CN204138686U - Blast furnace discharge yard slag prefabricated iron runner - Google Patents
Blast furnace discharge yard slag prefabricated iron runner Download PDFInfo
- Publication number
- CN204138686U CN204138686U CN201420509081.3U CN201420509081U CN204138686U CN 204138686 U CN204138686 U CN 204138686U CN 201420509081 U CN201420509081 U CN 201420509081U CN 204138686 U CN204138686 U CN 204138686U
- Authority
- CN
- China
- Prior art keywords
- groove
- slag
- iron
- blast furnace
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Blast Furnaces (AREA)
Abstract
The utility model belongs to ironmaking equipment technical field, particularly a kind of blast furnace discharge yard slag prefabricated iron runner.Comprise slag iron and accept section and prefabricated component junction, the iron notch place that section is arranged on blast furnace discharge yard accepted by slag iron, slag iron is accepted section and is comprised bottom, the first side wall extended by its same side of two side direction of bottom and the second sidewall also form the first groove, its cross section becomes U-shaped, prefabricated component junction is extended by the end face of slag iron undertaking section away from iron notch, there is the second groove, second groove has lower arcuate surface and first side of linearly being extended by lower arcuate surface and the second side, the junction of the first groove and the second groove has the 3rd side, the lower-most point of the first groove is higher than the lower-most point of the second groove.The utility model, by changing prefabricated component junction shape of cross section, improves the junction firmness of prefabricated component and slag iron runner, improves the prefabricated component life-span.
Description
Technical field
The utility model belongs to ironmaking equipment technical field, particularly a kind of blast furnace discharge yard slag prefabricated iron runner.
Background technology
The slag iron runner palpus being positioned at blast furnace iron notch transmits the slag iron of high temperature, can experience the process heated up rapidly with rapid cooling in the course of the work, and the prefabricated component being positioned at slag iron runner carrying slag iron can chilling and suddenly heat thereupon.Due to prefabricated component to slip mouth different with other part materials of slag iron runner, can cause prefabricated component to slip mouth not identical with the degree of expanding with heat and contract with cold of anxious thermal process at chilling with other part materials of slag iron runner with the degree of expanding with heat and contract with cold of anxious thermal process at chilling.And then easily cause the joint bearing of slag iron runner and prefabricated component to occur crackle.And then constantly washing away with under erosion action at high temperature sludge iron, crackle is expanded further, finally causes the joint bearing of slag iron runner and prefabricated component to occur leaking the phenomenon of iron, cause the accident.The appearance of crackle greatly reduces the work-ing life of prefabricated component.In addition, flow through " U " shape groove of prefabricated component for a long time at the slag iron of high temperature after, easily at the lower coagulum along forming similar beard shape of " U " shape groove, this coagulum can affect the normal discharge of slag iron.Slip the blast furnace of mouth and had a strong impact on the normal work of pendulum mouth having to swing in addition, shorten the work-ing life of prefabricated component.
At present, the scheme of solution is process the joint of prefabricated component weekly.Such as with the joint of ramming mass process prefabricated component.But so operation can increase artificial labour intensity greatly, increases the consumption of resistance to material, improve the maintenance cost of slag iron runner.The way also not good to the coagulative formation of similar beard shape solves.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of blast furnace discharge yard slag prefabricated iron runner, to realize the junction firmness improving prefabricated component and slag iron runner, improve the prefabricated component life-span, under slowing down the groove of prefabricated component, edge forms coagulum speed, normal discharge slag iron.
For solving the problems of the technologies described above, the utility model provides a kind of blast furnace discharge yard slag prefabricated iron runner, be fixed on described slag iron runner, comprise slag iron and accept section and prefabricated component junction, the iron notch place that section is arranged on described blast furnace discharge yard accepted by described slag iron, described slag iron is accepted section and is comprised bottom, the first side wall extended by the same side of bottom described in two side direction of bottom and the second sidewall, described bottom, described the first side wall and described second sidewall form the first groove extended along its length, described prefabricated component junction is extended by the end face of described slag iron undertaking section away from described iron notch, described prefabricated component junction has the second groove, described second groove has lower arcuate surface and is linearly expanded first side and the second side of extending by described lower arcuate surface, the junction of described first groove and described second groove has the 3rd side, the lower-most point of described first groove is higher than the lower-most point of described second groove.
Further, in described first trench cross-section, the internal surface of corresponding described first groove becomes U-shaped or described first groove have the bottom surface of arc and are linearly expanded the first side wall and the second sidewall that extend by the described bottom surface of arc.
Further, the ultimate range between described the first side wall and described second sidewall is less than the ultimate range between described first side and described second side.
Further, between the lower-most point of described first groove and the lower-most point of described second groove, difference of altitude is 20cm, and the difference of the ultimate range between described the first side wall and described second sidewall and the ultimate range between described first side and the second side is 10cm.
Further, the described slag iron bottom of accepting section is provided with guide part away from the end face of prefabricated component junction, and the upper surface of described guide part is downward-sloping inclined-plane.
Further, the acute angle of described inclined-plane and horizontal plane is 60 degree.
Further, described guide part is downward-sloping to the direction away from described slag iron runner, and the height of described guide part equals height corresponding to the lower-most point of described first groove.
Relative to prior art, a kind of blast furnace discharge yard slag prefabricated iron runner that the utility model provides, by the second groove of prefabricated component junction being set to be made up of lower arcuate surface and first side of linearly being extended by lower arcuate surface and the second side, the junction of the first groove and the second groove has the 3rd side, the lower-most point of the first groove is higher than the lower-most point of the second groove, and then change prefabricated component junction shape of cross section, namely the junction between the first groove and the second groove forms ladder, first side and the second side extend and can form the cross section of V-arrangement after converging, so make prefabricated component junction consistent with ramming machine bottom shape, improve the rapping compacting effect of ramming machine, slag iron runner is connected more firm with the joint of prefabricated component, improve the junction firmness of prefabricated component and slag iron runner, and then improve the prefabricated component life-span.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
The side-looking structural representation of a kind of blast furnace discharge yard slag prefabricated iron runner that Fig. 1 provides for the utility model embodiment one;
A kind of blast furnace discharge yard slag prefabricated iron runner that Fig. 2 provides for the utility model embodiment one face structural representation.
Wherein, 10, guide part; 20, section accepted by slag iron; 21, the bottom line of the first groove; 22, the first groove; 30, the line of delimitation of section and prefabricated component junction accepted by slag iron; 40, prefabricated component junction; 41, the bottom line of the second groove; 42, the second groove; 50, the 3rd side; 61, bottom; 62, the first side wall; 63, the second sidewall.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, the every other embodiment that those of ordinary skill in the art obtain, all belongs to the scope of the utility model protection.
Embodiment one
As depicted in figs. 1 and 2, the side-looking structural representation of a kind of blast furnace discharge yard slag prefabricated iron runner that Fig. 1 provides for the utility model embodiment one, a kind of blast furnace discharge yard slag prefabricated iron runner that Fig. 2 provides for the utility model embodiment one face structural representation.
A kind of blast furnace discharge yard slag prefabricated iron runner that the utility model provides, be fixed on slag iron runner, comprise slag iron and accept section 20 and prefabricated component junction 40, the iron notch place that section 20 is arranged on blast furnace discharge yard accepted by slag iron, slag iron is accepted section 20 and is comprised bottom 61, the first side wall 62 extended by the same side bottom two side direction of bottom 61 and the second sidewall 63, bottom 61, the first side wall 62 and the second sidewall 63 form the first groove 22 extended along its length, the cross section of the first groove 22 becomes U-shaped, prefabricated component junction 40 is extended by the end face of slag iron undertaking section 20 away from iron notch, prefabricated component junction 40 has the second groove 42, second groove 42 has lower arcuate surface and first side of linearly being extended by lower arcuate surface and the second side, the junction of the first groove 22 and the second groove 42 has the 3rd side 50, the lower-most point of the first groove 22 is higher than the lower-most point of the second groove 42.
Concrete, blast furnace discharge yard slag prefabricated iron runner entirety, in similar cuboid, is divided into two portions.Wherein the first part at the iron notch place of corresponding blast furnace discharge yard is that section 20 accepted by slag iron.This section of edge is followed successively by guide part 10, slag iron carrier and alternately portion away from the iron notch direction of blast furnace discharge yard.Wherein slag iron carrier and alternately portion include bottom 61 and the first side wall 62 upwards extended by the two ends of bottom 61 respectively and the second sidewall 63.Wherein the first side wall 62 and the second sidewall 63 are arranged relative to the center line mirror image of bottom 61.From the difference in the portion of replacing, slag iron carrier is that corresponding the first side wall 62 is different with the second sidewall 63 thickness, the side thickness of slag iron carrier is less than the side thickness in alternately portion, and the medial surface of slag iron carrier overlaps with the medial surface in the portion of replacing.In the cross section of the first groove 22 be made up of bottom 61, the first side wall 62 and the second sidewall 63, the internal surface of corresponding first groove 22 becomes U-shaped.Guide part 10 is extended away from the one end in the portion of replacing at slag iron carrier, the upper surface of guide part 10 is downward-sloping inclined-plane, and the height of junction that guide part 10 is connected with slag iron carrier is maximum, and constantly decline along with the direction height away from slag iron carrier, form a descending grade tilted.In the present embodiment, guide part 10 is consistent with the height of slag iron carrier junction and the lower-most point line height of the first groove 22, namely consistent with the height of the bottom line 21 of the first groove.So when normally producing, slag iron is less and more level and smooth by the process resistance that bottom line 21 falls into slag iron flask through the upper surface of guide part 10, swing is slipped in mouth and sluice of the first groove.The upper surface of guide part 10 and the acute angle of horizontal plane are 60 degree in addition.Slag iron is made to be not easy to be bonded at the upper surface of guide part 10.Prefabricated component junction 40 is extended by the end face of slag iron undertaking section 20 away from iron notch, and forms the second groove 42.Because the bottom line 41 of the second groove is lower than the bottom line 21 of the first groove, and the second groove 42 opening maximum width is greater than the first groove 22 opening maximum width, and then forming the 3rd side 50 in the junction of the first groove 22 and the second groove 42, line of delimitation 30 place that the slag iron namely between the first groove 22 and the second groove 42 accepts section and prefabricated component junction forms ladder.In the present embodiment, the second groove 42 has lower arcuate surface, and lower arcuate surface is opening up.That linearly expands in two ends of lower arcuate surface extends upward the first side and the second side.Namely the first side and the second side extend closed rear V-shaped.
Be understandable that, the first groove 22 can also by having the bottom surface of arc and linearly expanding by the bottom surface of arc the first side wall that stretches out and the second sidewall substitutes.
In the present embodiment, the difference of altitude between the bottom line 21 of the first groove and the bottom line 41 of the second groove is 20cm, and the difference of the distance between first groove 22 opening the widest part and second groove 42 opening the widest part is 10cm.
A kind of blast furnace discharge yard slag prefabricated iron runner that the utility model provides, by the second groove 42 of prefabricated component junction being set to be made up of lower arcuate surface and first side of linearly being extended by lower arcuate surface and the second side, the junction of the first groove 22 and the second groove 42 has the 3rd side 50, the lower-most point of the first groove 22 is higher than the lower-most point of the second groove 42, and then change prefabricated component junction shape of cross section, namely the junction between the first groove 22 and the second groove 42 forms ladder, first side and the second side extend and can form the cross section of V-arrangement after converging, so make prefabricated component junction consistent with ramming machine bottom shape, improve the rapping compacting effect of ramming machine, slag iron runner is connected more firm with the joint of prefabricated component, improve the junction firmness of prefabricated component and slag iron runner, and then improve the prefabricated component life-span, the preparation of large component needs multiple mould jointly to complete, and the internal surface of the first groove 22 is kept U-shaped, can not change the mould of manufacture first groove 22 part, and then reduces the design of mould and remodeling workload, reduces improvement cost, ultimate range between the first side wall and the second sidewall is less than the ultimate range between the first side and the second side, making the second groove 42 by adding fixing material, making blast furnace discharge yard slag prefabricated iron runner more fixedly secure on slag iron runner by joint, by the end face in the bottom of slag iron undertaking section 20 away from prefabricated component junction 40, guide part is set, prefabricated component leading portion is made to form a little slope, less slag flowing molten iron can be dirty and can not condense in and slip mouth front end along guide part 10, avoid and form coagulum " beard " on the lower edge of groove, reduce the labour intensity of staff, save the refractory consumption of stokehold, the height of guide part 10 equals height corresponding to the lower-most point of the first groove 22, is convenient to the importing guide part 10 that slag flowing molten iron is more smooth, improves the action effect of guide part 10.
It should be noted last that, above embodiment is only in order to illustrate the technical solution of the utility model and unrestricted, although be described in detail the utility model with reference to example, those of ordinary skill in the art is to be understood that, can modify to the technical solution of the utility model or equivalent replacement, and not departing from the spirit and scope of technical solutions of the utility model, it all should be encompassed in the middle of right of the present utility model.
Claims (7)
1. a blast furnace discharge yard slag prefabricated iron runner, be fixed on described slag iron runner, it is characterized in that, comprise slag iron and accept section and prefabricated component junction, the iron notch side that section is set to close described blast furnace discharge yard accepted by described slag iron, described slag iron is accepted section and is comprised bottom, the first side wall extended by the same side of bottom described in two side direction of bottom and the second sidewall, described bottom, described the first side wall and described second sidewall form the first groove extended along its length, described prefabricated component junction is extended by the end face of described slag iron undertaking section away from described iron notch, described prefabricated component junction has the second groove, described second groove has lower arcuate surface and is linearly expanded first side and the second side of extending by described lower arcuate surface, the junction of described first groove and described second groove has the 3rd side, the lower-most point of described first groove is higher than the lower-most point of described second groove.
2. blast furnace discharge yard slag prefabricated iron runner as claimed in claim 1, it is characterized in that, in described first trench cross-section, the internal surface of corresponding described first groove becomes U-shaped or described first groove have the bottom surface of arc and are linearly expanded the first side wall and the second sidewall that extend by the described bottom surface of arc.
3. the blast furnace discharge yard slag prefabricated iron runner as described in any one of claim 1 or 2, is characterized in that, the ultimate range between described the first side wall and described second sidewall is less than the ultimate range between described first side and described second side.
4. blast furnace discharge yard slag prefabricated iron runner as claimed in claim 3, it is characterized in that, between the lower-most point of described first groove and the lower-most point of described second groove, difference of altitude is 20cm, and the difference of the ultimate range between described the first side wall and described second sidewall and the ultimate range between described first side and the second side is 10cm.
5. blast furnace discharge yard slag prefabricated iron runner as claimed in claim 3, is characterized in that, the described slag iron bottom of accepting section is provided with guide part away from the end face of prefabricated component junction, and the upper surface of described guide part is downward-sloping inclined-plane.
6. blast furnace discharge yard slag prefabricated iron runner as claimed in claim 5, it is characterized in that, the angle of described inclined-plane and horizontal plane is 60 degree.
7. blast furnace discharge yard slag prefabricated iron runner as claimed in claim 5, it is characterized in that, described guide part is downward-sloping to the direction away from described slag iron runner, and the height of described guide part equals height corresponding to the lower-most point of described first groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420509081.3U CN204138686U (en) | 2014-09-04 | 2014-09-04 | Blast furnace discharge yard slag prefabricated iron runner |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420509081.3U CN204138686U (en) | 2014-09-04 | 2014-09-04 | Blast furnace discharge yard slag prefabricated iron runner |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204138686U true CN204138686U (en) | 2015-02-04 |
Family
ID=52415386
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420509081.3U Expired - Fee Related CN204138686U (en) | 2014-09-04 | 2014-09-04 | Blast furnace discharge yard slag prefabricated iron runner |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204138686U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105200175A (en) * | 2015-10-10 | 2015-12-30 | 无锡兴达节能科技股份有限公司 | Iron runner material prefabricated part for blast furnace cast houses |
CN105219903A (en) * | 2015-11-04 | 2016-01-06 | 长兴明天炉料有限公司 | A kind of iron storage type taps a blast furnace tap drain |
-
2014
- 2014-09-04 CN CN201420509081.3U patent/CN204138686U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105200175A (en) * | 2015-10-10 | 2015-12-30 | 无锡兴达节能科技股份有限公司 | Iron runner material prefabricated part for blast furnace cast houses |
CN105219903A (en) * | 2015-11-04 | 2016-01-06 | 长兴明天炉料有限公司 | A kind of iron storage type taps a blast furnace tap drain |
CN105219903B (en) * | 2015-11-04 | 2018-10-23 | 长兴明天炉料有限公司 | A kind of iron storage type taps a blast furnace tap drain |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204138686U (en) | Blast furnace discharge yard slag prefabricated iron runner | |
CN204657460U (en) | A kind of aluminium liquid constant-current stabilizer | |
CN104647570B (en) | Before a kind of State of Blast Furnace, resistance to material pours mould and pouring procedure | |
CN208772448U (en) | A kind of magnesium tundish flow straightener | |
CN205893362U (en) | A sector electrode for producing hollow electroslag spindle | |
CN104722746A (en) | Slab continuous casting tundish working lining and manufacturing method thereof | |
CN104057077A (en) | High-pulling-speed sheet billet immersion-type water opening | |
CN206858481U (en) | New Type Coke Oven regenerator lattice brick | |
CN105983665A (en) | Narrow-edge copper plate for slab mold with continuous variable taper at corner | |
CN216039659U (en) | Composite type slag skimming device for main iron runner of blast furnace | |
CN202398785U (en) | Pouring device for casting roller | |
CN101992276A (en) | Aluminum alloy crystallizer | |
CN204504207U (en) | A kind of slab CC tundish working lining | |
CN204842872U (en) | Water -cooling fire door the whole cast sand mould structure | |
CN202461456U (en) | Tiled butt joint type ingot mold | |
CN208276131U (en) | A kind of spherical exothermic riser sleeve of mining machinery | |
CN104801381B (en) | Two-component circular cone sand making machine crushing wall and production method | |
CN202955960U (en) | Material discharging structure of cupola furnace | |
CN102554144B (en) | Tiled butting type ingot mold and casting method thereof | |
CN207787659U (en) | Die casting | |
CN205236968U (en) | Casting mold | |
CN203184618U (en) | Continuous casting tundish stop dam current stabilizer | |
CN203936372U (en) | A kind of antidrip casting casting ladle | |
CN105195671B (en) | A kind of casting technique of embedded bimetal hammerhead and its production method and the bimetal hammerhead based on Sand-Faced Metal Mould Casting | |
CN204325395U (en) | A kind of tap drain structure of smelting furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170725 Address after: 430080 Qingshan District stock company of Hubei, Wuhan Province Patentee after: Wuhan iron and Steel Company Limited Address before: 430080 Friendship Avenue, Hubei, Wuhan, No. 999 Patentee before: Wuhan Iron & Steel (Group) Corp. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150204 Termination date: 20190904 |
|
CF01 | Termination of patent right due to non-payment of annual fee |