CN204104934U - A kind of station of passing a bridge - Google Patents

A kind of station of passing a bridge Download PDF

Info

Publication number
CN204104934U
CN204104934U CN201420378788.5U CN201420378788U CN204104934U CN 204104934 U CN204104934 U CN 204104934U CN 201420378788 U CN201420378788 U CN 201420378788U CN 204104934 U CN204104934 U CN 204104934U
Authority
CN
China
Prior art keywords
track
station
production line
gap bridge
conveyor chain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420378788.5U
Other languages
Chinese (zh)
Inventor
钟康
郭超
何伟
俞明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yun Dao Information Technology Co Ltd
Nantong Mingxing Science & Technology Development Co Ltd
Original Assignee
Jiangsu Yun Dao Information Technology Co Ltd
Nantong Mingxing Science & Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yun Dao Information Technology Co Ltd, Nantong Mingxing Science & Technology Development Co Ltd filed Critical Jiangsu Yun Dao Information Technology Co Ltd
Priority to CN201420378788.5U priority Critical patent/CN204104934U/en
Application granted granted Critical
Publication of CN204104934U publication Critical patent/CN204104934U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of station of passing a bridge, comprise approach track, the transmitting device that enters the station, outbound transport device and departures track four critical pieces; Two different production lines realize connecting by a pair gap bridge station, and a pair corresponding a pair gap bridge track in gap bridge station realizes being bi-directionally connected of production line, and a pair gap bridge track is called the first gap bridge station and second and passes a bridge station; Each production line main orbit is connected with the transmitting device that enters the station by approach track, is connected with outbound transport device by departures track; Namely the two ends of approach track connect production line main orbit and the transmitting device that enters the station respectively, and the two ends of departures track connect outbound transport device and production line main orbit respectively; The described transmitting device that enters the station is connected by gap bridge track with outbound transport device.The utility model can realize the seamless link between production line and production line, production line and sorting line etc.

Description

A kind of station of passing a bridge
Technical field
The utility model relates to a kind of station of passing a bridge, the seamless link to be mainly used in realizing between garment industry production line and production line, between production line and sorting line etc.
Background technology
Along with socioeconomic development, the production that Chinese costume, family are spun etc. is faced with lot of challenges.On the one hand, demographic dividend disappears gradually, and labor cost rises, and recruitment difficulty becomes universal phenomenon; On the other hand, customer demand there occurs larger change, and the order of small lot, multi items gets more and more.In this case, traditional production model that spelling manpower, time of beating fight has been difficult to meet current Production requirement, uses more advanced sewing device, and equips intelligent clothing production line, reduce artificial demand, enhance productivity and become the only way of relevant enterprise development with managerial skills.
Multiple patent relevant to clothes intelligence production line has been applied for before applicant, such as: the method for supervising of intelligent material allocation and system, the patent No. 200610011949.7; A monitoring system for intelligent material allocation, patent No. 200920110318.X etc.These patents describe a kind of system composition of intelligent clothing production line, principle and operating mechanism.By using RFID technique, achieving the intelligent scheduling to Apparel Manufacturing and monitoring, can production efficiency be significantly improved.
Along with the development of technology, in prior art, the intellectuality of single production line cannot meet the intellectuality of enterprise, the demand of high-efficiency homework, for this problem, applicant wish can by before independently production line couple together, realize the full-range intelligent transportation of material and management and running, simultaneously, enterprise also wishes production line and other boost lines to couple together, after ready-made clothes machine, carry out the arrangement of rear road, sorting and packaging, by artificial, ready-made clothes on production line are transferred on rear diatom or sorting line in prior art, waste time and energy like this, easily there is human error, therefore a kind of device is needed, realize production line and production line, the slitless connection of production line and other boost lines.
Utility model content
Utility model object: for problems of the prior art with not enough, the utility model provides a kind of station of passing a bridge.
Technical scheme: a kind of station of passing a bridge, is located in production line or sorting line or other boost lines, realizes the seamless link between production line and production line, production line and sorting line, sorting line and sorting line etc.; No matter on a production line, on sorting line or in other boost lines, it is all the same to install connected mode, the fast understanding of the technical solution of the utility model and reader is described conveniently brief and concisely, is only described the gap bridge station on production line pass a bridge station.
Gap bridge station comprises approach track, the transmitting device that enters the station, outbound transport device and departures track four critical pieces; Two different production lines realize connecting by a pair gap bridge station, and a pair corresponding a pair gap bridge track in gap bridge station realizes being bi-directionally connected between production line, and a pair gap bridge track is called the first gap bridge station and second and passes a bridge station; Each production line main orbit is connected with the transmitting device that enters the station by approach track, is connected with outbound transport device by departures track; Namely the two ends of approach track connect production line main orbit and the transmitting device that enters the station respectively, and the two ends of departures track connect outbound transport device and production line main orbit respectively; The described transmitting device that enters the station is connected by gap bridge track with outbound transport device.
Further, the position of the deployment at the gap bridge station on described production line and quantity can arrange according to actual production demand, article two, the gap bridge station logarithm connected between production line also can set as required, can be more than or equal to 1 right, but be less than the work station quantity of that line of work station negligible amounts in two production lines.
Further, each transmitting device is again primarily of conveyor chain and 3 travelling gear compositions;
Entering the station in transmitting device, described 3 travelling gear distributions triangular in shape, deliver drive chain, conveyor chain on the travelling gear of approach track is connected work with approach track, the conveyor chain be positioned on the travelling gear of highest point is connected work with gap bridge track, and the travelling gear of highest point is called to let pass in upper end takes turns; Described conveyor chain is provided with latch, for blocking suspension bracket; In the process of gap bridge station work, suspension bracket on approach track is due to Action of Gravity Field, slide in the groove of approach track end, between approach track and conveyor chain extruding force effect under, suspension bracket is stuck in the latch of conveyor chain, conveyor chain is under the effect of travelling gear, upwards transmitted by suspension bracket, when suspension bracket arrives the position of upper end clearance wheel, latch unclamps, suspension bracket, again by the effect of gravity, is sent on gap bridge track from the latch of lifting chain;
In outbound transport device, described 3 travelling gear distributions triangular in shape, deliver drive chain, conveyor chain on the travelling gear of departures track is connected work with departures track, now near the travelling gear of departures track, be called to let pass in lower end to take turns, the conveyor chain be positioned on the travelling gear of highest point is connected work with gap bridge track, and gap bridge track is provided with groove near the end of conveyor chain; Described conveyor chain is provided with latch, for blocking suspension bracket; In the process of gap bridge station work, dress hanger falls into the groove of the outlet ends of gap bridge track, then enters in the latch of conveyor chain, and suspension bracket is under the effect of gap bridge track export end and conveyor chain extruding force, is squeezed in the latch of conveyor chain; Suspension bracket be transmitted chain be sent to departures track entrance point time, come off from latch and enter departures track.
Further, the denticle of described upper end clearance wheel and lower end clearance wheel is provided with long tooth and short tooth, and between the two every setting, namely long tooth is adjacent with short tooth; Described latch is located on conveyor chain by bouncing plate, and when conveyor chain lets pass wheel or lower end clearance wheel through upper end, because long tooth is longer, the effect handle of latch is withstood in long pitch upper end, and latch opens, and suspension bracket is come off from latch.
Further, the junction of described approach track and production line main orbit, the junction of set off track and production line main orbit are equipped with connecting valve; Connecting valve is for controlling the junction of approach track and production line main orbit, being communicated with and disconnection of set off track and production line main orbit.
Suppose there are two production lines, be respectively the first production line and the second production line, dress hanger runs along the main orbit of the first production line, if the suspension bracket of the first production line need be transferred to the second production line, then pass through connecting valve, first production line main orbit and approach track are connected, and departures track and the second production line main orbit are connected; Then the suspension bracket on the first production line main orbit is sent to the transmitting device that enters the station at the first production line gap bridge station by the approach track at the first production line gap bridge station, suspension bracket is promoted to the first gap bridge track by the transmitting device that enters the station at the first production line gap bridge station, suspension bracket is sent to the outbound transport device at the second production line gap bridge station by the first gap bridge track again, the departures track at the second production line gap bridge station is down to by suspension bracket by the outbound transport device at the second production line gap bridge station, and suspension bracket is sent on the main orbit of the second production line by the departures track that the second production line gap bridge is stood;
In like manner, if the suspension bracket of the second production line need be transferred to the first production line, then the suspension bracket on the second production line main orbit is sent to the transmitting device that enters the station at the second production line gap bridge station by the approach track at the second production line gap bridge station, suspension bracket is promoted to the second gap bridge track by the transmitting device that enters the station of the second production line, suspension bracket is sent to the outbound transport device at the first production line gap bridge station by the second gap bridge track again, the departures track at the first production line gap bridge station is down to by suspension bracket by the gap bridge station transmitting device of the first production line, suspension bracket is sent on the first production line main orbit by the departures track at the first production line gap bridge station.
Beneficial effect: compared with prior art, the gap bridge station that the utility model provides, structure is simple, is easy to realize, and cost is low, be convenient to organic connection with production line, the connection that user can be made to utilize lower cost to realize between production line, enhances productivity, is convenient to the unified intelligentized control method that production unit realizes production line, use manpower and material resources sparingly, have a extensive future.
Accompanying drawing explanation
Fig. 1 is the application state figure of the utility model embodiment;
Fig. 2 is that the production line of the utility model embodiment is stood with gap bridge, the connection diagram of gap bridge track;
Fig. 3 is the structure for amplifying schematic diagram at the gap bridge station of the utility model embodiment;
Fig. 4 is the close departures travelling gear of track and the structure for amplifying schematic diagram of conveyor chain of the utility model embodiment;
Fig. 5 is the travelling gear structure for amplifying schematic diagram with long tooth and short tooth of the utility model embodiment;
Wherein, the 1, first gap bridge station 12, first, production line 2, second production line 11, first gap bridge station 21, second gap bridge track 22, second gap bridge track 211, approach track 212, the conveyor chain 213 that enters the station, departures track 214, outbound transport chain 215, first travelling gear 216, second travelling gear 3, extrusion 6, latch 7, gap.
Detailed description of the invention
Below in conjunction with specific embodiment, illustrate the utility model further, these embodiments should be understood and be only not used in restriction scope of the present utility model for illustration of the utility model, after having read the utility model, the amendment of those skilled in the art to the various equivalent form of value of the present utility model has all fallen within the application's claims limited range.
As shown in Figure 1, enterprise according to the demand of oneself, can connect between corresponding two production lines 1 to or multipair gap bridge station, connected by a pair two-way gap bridge track between a pair gap bridge station.
As shown in Figure 2, the main orbit of the first production line 1 is connected with the first gap bridge station 11, and the main orbit of the second production line 2 is connected with the second gap bridge station 21; The transmitting device that enters the station at the first gap bridge station 11 is connected by the outbound transport device of the first gap bridge track 12 with the second gap bridge station 21; The transmitting device that enters the station at the second gap bridge station 21 is connected by the outbound transport device of the second gap bridge track 22 with the first gap bridge station 11.
As shown in Figure 3, each gap bridge station comprises an approach track 211, transmitting device that enters the station, a departures track 213, outbound transport device.
No matter enter the station transmitting device or outbound transport device, and each transmitting device is again primarily of conveyor chain and 3 travelling gear compositions; The conveyor chain of transmitting device of entering the station is called the conveyor chain 212 that enters the station, and the conveyor chain of outbound transport device is called outbound transport chain 214.
3 travelling gear distributions triangular in shape, deliver drive chain, the outbound transport chain 214 on the first travelling gear 215 is connected cooperating with the first gap bridge track 12, and the second travelling gear 216 is connected cooperating with departures track 213; Conveyor chain is provided with latch 6, and for blocking suspension bracket, latch 6 is located on conveyor chain by latch shell fragment 502.First gap bridge track 12 near the end of the first travelling gear 215 be provided with gap 7 downward-sloping extrusion 3(as shown in Figure 4); Suspension bracket is sent to gap 7 from the first gap bridge track 12, enters in the latch 6 of outbound transport chain 214 through extrusion 3 and the extruding of outbound transport chain 214; Suspension bracket is sent to the second travelling gear 216, second travelling gear 216 by outbound transport chain 214 and is provided with long tooth 503 and short tooth 504, and between the two every setting, namely long tooth 503 is adjacent with short tooth 504, as shown in Figure 5.When outbound transport chain 214 is when the long tooth 503 of the second travelling gear 216, latch effect handle 501 is withstood on the top that long tooth 503 saves, latch 6 is unclamped, and suspension bracket, again by the effect of gravity, is sent on departures track 213 from the latch 6 of outbound transport chain 214.
The operation principle that suspension bracket is sent to the second gap bridge track 22 from approach track 211 through the transmitting device that enters the station is sent to set off track 213 the same from the first gap bridge track 12 through outbound transport device with above-mentioned suspension bracket, difference is, suspension bracket transmission direction is contrary, travelling gear near the second gap bridge track 22 is provided with long tooth and short tooth, between the two every setting, extrusion 3 is located at the end of approach track near travelling gear.Therefore its structure is repeated no more.
Dress hanger runs along the main orbit of the first production line 1, if the suspension bracket of the first production line 1 need be transferred to the second production line 2, then by connecting valve, the first production line 1 main orbit and approach track 211 are connected, departures track 213 and the second production line 2 main orbit are connected; Then the suspension bracket on the first production line 1 main orbit drives towards to approach track 211, under gravity, slide into the latch 6 li of the conveyor chain 212 that enters the station, enter the station conveyor chain 212 under the effect of travelling gear, suspension bracket is upwards transmitted, suspension bracket, again by the effect of gravity, is sent on the first gap bridge track 12 from the latch 6 of the conveyor chain 212 that enters the station; Suspension bracket walks to the first travelling gear 215 adjacent place through the first gap bridge track 12, under gravity, slide into the latch 6 li of outbound transport chain 214, suspension bracket, under the effect of travelling gear, is sent to the second travelling gear 216 downwards by outbound transport chain 214, and suspension bracket is again by the effect of gravity, departures track 213 is fallen into from the latch 6 of outbound transport chain 214, walk to the second production line 2 main orbit by departures track 213, if all suspension brackets have shifted, this has disconnected switch.

Claims (6)

1. a station of passing a bridge, is characterized in that: comprise approach track, the transmitting device that enters the station, outbound transport device and departures track four critical pieces; Two different production lines realize connecting by a pair gap bridge station, and a pair corresponding a pair gap bridge track in gap bridge station realizes being bi-directionally connected of production line, and a pair gap bridge track is called the first gap bridge track and second and crosses gap bridge track; Each production line main orbit is connected with the transmitting device that enters the station by approach track, is connected with outbound transport device by departures track; Namely the two ends of approach track connect production line main orbit and the transmitting device that enters the station respectively, and the two ends of departures track connect outbound transport device and production line main orbit respectively; The described transmitting device that enters the station is connected by gap bridge track with outbound transport device.
2. to pass a bridge as claimed in claim 1 station, it is characterized in that: gap bridge station is located on production line or sorting line, realize the seamless link between production line and production line, production line and sorting line, sorting line and sorting line etc.
3. to pass a bridge as claimed in claim 1 station, it is characterized in that: the gap bridge station logarithm connected between two production lines also can set as required, can be more than or equal to 1 right, but be less than the work station quantity of that line of work station negligible amounts in two production lines.
4. to pass a bridge as claimed in claim 1 or 2 station, it is characterized in that: each transmitting device is again primarily of conveyor chain and 3 travelling gears compositions;
Entering the station in transmitting device, described 3 travelling gear distributions triangular in shape, deliver drive chain, conveyor chain on the travelling gear of approach track is connected work with approach track, the conveyor chain be positioned on the travelling gear of highest point is connected work with gap bridge track, and the travelling gear of highest point is called to let pass in upper end takes turns; Described conveyor chain is provided with latch, for blocking suspension bracket; In the process of gap bridge station work, suspension bracket on approach track is due to Action of Gravity Field, slide in the groove of approach track end, between approach track and conveyor chain extruding force effect under, suspension bracket is stuck in the latch of conveyor chain, conveyor chain is under the effect of travelling gear, upwards transmitted by suspension bracket, when suspension bracket arrives the position of upper end clearance wheel, latch unclamps, suspension bracket, again by the effect of gravity, is sent on gap bridge track from the latch of lifting chain;
In outbound transport device, described 3 travelling gear distributions triangular in shape, deliver drive chain, conveyor chain on the travelling gear of departures track is connected work with departures track, now near the travelling gear of departures track, be called to let pass in lower end to take turns, the conveyor chain be positioned on the travelling gear of highest point is connected work with gap bridge track, and gap bridge track is provided with groove near the end of conveyor chain; Described conveyor chain is provided with latch, for blocking suspension bracket; In the process of gap bridge station work, dress hanger falls into the groove of the outlet ends of gap bridge track, then enters in the latch of conveyor chain, and suspension bracket is under the effect of gap bridge track export end and conveyor chain extruding force, is squeezed in the latch of conveyor chain; Suspension bracket be transmitted chain be sent to departures track entrance point time, come off from latch and enter departures track.
5. to pass a bridge as claimed in claim 4 station, it is characterized in that: described upper end wheel and the lower end denticle of taking turns of letting pass of letting pass is provided with long tooth and short tooth, and between the two every setting, namely long tooth is adjacent with short tooth; Described latch is located on conveyor chain by bouncing plate, and when conveyor chain lets pass wheel or lower end clearance wheel through upper end, because long tooth is longer, the effect handle of latch is withstood in long pitch upper end, and latch opens, and suspension bracket is come off from latch.
6. to pass a bridge as claimed in claim 4 station, it is characterized in that: the junction of described approach track and production line main orbit, the junction of set off track and production line main orbit are equipped with connecting valve; Connecting valve is for controlling the junction of approach track and production line main orbit, being communicated with and disconnection of set off track and production line main orbit.
CN201420378788.5U 2014-07-09 2014-07-09 A kind of station of passing a bridge Withdrawn - After Issue CN204104934U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420378788.5U CN204104934U (en) 2014-07-09 2014-07-09 A kind of station of passing a bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420378788.5U CN204104934U (en) 2014-07-09 2014-07-09 A kind of station of passing a bridge

Publications (1)

Publication Number Publication Date
CN204104934U true CN204104934U (en) 2015-01-21

Family

ID=52322311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420378788.5U Withdrawn - After Issue CN204104934U (en) 2014-07-09 2014-07-09 A kind of station of passing a bridge

Country Status (1)

Country Link
CN (1) CN204104934U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104106863A (en) * 2014-07-09 2014-10-22 南通明兴科技开发有限公司 Bridging station

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104106863A (en) * 2014-07-09 2014-10-22 南通明兴科技开发有限公司 Bridging station
CN104106863B (en) * 2014-07-09 2015-10-14 南通明兴科技开发有限公司 A kind of station of passing a bridge

Similar Documents

Publication Publication Date Title
CN104106863B (en) A kind of station of passing a bridge
CN203903397U (en) Clothing hanger control device
CN201133951Y (en) Two-way signal photoelectric isolation device and two-way signal photoelectric isolation integrated chip
CN206766937U (en) A kind of suspended chain induction system accumulates structure
CN207759529U (en) A kind of double-speed chain multistation production line
CN204104934U (en) A kind of station of passing a bridge
CN104122862B (en) One kind is without master control production line connection system and method
CN207046402U (en) A kind of full-automatic spring fitting device
CN106166793B (en) Efficient workshop production system
CN103169186A (en) Suspending system interlayer transmission device
CN203112106U (en) Vertical sorting belt mechanism used for logistics automatic conveying line
CN206122176U (en) Clothing letter sorting unloader construct
CN205442005U (en) A receive frame for commodity circulation transport workstation
CN101181100A (en) Method for conveying cloth rack by screw type guideway
CN209522172U (en) A kind of technique home textile mechanized production system
CN207275665U (en) Band ball-type transport mechanism
CN207827136U (en) A kind of multichannel cycle Cargo Delivery System
CN205675340U (en) The upper bag machine automatic bag feeding installation system of a kind of intelligence
CN205187205U (en) Automatic transmission line butt -joint structural in skylight
CN205820235U (en) Unmanned high-speed flow line
CN205644590U (en) Automatic play of card sender clamps puts
CN203473761U (en) Conveying chain
CN204198112U (en) A kind of rigging knits out materials device
CN204038329U (en) Tea seed Bidirectional conveying device
CN206497256U (en) A kind of industrial viewboxs of the LED of Discrete control

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150121

Effective date of abandoning: 20151014

C25 Abandonment of patent right or utility model to avoid double patenting