CN204111167U - The steel-making slag bucket improved - Google Patents

The steel-making slag bucket improved Download PDF

Info

Publication number
CN204111167U
CN204111167U CN201420373898.2U CN201420373898U CN204111167U CN 204111167 U CN204111167 U CN 204111167U CN 201420373898 U CN201420373898 U CN 201420373898U CN 204111167 U CN204111167 U CN 204111167U
Authority
CN
China
Prior art keywords
slag bucket
bucket body
articulated
arranges
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420373898.2U
Other languages
Chinese (zh)
Inventor
郭庆华
吴军
王会海
汤新彦
卜志胜
丁寅
王建新
张怀忠
吾塔
李世晨
秦军
于挥
韩彤
李鹏程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Bayi Iron and Steel Co Ltd
Original Assignee
Xinjiang Bayi Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Bayi Iron and Steel Co Ltd filed Critical Xinjiang Bayi Iron and Steel Co Ltd
Priority to CN201420373898.2U priority Critical patent/CN204111167U/en
Application granted granted Critical
Publication of CN204111167U publication Critical patent/CN204111167U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a kind of steel-making slag bucket of improvement, comprise slag bucket body, on the top front and rear wall of slag bucket body, corresponding interval arranges four gudgeons respectively, on left and right, the top wall of slag bucket body, correspondence arranges a main hook gudgeon, at the articulated pull bar of slag bucket body bottom center, the articulated cantilever of external side end of pull bar, the articulated strut bar in the slag bucket body back side, the cantilever upper free ends hinged with strut bar arranges an auxiliary hook gudgeon.The utility model is tumbled conveniently, processing ease, is conducive to ensureing operator's personal safety.

Description

The steel-making slag bucket improved
Technical field
The utility model relates to a kind of steel-making slag bucket of improvement.
Background technology
The 8m of current use 3slag bucket adopts channel-section steel as framework, inner use Plate Welding, along position welding hanger on channel-section steel, lays refractory material during use on steel plate, uses Current Collector Sleave to lift by crane when needing handling or tumble.This kind of 8m 3slag bucket in use exists that hanger easily damages, more difficult, the defect such as refractory material very easily comes off of tumbling.
Summary of the invention
The purpose of this utility model is the steel-making slag bucket providing a kind of improvement, tumbles conveniently, processing ease, is conducive to ensureing operator's personal safety.
The purpose of this utility model realizes like this, a kind of steel-making slag bucket of improvement, comprise slag bucket body, on the top front and rear wall of slag bucket body, corresponding interval arranges four gudgeons respectively, on left and right, the top wall of slag bucket body, correspondence arranges a main hook gudgeon, at the articulated pull bar of slag bucket body bottom center, the articulated cantilever of external side end of pull bar, the articulated strut bar in the slag bucket body back side, the cantilever upper free ends hinged with strut bar arranges an auxiliary hook gudgeon.
Slag bucket body end is increased single raise main hook gudgeon by the utility model, directly lift by crane with driving main hook gauntry crane during use, slag bucket bottom increases single raise driving auxiliary hook hanger, rise with driving auxiliary hook when tumbling and tumble, major and minor hook is driven a vehicle in hanging can automatic operation, realizes separate men from machines, ensure that the safety of operator, and can manpower be saved, material resources, improve labor strength.4 gudgeons are designed in two sides, when transporting outward hot vexed workshop without driving gantry hook, ring chain can be used to sling.The utility model effectively saves manpower, material resources, need not repeat to lay refractory material, reduces labor strength, improves slag bucket turnover rate.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Fig. 1 is main TV structure schematic diagram of the present utility model.
Detailed description of the invention
A steel-making slag bucket for improvement, as shown in Figure 1, comprises slag bucket body 2, and on the top front and rear wall of slag bucket body 2, corresponding interval arranges four gudgeons 1 respectively, and on left and right, the top wall of slag bucket body 2, correspondence arranges a main hook gudgeon 3.At the articulated pull bar 7 of slag bucket body bottom center, the articulated cantilever 5 of external side end of pull bar 7, the articulated strut bar 6 in the slag bucket body back side, cantilever 5 upper free ends hinged with strut bar 6 arranges an auxiliary hook gudgeon 4.

Claims (1)

1. the steel-making slag bucket improved, comprise slag bucket body, it is characterized in that: on the top front and rear wall of slag bucket body, corresponding interval arranges four gudgeons respectively, on left and right, the top wall of slag bucket body, correspondence arranges a main hook gudgeon, at the articulated pull bar of slag bucket body bottom center, the articulated cantilever of external side end of pull bar, the articulated strut bar in the slag bucket body back side, the cantilever upper free ends hinged with strut bar arranges an auxiliary hook gudgeon.
CN201420373898.2U 2014-07-08 2014-07-08 The steel-making slag bucket improved Expired - Fee Related CN204111167U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420373898.2U CN204111167U (en) 2014-07-08 2014-07-08 The steel-making slag bucket improved

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420373898.2U CN204111167U (en) 2014-07-08 2014-07-08 The steel-making slag bucket improved

Publications (1)

Publication Number Publication Date
CN204111167U true CN204111167U (en) 2015-01-21

Family

ID=52328504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420373898.2U Expired - Fee Related CN204111167U (en) 2014-07-08 2014-07-08 The steel-making slag bucket improved

Country Status (1)

Country Link
CN (1) CN204111167U (en)

Similar Documents

Publication Publication Date Title
CN204454254U (en) A kind of steel rolling tube suspender
CN204917661U (en) Steel pipe hoisting machine constructs
CN104577865A (en) Cable duct cover plate lifting device
CN204111167U (en) The steel-making slag bucket improved
CN202481909U (en) Wire coil lifting device
CN204454274U (en) Cylinder body rolls off the production line suspender
CN103818819A (en) Suspender for turning large-sized workpieces including vehicle cab
CN204938727U (en) A kind of steel spring suspender
CN204778302U (en) Aluminium alloy transport frock
CN205114127U (en) Automatic open and merge material jar at end
CN206767570U (en) A kind of pork hoisting mechanism
CN204737590U (en) A hoist for belted steel handling
CN204474129U (en) Upending frame
CN204022311U (en) A kind of special tool controlling chain suspension hook
CN205575369U (en) Sash weight device is raised to stacking crane rouleau
CN204265220U (en) A kind of aluminium alloy bars special hanger
CN204471078U (en) Front overhang fixture
CN205061390U (en) Device is put to steel mill forge scale sediment fill
CN204110632U (en) The base head base tail collection bucket improved
CN204111185U (en) The base head base tail collection bucket improved
CN208964369U (en) A kind of disassembling furnace machine hoisting structure
CN107352375A (en) A kind of industrial and mineral convenience in transport and the conveying device of batch turning
CN203998839U (en) A kind of device that facilitates fork truck stevedore ton bag to use
CN207175305U (en) A kind of electric block chain bag
CN205892559U (en) Separable crane of locomotive

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150121

Termination date: 20150708

EXPY Termination of patent right or utility model