CN204081638U - Industrialization enclosure wall - Google Patents

Industrialization enclosure wall Download PDF

Info

Publication number
CN204081638U
CN204081638U CN201420469518.5U CN201420469518U CN204081638U CN 204081638 U CN204081638 U CN 204081638U CN 201420469518 U CN201420469518 U CN 201420469518U CN 204081638 U CN204081638 U CN 204081638U
Authority
CN
China
Prior art keywords
bed course
wall
enclosure wall
bearing plate
foundation trench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420469518.5U
Other languages
Chinese (zh)
Inventor
谢其盛
高君
吴叶青
周治勺
邵徽斌
邢伟
谢其阳
孙效明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Baoye Construction Engineering Group Co ltd
Baoye Sievert Concrete Precast Elements Hefei Co ltd
Original Assignee
Western Wei Debao Precast Concrete Industry (hefei) Co Ltd
ANHUI BAOYE HOUSING INDUSTRIALIZATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Western Wei Debao Precast Concrete Industry (hefei) Co Ltd, ANHUI BAOYE HOUSING INDUSTRIALIZATION Co Ltd filed Critical Western Wei Debao Precast Concrete Industry (hefei) Co Ltd
Priority to CN201420469518.5U priority Critical patent/CN204081638U/en
Application granted granted Critical
Publication of CN204081638U publication Critical patent/CN204081638U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of industrialization enclosure wall, comprise the foundation trench excavated in advance, bottom foundation trench, bed course is set, bed course arranges bearing plate, bed course in described foundation trench, foundation trench and the bearing plate on bed course three are one group, the bearing plate of both sides is fixed with column, fixedly mount between column two pieces overall, in inverted "T"-shaped body of wall, empty portions on two pieces of bodies of wall is installed with railing, bed course, bearing plate, column, body of wall and railing are single overall structure, are installed by lifting combination.The utility model is mainly used in Housing Project, the major part of enclosure wall all adopts prefabricated form to produce in batches in factory building, reduce the soil excavation of enclosure wall foundation ditch, save time, standardization, speed of application is fast, cost is low, compares cost reduction about 10%, environmental protection with traditional enclosure wall, reduce solid waste and effluent discharge, avoid traditional cast-in-place enclosure wall because foundation settlement causes crack.

Description

Industrialization enclosure wall
technical field:
The utility model relates to the construction applications of enclosure wall, particularly a kind of industrialization enclosure wall.
background technology:
At present, enclosure wall on the street that we can see, be workman's built on-site, this mode of construction needs field operation, concreting, installation form etc., the trouble operated very, and operation is many, inefficiency.
utility model content:
The purpose of this utility model be to provide a kind of can the industrialization enclosure wall of Fast Installation.
The technical solution adopted in the utility model is:
Industrialization enclosure wall, comprise the foundation trench excavated in advance, it is characterized in that: bottom described foundation trench, bed course is set, bed course arranges bearing plate, bed course in described foundation trench, foundation trench and the bearing plate on bed course three are one group, the bearing plate of both sides is fixed with column, between column, fixedly mounts that two pieces overall, in inverted "T"-shaped body of wall, the empty portions on two pieces of bodies of wall is installed with railing.
Described industrialization enclosure wall, is characterized in that: described bed course, bearing plate, column, body of wall and railing are single overall structure, is installed by lifting combination.
Compared with prior art, the beneficial effects of the utility model are:
The utility model is mainly used in Housing Project, the major part of enclosure wall all adopts prefabricated form to produce in batches in factory building, reduce the soil excavation of enclosure wall foundation ditch, reduce costs, form removal is not pacified in scene, traditional enclosure wall construction operation such as concreting and scaffold, installation simple-to-maintain is convenient, post and enclosure wall are fixed by the draw-in groove that basis is reserved, quality is good, reduce voids and pits and leakiness of vibrating, the common faults such as crack, save time, standardization, speed of application is fast, cost is low, cost reduction about 10% is compared with traditional enclosure wall, environmental protection, reduce solid waste and effluent discharge, avoid traditional cast-in-place enclosure wall because foundation settlement causes crack.
accompanying drawing illustrates:
Fig. 1 is the utility model structural representation.
detailed description of the invention:
Below in conjunction with accompanying drawing, by embodiment, the utility model is described in further detail:
Industrialization enclosure wall, comprise the foundation trench 1 excavated in advance, bed course 2 is set bottom foundation trench 1, bed course 2 is arranged bearing plate 3, bed course 2 in foundation trench 1, foundation trench 1 and the bearing plate on bed course 23 three are one group, the bearing plate 3 of both sides is fixed with column 4, fixedly mount between column 4 two pieces overall, in inverted "T"-shaped body of wall 5, empty portions on two pieces of bodies of wall 5 is installed with railing 6, bed course 2, bearing plate 3, column 4, body of wall 5 and railing 6 are single overall structure, are installed by lifting combination.
Above-described embodiment is only preferably embodiment of the present utility model, and in addition, the utility model can also have other implementations.It should be noted that, under the prerequisite not departing from the utility model design, any apparent improvement and modification all should fall within protection domain of the present utility model.

Claims (2)

1. industrialization enclosure wall, comprise the foundation trench excavated in advance, it is characterized in that: bottom described foundation trench, bed course is set, bed course arranges bearing plate, bed course in described foundation trench, foundation trench and the bearing plate on bed course three are one group, the bearing plate of both sides is fixed with column, between column, fixedly mounts that two pieces overall, in inverted "T"-shaped body of wall, the empty portions on two pieces of bodies of wall is installed with railing.
2. industrialization enclosure wall according to claim 1, is characterized in that: described bed course, bearing plate, column, body of wall and railing are single overall structure, is installed by lifting combination.
CN201420469518.5U 2014-08-19 2014-08-19 Industrialization enclosure wall Expired - Fee Related CN204081638U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420469518.5U CN204081638U (en) 2014-08-19 2014-08-19 Industrialization enclosure wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420469518.5U CN204081638U (en) 2014-08-19 2014-08-19 Industrialization enclosure wall

Publications (1)

Publication Number Publication Date
CN204081638U true CN204081638U (en) 2015-01-07

Family

ID=52174371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420469518.5U Expired - Fee Related CN204081638U (en) 2014-08-19 2014-08-19 Industrialization enclosure wall

Country Status (1)

Country Link
CN (1) CN204081638U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594707A (en) * 2015-01-19 2015-05-06 江苏中南建筑产业集团有限责任公司 Industrial prefabricated assembly type enclosure wall and production technology thereof
CN106593079A (en) * 2016-12-15 2017-04-26 中国能源建设集团广东省电力设计研究院有限公司 Finished product assembly type solid enclosing wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594707A (en) * 2015-01-19 2015-05-06 江苏中南建筑产业集团有限责任公司 Industrial prefabricated assembly type enclosure wall and production technology thereof
CN106593079A (en) * 2016-12-15 2017-04-26 中国能源建设集团广东省电力设计研究院有限公司 Finished product assembly type solid enclosing wall

Similar Documents

Publication Publication Date Title
CN101235649A (en) Covered digging system for pit
CN204081638U (en) Industrialization enclosure wall
CN202644543U (en) Combined recyclable foundation pit supporting inner supporting upright column
CN204753783U (en) Prefabricated concrete rain sewage inspection shaft device
CN204491678U (en) For the attractive joint of outer wall of basement
CN202247924U (en) Assembled steel structure open caisson in pipe jacking construction
CN201169781Y (en) Cap digging pit structure
CN204983107U (en) Assembly type rectangle open caisson
CN204475319U (en) There is pressure underground water bored pile in a kind of hole wall crack
CN204298845U (en) A kind of centrifuge ground based on existing terrace and spiral protecting wall
CN204098224U (en) Detachable concrete prefabricated wall plate structure house
CN202990418U (en) Slurry-leaking protection device preventing cast-in-place concrete column root from rotting
CN204326307U (en) The module wall that a kind of building construction uses
CN202577343U (en) External reinforcement retaining supporting structure
CN204849808U (en) Basis is assembled in prefabrication of large -scale tower machine concrete
CN204081653U (en) Basis digging-free Assembled enclosing wall
CN202017494U (en) Large-diameter jacking pipe structure for power tunnel engineering
CN204023600U (en) Pillar crane composite base structure
CN204139198U (en) Combination assembled mesolow electric fixtures basis
CN205134330U (en) Foundation fit base plate trades and props structure in dark excavation supporting construction
CN204919606U (en) Basement outer wall is exempted from to trade and is propped structure based on unilateral formwork
CN103243689A (en) Hydraulic movable dam water-stop system
CN205188978U (en) Integration stull formula bearing structure
CN103572963B (en) Secondary structure concrete casting building method
CN202474749U (en) Subway grounding net earthing leading out device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: The new industrial park in Hefei city in Anhui province 230011 Xiao and Li River Road junction road

Patentee after: ANHUI BAOYE CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Patentee after: BAOYE SIEVERT CONCRETE PRECAST ELEMENTS HEFEI Co.,Ltd.

Address before: The new industrial park in Hefei city in Anhui province 230011 Xiao and Li River Road junction road

Patentee before: ANHUI BAOYE HOUSING INDUSTRIALIZATION Co.,Ltd.

Patentee before: BAOYE SIEVERT CONCRETE PRECAST ELEMENTS HEFEI Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150107

CF01 Termination of patent right due to non-payment of annual fee