CN204122994U - Counterweight frame upper beam welding tooling - Google Patents
Counterweight frame upper beam welding tooling Download PDFInfo
- Publication number
- CN204122994U CN204122994U CN201420523604.XU CN201420523604U CN204122994U CN 204122994 U CN204122994 U CN 204122994U CN 201420523604 U CN201420523604 U CN 201420523604U CN 204122994 U CN204122994 U CN 204122994U
- Authority
- CN
- China
- Prior art keywords
- upper beam
- frame upper
- counterweight frame
- fixture
- fixer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Presses And Accessory Devices Thereof (AREA)
Abstract
Counterweight frame upper beam welding tooling, fixed mechanism is arranged on base plate, and fixed mechanism comprises anterior fixture, rear portion fixture and top fixture, and top fixture is the first fixer, and the first fixer is arranged on the top of rear portion fixture; Rear portion fixture comprises footstock and the second fixer, in the middle of footstock, be provided with a slide block, and the second fixer is just positioned at footstock rear end to slide block and arranges.The manufacturing process of the frock that the utility model adopts to counterweight frame upper beam is simple to operate, easy for installation, and makes shaping counterweight frame upper beam and also have good safety guarantee.
Description
Technical field
The utility model relates to a kind of elevator zero device formation technical field, is specifically related to carry out the frock of welding for counterweight frame upper beam.
Background technology
Counterweight frame plays very important effect on maintenance is elevator balanced.The overall counterweight frame device of elevator is primarily of counterweight frame, to pouring weight, lead boots and buffer head composition, and the vertical beam that counterweight frame mainly includes counterweight frame upper beam, counterweight frame underbeam and is arranged between counterweight frame upper beam and counterweight frame underbeam, in these compositions, counterweight frame upper beam has very important effect as zero device that will connect roller and multiple miscellaneous part.
General counterweight frame is by two pieces of surface plates and between two surface plates, be provided with the fixing side plate of polylith, this side plate offers for connecting the hole passed the rope of roller, the position that therefore side plate is fixing on two surface plates all has very large impact on the dispersion of roller power and the balance of elevator entirety.Existing a kind of novel counterweight frame upper beam, in order to the installation site of precise positioning side plate, is designed to the side plate of both sides with protruding point by side plate, the fixed position of surface plate offers can insert fixing opening for side plate protruding point.Such counterweight frame upper beam product is in order to ensure the normal operation of counterweight frame upper beam, need ensure that opening does not have gap when welding side plate protruding point and dull and stereotyped opening, namely opening is filled by the protruding point of side plate and is closed, this just needs the protruding point of side plate can compress in opening when welding, therefore, when carrying out welding operation to it, just need to realize by means of frock.
Therefore, the problems referred to above be to counterweight housing of elevator upper beam in welding process use in the design and use process of frock and should pay attention to and the problem solved.
Utility model content
For above-mentioned Problems existing, the utility model provides counterweight frame upper beam welding tooling.
Technical solution of the present utility model is: counterweight frame upper beam welding tooling, comprise base plate and fixed mechanism, described fixed mechanism is arranged on described base plate, described fixed mechanism comprises anterior fixture, rear portion fixture and top fixture, described top fixture is the first fixer, and described first fixer is arranged on the top of described rear portion fixture;
Described rear portion fixture comprises footstock and the second fixer, in the middle of described footstock, be provided with a slide block, and described second fixer is just positioned at described footstock rear end to described slide block and arranges.
Further improvement of the utility model is: described anterior fixture is fixed front plate, and described fixed front plate is also provided with the notch that polylith clamp forms the side plate placement for counterweight frame upper beam.
Further improvement of the utility model is: the side, rear end of described slide block is provided with salient point.
Further improvement of the utility model is: described anterior fixture also comprises for the concentric shafts through side plate.
Further improvement of the utility model is: described first fixer comprises riser, press strip and turning handle, the end of described press strip is connected in fixed angle with the front end of described turning handle, the junction of described press strip and described turning handle is arranged on described riser and forms the first fixed point, and described turning handle can drive described press strip also around described first fixed point rotary around described first fixed point rotary.
Further improvement of the utility model is: described second fixer comprises bearing, determines plate and swing arm, described bearing is fixed on described base plate, describedly determine the top that plate is fixed on described bearing, one end of described swing arm is arranged on describedly determines plate to be formed the second fixed point, and described swing arm can rotate between 0 ~ 180 ° around described second fixed point.
The utility model counterweight frame upper beam welding tooling, the baseplane plate of counterweight frame upper beam is placed on base plate, between anterior fixture and rear portion fixture, again the opening on aligning baseplane, the protruding point plate of side plate one end of counterweight frame upper beam is inserted, the front end of side plate falls in the notch of anterior fixture, fixed front plate is positioned at base plate foremost, props up the top of side plate, is pressed by side plate backward.Side plate is between anterior fixture and rear portion fixture, the footstock of rear portion fixture is to the power of the oriented sinciput of side plate, by the swing arm of the second fixer around the second fixed point rotary 180 °, swing arm points to front, prop up slide block, slide block in footstock forward, salient point makes the rear end of slide block be in the outside of footstock, slide block also has thrust forward to side plate forward under the effect of swing arm, the protruding point finally opening of upper surface plate being aimed at the side plate other end fixes, employing top fixture is fixed, by turning handle around the first fixed point rotary, turning handle drives press strip to rotate together, press strip is made to prop up surface plate downwards, the protruding point of side plate can be made to compress in the opening of surface plate, by the hole that concentric shafts is opened through side plate front end, ensure the concentricity of all side plate perforates.To its welding, again counterweight frame upper beam is overturn after the opening on upper surface plate welds, make lower plane plate to the position of upper surface plate, thus to the opening welding on lower plane plate.
The beneficial effects of the utility model are: the polylith side plate of counterweight frame upper beam can all fix by the frock designed by the utility model in the opening of two pieces of surface plates, and make the opening on the protruding point of side plate and surface plate there is not vacant small opening after welding, ensure that the counterweight frame upper beam quality made according to this is better and meet overall requirement.Be positioned at the stuck side plate of notch energy on base plate, adopt again concentric shafts through the concentricity that can ensure polylith side plate, also ensure that steel band is not worn.The manufacturing process of the frock that the utility model adopts to counterweight frame upper beam is simple to operate, easy for installation, and makes shaping counterweight frame upper beam and also have good safety guarantee.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model counterweight frame upper beam welding tooling.
Wherein, 1-base plate, the anterior fixture of 2-, 3-rear portion fixture, 4-top fixture, 5-first fixer, 6-footstock, 7-second fixer, 8-slide block, 9-fixed front plate, 10-notch, 11-concentric shafts.
Detailed description of the invention
In order to deepen, to understanding of the present utility model, to be described in further detail the utility model below in conjunction with drawings and Examples, this embodiment, only for explaining the utility model, not forming protection domain of the present utility model and limiting.
As shown in Figure 1, the present embodiment provides counterweight frame upper beam welding tooling, comprise base plate 1 and fixed mechanism, described fixed mechanism is arranged on described base plate 1, described fixed mechanism comprises anterior fixture 2, rear portion fixture 3 and top fixture 4, described top fixture 4 is the first fixer 5, and described first fixer 5 is arranged on the top of described rear portion fixture 3; Described rear portion fixture 3 comprises footstock 6 and the second fixer 7, in the middle of described footstock 6, be provided with a slide block 8, and described second fixer 7 is just positioned at described footstock 6 rear end to described slide block 8 and arranges.Described anterior fixture 2 is fixed front plate 9, and described fixed front plate 9 is also provided with the notch 10 that polylith clamp forms the side plate placement for counterweight frame upper beam.The side, rear end of described slide block 8 is provided with salient point.Described anterior fixture 2 also comprises for the concentric shafts 11 through side plate.Described first fixer 5 comprises riser, press strip and turning handle, the end of described press strip is connected in fixed angle with the front end of described turning handle, the junction of described press strip and described turning handle is arranged on described riser and forms the first fixed point, and described turning handle can drive described press strip also around described first fixed point rotary around described first fixed point rotary.Described second fixer 7 comprises bearing, determines plate and swing arm, described bearing is fixed on described base plate 1, describedly determine the top that plate is fixed on described bearing, one end of described swing arm is arranged on describedly determines plate to be formed the second fixed point, and described swing arm can rotate between 0 ~ 180 ° around described second fixed point.
The present embodiment counterweight frame upper beam welding tooling, the baseplane plate of counterweight frame upper beam is placed on base plate 1, between anterior fixture 2 and rear portion fixture 3, again the opening on aligning baseplane, the protruding point plate of side plate one end of counterweight frame upper beam is inserted, the front end of side plate falls in the notch 10 of anterior fixture 2, fixed front plate 9 is positioned at base plate 1 foremost, props up the top of side plate, is pressed by side plate backward.Side plate is between anterior fixture 2 and rear portion fixture 3, the power of footstock 6 pairs of oriented sinciputs of side plate of rear portion fixture 3, by the swing arm of the second fixer 7 around the second fixed point rotary 180 °, swing arm points to front, prop up slide block 8, slide block 8 in footstock 6 forward, salient point makes the rear end of slide block 8 be in the outside of footstock 6, slide block 8 also has thrust forward to side plate forward under the effect of swing arm, the protruding point finally opening of upper surface plate being aimed at the side plate other end fixes, top fixture 4 is adopted to fix, by the turning handle of the first fixer around the first fixed point rotary, turning handle drives press strip to rotate together, press strip is made to prop up surface plate downwards, the protruding point of side plate can be made to compress in the opening of surface plate, by the hole that concentric shafts 11 is opened through side plate front end, ensure the concentricity of all side plate perforates.To its welding, again counterweight frame upper beam is overturn after the opening on upper surface plate welds, make lower plane plate to the position of upper surface plate, thus to the opening welding on lower plane plate.
The beneficial effect of the present embodiment is: the polylith side plate of counterweight frame upper beam can all fix by the frock designed by the utility model in the opening of two pieces of surface plates, and make the opening on the protruding point of side plate and surface plate there is not vacant small opening after welding, ensure that the counterweight frame upper beam quality made according to this is better and meet overall requirement.Be positioned at the stuck side plate of notch energy on base plate, adopt again concentric shafts through the concentricity that can ensure polylith side plate, also ensure that steel band is not worn.The manufacturing process of the frock that the utility model adopts to counterweight frame upper beam is simple to operate, easy for installation, and makes shaping counterweight frame upper beam and also have good safety guarantee.
Claims (6)
1. counterweight frame upper beam welding tooling, it is characterized in that: comprise base plate (1) and fixed mechanism, described fixed mechanism is arranged on described base plate (1), described fixed mechanism comprises anterior fixture (2), rear portion fixture (3) and top fixture (4), described top fixture (4) is the first fixer (5), and described first fixer (5) is arranged on the top at described rear portion fixture (3);
Described rear portion fixture (3) comprises footstock (6) and the second fixer (7), in the middle of described footstock (6), be provided with a slide block (8), and described second fixer (7) is just positioned at described footstock (6) rear end to described slide block (8) and arranges.
2. counterweight frame upper beam welding tooling according to claim 1, it is characterized in that: described anterior fixture (2) is fixed front plate (9), described fixed front plate (9) is also provided with the notch (10) that polylith clamp forms the side plate placement for counterweight frame upper beam.
3. counterweight frame upper beam welding tooling according to claim 1, is characterized in that: the side, rear end of described slide block (8) is provided with salient point.
4. counterweight frame upper beam welding tooling according to claim 1, is characterized in that: described anterior fixture (2) also comprises for the concentric shafts (11) through side plate.
5. counterweight frame upper beam welding tooling according to claim 1, it is characterized in that: described first fixer (5) comprises riser, press strip and turning handle, the end of described press strip is connected in fixed angle with the front end of described turning handle, the junction of described press strip and described turning handle is arranged on described riser and forms the first fixed point, and described turning handle can drive described press strip also around described first fixed point rotary around described first fixed point rotary.
6. counterweight frame upper beam welding tooling according to claim 1, it is characterized in that: described second fixer (7) comprises bearing, determines plate and swing arm, described bearing is fixed on described base plate (1), describedly determine the top that plate is fixed on described bearing, one end of described swing arm is arranged on describedly determines plate to be formed the second fixed point, and described swing arm can rotate between 0 ~ 180 ° around described second fixed point.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420523604.XU CN204122994U (en) | 2014-09-12 | 2014-09-12 | Counterweight frame upper beam welding tooling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420523604.XU CN204122994U (en) | 2014-09-12 | 2014-09-12 | Counterweight frame upper beam welding tooling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204122994U true CN204122994U (en) | 2015-01-28 |
Family
ID=52379383
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420523604.XU Withdrawn - After Issue CN204122994U (en) | 2014-09-12 | 2014-09-12 | Counterweight frame upper beam welding tooling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204122994U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104209682A (en) * | 2014-09-12 | 2014-12-17 | 江苏创力电梯部件有限公司 | Welding jig of counterweight housing upper beam |
-
2014
- 2014-09-12 CN CN201420523604.XU patent/CN204122994U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104209682A (en) * | 2014-09-12 | 2014-12-17 | 江苏创力电梯部件有限公司 | Welding jig of counterweight housing upper beam |
CN104209682B (en) * | 2014-09-12 | 2016-02-24 | 江苏创力电梯部件有限公司 | Counterweight frame upper beam welding tooling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204545805U (en) | Eccentric lever weld clamp device | |
CN204052490U (en) | Apparatus for bending | |
CN202667403U (en) | Stamping die insert mounting structure | |
CN204122994U (en) | Counterweight frame upper beam welding tooling | |
CN104209682B (en) | Counterweight frame upper beam welding tooling | |
CN202357114U (en) | Sliding bearing press mounting jig | |
CN202668140U (en) | Tooling used in drilling and reaming of holes of bearing covers | |
CN204195169U (en) | A kind of pipeline hold down gag | |
CN203918854U (en) | A kind of mobile phone backlight source module General purpose jig | |
CN207282881U (en) | A kind of line device of LED light strip automatic welding machine | |
CN203031498U (en) | Automatic clamping device | |
CN202354733U (en) | Brush making machine | |
CN202079317U (en) | Copper pipe shearing device | |
CN203563777U (en) | Pneumatic metal single-vibrating disk double-sided U-shaped granule top stop machine | |
CN207326866U (en) | A kind of assembling product positioner | |
CN202591885U (en) | Location device for excavating bucket | |
CN202045223U (en) | Single-bend upper mould for fire bending machine | |
CN204125003U (en) | Be easy to the counterweight frame upper beam of accurately assembling | |
CN201906966U (en) | Auxiliary tool for replacing metering pump | |
CN204235486U (en) | The spacing hold down gag of sunshading board ornamental strip | |
CN203372439U (en) | Bag embracing mechanism of automatic bag feeder | |
CN204075441U (en) | A kind of guide's series welding machine device for exerting | |
CN204434121U (en) | For the guiding standard knot of tower crane | |
CN203610280U (en) | Syringe lifting device | |
CN202572196U (en) | Parallelogram positioning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20150128 Effective date of abandoning: 20160224 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |