CN204100506U - The auxiliary hot assembly of electricity of air-conditioner and the auxiliary hot mounting structure of electricity of air-conditioner - Google Patents

The auxiliary hot assembly of electricity of air-conditioner and the auxiliary hot mounting structure of electricity of air-conditioner Download PDF

Info

Publication number
CN204100506U
CN204100506U CN201420403476.5U CN201420403476U CN204100506U CN 204100506 U CN204100506 U CN 204100506U CN 201420403476 U CN201420403476 U CN 201420403476U CN 204100506 U CN204100506 U CN 204100506U
Authority
CN
China
Prior art keywords
electricity
auxiliary hot
evaporimeter
air
auxiliary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420403476.5U
Other languages
Chinese (zh)
Inventor
赵红梅
苏炳超
张健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Midea Group Wuhu Air Conditioning Equipment Co Ltd
Original Assignee
Guangdong Midea Group Wuhu Air Conditioning Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Midea Group Wuhu Air Conditioning Equipment Co Ltd filed Critical Guangdong Midea Group Wuhu Air Conditioning Equipment Co Ltd
Priority to CN201420403476.5U priority Critical patent/CN204100506U/en
Application granted granted Critical
Publication of CN204100506U publication Critical patent/CN204100506U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of auxiliary hot assembly of electricity of air-conditioner and the auxiliary hot mounting structure of electricity of air-conditioner, the auxiliary hot assembly of electricity of described air-conditioner comprises: evaporimeter bracing frame, and described evaporimeter bracing frame is formed with location division; The auxiliary heat of electricity, the auxiliary heat of described electricity one end corresponding with described location division is provided with electric auxiliary hot supporting seat, and the auxiliary hot supporting seat of described electricity is plugged on described location division, is connected and fixed between the auxiliary hot supporting seat of described electricity and described evaporimeter bracing frame by grab and chuck.According to the auxiliary hot assembly of the electricity of the air-conditioner of the utility model embodiment have easy to assembly, production efficiency is high, low cost and other advantages.

Description

The auxiliary hot assembly of electricity of air-conditioner and the auxiliary hot mounting structure of electricity of air-conditioner
Technical field
The utility model relates to electrical equipment manufacturing technology field, the auxiliary hot mounting structure of electricity of the auxiliary hot assembly of the electricity in particular to a kind of air-conditioner and air-conditioner.
Background technology
Air-conditioner in correlation technique, the auxiliary hot supporting seat of its electricity mainly relies on screw fastening with coordinating of air conditioner body left support, and not only efficiency of assembling is low, and needs manually to carry out rigging screw, increases cost of labor.
Utility model content
The utility model is intended to solve one of above-mentioned technical problem of the prior art at least to a certain extent.For this reason, the auxiliary hot assembly of electricity that an object of the present utility model is to propose a kind of air-conditioner, the auxiliary hot assembly of electricity of this air-conditioner have easy to assembly, production efficiency is high, low cost and other advantages.
Another object of the present utility model is to propose a kind of auxiliary hot mounting structure of electricity with the air-conditioner of the advantages such as production cost of can enhancing productivity, reduce.
For achieving the above object, first aspect of the present utility model proposes a kind of auxiliary hot assembly of electricity of air-conditioner, and the auxiliary hot assembly of electricity of described air-conditioner comprises: evaporimeter bracing frame, and described evaporimeter bracing frame is formed with location division; The auxiliary heat of electricity, the auxiliary heat of described electricity one end corresponding with described location division is provided with electric auxiliary hot supporting seat, and the auxiliary hot supporting seat of described electricity is plugged on described location division, is connected and fixed between the auxiliary hot supporting seat of described electricity and described evaporimeter bracing frame by grab and chuck.
According to the auxiliary hot assembly of the electricity of air-conditioner of the present utility model, by auxiliary for described electricity hot supporting seat is plugged on described location division, and be connected and fixed between auxiliary for described electricity hot supporting seat and described evaporimeter bracing frame by grab and chuck.Not only auxiliary for described electricity heat can be arranged on described evaporimeter bracing frame, and assemble convenient, production efficiency is higher.In addition, owing to not needing to utilize screw to be fixed, not only can save the cost of screw, and cost of labor can be reduced further.Therefore, according to the auxiliary hot assembly of the electricity of air-conditioner of the present utility model have easy to assembly, production efficiency is high, low cost and other advantages.
In addition, following additional technical characteristic can also be had according to the auxiliary hot assembly of the electricity of air-conditioner of the present utility model:
Described chuck is located on the auxiliary hot supporting seat of described electricity, and described grab is located on described evaporimeter bracing frame.Auxiliary for described electricity heat can be arranged on described evaporimeter bracing frame thus.
The auxiliary hot supporting seat of described electricity is provided with draw-in groove, and the outer side surface of described draw-in groove forms described chuck, and described grab is hooked on the outer side surface of described draw-in groove.Not only so that the formation of described chuck, and can save space thus.
Described location division is locating slot, and the auxiliary hot supporting seat of described electricity is provided with locating dowel, and described locating dowel is engaged in described locating slot, and described draw-in groove is located in described locating dowel.Not only so that the setting of described draw-in groove, and can improve the stability after the auxiliary heat installation of described electricity thus.
Described draw-in groove is along the through described locating dowel of thickness direction of described locating dowel, and described grab is two and two described grabs lay respectively at the both sides of described locating dowel, and two described grabs are hooked on the both sides of the outer side surface of described draw-in groove respectively.So not only can improve the bonding strength of the auxiliary hot supporting seat of described electricity and described evaporimeter bracing frame, and can prevent described chuck from departing from described grab.
Described chuck is located on described evaporimeter bracing frame, and described grab is located on the auxiliary hot supporting seat of described electricity.Auxiliary for described electricity heat can be arranged on described evaporimeter bracing frame equally thus.
Described location division is locating slot, and the auxiliary hot supporting seat of described electricity is provided with locating dowel, and described locating dowel is engaged in described locating slot, and described grab is located in described locating dowel.The stability after the auxiliary heat installation of described electricity can be improved thus.
The outer side surface of described locating slot is provided with locating hole, and described chuck is located on the internal face of described locating hole, and described grab is located on the outer face of described locating dowel, and described grab is engaged in described locating hole and described grab is hooked in described chuck.Described locating hole not only can be utilized thus to position the auxiliary hot supporting seat of described electricity further, and bonding strength and the stability of the auxiliary hot supporting seat of described electricity can be improved.
Described evaporimeter bracing frame comprises the evaporimeter left support frame being arranged on described evaporimeter left end and the evaporimeter right support frame being arranged on described evaporimeter right-hand member, the auxiliary hot supporting seat of described electricity comprises the auxiliary hot left support seat of the electricity being arranged on the auxiliary hot left end of described electricity and is arranged on the auxiliary hot right support seat of electricity of the auxiliary hot right-hand member of described electricity, one in the auxiliary hot left support seat of described electricity and described evaporimeter left support frame is provided with described grab, and another in the auxiliary hot left support seat of described electricity and described evaporimeter left support frame is provided with described chuck.Not only can ensure the structural strength of described evaporimeter thus, and the stability after the auxiliary heat installation of described electricity can be ensured.
Second aspect of the present utility model proposes a kind of auxiliary hot mounting structure of electricity of air-conditioner, and the auxiliary hot mounting structure of electricity of described air-conditioner comprises evaporimeter left support frame; The auxiliary hot left support seat of electricity, one in described evaporimeter left support frame and the left support seat of the auxiliary heat of described electricity is provided with grab, and another in described evaporimeter left support frame and the left support seat of the auxiliary heat of described electricity is provided with chuck, and described grab is hooked in described chuck.
According to the auxiliary hot mounting structure of the electricity of air-conditioner of the present utility model, by in described evaporimeter left support frame and the left support seat of the auxiliary heat of described electricity arranges grab, another in described evaporimeter left support frame and the left support seat of the auxiliary heat of described electricity arranges chuck, has that production efficiency is high, low cost and other advantages.
Accompanying drawing explanation
Fig. 1 is the explosive view figure according to the auxiliary hot assembly of the electricity of the air-conditioner of the utility model embodiment, and wherein evaporimeter right support frame is not shown.
Fig. 2 is the enlarged drawing at A place in Fig. 1.
Fig. 3 is the partial structurtes schematic diagram according to the auxiliary hot assembly of the electricity of the air-conditioner of another embodiment of the utility model.
Fig. 4 is the enlarged drawing at B place in Fig. 3.
Fig. 5 is the partial sectional view according to the auxiliary hot assembly of the electricity of the air-conditioner of another embodiment of the utility model.
Reference numeral: the auxiliary hot assembly 1 of electricity of air-conditioner, evaporimeter left support frame 110, grab 111, location division 112, grab spigot surface 113, locating hole 114, evaporimeter 200, the auxiliary hot supporting seat 300 of electricity, the auxiliary hot left support seat 310 of electricity, chuck 311, draw-in groove 312, locating dowel 313, chuck spigot surface 314, the auxiliary hot right support seat 320 of electricity, electricity auxiliary hot 400.
Detailed description of the invention
Be described below in detail embodiment of the present utility model, the example of described embodiment is shown in the drawings, and wherein same or similar label represents same or similar element or has element that is identical or similar functions from start to finish.Be exemplary below by the embodiment be described with reference to the drawings, be intended to for explaining the utility model, and can not be interpreted as restriction of the present utility model.
Below with reference to the accompanying drawings describe according to the auxiliary hot assembly 1 of the electricity of the air-conditioner of the utility model embodiment.
As Figure 1-Figure 5, evaporimeter bracing frame and electricity auxiliary hot 400 is comprised according to the auxiliary hot assembly 1 of the electricity of the air-conditioner of the utility model embodiment.
Described evaporimeter bracing frame is formed with location division 112.Auxiliary hot 400 one end corresponding with location division 112 of electricity are provided with the auxiliary hot supporting seat 300 of electricity, and the auxiliary hot supporting seat 300 of electricity is plugged on location division 112, is connected and fixed between electric auxiliary hot supporting seat 300 and described evaporimeter bracing frame by grab 111 and chuck 311.According to the auxiliary hot assembly 1 of the electricity of the air-conditioner of the utility model embodiment, by arranging location division 112 on described evaporimeter bracing frame, auxiliary hot 400 one end corresponding with location division 112 of electricity are provided with the auxiliary hot supporting seat 300 of electricity, and auxiliary for electricity hot supporting seat 300 is plugged on location division 112, the auxiliary location of hot supporting seat 300 on described evaporimeter bracing frame of electricity can be realized like this.
In addition, owing to being connected and fixed by grab 111 and chuck 311 between the auxiliary hot supporting seat 300 of electricity and described evaporimeter bracing frame.Grab 111 and chuck 311 not only can be utilized thus to be arranged on described evaporimeter bracing frame by auxiliary for electricity hot supporting seat 300, to be arranged on described evaporimeter bracing frame by auxiliary for electricity hot 400, and only need grab 111 be hooked in chuck 311 when mounted, assemble convenient, production efficiency is higher.In addition, owing to not needing to utilize screw to be fixed, not only can save the cost of screw, and the operation of manual assembly screw can be saved, reduce cost of labor further.Therefore, according to the auxiliary hot assembly 1 of the electricity of the air-conditioner of the utility model embodiment have easy to assembly, production efficiency is high, low cost and other advantages.
Below with reference to the accompanying drawings describe according to the auxiliary hot assembly 1 of the electricity of the air-conditioner of the utility model specific embodiment.
In specific embodiments more of the present utility model, as Figure 1-Figure 5, described evaporimeter bracing frame, evaporimeter 200, the auxiliary hot supporting seat 300 of electricity and electricity auxiliary hot 400 is comprised according to the auxiliary hot assembly 1 of the electricity of the air-conditioner of the utility model embodiment.
Described evaporimeter bracing frame can comprise the evaporimeter left support frame 110 being arranged on evaporimeter 200 left end and the evaporimeter right support frame (left and right directions is as shown in the arrow C in Fig. 1-Fig. 5) being arranged on evaporimeter 200 right-hand member.The auxiliary hot supporting seat 300 of electricity can comprise the auxiliary hot left support seat 310 of the electricity being arranged on auxiliary hot 400 left ends of electricity and be arranged on the auxiliary hot right support seat 320 of electricity of auxiliary hot 400 right-hand members of electricity, one in the auxiliary hot left support seat 310 of electricity and evaporimeter left support frame 110 upper can be provided with grab 111, and another in electric auxiliary hot left support seat 310 and evaporimeter left support frame 110 can be provided with chuck 311.The auxiliary hot right support seat 320 of electricity can be arranged in described evaporimeter right support frame.Not only can ensure the structural strength of evaporimeter 200 thus, and the stability after auxiliary hot 400 installations of electricity can be ensured.
That the auxiliary hot right support seat 320 of electricity can be any-mode with the mounting structure in described evaporimeter right support frame, and the utility model is not construed as limiting this with it will be appreciated by those skilled in the art that.
In a concrete example of the present utility model, as depicted in figs. 1 and 2, chuck 311 can be located on the auxiliary hot left support seat 310 of electricity, and grab 111 can be located in evaporimeter left support frame 110.The setting of grab 111 and chuck 311 can be realized thus to be arranged on auxiliary for electricity hot 400 in evaporimeter left support frame 110.
Particularly, as shown in Figure 2, the auxiliary hot left support seat 310 of electricity can be provided with draw-in groove 312, and the left side wall of draw-in groove 312 can form chuck 311, and grab 111 can be hooked on the left side wall of draw-in groove 312.Not only can so that the formation of chuck 311, and can prevent chuck 311 from protruding the auxiliary hot left support seat 310 of electricity, to save space thus.
Advantageously, as depicted in figs. 1 and 2, location division 112 can be locating slot, and the left side of the auxiliary hot left support seat 310 of electricity can be provided with locating dowel 313, locating dowel 313 can be engaged in described locating slot (both location division 112), and draw-in groove 312 can be located in locating dowel 313.Not only can so that the setting of draw-in groove 312, and locating dowel 313 and described locating slot can be utilized to position the auxiliary hot left support seat 310 of electricity further thus, to improve the stability after auxiliary hot 400 installations of electricity.
Wherein, the cross section of locating dowel 313 can be Long Circle, and the shape of described locating slot (both location division 112) can be suitable with the shape of locating dowel 313, relatively rotates in described locating slot to prevent locating dowel 313.
Alternatively, as depicted in figs. 1 and 2, draw-in groove 312 can along the through locating dowel 313 of the thickness direction of locating dowel 313, and grab 111 can be two, and two grabs 111 can lay respectively at the both sides in locating dowel 313 radial direction and two grabs 111 can in the radial direction of locating dowel 313 relatively.In other words, two long limits that two grabs 111 can be respectively adjacent to described locating slot (both location division 112) are arranged.Two grabs 111 can be hooked on the both sides of the left side wall of draw-in groove 312 respectively.Two grabs 111 and two chuck 311 can be utilized so jointly to be fixed the auxiliary hot left support seat 310 of electricity, not only can to improve the bonding strength of the auxiliary hot left support seat 310 of electricity and evaporimeter left support frame 110, and can prevent chuck 311 from departing from grab 111.
Wherein, as shown in Figure 2, the right flank of each grab 111 can be provided with grab spigot surface 113, and grab spigot surface 113 can left and the extension that slopes inwardly.Locating dowel 313 can be facilitated thus to enter between two grabs 111, and more smooth and easy when slipping into draw-in groove 312 to make grab 111, Portable hook 111 is hooked in chuck 311.
In another concrete example of the present utility model, as shown in Figure 3-Figure 5, chuck 311 can be located in evaporimeter left support frame 110, and grab 111 can be located on the auxiliary hot left support seat 310 of electricity.The setting of grab 111 and chuck 311 can be realized thus equally to be arranged on auxiliary for electricity hot 400 in evaporimeter left support frame 110.
Particularly, as shown in Figure 3-Figure 5, location division 112 can be locating slot, and the left side of the auxiliary hot left support seat 310 of electricity can be provided with locating dowel 313, locating dowel 313 can be engaged in described locating slot (both location division 112), and grab 111 can be located in locating dowel 313.Locating dowel 313 and described locating slot can be utilized thus to position the auxiliary hot left support seat 310 of electricity, to improve the stability after auxiliary hot 400 installations of electricity.
Wherein, the cross section of locating dowel 313 can be Long Circle, and the shape of described locating slot (both location division 112) can be suitable with the shape of locating dowel 313, relatively rotates in described locating slot to prevent locating dowel 313.
Advantageously, as shown in Figure 4 and Figure 5, the left side wall of described locating slot (both location division 112) can be provided with locating hole 114, chuck 311 can be located in the interior sidewall surface of locating hole 114, grab 111 can be located on the left side of locating dowel 313, grab 111 can be engaged in locating hole 114, and grab 111 can be hooked in chuck 311.Locating hole 114 not only can be utilized thus to position the auxiliary hot left support seat 310 of electricity further, and grab 111 can be made to coordinate tightr with chuck 311, to improve bonding strength and the stability of the auxiliary hot left support seat 310 of electricity.
Specifically, locating dowel 313 and described locating slot (both location division 112) can matched in clearance.Thus can so that locating dowel 313 be inserted described locating slot, so that by grab 111 through locating hole 114.
More specifically, as shown in Figure 4 and Figure 5, the part be positioned on the left of evaporimeter left support frame 110 of locating hole 114 can be opened wide, and the part that grab 111 and chuck 311 can be opened wide by locating hole 114 is exposed from evaporimeter left support frame 110 left surface.Not only can ensure thus the auxiliary hot left support seat 310 of electricity install after stability, and can so that observe grab 111 from outside and whether be hooked on chuck 311, so that the installation of the auxiliary hot left support seat 310 of electricity.
Wherein, as shown in Figure 4 and Figure 5, the left surface of grab 111 can be provided with grab spigot surface 113, and the right flank of chuck 311 can be provided with chuck spigot surface 314.Grab spigot surface 113 can to the right and outward-dipping extension, and chuck spigot surface 314 can left and the extension that slopes inwardly.Grab 111 can be made thus through more smooth and easy during locating hole 114, so that grab 111 is hooked in chuck 311 through locating hole 114.
According to the auxiliary hot assembly 1 of the electricity of the air-conditioner of the utility model embodiment other form and operation be all known for those of ordinary skills, be not described in detail here.
The following describes according to the auxiliary hot mounting structure of the electricity of the air-conditioner of the utility model embodiment.
Evaporimeter left support frame 110 and the auxiliary hot left support seat 310 of electricity is comprised according to the auxiliary hot mounting structure of the electricity of the air-conditioner of the utility model embodiment.One in evaporimeter left support frame 110 and the auxiliary hot left support seat 310 of electricity is provided with grab 111, and another in evaporimeter left support frame 110 and the auxiliary hot left support seat 310 of electricity is provided with chuck 311, and grab 111 is hooked in chuck 311.
According to the auxiliary hot mounting structure of the electricity of the air-conditioner of the utility model embodiment, by in evaporimeter left support frame 110 and the auxiliary hot left support seat 310 of electricity arranges grab 111, another in evaporimeter left support frame 110 and the auxiliary hot left support seat 310 of electricity arranges chuck 311, has that production efficiency is high, low cost and other advantages.
In description of the present utility model, it will be appreciated that, term " " center ", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", " on ", D score, " front ", " afterwards ", " left side ", " right side ", " vertically ", " level ", " top ", " end " " interior ", " outward ", " clockwise ", orientation or the position relationship of the instruction such as " counterclockwise " are based on orientation shown in the drawings or position relationship, only the utility model and simplified characterization for convenience of description, instead of indicate or imply that the device of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore can not be interpreted as restriction of the present utility model.
In addition, term " first ", " second " only for describing object, and can not be interpreted as instruction or hint relative importance or imply the quantity indicating indicated technical characteristic.Thus, be limited with " first ", the feature of " second " can express or impliedly comprise one or more these features.In description of the present utility model, the implication of " multiple " is at least two, such as two, three etc., unless otherwise expressly limited specifically.
In the utility model, unless otherwise clearly defined and limited, the term such as term " installation ", " being connected ", " connection ", " fixing " should be interpreted broadly, and such as, can be fixedly connected with, also can be removably connect, or integral; Can be mechanical connection, also can be electrical connection; Can be directly be connected, also indirectly can be connected by intermediary, can be the connection of two element internals or the interaction relationship of two elements.For the ordinary skill in the art, the concrete meaning of above-mentioned term in the utility model can be understood as the case may be.
In the utility model, unless otherwise clearly defined and limited, fisrt feature second feature it " on " or D score can comprise the first and second features and directly contact, also can comprise the first and second features and not be directly contact but by the other characterisation contact between them.And, fisrt feature second feature " on ", " top " and " above " comprise fisrt feature directly over second feature and oblique upper, or only represent that fisrt feature level height is higher than second feature.Fisrt feature second feature " under ", " below " and " below " comprise fisrt feature immediately below second feature and tiltedly below, or only represent that fisrt feature level height is less than second feature.
In the description of this description, specific features, structure, material or feature that the description of reference term " embodiment ", " some embodiments ", " example ", " concrete example " or " some examples " etc. means to describe in conjunction with this embodiment or example are contained at least one embodiment of the present utility model or example.In this manual, to the schematic representation of above-mentioned term not must for be identical embodiment or example.And the specific features of description, structure, material or feature can combine in an appropriate manner in any one or more embodiment or example.In addition, the different embodiment described in this description or example can carry out engaging and combining by those skilled in the art.
Although illustrate and described embodiment of the present utility model above, be understandable that, above-described embodiment is exemplary, can not be interpreted as restriction of the present utility model, those of ordinary skill in the art can change above-described embodiment, revises, replace and modification in scope of the present utility model.

Claims (10)

1. the auxiliary hot assembly of the electricity of air-conditioner, is characterized in that, comprising:
Evaporimeter bracing frame, described evaporimeter bracing frame is formed with location division;
The auxiliary heat of electricity, the auxiliary heat of described electricity one end corresponding with described location division is provided with electric auxiliary hot supporting seat, and the auxiliary hot supporting seat of described electricity is plugged on described location division, is connected and fixed between the auxiliary hot supporting seat of described electricity and described evaporimeter bracing frame by grab and chuck.
2. the auxiliary hot assembly of the electricity of air-conditioner according to claim 1, is characterized in that, described chuck is located on the auxiliary hot supporting seat of described electricity, and described grab is located on described evaporimeter bracing frame.
3. the auxiliary hot assembly of the electricity of air-conditioner according to claim 2, is characterized in that, the auxiliary hot supporting seat of described electricity is provided with draw-in groove, and the outer side surface of described draw-in groove forms described chuck, and described grab is hooked on the outer side surface of described draw-in groove.
4. the auxiliary hot assembly of the electricity of air-conditioner according to claim 3, is characterized in that, described location division is locating slot, and the auxiliary hot supporting seat of described electricity is provided with locating dowel, and described locating dowel is engaged in described locating slot, and described draw-in groove is located in described locating dowel.
5. the auxiliary hot assembly of the electricity of air-conditioner according to claim 4, it is characterized in that, described draw-in groove is along the through described locating dowel of thickness direction of described locating dowel, described grab is two and lays respectively at the both sides of described locating dowel, and two described grabs are hooked on the both sides of the outer side surface of described draw-in groove respectively.
6. the auxiliary hot assembly of the electricity of air-conditioner according to claim 1, is characterized in that, described chuck is located on described evaporimeter bracing frame, and described grab is located on the auxiliary hot supporting seat of described electricity.
7. the auxiliary hot assembly of the electricity of air-conditioner according to claim 6, is characterized in that, described location division is locating slot, and the auxiliary hot supporting seat of described electricity is provided with locating dowel, and described locating dowel is engaged in described locating slot, and described grab is located in described locating dowel.
8. the auxiliary hot assembly of the electricity of air-conditioner according to claim 7, it is characterized in that, the outer side surface of described locating slot is provided with locating hole, described chuck is located on the internal face of described locating hole, described grab is located on the outer face of described locating dowel, and described grab to be engaged in described locating hole and to be hooked in described chuck.
9. the auxiliary hot assembly of electricity of the air-conditioner according to any one of claim 1-8, it is characterized in that, described evaporimeter bracing frame comprises the evaporimeter left support frame being arranged on described evaporimeter left end and the evaporimeter right support frame being arranged on described evaporimeter right-hand member, the auxiliary hot supporting seat of described electricity comprises the auxiliary hot left support seat of the electricity being arranged on the auxiliary hot left end of described electricity and is arranged on the auxiliary hot right support seat of electricity of the auxiliary hot right-hand member of described electricity, and one in the auxiliary hot left support seat of described electricity and described evaporimeter left support frame is provided with described grab and another is provided with described chuck.
10. the auxiliary hot mounting structure of the electricity of air-conditioner, is characterized in that, comprising:
Evaporimeter left support frame;
The auxiliary hot left support seat of electricity, one in described evaporimeter left support frame and the left support seat of the auxiliary heat of described electricity is provided with grab and another is provided with chuck, and described grab is hooked in described chuck.
CN201420403476.5U 2014-07-21 2014-07-21 The auxiliary hot assembly of electricity of air-conditioner and the auxiliary hot mounting structure of electricity of air-conditioner Active CN204100506U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420403476.5U CN204100506U (en) 2014-07-21 2014-07-21 The auxiliary hot assembly of electricity of air-conditioner and the auxiliary hot mounting structure of electricity of air-conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420403476.5U CN204100506U (en) 2014-07-21 2014-07-21 The auxiliary hot assembly of electricity of air-conditioner and the auxiliary hot mounting structure of electricity of air-conditioner

Publications (1)

Publication Number Publication Date
CN204100506U true CN204100506U (en) 2015-01-14

Family

ID=52268926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420403476.5U Active CN204100506U (en) 2014-07-21 2014-07-21 The auxiliary hot assembly of electricity of air-conditioner and the auxiliary hot mounting structure of electricity of air-conditioner

Country Status (1)

Country Link
CN (1) CN204100506U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106766091A (en) * 2017-01-04 2017-05-31 青岛海尔空调器有限总公司 Dust-collecting box and air-conditioner
CN106813369A (en) * 2015-11-30 2017-06-09 广东美的制冷设备有限公司 Heat exchanger assembly and indoor apparatus of air conditioner

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106813369A (en) * 2015-11-30 2017-06-09 广东美的制冷设备有限公司 Heat exchanger assembly and indoor apparatus of air conditioner
CN106766091A (en) * 2017-01-04 2017-05-31 青岛海尔空调器有限总公司 Dust-collecting box and air-conditioner
CN106766091B (en) * 2017-01-04 2019-10-01 青岛海尔空调器有限总公司 Dust-collecting box and air conditioner

Similar Documents

Publication Publication Date Title
CN204115385U (en) The Fomento dish of refrigerator and refrigerator
CN204100506U (en) The auxiliary hot assembly of electricity of air-conditioner and the auxiliary hot mounting structure of electricity of air-conditioner
CN204335266U (en) The electric-controlled box radiator structure of air conditioner
CN203912237U (en) Electromagnetic heating coil disc
CN203457438U (en) Electronic device
CN204994961U (en) Prefabricated section and be equipped with express delivery cabinet of this prefabricated section
CN103148656A (en) Refrigeration device
CN204717859U (en) The indoor set of air-conditioner
CN102997569B (en) Compressor installation board and refrigerator with same
CN204176867U (en) Separated wall type air-conditioning
CN105352045A (en) Volute casing assembly and air conditioner with same
CN204962969U (en) Wall -hanging type air conditioner indoor set and chassis assembly spare thereof
CN203869202U (en) Air conditioner outdoor unit and machine casing thereof
CN205048860U (en) Top cap subassembly and refrigerator of refrigerator
CN204027201U (en) The aobvious control plate mounting box assembly of refrigerator
CN103542676B (en) The compressor bottom board of refrigerator and refrigerator
CN203206029U (en) Novel motor shell
CN203457351U (en) Coil panel frame assembly, coil panel and induction cooker
CN202059114U (en) Open type double track wire frame
CN205137929U (en) Evaporimeter support frame and hot water machine
CN103821802A (en) Fixing component, multi-part connection structure provided with fixing component, and refrigerator
CN203454569U (en) Refrigerator
CN204442029U (en) Compressor
CN203457349U (en) Coil panel assembly and induction cooker having same
CN202885186U (en) Air-conditioner with wire holder mounting plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant