CN204134937U - A kind of frost and snow cleanout tool of cement pole - Google Patents

A kind of frost and snow cleanout tool of cement pole Download PDF

Info

Publication number
CN204134937U
CN204134937U CN201420348355.5U CN201420348355U CN204134937U CN 204134937 U CN204134937 U CN 204134937U CN 201420348355 U CN201420348355 U CN 201420348355U CN 204134937 U CN204134937 U CN 204134937U
Authority
CN
China
Prior art keywords
frost
snow
erasing portion
cement pole
cleanout tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420348355.5U
Other languages
Chinese (zh)
Inventor
王秀平
刘宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Chengde Power Supply Co of State Grid Jibei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Chengde Power Supply Co of State Grid Jibei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Chengde Power Supply Co of State Grid Jibei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420348355.5U priority Critical patent/CN204134937U/en
Application granted granted Critical
Publication of CN204134937U publication Critical patent/CN204134937U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This application provides a kind of frost and snow cleanout tool of cement pole, the grip part that this frost and snow cleanout tool comprises erasing portion and is connected with this erasing portion.Erasing portion comprises arc bayonet socket, and bayonet socket is provided with wire brush, and wire brush is for wiping the frost and snow of cement pole; The grip part be connected with erasing portion, for providing the handle of gripping for operation maintenance personnel, is removed the frost and snow on cement pole to control this erasing portion.Due to the frost and snow on cement pole, that this instrument can be utilized to remove is clean, landing when operation maintenance personnel also just can be avoided to step on bar operation, thus guarantee operation maintenance personnel carries out stepping on bar operation safely.

Description

A kind of frost and snow cleanout tool of cement pole
Technical field
The application relates to technical field of electric power, more particularly, relates to a kind of frost and snow cleanout tool of cement pole.
Background technology
In the winter time, the cement pole in the north generally can be coated with frost and snow, the likely landing because of these frost and snows when operation maintenance personnel needs to step on bar operation, thus bring danger to operation maintenance personnel, for this reason, need a kind of instrument of the frost and snow can removed on cement pole badly, landing when stepping on bar operation to avoid operation maintenance personnel.
Utility model content
In view of this, the application provides a kind of frost and snow cleanout tool of cement pole, for removing the frost and snow on cement pole in the winter time, and landing when stepping on bar operation to avoid operation maintenance personnel.
To achieve these goals, the existing scheme proposed is as follows:
A frost and snow cleanout tool for cement pole, comprises erasing portion and grip part, wherein:
Erasing portion comprises supporting plate, and described supporting plate comprises arc bayonet socket, and described arc bayonet socket is provided with wire brush, and described wire brush is for wiping the frost and snow on cement pole;
Grip part is connected with described erasing portion, for manipulating described erasing portion, and drives described erasing portion with frost and snow described in described wire brush wiping.
Preferably, described supporting plate comprises the first steel disc, the second steel disc and the 3rd steel disc;
The two ends of described first steel disc are connected by bolt with one end of described second steel disc, one end of described 3rd steel disc respectively, and form described arc bayonet socket in same level.
Preferably, described wire brush comprises multiple soft steel pompon.
Preferably, described grip part comprises insulating bar for handling electrical device or scalable stock.
Preferably, described erasing portion is fixedly connected with described grip part or hinged.
Preferably, described erasing portion and described grip part are hinged by Oldham's coupling.
As can be seen from technique scheme, this application provides a kind of frost and snow cleanout tool of cement pole, the grip part that this frost and snow cleanout tool comprises erasing portion and is connected with this erasing portion.Erasing portion comprises arc bayonet socket, and bayonet socket is provided with wire brush, and wire brush is for wiping the frost and snow of cement pole; The grip part be connected with erasing portion, for providing the handle of gripping for operation maintenance personnel, is removed the frost and snow on cement pole to control this erasing portion.Due to the frost and snow on cement pole, that this instrument can be utilized to remove is clean, landing when operation maintenance personnel also just can be avoided to step on bar operation, thus guarantee operation maintenance personnel carries out stepping on bar operation safely.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present application or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only the embodiment of the application, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the accompanying drawing provided.
The structure chart of the frost and snow cleanout tool of a kind of cement pole that Fig. 1 provides for the embodiment of the present application;
The structure chart of the frost and snow cleanout tool of the another kind of cement pole that Fig. 2 provides for the embodiment of the present application;
The structure chart of the frost and snow cleanout tool of a kind of cement pole that Fig. 3 provides for another embodiment of the application.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the embodiment of the present application, obviously, described embodiment is only some embodiments of the present application, instead of whole embodiments.Based on the embodiment in the application, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the application's protection.
Embodiment one
The structure chart of the frost and snow cleanout tool of a kind of cement pole that Fig. 1 provides for the embodiment of the present application.
As shown in Figure 1, the frost and snow cleanout tool of the cement pole that the present embodiment provides comprises erasing portion 10, and the grip part 20 be connected with this erasing portion 10.
Erasing portion 10 comprises supporting plate 11, supporting plate 11 be the metallic plate of sheet, the edge of metallic plate is provided with arc bayonet socket, and arc bayonet socket is provided with wire brush 12.
Supporting plate 11 is made up of three steel discs, comprises the first steel disc 111, second steel disc 112 and the 3rd steel disc 113.The two ends of the first steel disc 111 are linked together by bolt 114 with one end of the second steel disc 112, one end of the 3rd steel disc 113 respectively, common this supporting plate 11 of formation.Second steel disc 112 and the 3rd steel disc 113 all can move by relative first steel disc 111, thus the radian of the arc bayonet socket that it can be regulated to be formed, thus the cement pole of different-diameter can be adapted to.
Grip part 20 grips for convenient, wipes frost and snow to drive erasing portion 10.Grip part 20 is rod-shaped member, utilizes its length that erasing portion 10 is reached eminence, removes the frost and snow of eminence.
As can be seen from technique scheme, present embodiments provide a kind of frost and snow cleanout tool of cement pole, the grip part that this frost and snow cleanout tool comprises erasing portion and is connected with this erasing portion.Erasing portion comprises arc bayonet socket, and bayonet socket is provided with wire brush, and wire brush is for wiping the frost and snow of cement pole; The grip part be connected with erasing portion, for providing the handle of gripping for operation maintenance personnel, is removed the frost and snow on cement pole to control this erasing portion.Due to the frost and snow on cement pole, that this instrument can be utilized to remove is clean, landing when operation maintenance personnel also just can be avoided to step on bar operation, thus guarantee operation maintenance personnel carries out stepping on bar operation safely.
Grip part 20 in the present embodiment can utilize the insulating bar handling electrical device to substitute, and should be able to reduce the quantity of the instrument that going out constructs carries so mutually.
In order to remove the eminence of cement pole and the frost and snow of lower, the scalable stock 21 that grip part can also preferably be made up of multiple sleeve pipe, as shown in Figure 2.The frost and snow of lower can be removed when being in contraction state like this, and the frost and snow of eminence can be cleared up after being elongated by telescopic sleeve pipe.
Embodiment two
The structure chart of the frost and snow cleanout tool of a kind of cement pole that Fig. 3 provides for another embodiment of the application.
As shown in Figure 3, the frost and snow cleanout tool that the present embodiment provides has set up Oldham's coupling 30 on the basis of a upper embodiment.
This Oldham's coupling 30 is used for connecting grip part 20 and erasing portion 10, so erasing portion 10 all can regulate without restriction relative to the direction of grip part 20 and angle, to adapt to the needs of the frost and snow on the surface of the different parts different angles removing cement pole.Use more convenient, the effect of removing relatively also will be better.
Finally, also it should be noted that, in this article, the such as relational terms of first and second grades and so on is only used for an entity or operation to separate with another entity or operating space, and not necessarily requires or imply the relation that there is any this reality between these entities or operation or sequentially.And, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thus make to comprise the process of a series of key element, method, article or equipment and not only comprise those key elements, but also comprise other key elements clearly do not listed, or also comprise by the intrinsic key element of this process, method, article or equipment.When not more restrictions, the key element limited by statement " comprising ... ", and be not precluded within process, method, article or the equipment comprising described key element and also there is other identical element.
In this description, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiments, between each embodiment identical similar portion mutually see.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the application.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein when not departing from the spirit or scope of the application, can realize in other embodiments.Therefore, the application can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (6)

1. a frost and snow cleanout tool for cement pole, is characterized in that, comprises erasing portion and grip part, wherein:
Erasing portion comprises supporting plate, and described supporting plate comprises arc bayonet socket, and described arc bayonet socket is provided with wire brush, and described wire brush is for wiping the frost and snow on cement pole;
Grip part is connected with described erasing portion, for manipulating described erasing portion, and drives described erasing portion with frost and snow described in described wire brush wiping.
2. frost and snow cleanout tool as claimed in claim 1, it is characterized in that, described supporting plate comprises the first steel disc, the second steel disc and the 3rd steel disc;
The two ends of described first steel disc are connected by bolt with one end of described second steel disc, one end of described 3rd steel disc respectively, and form described arc bayonet socket in same level.
3. frost and snow cleanout tool as claimed in claim 1, it is characterized in that, described wire brush comprises multiple soft steel pompon.
4. the frost and snow cleanout tool as described in any one of claims 1 to 3, is characterized in that, described grip part comprises insulating bar for handling electrical device or scalable stock.
5. frost and snow cleanout tool as claimed in claim 4, is characterized in that, described erasing portion is fixedly connected with described grip part or hinged.
6. frost and snow cleanout tool as claimed in claim 5, is characterized in that, it is hinged that Oldham's coupling is passed through in described erasing portion and described grip part.
CN201420348355.5U 2014-06-26 2014-06-26 A kind of frost and snow cleanout tool of cement pole Active CN204134937U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420348355.5U CN204134937U (en) 2014-06-26 2014-06-26 A kind of frost and snow cleanout tool of cement pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420348355.5U CN204134937U (en) 2014-06-26 2014-06-26 A kind of frost and snow cleanout tool of cement pole

Publications (1)

Publication Number Publication Date
CN204134937U true CN204134937U (en) 2015-02-04

Family

ID=52411655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420348355.5U Active CN204134937U (en) 2014-06-26 2014-06-26 A kind of frost and snow cleanout tool of cement pole

Country Status (1)

Country Link
CN (1) CN204134937U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105013725A (en) * 2015-06-15 2015-11-04 国家电网公司 Line sweeping device
CN111293657A (en) * 2020-03-25 2020-06-16 安徽安康塑业有限公司 Handheld plastic brush structure for cable snow separation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105013725A (en) * 2015-06-15 2015-11-04 国家电网公司 Line sweeping device
CN105013725B (en) * 2015-06-15 2017-08-01 国家电网公司 Circuit clearing apparatus
CN111293657A (en) * 2020-03-25 2020-06-16 安徽安康塑业有限公司 Handheld plastic brush structure for cable snow separation
CN111293657B (en) * 2020-03-25 2021-02-26 安徽安康塑业有限公司 Handheld plastic brush structure for cable snow separation

Similar Documents

Publication Publication Date Title
CN104084358A (en) Oil pipeline painting device
CN203406586U (en) Wire deicer
CN202962972U (en) Device for clearing insulator at multiple angles
CN204134937U (en) A kind of frost and snow cleanout tool of cement pole
CN205577275U (en) Ware sweeps away snow
CN202910017U (en) Novel insulator cleaning device
CN205762460U (en) A kind of insulator cleaning brush
CN203684157U (en) Steel brush used for snow removal roller shaft
CN205074269U (en) Electrified sweeper of transformer vase
CN205074257U (en) Transformer vase cleans insulating brush cleaner with high voltage live
CN204118543U (en) A kind of power equipment deicer that clears the snow
CN204205425U (en) Power circuit insulation is removed obstacles cutter
CN204724489U (en) A kind of adjustable type high-tension porcelain insulator cleaning brush
CN103735228B (en) Drag, sweep the automatic broom of function
CN104184066A (en) Special hook rod for electric power maintenance
CN202626921U (en) Multifunctional besom
CN204271508U (en) Charged electric power apparatus snow removing specific purpose tool
CN206365608U (en) Eaves cleaning brush with flabellum
CN208100282U (en) A kind of clamping device of electric pick work head
CN204899060U (en) Warmhouse booth machine of clearing snow
CN204182606U (en) A kind of high-tension apparatus porcelain vase deicing tool
CN205141482U (en) Assembled multi -functional power maintenance action bars
CN205100522U (en) Special brush of jointing is built by laying bricks or stones to brick wall
CN204103344U (en) The special shank of a kind of electric power maintenance
CN204589906U (en) A kind of track tiling cleaning plant

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant