CN204110618U - Steel pipe stand for piling up - Google Patents
Steel pipe stand for piling up Download PDFInfo
- Publication number
- CN204110618U CN204110618U CN201420501722.0U CN201420501722U CN204110618U CN 204110618 U CN204110618 U CN 204110618U CN 201420501722 U CN201420501722 U CN 201420501722U CN 204110618 U CN204110618 U CN 204110618U
- Authority
- CN
- China
- Prior art keywords
- shaped frame
- steel pipe
- piling
- pipe stand
- welded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Pallets (AREA)
Abstract
The utility model discloses a kind of steel pipe stand for piling up, comprise U-shaped frame (1), longitudinal sleeve (3) is welded with in the outboard tube of two columns of U-shaped frame (1), longitudinal sleeve (3) is provided with top wire hole, jackscrew (4) is installed with in top wire hole, steel pipe stand for piling up is had to stack locating plate (6) in the upper end of two columns of U-shaped frame (1), the bottom girder of U-shaped frame (1) has and stacks knock hole (9) corresponding to locating plate (6) with steel pipe stand for piling up, every layer of two or three U-shaped frame (1) longitudinal arrangement together, and it is fixing to pierce into longitudinal sleeve (3) interior jackscrew (4) by scaffold tube (7).The utility model steel pipe enters that frame palletization operations is simple, single job does not need adjustment just can realize " one together " effect and easily one trigger and hang, waste of reducing work hours in support body after entering frame.
Description
Technical field
The utility model relates to a kind of shelf, especially a kind of steel pipe stand for piling up piled up for construction site scaffolding steel pipe.
Background technology
As everyone knows, the scaffolding steel pipe that building operation uses is normal after marching into the arena and in use procedure needs interim piling, and greatly often occupy the larger temporary site area in camp site, if piling is irregular will have a strong impact on on-the-spot modern-style construction due to steel pipe consumption.At present, traditional steel pipe stand for piling up all adopts scaffolding steel pipe to set up, and space structure is cuboid, steel pipe entering frame and to hang in process not only normal consume a large amount of artificial, and steel pipe on frame be often come and go uneven, unsightly.Therefore, design that a kind of steel pipe enters that frame palletization operations is simple, single job do not need adjustment just can realize " one neat " effect and easily one trigger and hang in support body after entering frame, the steel pipe stand for piling up wasted of reducing work hours is the current technical issues that need to address.
Summary of the invention
Frame palletization operations is simple, single job does not need adjustment just can realize " one neat " effect and easily one trigger and hang, the steel pipe stand for piling up wasted of reducing work hours in support body after entering frame to provide a kind of steel pipe to enter during technical problem to be solved in the utility model.
The technical scheme in the invention for solving the technical problem is:
Steel pipe stand for piling up, comprise U-shaped frame, longitudinal sleeve is welded with in the outboard tube of two columns of U-shaped frame, longitudinal sleeve is provided with top wire hole, in top wire hole, be installed with jackscrew, have steel pipe stand for piling up to stack locating plate in the upper end of two columns of U-shaped frame, the bottom girder of U-shaped frame has and stacks knock hole corresponding to locating plate with steel pipe stand for piling up, every layer of two or three U-shaped frame longitudinal arrangement together, and pierces in longitudinal sleeve by scaffold tube and fixes with jackscrew.
As a kind of preferred version of the present utility model, described U-shaped frame 16a channel-section steel is welded, the length of U-shaped frame is 875 ㎜, the height of U-shaped frame is 450 ㎜, the φ 60 ㎜ wrought iron of described longitudinal sleeve to be length be 100 ㎜, upper plug head is welded with in the upper end of two columns of U-shaped frame, steel pipe stand for piling up stacks locating plate and is welded on upper plug head, the length that steel pipe stand for piling up stacks locating plate is 30 ㎜, be highly 20 ㎜, thickness is 10 ㎜, and be welded with lower end cap in the lower end of two columns of U-shaped frame, described knock hole is located on lower end cap.
As a kind of preferred version of the present utility model, described upper plug head and lower end cap are 50 long ㎜ × 5 ㎜ angle steel of 100 ㎜, and described jackscrew is M14 bolt, and M14 bolt is provided with obstinate mother.
As a kind of preferred version of the present utility model, the outer face of two columns of U-shaped frame is provided with baffle plate groove, in order to steel pipe is piled up neatly, when piling up steel pipe a U-shaped frame wherein baffle plate groove in plug-in mounting baffle plate.
As a kind of preferred version of the present utility model, described baffle plate groove be two columns being welded on U-shaped frame outer face on height be the 50 ㎜ × 5 ㎜ angle steel of 300 ㎜, the lower surface of angle steel is welded with closure plate.
Compared with prior art, the utility model not only makes simply, conveniently has enough to meet the need use.Especially after steel pipe once enters frame, do not need specially to adjust the effect that just can realize " neat ", enter frame simple to operate, owing to having channel-section steel interval between levels steel pipe, entirety can be realized and hang, do not need manually to extract from frame one by one, save a large amount of artificial.Use this stand for piling up bearing to pile up steel pipe, effect clean and tidy, attractive in appearance can be realized easily, camp site civilized construction.
Accompanying drawing explanation
Fig. 1 is the front view of the utility model structural representation;
Fig. 2 is the birds-eye view of Fig. 1;
Fig. 3 is the A direction view of Fig. 2;
Fig. 4 is the B direction view of Fig. 3;
Fig. 5 be in Fig. 2 1-1 to part sectional view;
12 steel pipes for piling up in figure.
Indicate: Fig. 1-Fig. 5 is the concrete drawing of the utility model embodiment, in figure, other size is describe at specification sheets word segment.
Detailed description of the invention
As shown in the figure, steel pipe stand for piling up, comprise U-shaped frame 1, be welded with longitudinal sleeve 3 in the outboard tube of two columns of U-shaped frame 1, longitudinal sleeve 3 is provided with top wire hole, in top wire hole, be installed with jackscrew 4, steel pipe stand for piling up is had to stack locating plate 6 in the upper end of two columns of U-shaped frame 1, the bottom girder of U-shaped frame 1 has and stacks knock hole corresponding to locating plate 69 with steel pipe stand for piling up, every layer of two or three U-shaped frame 1 longitudinal arrangement together, and pierces in longitudinal sleeve 3 fixing with jackscrew 4 by scaffold tube 7.
Described U-shaped frame 1 is welded with 16a channel-section steel, the length of U-shaped frame 1 is 875 ㎜, the height of U-shaped frame 1 is 450 ㎜, described longitudinal sleeve 3 for length be the φ 60 ㎜ wrought iron of 100 ㎜, upper plug head 10 is welded with in the upper end of two columns of U-shaped frame 1, steel pipe stand for piling up stacks locating plate 6 and is welded on upper plug head 10, the length that steel pipe stand for piling up stacks locating plate 6 is 30 ㎜, be highly 20 ㎜, thickness is 10 ㎜, be welded with lower end cap 8 in the lower end of two columns of U-shaped frame 1, described knock hole 9 is located on lower end cap 8.
Described upper plug head 10 and lower end cap 8 are 50 long ㎜ × 5 ㎜ angle steel of 100 ㎜, and described jackscrew 4 is M14 bolt, and M14 bolt is provided with obstinate mother.
The outer face of two columns of U-shaped frame 1 is provided with baffle plate groove 2, when piling up steel pipe a U-shaped frame 1 wherein baffle plate groove 2 in plug-in mounting baffle plate.
Described baffle plate groove 2 for the height be welded on the outer face of two columns of U-shaped frame 1 be the 50 ㎜ × 5 ㎜ angle steel of 300 ㎜, the lower surface of angle steel is welded with closure plate 11.
Claims (5)
1. steel pipe stand for piling up, comprise U-shaped frame (1), it is characterized in that, longitudinal sleeve (3) is welded with in the outboard tube of two columns of U-shaped frame (1), longitudinal sleeve (3) is provided with top wire hole, jackscrew (4) is installed with in top wire hole, steel pipe stand for piling up is had to stack locating plate (6) in the upper end of two columns of U-shaped frame (1), the bottom girder of U-shaped frame (1) has and stacks knock hole (9) corresponding to locating plate (6) with steel pipe stand for piling up, every layer of two or three U-shaped frame (1) longitudinal arrangement together, and it is fixing to pierce into longitudinal sleeve (3) interior jackscrew (4) by scaffold tube (7).
2. steel pipe stand for piling up according to claim 1, it is characterized in that, described U-shaped frame (1) is welded with 16a channel-section steel, the length of U-shaped frame (1) is 875 ㎜, the height of U-shaped frame (1) is 450 ㎜, described longitudinal sleeve (3) for length be the φ 60 ㎜ wrought iron of 100 ㎜, upper plug head (10) is welded with in the upper end of two columns of U-shaped frame (1), steel pipe stand for piling up stacks locating plate (6) and is welded on upper plug head (10), the length that steel pipe stand for piling up stacks locating plate (6) is 30 ㎜, be highly 20 ㎜, thickness is 10 ㎜, lower end cap (8) is welded with in the lower end of two columns of U-shaped frame (1), described knock hole (9) is located on lower end cap (8).
3. steel pipe stand for piling up according to claim 2, is characterized in that, described upper plug head (10) and lower end cap (8) are 50 long ㎜ × 5 ㎜ angle steel of 100 ㎜, and described jackscrew (4) is M14 bolt.
4. steel pipe stand for piling up according to claim 1, is characterized in that, the outer face of two columns of U-shaped frame (1) is provided with baffle plate groove (2), when piling up steel pipe a U-shaped frame (1) wherein baffle plate groove (2) in plug-in mounting baffle plate.
5. steel pipe stand for piling up according to claim 4, is characterized in that, described baffle plate groove (2) for the height be welded on the outer face of two columns of U-shaped frame (1) be the 50 ㎜ × 5 ㎜ angle steel of 300 ㎜, the lower surface of angle steel is welded with closure plate (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420501722.0U CN204110618U (en) | 2014-09-02 | 2014-09-02 | Steel pipe stand for piling up |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420501722.0U CN204110618U (en) | 2014-09-02 | 2014-09-02 | Steel pipe stand for piling up |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204110618U true CN204110618U (en) | 2015-01-21 |
Family
ID=52327959
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420501722.0U Active CN204110618U (en) | 2014-09-02 | 2014-09-02 | Steel pipe stand for piling up |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204110618U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107934239A (en) * | 2017-11-17 | 2018-04-20 | 四川行之智汇知识产权运营有限公司 | A kind of new rack for pipeline |
-
2014
- 2014-09-02 CN CN201420501722.0U patent/CN204110618U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107934239A (en) * | 2017-11-17 | 2018-04-20 | 四川行之智汇知识产权运营有限公司 | A kind of new rack for pipeline |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202577934U (en) | Screw thread wall-connection member of scaffold and building | |
CN204110618U (en) | Steel pipe stand for piling up | |
CN202577347U (en) | Waterproof structure of basement steel formwork | |
CN204609300U (en) | A kind of fixed sleeving for construction drainage pipeline preformed hole hole | |
CN206769350U (en) | Outer on large-sized station boiler Steel Structure chooses net scaffold | |
CN204048796U (en) | A kind of work high above the ground stool being applicable to steel pipe pole | |
CN202284329U (en) | Concrete embedded part | |
CN202100000U (en) | Adjustable bracket girder structure for building template | |
CN204510465U (en) | A kind of novel building engineering protective stent | |
CN107234577A (en) | A kind of box spanner provided with shelf | |
CN201424816Y (en) | Large template supporting leg of wall | |
CN202492929U (en) | Overflowing hole device of concrete filled steel tube | |
CN203977857U (en) | Concrete plate surface reserved holes of pipes capping tools formula erecting device | |
CN106522535B (en) | A kind of scaffold being connected firmly is shored | |
CN204608829U (en) | A kind of Novel retaining wall structure quick for installation | |
CN205189139U (en) | Prevent not hard up steel construction locating component of pre -buried connecting piece | |
CN204194489U (en) | Steel pipe brace | |
CN204957287U (en) | Steel pipe groove protector | |
CN205063311U (en) | A connecting piece for building scaffold | |
CN204819404U (en) | Multi -functional instrument hammer | |
CN203891448U (en) | Outer frame wall-connecting device | |
CN208734062U (en) | A kind of adjusting nut connection structure in adjustable support | |
CN203626215U (en) | Floor-type scaffold | |
CN203213107U (en) | Foot fixing drill rod device | |
CN203676963U (en) | Clamping mechanism for roll paper of paper tube |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |