wu Jian Town, Jiangdu District, Yangzhou, Jiangsu Patentee before: YANGZHOU XINYUAN ELECTRIC Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150204 |