CN204081574U - A kind of steel work transformer station - Google Patents
A kind of steel work transformer station Download PDFInfo
- Publication number
- CN204081574U CN204081574U CN201420399282.2U CN201420399282U CN204081574U CN 204081574 U CN204081574 U CN 204081574U CN 201420399282 U CN201420399282 U CN 201420399282U CN 204081574 U CN204081574 U CN 204081574U
- Authority
- CN
- China
- Prior art keywords
- girder steel
- clamp
- steel
- steel clamp
- sheet metal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of steel work transformer station, it comprises main body, in described main body, roofing top girder steel adopts U-steel, described girder steel is provided with multiple girder steel clamp, described girder steel clamp can with being intended to reversing of position and handling on girder steel, girder steel clamp has hung wire casing and lighting by suspension rod in below, and described girder steel clamp is made up of C shape sheet metal and bolt, and arbitrary horizontal edge of C shape sheet metal is provided with screw.The time that the utility model does not put forward money by electric specialty preheating embedding line restricts, improve efficiency of construction, accelerate engineering construction progress, and decrease the link of the pre-buried illumination pipeline of engineering, remain the integrality of profiled sheet, girder steel clamp can be installed according to light fixture and wire casing to be needed to carry out position adjustment, thus makes in-site installation more convenient, faster.
Description
Technical field:
The utility model relates to transformation facility technical field, particularly relates to a kind of steel work transformer station.
Background technology:
In present stage national grid construction, gradually occurred that a kind of standard dispensing formula substation project builds form, namely prefabricated assembled steel work is adopted to carry out building constructions thing, to reaching minimizing resource consumption, the object of increasing work efficiency and preserving the ecological environment, but in the practical set process of steel-structure factory building, need the link of carrying out the pre-buried illumination pipeline of engineering, so just there will be civil engineering and be subject to the restriction that money put forward by electric lighting light fixture pipeline, and profiled sheet also becomes imperfect after pre-buried illumination pipeline, have impact on the integrally-built fastness of transformer station and stability, and because pre-buried illumination pipeline is fixed, therefore often there will be in illumination in-site installation and inconvenient situation is installed, thus have impact on efficiency of construction, slowed down engineering construction progress.
Utility model content:
In order to solve Problems existing in background technology, the utility model is by the following technical solutions: it comprises main body, in described main body, roofing top girder steel adopts U-steel, described girder steel is provided with multiple girder steel clamp, described girder steel clamp can with being intended to reversing of position and handling on girder steel, girder steel clamp has hung wire casing and lighting by suspension rod in below, and described girder steel clamp is made up of C shape sheet metal and bolt, and arbitrary horizontal edge of C shape sheet metal is provided with screw.
Described U-steel is C-type steel or i iron.
The time that the utility model does not put forward money by electric specialty preheating embedding line when lighting installation is installed in civil engineering restricts, operation can be carried out according to the construction period of civil engineering building and node, improve efficiency of construction, accelerate engineering construction progress, and decrease the link of the pre-buried illumination pipeline of engineering, remain the integrality of profiled sheet, girder steel clamp can be installed according to light fixture and wire casing to be needed to carry out position adjustment, thus makes in-site installation more convenient, faster.
Accompanying drawing illustrates:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the enlarged drawing of the utility model girder steel clamp.
Detailed description of the invention:
With reference to Fig. 1-2, the utility model it comprise main body 1, in described main body 1, roofing top girder steel adopts the U-steel 2 of C-type steel or i iron, described girder steel is provided with multiple girder steel clamp 3, described girder steel clamp 3 is made up of C shape sheet metal 7 and bolt 8, first be set on the base of U-steel 2 with the groove part of C shape sheet metal 7 during installation, then to penetrate from the screw arbitrary horizontal edge of C shape sheet metal 7 with bolt 8 and tighten to direction, U-steel 2 base, thus girder steel clamp 3 is fixed on the base of C-type steel or i iron, when needs carry out reversing of position, only need unclamp bolt 8 moves C shape sheet metal 7 to relevant position, again bolt 8 is tightened again, therefore girder steel clamp 3 can with being intended to reversing of position and handling on girder steel, thus avoid pre-buried illumination pipeline on profiled sheet, remain the integrality of profiled sheet, do not need the time putting forward money by electric specialty preheating embedding line to restrict when lighting installation is installed in civil engineering simultaneously yet, thus improve efficiency of construction, accelerate engineering construction progress, suspension rod 4 is connected with below described girder steel clamp 3, and thereunder hung wire casing 5 and lighting 6 by suspension rod 4, when mounted lamp 6 and wire casing 5, the position adjusting girder steel clamp 3 can be needed according to the position of light fixture 6 and wire casing 5, thus make in-site installation more convenient, faster.
Claims (2)
1. a steel work transformer station, it is characterized in that, it comprises main body, in described main body, roofing top girder steel adopts U-steel, described girder steel is provided with multiple girder steel clamp, described girder steel clamp can with being intended to reversing of position and handling on girder steel, and girder steel clamp has hung wire casing and lighting by suspension rod in below, described girder steel clamp is made up of C shape sheet metal and bolt, and arbitrary horizontal edge of C shape sheet metal is provided with screw.
2. transformer station according to claim 1, is characterized in that, described U-steel is C-type steel or i iron.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420399282.2U CN204081574U (en) | 2014-07-21 | 2014-07-21 | A kind of steel work transformer station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420399282.2U CN204081574U (en) | 2014-07-21 | 2014-07-21 | A kind of steel work transformer station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204081574U true CN204081574U (en) | 2015-01-07 |
Family
ID=52174307
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420399282.2U Active CN204081574U (en) | 2014-07-21 | 2014-07-21 | A kind of steel work transformer station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204081574U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113718629A (en) * | 2021-08-24 | 2021-11-30 | 山西中煤担水沟煤业有限公司 | Pedestrian bridge-crossing device suitable for belt conveyor in mine |
-
2014
- 2014-07-21 CN CN201420399282.2U patent/CN204081574U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113718629A (en) * | 2021-08-24 | 2021-11-30 | 山西中煤担水沟煤业有限公司 | Pedestrian bridge-crossing device suitable for belt conveyor in mine |
CN113718629B (en) * | 2021-08-24 | 2023-08-15 | 山西中煤担水沟煤业有限公司 | Pedestrian bridge crossing device applicable to belt conveyor in mine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204629289U (en) | The street lamp of automatically replaceable bulb | |
CN202299465U (en) | Quick adjustment device for steel beam hoisting | |
CN204081574U (en) | A kind of steel work transformer station | |
CN104210758A (en) | Pipe fitting placing frame for building | |
CN201420317Y (en) | Three-dimensional adjustable curtain wall installation connecting piece | |
CN204387992U (en) | A kind of light weight steel structure spool lays and lamp installation hanger | |
CN204000868U (en) | The device of sand concrete free pipe is transferred in a kind of pipe well well-points dewatering | |
CN203370942U (en) | Bending die for multifunctional hydraulic angle steel processing machine | |
CN203571610U (en) | Multifunctional vertical rod for construction | |
CN105442868A (en) | Adjustable steel-structure reticulated shell spliced scaffold | |
CN204137550U (en) | A kind of pipe fitting rack for building | |
CN205104147U (en) | Simulation building sand table | |
CN204569139U (en) | Facilitate the lifting appliance that object is laid | |
CN204186081U (en) | Wallboard riser erecting device | |
CN204345208U (en) | A kind of spherical camera mounting bracket | |
CN203409762U (en) | Cross-shaped petroleum pipeline cutting identification strip | |
CN204171698U (en) | The short material clamping seat of a kind of copper pipe | |
CN204420513U (en) | Electronic information management building device | |
CN203892726U (en) | Prefabricated hanging piece supporting plate | |
CN203067933U (en) | Supporting plate for hoisting pieces | |
CN203769210U (en) | Lightning strip fixing piece special for tile roofs | |
CN204879048U (en) | Novel pipeline support | |
CN203924504U (en) | A kind of building roof steel work | |
CN204456427U (en) | High-altitude long-span wire rope pipe arrangement support | |
CN205070331U (en) | Novel electrician's sleeve pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |