CN204113096U - Steel work double ladder - Google Patents
Steel work double ladder Download PDFInfo
- Publication number
- CN204113096U CN204113096U CN201420544949.3U CN201420544949U CN204113096U CN 204113096 U CN204113096 U CN 204113096U CN 201420544949 U CN201420544949 U CN 201420544949U CN 204113096 U CN204113096 U CN 204113096U
- Authority
- CN
- China
- Prior art keywords
- ladder
- box
- sliding part
- rail bar
- double ladder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Ladders (AREA)
Abstract
The utility model provides a kind of steel work double ladder, belongs to mechanical field.This steel work double ladder comprises a pair symmetrically arranged ladder row, two vertical rods and the cross bar between two vertical rods are drawn together in ladder package, the top of each ladder row is all fixed with one piece of gangboard, one piece of gangboard is articulated with on another block gangboard, between ladder row, there is telescopic gag lever post, gag lever post two ends are connected on the cross bar of both sides respectively, the outer wall of the vertical rod sidepiece of a ladder row has guide rail, the rail bar two that guide rail comprises rail bar one and be arranged in parallel with rail bar one, rail bar one and rail bar two has symmetrically arranged sliding part, sliding part slidably connects box, the side of box has trolley shoe, trolley shoe two opposite side has groove, groove and sliding part mate and both mutual clampings mutually, box can slide up and down along sliding part, box has through hole, connection cord is tied with in through hole.This double ladder can in any height access tools of double ladder.
Description
Technical field
The utility model belongs to mechanical field, relates to a kind of steel work double ladder.
Background technology
Structural steelwork is made as main structure with steel, is one of main building construction types.Being made as main structure with steel, is one of main building construction types.The feature of steel is that intensity is high, from heavy and light, integral rigidity is good, deformability is strong, thus for building large span and superelevation, extra-duty building is suitable especially; Material homogeneity and isotropism good, belong to perfect elastic body, meet the basic assumption of common engineering mechanics most; Material plasticity, good toughness, can have moderate finite deformation, can bear dynamic loading well; Construction period is short; Its industrialization degree is high, can carry out the high Virtual production of mechanization degree; Machining accuracy is high, efficiency is high, good leak tightness, therefore can be used for building gas tank, oil tank and transformer etc.
Double ladder: also claim folding step, carries out a class ascending tool of work for side space in the plane, because of its use time, the terraced bar of front and back and ground form an isosceles triangle, look like ' people ' word, calling ' double ladder ' thus its image.Practical double ladder has fixing double ladder and moving herringbone ladder.Fixing double ladder is that people build instrument temporarily; Movable double ladder is connected together by the top loose-leaf of two ladders, can altogether, due to its flexibility, therefore be widely used in ascending a height in operation when movement temporarily.
Early stage double ladder is generally that timber makes, and along with the development of metal industry, utilizes aluminum alloy materials now more; Aluminium alloy herringbone ladder has light, attractive in appearance, durable feature, and cost is not high, therefore is widely used.Existing double ladder in use, when operating personnel are positioned at the top operation of double ladder, can the instrument used be needed to be placed on top some, but when operating personnel are positioned in the middle part of double ladder due to action need, the instrument now operated can be put nowhere, operator also needs to climb to top and goes to take instrument, and very cloth is convenient.
Summary of the invention
The purpose of this utility model is for the above-mentioned problems in the prior art, provide a kind of steel work double ladder, this steel work double ladder can in any height access tools of double ladder, solve the design of existing trestle ladder structure unreasonable, and function such as to optimize not at the problem.
The purpose of this utility model realizes by following technical proposal: a kind of steel work double ladder, it is characterized in that, comprise the ladder row be symmetrical arranged for a pair for climbing, two vertical rods and the cross bar between two vertical rods are drawn together in described terraced package, the top of described each ladder row is all fixed with one piece of gangboard, described one piece of gangboard is articulated with on another block gangboard, between described ladder row, there is telescopic gag lever post, described gag lever post two ends are connected on the cross bar of described both sides respectively, the outer wall of the vertical rod sidepiece of a described ladder row has guide rail, the rail bar two that described guide rail comprises rail bar one and be arranged in parallel with described rail bar one, described rail bar one and rail bar two has the sliding part of symmetrically arranged protrusion, described sliding part is consistent with the incline direction that described ladder is arranged, described sliding part slidably connects the box in square box shaped, the side of described box has the trolley shoe be square, described trolley shoe two opposite side has the groove be arranged in parallel, described groove mates mutually with described sliding part and both mutual clampings, described box can slide up and down along described sliding part, described box has through hole, the connection cord for pulling is tied with in described through hole.
In existing double ladder, storing tools is a great problem, this double ladder mutually to be mated with sliding part by the groove on trolley shoe and is slidably mounted on guide rail by box, box is slided along the direction of vertical rod, operator can pull connection cord that box can be made to slide when double ladder differing heights, obtain the instrument wanted, increasing degree is saved the labour of operator, fetching tool is climbed down without the need to climbing up, very convenient, connection cord can realize tying up on the clothing of operator, when instrument got by needs, only needs one to draw box can be made to slide gently.This double ladder is from practical problem, and by structure optimization, operator is saved labour, has stronger practicality.
As preferably, have rolling bearing with described box junction bottom described trolley shoe, described box has the cylindrical connecting portion of protrusion, described connecting portion is plugged in described bearing.When operator is positioned at another ladder row, often can there is not phenomenon smoothly in the instrument of taking away in box, by the setting of rolling bearing, the rotatable box of operator reaches desirable angle of taking, and designs very hommization.
As preferably, bottom described trolley shoe, there is cylindrical mounting groove.Be slightly less than the diameter of rolling bearing by the diameter of mounting groove, both pass through tight fit connection.
As preferably, the port, bottom of described vertical rod is arranged with Anti-slip cover.Anti-slip cover can increase the frictional force of double ladder and bottom surface, strengthens security performance.
As preferably, the end of described connection cord has pull head.The setting of pull head makes operator better capture and act on connection cord, humanization designing.
As preferably, described rail bar one and described rail bar two are all in " 7 " font and both are symmetrical, and the sliding part that described rail bar one and rail bar two comprise protrusion and the fixed part be connected with described sliding part, described fixed part is connected on the outer wall of described vertical rod.Guide rail simple and practical, improves production efficiency, reduces cost of production in batch production, in actual production, and can according to actual conditions designed, designed.
Compared with prior art, this steel work double ladder has the following advantages:
1, this steel work double ladder is from practical problem, and by structure optimization, by arranging the box that can slide along vertical rod, operator is saved labour, has stronger practicality.
The box of 2, this steel work double ladder is tied with connection cord, operator can pull connection cord that box can be made to slide when double ladder differing heights, obtain the instrument wanted, increasing degree has been saved the labour of operator, fetching tool is climbed down without the need to climbing up, very convenient.
3, have rolling bearing with box junction bottom this steel work double ladder trolley shoe, box has the cylindrical connecting portion of protrusion, connecting portion is plugged in described bearing.When operator is positioned at another ladder row, often can there is not phenomenon smoothly in the instrument of taking away in box, by the setting of rolling bearing, the rotatable box of operator reaches desirable angle of taking, and designs very hommization.
4, the port, bottom of the vertical rod of this steel work double ladder is arranged with Anti-slip cover.Anti-slip cover can increase the frictional force of double ladder and bottom surface, strengthens security performance.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model;
Fig. 2 is the utility model middle guide and trolley shoe johning knot composition;
Fig. 3 is the structural blast figure of box in the utility model.
Coding in figure is respectively: 1, ladder row; 1a, vertical rod; 1b, cross bar; 2, gangboard; 3, gag lever post; 4, guide rail; 4a, rail bar one; 4b, rail bar two; 4a1, sliding part; 4a2, fixed part; 5, box; 5a, connecting portion; 6, trolley shoe; 6a, groove; 6b, mounting groove; 7, connection cord; 7a, pull head; 8, rolling bearing; 9, Anti-slip cover.
Detailed description of the invention
As shown in Figure 1 to Figure 3, this steel work double ladder comprises the ladder row 1 be symmetrical arranged for a pair for climbing, ladder row 1 comprises two vertical rod 1a and the cross bar 1b between two vertical rod 1a, the top of each ladder row 1 is all fixed with one piece of gangboard 2, one piece of gangboard 2 is articulated with on another block gangboard 2, between ladder row 1, there is telescopic gag lever post 3, gag lever post 3 two ends are connected on the cross bar 1b of both sides respectively, the outer wall of the vertical rod 1a sidepiece of a ladder row 1 has guide rail 4, rail bar two 4b that guide rail 4 comprises rail bar one 4a and be arranged in parallel with rail bar one 4a, rail bar one 4a and rail bar two 4b has the sliding part 4a1 of symmetrically arranged protrusion, sliding part 4a1 is consistent with the incline direction that ladder arranges 1, sliding part 4a1 slidably connects the box 5 in square box shaped, the side of box 5 has the trolley shoe 6 be square, trolley shoe 6 liang of opposite sides has the groove 6a be arranged in parallel, groove 6a mates mutually with sliding part 4a1 and both mutual clampings, box 5 can slide up and down along sliding part 4a1, box 5 has through hole, the connection cord 7 for pulling is tied with in through hole.
In existing double ladder, storing tools is a great problem, this double ladder is mutually mated by the groove 6a on trolley shoe 6 and sliding part 4a1 and is slidably mounted on guide rail 4 by box 5, box 5 can be slided along the direction of vertical rod 1a, operator can pull connection cord 7 that box 5 can be made to slide when double ladder differing heights, obtain the instrument wanted, increasing degree is saved the labour of operator, fetching tool is climbed down without the need to climbing up, very convenient, connection cord 7 can realize tying up on the clothing of operator, when instrument got by needs, only need one to draw box 5 can be made to slide gently.This double ladder is from practical problem, and by structure optimization, operator is saved labour, has stronger practicality.
As shown in Figure 3, have rolling bearing 8 bottom trolley shoe 6 with box 5 junction, box 5 has the cylindrical connecting portion 5a of protrusion, connecting portion 5a is plugged in bearing.When operator is positioned at another ladder row 1, often can there is not phenomenon smoothly in the instrument of taking away in box 5, by the setting of rolling bearing 8, the rotatable box of operator 5 reaches desirable angle of taking, and designs very hommization.
There is bottom trolley shoe 6 cylindrical mounting groove 6b.Be slightly less than the diameter of rolling bearing 8 by the diameter of mounting groove 6b, both pass through tight fit connection.
As shown in Figure 1, the port, bottom of vertical rod 1a is arranged with Anti-slip cover 9.Anti-slip cover 9 can increase the frictional force of double ladder and bottom surface, strengthens security performance.
Further, the end of connection cord 7 has pull head 7a.The setting of pull head 7a makes operator better capture and acts on connection cord 7, humanization designing.
As shown in Figure 2, rail bar one 4a and rail bar two 4b is all in " 7 " font and both are symmetrical, and the sliding part 4a1 that rail bar one 4a and rail bar two 4b comprises protrusion and the fixed part 4a2 be connected with sliding part 4a1, fixed part 4a2 is connected on the outer wall of vertical rod 1a.Guide rail 4 simple and practical, improves production efficiency, reduces cost of production in batch production, in actual production, and can according to actual conditions designed, designed.
Claims (6)
1. a steel work double ladder, it is characterized in that, comprise the ladder row be symmetrical arranged for a pair for climbing, two vertical rods and the cross bar between two vertical rods are drawn together in described terraced package, the top of described each ladder row is all fixed with one piece of gangboard, described one piece of gangboard is articulated with on another block gangboard, between described ladder row, there is telescopic gag lever post, described gag lever post two ends are connected on the cross bar of described both sides respectively, the outer wall of the vertical rod sidepiece of a described ladder row has guide rail, the rail bar two that described guide rail comprises rail bar one and be arranged in parallel with described rail bar one, described rail bar one and rail bar two has the sliding part of symmetrically arranged protrusion, described sliding part is consistent with the incline direction that described ladder is arranged, described sliding part slidably connects the box in square box shaped, the side of described box has the trolley shoe be square, described trolley shoe two opposite side has the groove be arranged in parallel, described groove mates mutually with described sliding part and both mutual clampings, described box can slide up and down along described sliding part, described box has through hole, the connection cord for pulling is tied with in described through hole.
2. steel work double ladder according to claim 1, is characterized in that, have rolling bearing with described box junction bottom described trolley shoe, described box has the cylindrical connecting portion of protrusion, described connecting portion is plugged in described bearing.
3. steel work double ladder according to claim 1, is characterized in that, has cylindrical mounting groove bottom described trolley shoe.
4. steel work double ladder according to claim 1, is characterized in that, the port, bottom of described vertical rod is arranged with Anti-slip cover.
5. steel work double ladder according to claim 1, is characterized in that, the end of described connection cord has pull head.
6. steel work double ladder according to claim 1, it is characterized in that, described rail bar one and described rail bar two are all in " 7 " font and both are symmetrical, the sliding part that described rail bar one and rail bar two comprise protrusion and the fixed part be connected with described sliding part, described fixed part is connected on the outer wall of described vertical rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420544949.3U CN204113096U (en) | 2014-09-13 | 2014-09-13 | Steel work double ladder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420544949.3U CN204113096U (en) | 2014-09-13 | 2014-09-13 | Steel work double ladder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204113096U true CN204113096U (en) | 2015-01-21 |
Family
ID=52330421
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420544949.3U Expired - Fee Related CN204113096U (en) | 2014-09-13 | 2014-09-13 | Steel work double ladder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204113096U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105317368A (en) * | 2015-11-20 | 2016-02-10 | 温四妹 | Trestle ladder for single-person operation |
CN108119054A (en) * | 2017-12-15 | 2018-06-05 | 广东五月花网络科技有限公司 | A kind of humanoid ladder device for construction wall decorations |
CN110422807A (en) * | 2019-08-16 | 2019-11-08 | 仙居贝格智能设备科技有限公司 | A kind of human body lifting device for gardens pruning |
-
2014
- 2014-09-13 CN CN201420544949.3U patent/CN204113096U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105317368A (en) * | 2015-11-20 | 2016-02-10 | 温四妹 | Trestle ladder for single-person operation |
CN108119054A (en) * | 2017-12-15 | 2018-06-05 | 广东五月花网络科技有限公司 | A kind of humanoid ladder device for construction wall decorations |
CN110422807A (en) * | 2019-08-16 | 2019-11-08 | 仙居贝格智能设备科技有限公司 | A kind of human body lifting device for gardens pruning |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204113096U (en) | Steel work double ladder | |
CN105565155A (en) | Temporary lifting construction method for construction site | |
CN209085626U (en) | A kind of house construction engineering verticality measurement device | |
CN203756633U (en) | Supporting cylinder and wall plastering machine | |
CN204778567U (en) | Convenient building engineering hoisting device who carries out | |
CN207495548U (en) | A kind of robot multi-stage stairs pavement test platform | |
CN207177339U (en) | A kind of easy-disassembling-assembling Construction of Civil Engineering Support bracket | |
CN202359804U (en) | Pulley type walking hanging basket fastener | |
CN204113095U (en) | Adjustable extended type steel work double ladder | |
CN204113101U (en) | There is the steel work double ladder of stop device of stopping | |
CN107758578A (en) | A kind of hydraulic lifting platform machine structure | |
CN203407770U (en) | Portable folding worktable | |
CN204139940U (en) | Novel compositions type pin ladder frame | |
CN207296111U (en) | Assembled Building board fixing piece | |
CN208473258U (en) | A kind of new type mortar apparatus of plastering used based on architectural engineering | |
CN203374194U (en) | Multi-functional halfpace | |
CN206046746U (en) | A kind of apparatus for bending of two-way elevator angle steel | |
CN207453424U (en) | A kind of construction scaffold | |
CN202831665U (en) | Elevated safety net | |
CN202578480U (en) | Multifunctional ladder | |
CN205513399U (en) | Telescopic steel pipe piling bin | |
CN201981772U (en) | Folding horse stool | |
CN204419010U (en) | Telescopic ladder | |
CN205857729U (en) | A kind of deflection is encorbelmented interior pull-type sliding and lifting device | |
CN205766072U (en) | A kind of upset staged stepping platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150121 Termination date: 20150913 |
|
EXPY | Termination of patent right or utility model |