CN204118546U - A kind of cable interim reconfiguration transition case - Google Patents

A kind of cable interim reconfiguration transition case Download PDF

Info

Publication number
CN204118546U
CN204118546U CN201420585030.9U CN201420585030U CN204118546U CN 204118546 U CN204118546 U CN 204118546U CN 201420585030 U CN201420585030 U CN 201420585030U CN 204118546 U CN204118546 U CN 204118546U
Authority
CN
China
Prior art keywords
cable
sleeve pipe
interim
reconfiguration
switching station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420585030.9U
Other languages
Chinese (zh)
Inventor
龚华勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Lishui Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Lishui Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Lishui Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420585030.9U priority Critical patent/CN204118546U/en
Application granted granted Critical
Publication of CN204118546U publication Critical patent/CN204118546U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of cable interim reconfiguration transition case, when being intended to solve the transformation of urban power distribution network needs or break down, switching station carries out integral replacing or the longer problem of cable interim reconfiguration spended time, comprise casing, be arranged on the bracing frame in casing, be arranged on the airtight container that on bracing frame and inside is filled with insulating gas, ground row, airtight container is provided with charge valve, explosion-proof valve and sleeve pipe group, each sleeve pipe group is made up of the sleeve pipe that three match with cable plug, on airtight container, inside is provided with three copper bars, three sleeve pipes of each sleeve pipe group are connected with three copper bars respectively.When switching station breaks down, switching station, wherein in a sleeve pipe group, is connected in remaining sleeve pipe group to the cable that client powers by the interim reconfiguration of cable transformer station can powered to switching station; Play the effect of an interim transition, after switching station has keeped in repair, by cable reconfiguration on switching station; Easy to connect, operating efficiency is high, and customer outage hours is short.

Description

A kind of cable interim reconfiguration transition case
Technical field
The utility model relates to a kind of cable interim reconfiguration transition case.
Background technology
When urban power distribution network needs transformation or when breaking down, need carry out integral replacing or the interim reconfiguration of cable to 10kV switching station; Very large owing to changing switching station and interim reconfiguration cable workload at present, spended time is longer, and this can cause user to have a power failure for a long time, brings great inconvenience to user, and power supply reliability reduces, and causes customer complaint, affects good service level.
Utility model content
The utility model provides a kind of cable interim reconfiguration transition case, and be intended to solve urban power distribution network when needing transformation or break down, switching station carries out integral replacing or the longer problem of cable interim reconfiguration spended time.
In order to solve above technical problem, the utility model is achieved through the following technical solutions: a kind of cable interim reconfiguration transition case, comprise casing, the bracing frame be arranged in casing, be arranged on bracing frame and inside be filled with insulating gas airtight container, be arranged on bracing frame ground row, described airtight container is provided with charge valve, explosion-proof valve and at least two sleeve pipe groups, each sleeve pipe group is made up of the sleeve pipe that three match with cable plug, on described airtight container, inside is provided with three copper bars, and three sleeve pipes of each sleeve pipe group are connected with three copper bars respectively.
Further, described airtight container is provided with air gauge; The air pressure in casing can be detected.
Further, casing is provided with case lid, and case lid is provided with electrification display; The charged situation of box house can be observed at any time, ensure the safety of staff.
Further, the distance at the bottom of described sleeve pipe to case is 500mm ~ 600mm; Be convenient to the operation of staff.
Further, the distance at the bottom of described sleeve pipe to case is 540mm; This highly facilitates disconnecting temporarily and installing of staff.
Further, described airtight container is filled with the SF6 gas of 1.2bar ~ 1.35bar; Make whole box volume less, can be used for inside and outside cable trough.
Compared with prior art the utility model has the advantages that: when switching station breaks down, switching station, wherein in a sleeve pipe group, is connected in remaining sleeve pipe group to the cable that client powers by the interim reconfiguration of cable transformer station can powered to switching station; Play the effect of an interim transition, after switching station has keeped in repair, by cable reconfiguration on switching station; Easy to connect, operating efficiency is high, and customer outage hours is short.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is after the utility model removes casing, the structural representation of front part;
Fig. 3 is after the utility model removes casing, the structural representation of rear section;
Fig. 4 is that the utility model is removed after casing and airtight container after plate, the structural representation of rear section.
Embodiment
Consult Fig. 1 to Fig. 4, a kind of cable interim reconfiguration transition case, comprise casing 1, the bracing frame 2 be arranged in casing 1, be arranged on bracing frame 2 and inside be filled with insulating gas airtight container 3, be arranged on bracing frame 2 ground row 4, described airtight container 3 is provided with charge valve 5, explosion-proof valve 6 and at least two sleeve pipe groups, each sleeve pipe group is made up of the sleeve pipe 8 that three match with cable plug 9, on described airtight container 3, inside is provided with three copper bars 7, and three sleeve pipes 8 of each sleeve pipe group are connected with three copper bars 7 respectively.Described airtight container 3 is provided with air gauge 10.Casing 1 is provided with case lid 11, and case lid 11 is provided with electrification display 12.Distance at the bottom of described sleeve pipe 8 to case is 540mm.Described airtight container 3 is filled with the SF6 gas of 1.3bar.
During use, casing 1 is placed in cable trough; In airtight container 3, the SF6 gas of 1.3bar is poured by charge valve 5, prevent electric arc, switching station, wherein in a sleeve pipe group, is connected in remaining sleeve pipe group to the cable 13 that client powers by the interim reconfiguration of the cable 13 of transformer station being powered to switching station; During reconfiguration, the cable plug 9 of three wires 131 in every root cable 13 is inserted on three sleeve pipes 8 of one group of sleeve pipe respectively; Live wire, zero line and ground wire one_to_one corresponding during connection; Each sleeve pipe 8 can connect two cable plugs 9, the multi-plug cable 9 of front side is inserted on sleeve pipe 8, and the cable plug 9 of rear side is inserted on the cable plug 9 of front side, then blocks the cable plug 9 of rear side with plug 14, prevents electric leakage.
Airtight container 3 is provided with explosion-proof valve when occurring, and when breaking down in inside, gases at high pressure from explosion-proof valve release, and are unlikely to damage operator and destroy miscellaneous part.
Two transition casees can adopt cable to connect, and infinite expanding realizes multiple loops diverse location, the dismounting of transition simultaneously.
When switching station breaks down, switching station, wherein in a sleeve pipe group, is connected in remaining sleeve pipe group to the cable that client powers by the interim reconfiguration of cable transformer station can powered to switching station; Play the effect of an interim transition, after switching station has keeped in repair, by cable reconfiguration on switching station; Easy to connect, operating efficiency is high, and customer outage hours is short.
The foregoing is only specific embodiment of the utility model, but technical characteristic of the present utility model is not limited thereto, any those skilled in the art is in field of the present utility model, and the change done or modification are all encompassed among the scope of the claims of the present utility model.

Claims (6)

1. a cable interim reconfiguration transition case, it is characterized in that: comprise casing (1), be arranged on the bracing frame (2) in casing (1), be arranged on the airtight container (3) that on bracing frame (2) and inside is filled with insulating gas, be arranged on ground row (4) on bracing frame (2), described airtight container (3) is provided with charge valve (5), explosion-proof valve (6) and at least two sleeve pipe groups, each sleeve pipe group is made up of the sleeve pipe (8) that three match with cable plug (9), the upper inside of described airtight container (3) is provided with three copper bars (7), three sleeve pipes (8) of each sleeve pipe group are connected with three copper bars (7) respectively.
2. a kind of cable according to claim 1 interim reconfiguration transition case, is characterized in that: described airtight container (3) is provided with air gauge (10).
3. a kind of cable according to claim 1 interim reconfiguration transition case, it is characterized in that: casing (1) is provided with case lid (11), case lid (11) is provided with electrification display (12).
4. a kind of cable according to claim 1 interim reconfiguration transition case, is characterized in that: the distance at the bottom of described sleeve pipe (8) to case is 500mm ~ 600mm.
5. a kind of cable according to claim 1 interim reconfiguration transition case, is characterized in that: the distance at the bottom of described sleeve pipe (8) to case is 540mm.
6. a kind of cable according to claim 1 interim reconfiguration transition case, is characterized in that: described airtight container (3) is filled with the SF6 gas of 1.2bar ~ 1.35bar.
CN201420585030.9U 2014-10-10 2014-10-10 A kind of cable interim reconfiguration transition case Active CN204118546U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420585030.9U CN204118546U (en) 2014-10-10 2014-10-10 A kind of cable interim reconfiguration transition case

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420585030.9U CN204118546U (en) 2014-10-10 2014-10-10 A kind of cable interim reconfiguration transition case

Publications (1)

Publication Number Publication Date
CN204118546U true CN204118546U (en) 2015-01-21

Family

ID=52335826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420585030.9U Active CN204118546U (en) 2014-10-10 2014-10-10 A kind of cable interim reconfiguration transition case

Country Status (1)

Country Link
CN (1) CN204118546U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111509611A (en) * 2020-04-27 2020-08-07 中船澄西船舶修造有限公司 Repair and replacement method for ship deck cable transition box

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111509611A (en) * 2020-04-27 2020-08-07 中船澄西船舶修造有限公司 Repair and replacement method for ship deck cable transition box

Similar Documents

Publication Publication Date Title
CN203277686U (en) Detachable type ground wire pile head
CN203589807U (en) Charging-feeding separating type direct-current control cabinet
CN202586124U (en) Bypass operation trolley capable of being used to replace distribution transformer without cutting off power
CN204118546U (en) A kind of cable interim reconfiguration transition case
CN106936094A (en) A kind of pluggable cable head dismantling device
CN104124567A (en) Electric connector
CN202315042U (en) Electrified water-flushing fire extinguishing system and electrified water-flushing fire truck
CN204696526U (en) A kind of European cable end connects the device of American ring main unit
CN105092902B (en) Electric system switching on/off handcart examines auxiliary device
CN203660401U (en) Oil gas bushing connection gas pipe apparatus for 220 combination electric appliance
CN103050905B (en) Switch cubicle ac voltage withstanding insulation annex
CN105098637A (en) Integrated 35kV power transformation device
CN204046008U (en) Handcart type breaker lowering or hoisting gear
CN203951083U (en) The embedded combined insulation device in a kind of 10kV ring main unit interval
CN206041016U (en) Practical earth connection in indoor GIS terminal
CN206302059U (en) A kind of switch cubicle of the quick secondary connection of energy
CN202737339U (en) Split type medium voltage load switch ring main unit
CN205080225U (en) Air circuit breaker calibration system
CN203983783U (en) There is the box Switching Station of self-powered function
CN201910593U (en) Pluggable sleeve used for medium-pressure inflatable air tank
CN203774675U (en) Inflatable breaker cabinet
CN202817550U (en) Novel power distribution cabinet body
CN203967529U (en) A kind of arrangement of 220kV power distribution equipment
CN205231314U (en) Disconnect secondary circuit and termination do not have a power failure and and meet terminal arrangement thereof
CN105449566A (en) Grounding device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant