CN204110764U - A kind of deviation correcting device being applied to pipe conveyer - Google Patents

A kind of deviation correcting device being applied to pipe conveyer Download PDF

Info

Publication number
CN204110764U
CN204110764U CN201420509376.0U CN201420509376U CN204110764U CN 204110764 U CN204110764 U CN 204110764U CN 201420509376 U CN201420509376 U CN 201420509376U CN 204110764 U CN204110764 U CN 204110764U
Authority
CN
China
Prior art keywords
carrying roller
adhesive tape
correcting device
deviation correcting
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420509376.0U
Other languages
Chinese (zh)
Inventor
张治岗
罗志忠
刘伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Desheng Group Vanadium Titanium Co Ltd
Original Assignee
Sichuan Desheng Group Vanadium Titanium Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Desheng Group Vanadium Titanium Co Ltd filed Critical Sichuan Desheng Group Vanadium Titanium Co Ltd
Priority to CN201420509376.0U priority Critical patent/CN204110764U/en
Application granted granted Critical
Publication of CN204110764U publication Critical patent/CN204110764U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structure Of Belt Conveyors (AREA)

Abstract

The utility model provides a kind of deviation correcting device being applied to pipe conveyer, comprises the first support (1), regulating part (2), the first carrying roller (3), the second support (4) and the second carrying roller (5).The feature of this deviation correcting device is: the body of roll of described first carrying roller is pressed against on the material load bearing surface of adhesive tape, plays the effect pushing down adhesive tape downwards, effectively can reduce rubber belt from deviating degree and prevent adhesive tape from scrolling up because of sideslip; Described second carrying roller is arranged on the position near tape edge, and namely adhesive tape will be once generation sideslip will bump against on described second carrying roller, and therefore described second carrying roller can give adhesive tape along the power of belt width direction, effectively corrects rubber belt from deviating.The utility model effectively can be corrected rubber belt from deviating in comparatively short range, and the belt-distortion that may occur controls in normal range, avoids the formation of adhesive tape torsion tube, improves belt work life, reduces maintenance cost, improves traffic capacity.

Description

A kind of deviation correcting device being applied to pipe conveyer
Technical field
The utility model relates to pipe conveyer technical field, particularly relates to a kind of deviation correcting device being applied to pipe conveyer.
Background technology
Pipe conveyer has plurality of advantages relative to general belt conveyor, as can prevent outside foreign material be mixed into convey materials, frame width little, high spud angle conveying can be realized, and can flexible layout design etc. be realized.Wherein, flexible layout design refers to that pipe conveyer can realize minor radius three dimensional space and turn, and thus can avoid setting up of intermediate transition station and corresponding accessory equipment, reduce project total cost.
But adopt pipe conveyer, when transportation route has obvious radian, adhesive tape is easily in head transition phase generation deviation phenomenon.Rubber belt from deviating easily causes pipe conveyer to form distortion at head transition phase, when belt-distortion exceeds normal range, finally causes adhesive tape torsion tube, causes equipment breakdown.After adhesive tape torsion tube, the repair time is long, and easily causes belt work life to shorten, and even adhesive tape damages.
At present, the deviation correcting device being applied to pipe conveyer is made up of aligning support and aligning carrier roller usually, but, because head transition phase distance is shorter, and aligning support and aligning carrier roller take effect slow to the adjustment of adhesive tape in comparatively short range, so be difficult to reach good rectifying effect, the generation of accident effectively cannot be avoided.
Utility model content
In view of this, the utility model provides a kind of deviation correcting device being applied to pipe conveyer, this deviation correcting device effectively can be corrected rubber belt from deviating in comparatively short range, and the belt-distortion that may occur controls in normal range, avoids the formation of adhesive tape torsion tube.
In order to achieve the above object, the utility model provides following technical scheme:
Be applied to a deviation correcting device for pipe conveyer, comprise the first support, regulating part, the first carrying roller, the second support and the second carrying roller;
Roll neck and the described regulating part of described first carrying roller are rotatably connected; The body of roll of described first carrying roller is pressed against on the material load bearing surface of the adhesive tape of described pipe conveyer;
Described regulating part is fixedly connected with described first support;
Described first support is fixedly connected in the frame of head transition phase of described pipe conveyer, and with adhesive tape deployed position on Belt transport direction at a distance of the first predeterminable range;
Described second carrying roller and the first carrying roller are positioned at the same avris of the adhesive tape of described pipe conveyer;
Roll neck and second bracket-rotatable of described second carrying roller are dynamically connected; The body of roll of described second carrying roller and the adhesive tape of described pipe conveyer on belt width direction at a distance of the second predeterminable range;
Described second support is fixedly connected in the frame of head transition phase of described pipe conveyer, and with adhesive tape deployed position on Belt transport direction at a distance of the 3rd predeterminable range.
Preferably, be above-mentionedly applied in the deviation correcting device of pipe conveyer, described second carrying roller is positioned at the outside of the nearest transportation route radian of the distance head transition phase of described pipe conveyer.
Preferably, be above-mentionedly applied in the deviation correcting device of pipe conveyer, described regulating part and described first support are bolted to connection.
Preferably, be above-mentionedly applied in the deviation correcting device of pipe conveyer, described first support is provided with the position adjustment part of the fixed position for regulating described bolt.
Preferably, be above-mentionedly applied in the deviation correcting device of pipe conveyer, described position adjustment part is strip shape through hole.
Preferably, be above-mentionedly applied in the deviation correcting device of pipe conveyer, one end away from described regulating part of the body of roll of described first carrying roller is sphere.
Preferably, be above-mentionedly applied in the deviation correcting device of pipe conveyer, axis and the tape edge of described second carrying roller are perpendicular.
Preferably, be above-mentionedly applied in the deviation correcting device of pipe conveyer, described first predeterminable range is 13m ~ 15m.
Preferably, be above-mentionedly applied in the deviation correcting device of pipe conveyer, described second predeterminable range is 10mm ~ 15mm.
Preferably, be above-mentionedly applied in the deviation correcting device of pipe conveyer, described 3rd predeterminable range is 12.9m ~ 15.1m.
According to technique scheme, because the body of roll of the first carrying roller described in the utility model is pressed against on the material load bearing surface of adhesive tape, make the spacing of adhesive tape and head transition phase snub pulley less, and give adhesive tape downward pressure, serve the effect pushing down adhesive tape downwards, so rubber belt from deviating degree effectively can be reduced and prevent adhesive tape from scrolling up because of sideslip; Described second carrying roller is arranged on the position near tape edge, and namely adhesive tape will be once generation sideslip will bump against on described second carrying roller, and therefore described second carrying roller can give adhesive tape along the power of belt width direction, effectively corrects rubber belt from deviating.First carrying roller described in the utility model and described second carrying roller with the use of, compact installation site can be adopted, and the correction of rubber belt from deviating is taken effect rapidly, therefore the utility model effectively can be corrected rubber belt from deviating in comparatively short range, the belt-distortion that may occur controls in normal range, avoids the formation of adhesive tape torsion tube, improves belt work life, reduce maintenance cost, improve traffic capacity.
Accompanying drawing explanation
Fig. 1 is the first support of the utility model embodiment, regulating part and the first carrying roller scheme of installation;
Fig. 2 is the second support and the second carrying roller scheme of installation of the utility model embodiment.
Detailed description of the invention
For the ease of understanding, below in conjunction with accompanying drawing, the utility model will be further described.
See Fig. 1 and Fig. 2, a kind of deviation correcting device being applied to pipe conveyer, comprises the first support 1, regulating part 2, first carrying roller 3, second support 4 and the second carrying roller 5.
Roll neck and the regulating part 2 of the first carrying roller 3 are rotatably connected, and the body of roll of the first carrying roller 3 is pressed against on the material load bearing surface of adhesive tape 6.
The face that described material load bearing surface contacts with material when referring to transported material, this face forms the inside face of tubulose adhesive tape when adhesive tape 6 is rolled into tubulose.Cause damage to adhesive tape 6 when rotating to avoid the first carrying roller 3 to carry motion along with adhesive tape 6 as far as possible, in the present embodiment, one end away from regulating part 2 of the body of roll of the first carrying roller 3 is made into sphere.
Regulating part 2 is fixedly connected with the first support 1.
Conveniently change the connection location of regulating part 2 on the first support 1, regulating part 2 and the first support 1 can be bolted to connection, and strip shape through hole can be provided with on the first support 1, bolt changes position in this strip shape through hole, thus change the connection location of regulating part 2 on the first support 1, realize the position adjustments to the first carrying roller 3.
First support 1 is fixedly connected in the frame of head transition phase of pipe conveyer, and with adhesive tape 6 deployed position on adhesive tape 6 transporting direction at a distance of the first predeterminable range.
First predeterminable range can be 13m ~ 15m, is set to 13m in the present embodiment, certainly, also can need to adopt other length according to actual conditions.
Second carrying roller 5 and the first carrying roller 3 are positioned at the same avris of adhesive tape 6.
Because rubber belt from deviating often occurs in the outside of transportation route radian, therefore, in the present embodiment, the second carrying roller 5 and the first carrying roller 3 are positioned at the outside of the nearest transportation route radian of the distance head transition phase of pipe conveyer, certainly, also can need to be positioned at other sides according to actual conditions.
Roll neck and second support 4 of the second carrying roller 5 are rotatably connected.
The body of roll of the second carrying roller 5 and adhesive tape 6 are at a distance of the second predeterminable range a.
Acting as of second carrying roller 5, when adhesive tape 6 outwards sideslip when bumping against the second carrying roller 5, by correcting sideslip along the power of belt width direction to adhesive tape 6, therefore the second carrying roller 5 should being installed near adhesive tape 6 edge.Second predeterminable range a can be 10mm ~ 15mm, is set to 10mm in the present embodiment, certainly, also can need to adopt other length according to actual conditions.In order to reach good force effect, in the present embodiment, make the edge of the axis of the second carrying roller 5 and adhesive tape 6 perpendicular.
Second support 4 is fixedly connected in the frame of head transition phase of pipe conveyer, and with adhesive tape 6 deployed position on adhesive tape 6 transporting direction at a distance of the 3rd predeterminable range.
In order to make the first carrying roller 3 and the second carrying roller 5 mating reaction, should as far as possible by the two compact Layout.3rd predeterminable range can be 12.9m ~ 15.1m, is set to 12.9m in the present embodiment, certainly, also can need to adopt other length according to actual conditions.
In the utility model the first carrying roller 3 and the second carrying roller 5 with the use of, adopt compact installation site, and take effect rapidly to the correction of adhesive tape 6 sideslip, therefore the utility model effectively can be corrected adhesive tape 6 sideslip in comparatively short range, the belt-distortion that may occur controls in normal range, avoids the formation of adhesive tape torsion tube, improves adhesive tape 6 service life, reduce maintenance cost, improve traffic capacity.
Below in conjunction with embodiment, introduce principle of work of the present utility model:
The deviation correcting device that the utility model provides is installed under stopped status, distance adhesive tape 6 deployed position 12.9m place at head transition phase and outside transportation route radian, second support 4 is fixedly mounted on the horizontal surface outside frame, and make the second carrying roller 5 axes normal in adhesive tape 6 edge, the second carrying roller 5 body of roll distance adhesive tape 6 edge 10mm; At the distance adhesive tape 6 deployed position 13m place of head transition phase, first support 1 is fixedly mounted on outside frame, the first carrying roller 3 and the second carrying roller 5 is made to be positioned at the same avris of adhesive tape 6, and make first carrying roller 3 body of roll be pressed against on the material load bearing surface of adhesive tape 6 by the position of adjustment regulating part 2 on the first support 1 and angle, then by bolt, regulating part 2 is fixedly connected with the first support 1.
Under open state, the first carrying roller 3 is carried motion along with adhesive tape 6 and rotates, and the pressure giving adhesive tape 6 downward, effectively prevent adhesive tape 6 from scrolling up because of sideslip.Owing to not flattening completely at head transition phase adhesive tape 6, when adhesive tape 6 is to direction sideslip away from the second carrying roller 5, adhesive tape 6 horizontal applied force given by the first carrying roller 3, effectively reduces sideslip degree.When adhesive tape 6 is to the second carrying roller 5 side sideslip, adhesive tape 6 edge will bump against on second carrying roller 5 body of roll, and therefore, the second carrying roller 5 corrects to adhesive tape 6 horizontal applied force to sideslip.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the utility model.To be apparent for those skilled in the art to the multiple amendment of embodiment, General Principle as defined herein when not departing from spirit or scope of the present utility model, can realize in other embodiments.Therefore, the utility model can not be restricted to embodiment illustrated herein, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (10)

1. one kind is applied to the deviation correcting device of pipe conveyer, it is characterized in that, comprise the first support (1), regulating part (2), the first carrying roller (3), the second support (4) and the second carrying roller (5);
Roll neck and the described regulating part (2) of described first carrying roller (3) are rotatably connected; The body of roll of described first carrying roller (3) is pressed against on the material load bearing surface of the adhesive tape of described pipe conveyer;
Described regulating part (2) is fixedly connected with described first support (1);
Described first support (1) is fixedly connected in the frame of head transition phase of described pipe conveyer, and with adhesive tape deployed position on Belt transport direction at a distance of the first predeterminable range;
Described second carrying roller (5) and described first carrying roller (3) are positioned at the same avris of the adhesive tape of described pipe conveyer;
Roll neck and described second support (4) of described second carrying roller (5) are rotatably connected; The body of roll of described second carrying roller (5) and the adhesive tape of described pipe conveyer on belt width direction at a distance of the second predeterminable range (a);
Described second support (4) is fixedly connected in the frame of head transition phase of described pipe conveyer, and with adhesive tape deployed position on Belt transport direction at a distance of the 3rd predeterminable range.
2. deviation correcting device according to claim 1, is characterized in that, described second carrying roller (5) is positioned at the outside of the nearest transportation route radian of the distance head transition phase of described pipe conveyer.
3. deviation correcting device according to claim 1, is characterized in that, described regulating part (2) and described first support (1) are bolted to connection.
4. deviation correcting device according to claim 3, is characterized in that, described first support (1) is provided with the position adjustment part of the fixed position for regulating described bolt.
5. deviation correcting device according to claim 4, is characterized in that, described position adjustment part is strip shape through hole.
6. the deviation correcting device according to any one of claim 1-5, is characterized in that, one end away from described regulating part (2) of the body of roll of described first carrying roller (3) is sphere.
7. the deviation correcting device according to any one of claim 1-5, is characterized in that, axis and the tape edge of described second carrying roller (5) are perpendicular.
8. the deviation correcting device according to any one of claim 1-5, is characterized in that, described first predeterminable range is 13m ~ 15m.
9. the deviation correcting device according to any one of claim 1-5, is characterized in that, described second predeterminable range (a) is 10mm ~ 15mm.
10. the deviation correcting device according to any one of claim 1-5, is characterized in that, described 3rd predeterminable range is 12.9m ~ 15.1m.
CN201420509376.0U 2014-09-04 2014-09-04 A kind of deviation correcting device being applied to pipe conveyer Active CN204110764U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420509376.0U CN204110764U (en) 2014-09-04 2014-09-04 A kind of deviation correcting device being applied to pipe conveyer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420509376.0U CN204110764U (en) 2014-09-04 2014-09-04 A kind of deviation correcting device being applied to pipe conveyer

Publications (1)

Publication Number Publication Date
CN204110764U true CN204110764U (en) 2015-01-21

Family

ID=52328105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420509376.0U Active CN204110764U (en) 2014-09-04 2014-09-04 A kind of deviation correcting device being applied to pipe conveyer

Country Status (1)

Country Link
CN (1) CN204110764U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105923344A (en) * 2016-06-30 2016-09-07 兖州煤业股份有限公司 Belt conveying device
CN106743111A (en) * 2016-12-29 2017-05-31 安徽清水岩生态科技有限公司 A kind of deviation correcting device based on raising conveyer belt service life
CN109823791A (en) * 2019-03-18 2019-05-31 新疆天池能源有限责任公司 Flexible pressure zone component and belt conveyor systems

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105923344A (en) * 2016-06-30 2016-09-07 兖州煤业股份有限公司 Belt conveying device
CN106743111A (en) * 2016-12-29 2017-05-31 安徽清水岩生态科技有限公司 A kind of deviation correcting device based on raising conveyer belt service life
CN109823791A (en) * 2019-03-18 2019-05-31 新疆天池能源有限责任公司 Flexible pressure zone component and belt conveyor systems
CN109823791B (en) * 2019-03-18 2024-03-22 新疆天池能源有限责任公司 Flexible press belt assembly and belt conveyor system

Similar Documents

Publication Publication Date Title
CN204110764U (en) A kind of deviation correcting device being applied to pipe conveyer
CN201052911Y (en) Conveyor transporting belt caging device
CN204223632U (en) A kind of turning guiding mechanism
CN101613040A (en) Roll cloth loading conveyor
CN204714169U (en) Load-transfer device deviation correcting device on a kind of rubber tape shears
CN209113029U (en) Convey with stopper and belt conveyor
CN203581889U (en) Automatic deflection correcting device of circular tube belt conveyor
WO2024036912A1 (en) Coal conveying belt deviation rectifying apparatus
CN203638635U (en) Novel belt conveyor
CN202175404U (en) Full-automatic deviation rectifying device of rubber belt conveyor
CN104418023A (en) Slope belt conveyor
CN203638639U (en) 360-degree rotary slope conveyor belt device
CN106743109B (en) A kind of belt conveyor alternating expression automatic deviation rectifying device
CN202080696U (en) Driven wheel adjusting device for belt conveyors
CN102358489B (en) Intermittent covering belt floating-type skidproof device
CN104003105B (en) Belt conveyer system for automatically correcting
CN202880301U (en) Anti-deviation device of belt conveyor
CN207844318U (en) A kind of pipeline centralising device
CN203667384U (en) Articulated adjustable groove angle transition carrier roller
CN103144800A (en) Carton sealing machine
CN204280660U (en) A kind of pipeline transmits material flow line upset roller-way
CN207511242U (en) A kind of simple deviation correcting device of conveying belt production line
CN105523342A (en) Multi-row soft bag lifting conveyor
CN201980678U (en) Automatic deviation corrector for conveyor belt
CN201411237Y (en) Deviation-resisting adjusting device of belt conveyor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant