CN204102690U CN201420317172.7U CN201420317172U CN204102690U CN 204102690 U CN204102690 U CN 204102690U CN 201420317172 U CN201420317172 U CN 201420317172U CN 204102690 U CN204102690 U CN 204102690U
Authority
CN
China
Prior art keywords
casing
transformer
holder
screw rod
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420317172.7U
Other languages
Chinese (zh)
Inventor
姚田彪
刘志刚
程娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Taikai Transformer Co Ltd
Original Assignee
Shandong Taikai Transformer Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Taikai Transformer Co Ltd filed Critical Shandong Taikai Transformer Co Ltd
Priority to CN201420317172.7U priority Critical patent/CN204102690U/en
Application granted granted Critical
Publication of CN204102690U publication Critical patent/CN204102690U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

A kind of erecting device of the built-in instrument transformer for transformer, include the casing (1) connected with the tank wall of transformer, to be arranged in casing (1) and holder for supporting mutual inductor coil is pulled (6), be arranged on holder to pull between (6) and casing (1) and the screw rod (5) pulling (6) position for holder for regulating, holder is pulled (6) and is set to layer distributed on screw rod (5), connected with the tank wall of transformer by casing (1), (6) are pulled and screw rod (5) is fixed mutual inductor coil by holder, no longer in erecting bed, mutual inductor coil is installed, therefore ensure that the installation accuracy of mutual inductor coil, improve the installation progress of transformer.

Description

For the erecting device of the built-in instrument transformer of transformer
One, technical field
The utility model relates to a kind of erecting device, especially a kind of erecting device of the built-in instrument transformer for transformer.
Two, background technology
The built-in instrument transformer of transformer is the device changing curtage, it is a vitals of transformer, therefore the erecting device for the built-in instrument transformer of transformer is a kind of important transformer part, in the erecting device of the existing built-in instrument transformer for transformer, all according to circumstances need at the scene again to carry out design and installation, and then carry out wiring and oiling step, affect coil installation accuracy, also affect the installation progress of transformer.
Three, summary of the invention
In order to overcome above-mentioned technical disadvantages, the purpose of this utility model is to provide a kind of erecting device of the built-in instrument transformer for transformer, therefore ensure that the installation accuracy of mutual inductor coil, improves the installation progress of transformer.
For achieving the above object, the technical scheme that the utility model is taked is: include connect with the tank wall of transformer casing, to be arranged in casing and holder for supporting mutual inductor coil is pulled, is arranged on to hold in the palm and pulls between casing and to pull the screw rod of position for holder for regulating, holder is pulled and is set to layer distributed on screw rod.
Mutual inductor coil is placed on holder pull, by the position that screw rod holder for regulating is pulled, adapt to the height of mutual inductor coil, owing to devising casing, holder is pulled and screw rod, connected with the tank wall of transformer by casing, pulled by holder and with screw rod, mutual inductor coil is fixed, no longer in erecting bed, mutual inductor coil is installed, therefore ensure that the installation accuracy of mutual inductor coil, improve the installation progress of transformer.
The utility model devises, also include outlet box, casing flange dish, oil fuel tube and boatswain chair, the tank wall that casing is arranged on transformer is set to connect with tank wall, screw rod to be arranged in the inner chamber body of casing and to be set to connect with the upper cover plate of casing, holder is pulled and is set to connect with screw rod, outlet box is arranged on the lateral wall of casing, on the position, outer face that casing flange dish, oil fuel tube and boatswain chair are located at the upper cover plate of casing respectively and oil fuel tube be set to be communicated with the inner chamber body of casing.
The utility model devises, and casing is provided with a demountable side cover plate.
The utility model devises, and screw rod is set to two and is set to corresponding distribution and is set in tandem in holder is pulled.
The utility model devises, and holder is pulled and is set to two and arranges along the distribution of pitch line.
The utility model devises, and boatswain chair is set to corresponding two.
Technique effect of the present utility model is: wherein outlet box is connected on tank wall; Screw rod is welded on bottom upper cover plate successively; Supporting plate is connected on screw rod, and for supporting mutual inductor coil, the position of supporting plate arbitrarily can regulate according to the height of mutual inductor coil on screw rod; Flange joint on upper cover plate, for connecting instrument transformer sleeve pipe.After instrument transformer installation and wiring complete, front shroud is connected on tank wall, flange will be had to seal, from oil filler point oiling.Quantity and the size of supporting plate, screw rod, outlet box and flange are determined according to mutual inductor coil.Adopt the technical program, directly install and use after the oiling of this device in required place, without the need to secondary oiling, solve instrument transformer and install and awkward problem, and mutual inductor coil is reliable and stable in this device.
In the technical program, it is important technical characteristic that the holder that mutual inductor coil is fixed is pulled with screw rod, in the technical field of the erecting device of the built-in instrument transformer for transformer, has novelty, creativeness and practicality.
Four, accompanying drawing explanation
Fig. 1 is schematic diagram of the present utility model:
Fig. 2 is the right view of Fig. 1.
Five, embodiment
Fig. 1 is an embodiment of the present utility model, illustrate the present embodiment by reference to the accompanying drawings, include casing 1, screw rod 5, holder pulls 6, outlet box 7, casing flange dish 8, oil fuel tube 9 and boatswain chair 10, the tank wall that casing 1 is arranged on transformer is set to connect with tank wall, screw rod 5 to be arranged in the inner chamber body of casing 1 and to be set to connect with the upper cover plate of casing 1, holder is pulled 6 and is set to connect with screw rod 5, outlet box 7 is arranged on the lateral wall of casing 1, casing flange dish 8, on the position, outer face that oil fuel tube 9 and boatswain chair 10 are located at the upper cover plate of casing 1 respectively and oil fuel tube 9 be set to be communicated with the inner chamber body of casing 1.
In the present embodiment, casing 1 is provided with a demountable side cover plate.
In the present embodiment, screw rod 5 is set to two and is set to corresponding distribution and is set in tandemly to pull in 6 in holder.
In the present embodiment, holder pull 6 be set to two and along screw rod 5 center line distribution arrange.
In the present embodiment, boatswain chair 10 is set to corresponding two.
Mutual inductor coil is placed on holder to be pulled on 6, pulled the position of 6 by screw rod 5 holder for regulating, adapt to the height of mutual inductor coil, instrument transformer sleeve pipe is arranged in casing flange dish 8, mutual inductor coil is connected on outlet box 7, fluid is injected in the inner chamber body of casing 1 by oil fuel tube 9.
The utility model has lower feature:
1, due to devise casing 1, holder pull 6 and screw rod 5, connected with the tank wall of transformer by casing 1, by holder pull 6 and screw rod 5 mutual inductor coil is fixed, no longer in erecting bed, mutual inductor coil is installed, therefore ensure that the installation accuracy of mutual inductor coil, improve the installation progress of transformer.
2, owing to devising casing 1, screw rod 5, holder pull 6, outlet box 7, casing flange dish 8, oil fuel tube 9, meet the installation requirement of instrument transformer.
3, owing to devising boatswain chair 10, improve the installation progress of transformer.
Also have other with the holder that mutual inductor coil is fixed pull 6 and the technical characteristic that connects of screw rod 5 be all one of embodiment of the present utility model; therefore in the erecting device technical field of the built-in instrument transformer for transformer; every include connect with the tank wall of transformer casing 1, be arranged in casing 1 and pull 6, be arranged on to hold in the palm and pull between 6 and casing 1 and to pull the screw rod 5 of 6 positions for holder for regulating due to the holder supporting mutual inductor coil, holder is pulled 6 and is set to the technology contents of layer distributed on screw rod 5 all in protection range of the present utility model.

Claims (6)

1. the erecting device for the built-in instrument transformer of transformer, it is characterized in that: include connect with the tank wall of transformer casing (1), to be arranged in casing (1) and holder for supporting mutual inductor coil is pulled (6), is arranged on holder and pulls between (6) and casing (1) and the screw rod (5) pulling (6) position for holder for regulating, holder is pulled (6) and is set to layer distributed on screw rod (5).
2. the erecting device of the built-in instrument transformer for transformer according to claim 1, it is characterized in that: also include outlet box (7), casing flange dish (8), oil fuel tube (9) and boatswain chair (10), the tank wall that casing (1) is arranged on transformer is set to connect with tank wall, screw rod (5) to be arranged in the inner chamber body of casing (1) and to be set to connect with the upper cover plate of casing (1), holder is pulled (6) and is set to connect with screw rod (5), outlet box (7) is arranged on the lateral wall of casing (1), casing flange dish (8), oil fuel tube (9) and boatswain chair (10) are located on the position, outer face of the upper cover plate of casing (1) respectively and oil fuel tube (9) is set to be communicated with the inner chamber body of casing (1).
3. the erecting device of the built-in instrument transformer for transformer according to claim 2, is characterized in that: casing (1) is provided with a demountable side cover plate.
4. the erecting device of the built-in instrument transformer for transformer according to claim 2, is characterized in that: screw rod (5) is set to two and is set to corresponding distribution and is set in tandemly to pull in (6) in holder.
5. the erecting device of the built-in instrument transformer for transformer according to claim 2, is characterized in that: holder is pulled (6) and is set to two and arranges along the distribution of screw rod (5) center line.
6. the erecting device of the built-in instrument transformer for transformer according to claim 2, is characterized in that: boatswain chair (10) is set to corresponding two.
CN201420317172.7U 2014-06-16 2014-06-16 For the erecting device of the built-in instrument transformer of transformer Expired - Fee Related CN204102690U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420317172.7U CN204102690U (en) 2014-06-16 2014-06-16 For the erecting device of the built-in instrument transformer of transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420317172.7U CN204102690U (en) 2014-06-16 2014-06-16 For the erecting device of the built-in instrument transformer of transformer

Publications (1)

Publication Number Publication Date
CN204102690U true CN204102690U (en) 2015-01-14

Family

ID=52271097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420317172.7U Expired - Fee Related CN204102690U (en) 2014-06-16 2014-06-16 For the erecting device of the built-in instrument transformer of transformer

Country Status (1)

Country Link
CN (1) CN204102690U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111524684A (en) * 2020-05-07 2020-08-11 安徽华能集团电器有限公司 Built-in current transformer assembly convenient to detect and maintain

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111524684A (en) * 2020-05-07 2020-08-11 安徽华能集团电器有限公司 Built-in current transformer assembly convenient to detect and maintain

Similar Documents

Publication Publication Date Title
CN103968249A (en) Natural gas collection integrated device
CN203907219U (en) Natural gas collecting all-in-one integrated device
CN204102690U (en) For the erecting device of the built-in instrument transformer of transformer
CN203099342U (en) Dripping balance tank filling device
CN204118674U (en) Prefabricated transformer cable jockey
CN107860444A (en) A kind of liquid flow standard device and its scaling method
CN105439070A (en) Technological configuration method and configuration structure of enterprise-owned gas station adopting oil-submerged pump
CN203928312U (en) A kind of mounting structure of external efficient air distributor DOP pipe
CN203856019U (en) Hydrophone under cup apart from adjustable
CN205258053U (en) External liquid level regulating device
CN203639141U (en) Pressure gauge oil charger
CN204285431U (en) The anti-pollution flash vessel of steam injection
CN204226782U (en) Non-tower water feeder special three-way four-way valve
CN204897379U (en) Electronic oil -can of tractor with scale
CN204315339U (en) The switch oil conservator of the improvement of 110kV power transformer
CN204242795U (en) The neutral point measurement mechanism of autotransformer
CN203370336U (en) Drain water expander for heavy oil heater
CN203686459U (en) Device for balancing blind plate force
CN202615982U (en) Semi-oblique fuel tank outer bracket of transformer
CN108042029A (en) A kind of Portable shoer-bath
CN203659586U (en) Vacuum oil injection machine with pressurizing device
CN207046136U (en) A kind of overflow mechanism of horizontal tank
CN203585478U (en) PVC pipe with water flow controller
CN204463997U (en) For the power transformer of high-low pressure plug-in
CN204923417U (en) Integrated electric water heater

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150114