CN204089884U - One converges control real-time monitoring platform - Google Patents

One converges control real-time monitoring platform Download PDF

Info

Publication number
CN204089884U
CN204089884U CN201420395904.4U CN201420395904U CN204089884U CN 204089884 U CN204089884 U CN 204089884U CN 201420395904 U CN201420395904 U CN 201420395904U CN 204089884 U CN204089884 U CN 204089884U
Authority
CN
China
Prior art keywords
server
wired
time monitoring
wireless
management server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420395904.4U
Other languages
Chinese (zh)
Inventor
郝炜
郭宏伟
宋鹏飞
赵玲玲
张冲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANXI BAINAHUANKE CONTRACT ENERGY MANAGEMENT CO., LTD.
Original Assignee
郝炜
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 郝炜 filed Critical 郝炜
Priority to CN201420395904.4U priority Critical patent/CN204089884U/en
Application granted granted Critical
Publication of CN204089884U publication Critical patent/CN204089884U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The utility model discloses one and converge control real-time monitoring platform, this converges control real-time monitoring platform and mainly comprises: center management server, storage server, WAP server, wired or wireless transmission network, Surveillance center, client, wireless lathe station, portable terminal device, wired or wireless video server, alarm follower, transducing signal, video camera; Described center management server is arranged on the intermediate layer of converging control real-time monitoring platform, described storage server is arranged on the right side of center management server, described WAP server is arranged on the right side of storage server, described Surveillance center is arranged on the upper end of center management server, and described portable terminal device is arranged on the bottom of wired or wireless transmission network.The utility model achieves Real-time Collection, process, analysis and issues the environment protection digital at chemical industry scene, makes chemical enterprise control the discharge work of the waste gas waste water and dregs of self better more easily, will be down to minimum on the pollution of environment and impact.

Description

One converges control real-time monitoring platform
Technical field
The utility model belongs to energy-conserving and environment-protective technical field, particularly relates to one and converges control real-time monitoring platform.
Background technology
When current efforts at environmental protection increase the weight of day by day, how can obtain pollutant sources field data the very first time and become extremely important.Therefore policy of environment protection person is analyzed after data taking, need to monitor in real time major polluting sources, in event before distress phase development, make a policy.Current chemical industry has negative greatly to natural change.Such as, a series of chemical substance of sulfur dioxide, freon etc.It is earthshaking to the infringement of natural boundary.The former can form the very strong acid rain of corrosivity, affects the biological environment in this area.The latter can destroy atmosphere especially, under making the whole earth be exposed to the strong ultraviolet of the sun.These finally make the existence of the mankind receive threat.Along with the development in epoch, people appreciate chemical industry gradually to natural injury.But chemical industry is by being the part can not isolated during human being's production is lived.In chemical industry, the discharge of waste gas waste water and dregs is absolutely necessary, chemical enterprise should process waste gas waste water and dregs to greatest extent, purification work, makes it the standard of the discharge of the rational environmental protection of the science that reaches, and reduces waste gas waste water and dregs to the impact of natural environment.But in actual chemical production work, the process of waste gas waste water and dregs, purification work probably go out and can occur situation not in place because of various reasons, cause discharging the phenomenon occurring exceeding standard.On the one hand, it can produce certain adverse effect to natural ecological environment, and it is also for chemical enterprise brings negative social influence simultaneously, even can bring and be ordered the risk of closedown.How effectively to evade the generation of this kind of situation, ensure the qualified discharge of waste gas waste water and dregs, environment protection digital real-time monitoring system just can play good effect.
At present, there is the monitoring problem causing giving off phenomenon, in real time monitoring effect difference that waste gas waste water and dregs exceeds standard not in place in traditional monitor supervision platform.
Utility model content
The object of the utility model embodiment is to provide one to converge control real-time monitoring platform, is intended to solve traditional monitor supervision platform and there is the monitoring problem causing giving off phenomenon, in real time monitoring effect difference that waste gas waste water and dregs exceeds standard not in place.
The utility model embodiment realizes like this, one converges control real-time monitoring platform, and this converges control real-time monitoring platform and mainly comprises: center management server, storage server, WAP server, wired or wireless transmission network, Surveillance center, client, wireless lathe station, portable terminal device, wired or wireless video server, alarm follower, transducing signal, video camera;
Described center management server is arranged on the intermediate layer of converging control real-time monitoring platform, described storage server is arranged on the right side of center management server, described WAP server is arranged on the right side of storage server, described wired or wireless transmission network is arranged on the lower end of center management server, described Surveillance center is arranged on the upper end of center management server, described client is arranged on the left side of Surveillance center, described wireless lathe station is arranged on the lower end of WAP server, described portable terminal device is arranged on the bottom of wired or wireless transmission network, described wired or wireless video server is arranged on the left side of wired or wireless transmission network, described alarm follower is arranged on the upper end of wired or wireless video server, described transducing signal is arranged on the left side of alarm follower, described video camera is arranged on the left side of wired or wireless video server.
Further, described portable terminal device specifically adopts integrated industry control number to adopt instrument, environmental protection information monitor supervision platform based on large-screen and GIS-Geographic Information System is set, for environment protection emission field monitoring and data acquisition system, controller adopts adam4000 system, analog module adopts adam4017, the operating system of computer adopts the windows xp system that conventional compatibility is higher, system configuration software adopts intellutionifix3.0, database adopts sql server2000, gather the Various types of data that discharge is on-the-spot, and set up corresponding database, and the index Data Comparison to setting, carry out Internet Transmission by tcp/ip agreement simultaneously, data are sent into control centre.
Further, described center management server, storage server and WAP server form intermediate layer, in order to connect environment protection emission field monitoring and data acquisition system and Surveillance center, that adopt is ie7.0 browser and iwebserver, host-host protocol adopts tcp/ip, and the information data in order to realize Surveillance center and environment protection emission field monitoring and data acquisition system exchanges and environment protection digital distributed calls and instantaneity arranges.
Further, described Surveillance center specifically adopts windows2003server network operating system, server manager adopts iis6.0interent, framework technology adopts microsoft.net, sql server2005 database, arranges environmental protection real-time data analysis system, in order to the on-the-spot emissions data of monitor and managment, realize the real-time Transmission of data and the instant execution of decision instruction, meanwhile, can real-time query historical data, carry out sampling and contrast work.
Effect gathers
What the utility model provided converges control real-time monitoring platform, Surveillance center, intermediate layer and portable terminal device are set, achieve the Real-Time Monitoring of environment protection digital, help chemical enterprise can Real-time Collection, process, analysis and issue the environment protection digital at chemical industry scene, chemical enterprise is made to control the discharge work of the waste gas waste water and dregs of self better more easily, by being down to minimum on the pollution of environment and impact, establish the system that can meet burst mode tra nsmitter emergency reaction needs, science decision is provided for emergency command.Converge control real-time monitoring platform and define " Digital Environmental Protection " figure, achieve the functions such as real-time monitoring, information inquiry, analytic statistics, spatial analysis displaying.
Accompanying drawing explanation
Fig. 1 is the structural representation converging control real-time monitoring platform that the utility model embodiment provides;
In figure: 1, center management server; 2, storage server; 3, WAP server; 4, wired or wireless transmission network; 5, Surveillance center; 6, client; 7, wireless lathe station; 8, portable terminal device; 9, wired or wireless video server; 10, alarm follower; 11, transducing signal; 12, video camera.
Embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with embodiment, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
Below in conjunction with drawings and the specific embodiments, application principle of the present utility model is further described.
As shown in Figure 1, the utility model embodiment realizes like this, one converges control real-time monitoring platform, and this converges control real-time monitoring platform and mainly comprises: center management server 1, storage server 2, WAP server 3, wired or wireless transmission network 4, Surveillance center 5, client 6, wireless lathe station 7, portable terminal device 8, wired or wireless video server 9, alarm follower 10, transducing signal 11, video camera 12;
Described center management server 1 is arranged on the intermediate layer of converging control real-time monitoring platform, described storage server 2 is arranged on the right side of center management server, described WAP server 3 is arranged on the right side of storage server 2, described wired or wireless transmission network 4 is arranged on the lower end of center management server 1, described Surveillance center 5 is arranged on the upper end of center management server 1, described client 6 is arranged on the left side of Surveillance center 5, described wireless lathe station 7 is arranged on the lower end of WAP server 3, described portable terminal device 8 is arranged on the bottom of wired or wireless transmission network 4, described wired or wireless video server 9 is arranged on the left side of wired or wireless transmission network 4, described alarm follower 10 is arranged on the upper end of wired or wireless video server 9, described transducing signal 11 is arranged on the left side of alarm follower 10, described video camera 12 is arranged on the left side of wired or wireless video server 9.
Further, described portable terminal device 8 specifically adopts integrated industry control number to adopt instrument, environmental protection information monitor supervision platform based on large-screen and GIS-Geographic Information System is set, for environment protection emission field monitoring and data acquisition system, controller adopts adam4000 system, analog module adopts adam4017, the operating system of computer adopts the windows xp system that conventional compatibility is higher, system configuration software adopts intellutionifix3.0, database adopts sql server2000, gather the Various types of data that discharge is on-the-spot, and set up corresponding database, and the index Data Comparison to setting, carry out Internet Transmission by tcp/ip agreement simultaneously, data are sent into control centre.
Further, described center management server 1, storage server 2 and WAP server 3 form intermediate layer, in order to connect environment protection emission field monitoring and data acquisition system and Surveillance center 5, that adopt is ie7.0 browser and iwebserver, host-host protocol adopts tcp/ip, and the information data in order to realize Surveillance center 5 and environment protection emission field monitoring and data acquisition system exchanges and environment protection digital distributed calls and instantaneity arranges.
Further, described Surveillance center 5 specifically adopts windows2003server network operating system, server manager adopts iis6.0interent, framework technology adopts microsoft.net, sql server2005 database, arranges environmental protection real-time data analysis system, in order to the on-the-spot emissions data of monitor and managment, realize the real-time Transmission of data and the instant execution of decision instruction, meanwhile, can real-time query historical data, carry out sampling and contrast work.
Operation principle
As shown in Figure 1, converge control real-time monitoring platform mainly to comprise: center management server 1, storage server 2, WAP server 3, wired or wireless transmission network 4, Surveillance center 5, client 6, wireless lathe station 7, portable terminal device 8, wired or wireless video server 9, alarm follower 10, transducing signal 11, video camera 12, during work, by fixing wire communication means and ZGBEE, 3G, the wireless modes such as 4G, set up pollutant sources communication network, by GIS information system, environmental protection real-time data analysis System's composition real-time monitoring system, portable terminal device 8 is utilized to gather the on-the-spot Various types of data of discharge, and set up corresponding database, and the index Data Comparison to setting, carry out Internet Transmission by tcp/ip agreement simultaneously, data are sent into center management server 1, the intermediate layer that storage server 2 and WAP server 3 are formed, Surveillance center 5 is sent to after environment protection emission field monitoring and image data are carried out analyzing and processing, in order to the on-the-spot emissions data of monitor and managment, realize the real-time Transmission of data and the instant execution of decision instruction, simultaneously, can real-time query historical data, carry out sampling and contrast work.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all do within spirit of the present utility model and principle any amendment, equivalent to replace and improvement etc., all should be included within protection range of the present utility model.

Claims (3)

1. one kind is converged control real-time monitoring platform, it is characterized in that, this converges control real-time monitoring platform and mainly comprises: center management server, storage server, WAP server, wired or wireless transmission network, Surveillance center, client, wireless lathe station, portable terminal device, wired or wireless video server, alarm follower, transducing signal, video camera;
Described center management server is arranged on the intermediate layer of converging control real-time monitoring platform, described storage server is arranged on the right side of center management server, described WAP server is arranged on the right side of storage server, described wired or wireless transmission network is arranged on the lower end of center management server, described Surveillance center is arranged on the upper end of center management server, described client is arranged on the left side of Surveillance center, described wireless lathe station is arranged on the lower end of WAP server, described portable terminal device is arranged on the bottom of wired or wireless transmission network, described wired or wireless video server is arranged on the left side of wired or wireless transmission network, described alarm follower is arranged on the upper end of wired or wireless video server, described transducing signal is arranged on the left side of alarm follower, described video camera is arranged on the left side of wired or wireless video server.
2. converge control real-time monitoring platform as claimed in claim 1, it is characterized in that, described portable terminal device specifically adopts integrated industry control number to adopt instrument, environmental protection information monitor supervision platform based on large-screen and GIS-Geographic Information System is set, for environment protection emission field monitoring and data acquisition system, controller adopts adam4000 system, analog module adopts adam4017, the operating system of computer adopts the windows xp system that conventional compatibility is higher, system configuration software adopts intellutionifix3.0, database adopts sql server2000, gather the Various types of data that discharge is on-the-spot, and set up corresponding database, and the index Data Comparison to setting, carry out Internet Transmission by tcp/ip agreement simultaneously, data are sent into control centre.
3. converge control real-time monitoring platform as claimed in claim 1, it is characterized in that, described center management server, storage server and WAP server form intermediate layer, in order to connect environment protection emission field monitoring and data acquisition system and Surveillance center, that adopt is ie7.0 browser and iwebserver, host-host protocol adopts tcp/ip, and the information data in order to realize Surveillance center and environment protection emission field monitoring and data acquisition system exchanges and environment protection digital distributed calls and instantaneity arranges.
CN201420395904.4U 2014-07-18 2014-07-18 One converges control real-time monitoring platform Expired - Fee Related CN204089884U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420395904.4U CN204089884U (en) 2014-07-18 2014-07-18 One converges control real-time monitoring platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420395904.4U CN204089884U (en) 2014-07-18 2014-07-18 One converges control real-time monitoring platform

Publications (1)

Publication Number Publication Date
CN204089884U true CN204089884U (en) 2015-01-07

Family

ID=52182550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420395904.4U Expired - Fee Related CN204089884U (en) 2014-07-18 2014-07-18 One converges control real-time monitoring platform

Country Status (1)

Country Link
CN (1) CN204089884U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106680447A (en) * 2016-12-30 2017-05-17 安徽国通亿创科技股份有限公司 Sewage treatment analysis and intelligent control system based on cloud platform
CN107271613A (en) * 2017-07-31 2017-10-20 合肥桥旭科技有限公司 A kind of chemical plant environment pollution detection cleaning system
CN112291738A (en) * 2020-11-05 2021-01-29 陕西科技大学 Edge computing network monitoring system based on Mesh network and method and application thereof
CN113341832A (en) * 2021-06-22 2021-09-03 天津航通科技有限公司 Operation monitoring and management system for underground well equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106680447A (en) * 2016-12-30 2017-05-17 安徽国通亿创科技股份有限公司 Sewage treatment analysis and intelligent control system based on cloud platform
CN107271613A (en) * 2017-07-31 2017-10-20 合肥桥旭科技有限公司 A kind of chemical plant environment pollution detection cleaning system
CN112291738A (en) * 2020-11-05 2021-01-29 陕西科技大学 Edge computing network monitoring system based on Mesh network and method and application thereof
CN113341832A (en) * 2021-06-22 2021-09-03 天津航通科技有限公司 Operation monitoring and management system for underground well equipment

Similar Documents

Publication Publication Date Title
Dan et al. Intelligent agriculture greenhouse environment monitoring system based on IOT technology
Su et al. Smart city and the applications
CN108574737B (en) Agricultural automatic monitoring system and method based on cloud technology and zynq platform
CN204089884U (en) One converges control real-time monitoring platform
CN104656719A (en) Dust removing system
CN201503545U (en) Pollution source real-time monitoring system
CN202940848U (en) Bridge group monitoring system based on cloud computing platform
CN205378008U (en) Big data acquisition and processing apparatus
CN203799241U (en) Cloud platform-based building monitoring system
CN105468741A (en) Police affair big data processing system
CN204168310U (en) A kind of safe O&M service terminal of telemanagement
CN112669009A (en) Project management method based on intelligent supervision system
CN204924358U (en) Reservoir flood control monitoring system based on GPRS communication and internet
CN203204411U (en) Hotel energy consumption monitoring management system
Wu et al. Function orientation and typical application scenarios of the Internet of Things construction for power transmission and transformation equipment
CN201637865U (en) Network automatic meteorological station
CN205540156U (en) Environmental pollution source on -line monitoring monitored control system based on sensing net
Wu Intelligent agricultural automatic control system based on internet of things
CN204741524U (en) Policeman audio frequency and video recording system that enforces law
CN208705694U (en) A kind of third party's spot sampling, detection device data acquisition and transmission device
CN104978848A (en) Environment monitoring Internet of Things system
CN206133655U (en) Place name generaI investigation acquisition manager system based on cloud
CN205265695U (en) Emergent communication device of air -drop formula and system based on big dipper communication
CN111080147A (en) Operating personnel state risk management and control system based on Internet of things technology
CN103995524A (en) Method of adopting mobile phone to regulate and control environment quality in real time and monitor equipment online

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160811

Address after: 523, room 288, 030006 Changzhi Road, Taiyuan hi tech Zone, Shanxi, China

Patentee after: SHANXI BAINAHUANKE CONTRACT ENERGY MANAGEMENT CO., LTD.

Address before: 030000 Shanxi Province, Taiyuan city Xinghualing District No. 247 Jiefang Road No. 11 Building 2 unit 18

Patentee before: Hao Wei

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150107

Termination date: 20190718