CN204096988U - The built-in trolley track of KBK - Google Patents

The built-in trolley track of KBK Download PDF

Info

Publication number
CN204096988U
CN204096988U CN201420619825.7U CN201420619825U CN204096988U CN 204096988 U CN204096988 U CN 204096988U CN 201420619825 U CN201420619825 U CN 201420619825U CN 204096988 U CN204096988 U CN 204096988U
Authority
CN
China
Prior art keywords
copper pipe
track
kbk
bracing frame
support installing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420619825.7U
Other languages
Chinese (zh)
Inventor
王贇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kony crane equipment (Shanghai) Co., Ltd.
Original Assignee
NANTONG LIFUTONG LIFTING MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG LIFUTONG LIFTING MACHINERY Co Ltd filed Critical NANTONG LIFUTONG LIFTING MACHINERY Co Ltd
Priority to CN201420619825.7U priority Critical patent/CN204096988U/en
Application granted granted Critical
Publication of CN204096988U publication Critical patent/CN204096988U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Handcart (AREA)

Abstract

This practicality newly relates to a kind of track of KBK dolly, is related specifically to the built-in trolley track of a kind of KBK.It comprises track, it is characterized in that: arrange trolley in orbit, and described trolley is pressed from both sides by tactile line copper pipe, copper pipe bracing frame and support installing to form; Described copper pipe has some, and be arranged on copper pipe bracing frame respectively, the bottom of copper pipe bracing frame is provided with opening, and the bottom for steel pipe is exposed, and contacts with tactile line brush; Copper pipe erecting frame is fixed top in orbit by described support installing folder.

Description

The built-in trolley track of KBK
Technical field
This practicality newly relates to a kind of track of KBK dolly, is related specifically to a kind of track of built-in trolley.
Background technology
Hoisting crane standard package KBK. is combined by assemblies such as suspension gear, track, walking dolly, electric block, mobile power supply device (slip) and control setups, only need be suspended on the aerial directly conveying that factory building top board or roof beam structure just can realize material simply, therefore be widely used in mass transport link or the system of all trades and professions.
KBK rail system general at present all adopts external slide wire power supply, or lashed cable is powered.This power supply mode need separately join supporting track or support, and power supply distance is generally shorter, and has certain requirement to the distance between two tracks and crossing angle, and multiple stage uses easily interferes, and this just creates inconvenience to the installation of total and use.
Summary of the invention
For solving the problem, the present invention imagines exactly will make full use of track interior space, avoids affecting multiple stage and powers, and increases power supply distance and reduces interference, installs trolley equally and can successfully power to whole KBK rail system.
For completing foregoing invention object, the utility model is achieved in that the built-in trolley track of a kind of KBK, it comprises track, it is characterized in that: arrange trolley in orbit, and described trolley is pressed from both sides by tactile line copper pipe, copper pipe bracing frame and support installing to form; Described copper pipe has some, and be arranged on copper pipe bracing frame respectively, the bottom of copper pipe bracing frame is provided with opening, and the bottom for copper pipe is exposed, and contacts with tactile line brush; Copper pipe erecting frame is fixed top in orbit by described support installing folder.
This structure takes full advantage of track interior space, to the distance between two tracks and intersecting angle without interference, and trolley to be placed in track interior safer, be not easy to damage, thus directly increase useful life, for client has saved cost.
Be further improved and refinement technique scheme, described steel tube frame is tooth dress (shape), and the space in the middle of each tooth is for laying copper pipe.Match with the end face design of track in the top of described support installing folder; Establishing installation screw in orbit, matches in the top pressed from both sides with support installing; Support installing presss from both sides as the opening under shed presss from both sides, for clamping copper pipe bracing frame.The top of described copper pipe bracing frame is also provided with suspention buckle, is provided with at the inwall top of support installing folder the installation draw-in groove coordinating buckle.Described copper pipe bracing frame and support installing folder all adopt plastic material to make.
Plastic support frame is placed on KBK track interior, is installed clamp plastic support frame by bracing frame, fixes (side's punching in orbit) between the two with tie bolt.Copper pipe is placed in bracing frame, is powered to rail system by the operation in current-collecting cart direction, portion in orbit.During use, first copper pipe is put into plastic support frame inner, then with tie bolt, bracing frame mounting clamp is connected with KBK track; Finally bracing frame (comprising copper pipe) is put into mounting clamp, fix.Just system power supply can be given, finally to ensure that integrally-built electric device is safer, normally to run again by the operation of current-collecting cart in KBK track interior direction.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
In order to further description structure of the present utility model, be described further below in conjunction with accompanying drawing:
As shown in the figure, the built-in trolley track 1 of a kind of KBK, it comprises track 1, in track 1, arrange trolley, and described trolley presss from both sides 6 by tactile line copper pipe 2, copper pipe bracing frame 3 and support installing to form; Match with the end face design of track 1 in the support installing folder top of 6; Establishing installation screw on path 1, matches in the top pressing from both sides 6 with support installing; Support installing folder 6 is press from both sides, for clamping copper pipe bracing frame to the opening of under shed.The top of described copper pipe bracing frame is also provided with suspention buckle, is provided with at the inwall top of support installing folder 6 the installation draw-in groove coordinating buckle; Described copper pipe bracing frame is tooth dress, and the space in the middle of each tooth is for laying copper pipe, and described copper pipe has some, and be arranged on copper pipe bracing frame 3 respectively, the bottom of copper pipe bracing frame 3 is provided with opening, and the bottom for copper pipe is exposed, and contacts with tactile line brush; Copper pipe erecting frame is fixed on the top in track 1 by described support installing folder 6.Described copper pipe bracing frame 3 and support installing folder 6 all can adopt plastic material to make.
It is inner that plastic support frame is placed on KBK track 1, installed clamp plastic support frame by bracing frame, fixes (side's punching on path 1) between the two with tie bolt.Copper pipe is placed in bracing frame, is come to track 1 system power supply in the operation of track 1 internal direction by current-collecting cart.
This structure takes full advantage of track 1 inner space, to the distance between two tracks 1 and intersecting angle without interference, and trolley to be placed in track 1 inner safer, be not easy to damage, thus directly increase useful life, for client has saved cost.
During use, first copper pipe is put into plastic support frame inner, then with tie bolt, bracing frame mounting clamp is connected with KBK track 1; Finally bracing frame (comprising copper pipe) is put into mounting clamp, fix.Just system power supply can be given in the operation of KBK track 1 internal direction again, finally to ensure that integrally-built electric device is safer, normally to run by current-collecting cart.

Claims (5)

1. the built-in trolley track of KBK, it comprises track, it is characterized in that: arrange trolley in orbit, and described trolley is pressed from both sides by tactile line copper pipe, copper pipe bracing frame and support installing to form; Described copper pipe has some, and be arranged on copper pipe bracing frame respectively, the bottom of copper pipe bracing frame is provided with opening, and the bottom for steel pipe is exposed, and contacts with tactile line brush; Copper pipe erecting frame is fixed top in orbit by described support installing folder.
2. the built-in trolley track of a kind of KBK according to claim 1, is characterized in that: described copper pipe bracing frame is tooth dress, and the space in the middle of each tooth is for laying copper pipe.
3. the built-in trolley track of a kind of KBK according to claim 1, is characterized in that: match with the end face design of track in the top of described support installing folder; Establishing installation screw in orbit, matches in the top pressed from both sides with support installing; Support installing presss from both sides as the opening under shed presss from both sides, for clamping steel tube frame.
4. the built-in trolley track of a kind of KBK according to claim 3, is characterized in that: the top of described steel tube frame is also provided with suspention buckle, is provided with at the inwall top of support installing folder the installation draw-in groove coordinating buckle.
5. the built-in trolley track of a kind of KBK according to claim 3, is characterized in that: described copper pipe bracing frame and support installing folder all adopt plastic material to make.
CN201420619825.7U 2014-10-24 2014-10-24 The built-in trolley track of KBK Expired - Fee Related CN204096988U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420619825.7U CN204096988U (en) 2014-10-24 2014-10-24 The built-in trolley track of KBK

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420619825.7U CN204096988U (en) 2014-10-24 2014-10-24 The built-in trolley track of KBK

Publications (1)

Publication Number Publication Date
CN204096988U true CN204096988U (en) 2015-01-14

Family

ID=52265433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420619825.7U Expired - Fee Related CN204096988U (en) 2014-10-24 2014-10-24 The built-in trolley track of KBK

Country Status (1)

Country Link
CN (1) CN204096988U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104692248A (en) * 2015-03-17 2015-06-10 汉中市超能机电设备有限责任公司 Portal crane with embedded leads
CN111564742A (en) * 2020-05-18 2020-08-21 广东电网有限责任公司 Slide wire structure for rail-hanging robot

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104692248A (en) * 2015-03-17 2015-06-10 汉中市超能机电设备有限责任公司 Portal crane with embedded leads
CN111564742A (en) * 2020-05-18 2020-08-21 广东电网有限责任公司 Slide wire structure for rail-hanging robot

Similar Documents

Publication Publication Date Title
WO2010054852A3 (en) Current collector system for a vehicle, in particular for rtg container stacker cranes
CN203947375U (en) A kind of shield machine chassis and battery truck composite sleeper
CN204096988U (en) The built-in trolley track of KBK
CN207303796U (en) One kind is used for electric power apparatus examination Portable lifting device
CN203733923U (en) Square shelter antenna lodging device
CN104300452A (en) Electric cable wire clip
CN203402634U (en) Steel tube transportation device
CN204967204U (en) Complicated cable unwrapping wire ware for topography
CN103618236B (en) A kind of secondary wiring flattening device
CN205590169U (en) Tripolar overhead traveling crane wiping line structure
CN204402111U (en) A kind of splice track of three-dimensional parking device
CN206172814U (en) Get electric installation
CN203567814U (en) Width-adjustable auxiliary beam bearing mechanism
CN203159063U (en) Current collector bracket
CN201891936U (en) Wire placing structure of storage rack
CN203429828U (en) Spliced wall
CN204368060U (en) Plug-in fixing support for electrical equipment box
CN203835022U (en) Wing profile cross arm
CN203466498U (en) Single-person power operation auxiliary tool
CN201466454U (en) Oil-converted electric field bridge trolley-conductor power supply facility
CN202423986U (en) Spacer installation device
CN202978107U (en) Insulator cradle
CN202534795U (en) Comprehensive grounding system for railway
CN203787576U (en) Wire connection and fixation device
CN205328471U (en) Wiping line installation mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181122

Address after: 200300 Shanghai Suide Road 789

Patentee after: Kony crane equipment (Shanghai) Co., Ltd.

Address before: 226236 Jianghai Road, Binhai Industrial Park, Qidong City, Nantong City, Jiangsu Province

Patentee before: NANTONG LIFUTONG LIFTING MACHINERY CO., LTD.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150114

Termination date: 20191024

CF01 Termination of patent right due to non-payment of annual fee