CN204081449U - Scaffold station plate - Google Patents
Scaffold station plate Download PDFInfo
- Publication number
- CN204081449U CN204081449U CN201420516770.7U CN201420516770U CN204081449U CN 204081449 U CN204081449 U CN 204081449U CN 201420516770 U CN201420516770 U CN 201420516770U CN 204081449 U CN204081449 U CN 204081449U
- Authority
- CN
- China
- Prior art keywords
- support portion
- plate
- drag
- line
- plate body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of scaffold station plate, comprise plate body, plate is provided with stay hook with it, adjusting device is provided with below described plate body, described adjusting device comprises and is positioned at plate two groups of adjusting buttons with it, two groups of adjusting buttons lay respectively at the two ends of plate body, described adjusting button is connected with driving mechanism, described adjusting button is connected by drag-line with between driving mechanism, described plate is provided with the first support portion for wearing drag-line and the second support portion with it, first support portion is identical with the length direction of drag-line with the arragement direction of second, described stay hook is between the first support portion and the second support portion, can the position of two cross bars in orthotic foot hand cradle, thus facilitate the fixing of scaffold station plate.
Description
Technical field
The utility model relates to a kind of building implements, and more particularly, it relates to a kind of scaffold station plate.
Background technology
Scaffold refers to that job site is the various supports that operative also solves vertically and horizontal transport is set up.The generic term on building circle, refers to building site be used in the higher place that cannot directly construct of exterior wall, interior decoration or floor height.Work up and down mainly for constructor or perimeter security net is gone along with sb. to guard him and high-altitude installation component etc., be exactly plainly build a framework, scaffold makes material to be had usually: bamboo and wood, steel pipe or synthetic materials etc.Some engineering is also worked as template with scaffold and is used, and the department such as this external advertising, municipal administration, traffic road and bridge, mine is also extensively used.
After support is put up, need placement station plate on support, the stand two ends of plate are provided with stay hook, stay hook is anchored to the cross bar on support, thus station plate is fixed, but support existing error when building, cannot ensure that the stay hook of standing on plate cannot snap on cross bar completely, being inconvenient to the fixing of plate of standing.
Utility model content
For the deficiency that prior art exists, the purpose of this utility model is to provide a kind of scaffold station plate, can the position of two cross bars in orthotic foot hand cradle, thus facilitates the fixing of scaffold station plate.
For achieving the above object, the utility model provides following technical scheme: a kind of scaffold station plate, comprise plate body, plate is provided with stay hook with it, adjusting device is provided with below described plate body, described adjusting device comprises and is positioned at plate two groups of adjusting buttons with it, two groups of adjusting buttons lay respectively at the two ends of plate body, described adjusting button is connected with driving mechanism, described adjusting button is connected by drag-line with between driving mechanism, described plate is provided with the first support portion for wearing drag-line and the second support portion with it, first support portion, the arragement direction of the second support portion is identical with the length direction of drag-line, described stay hook is between the first support portion and the second support portion.
By adopting technique scheme, easily error is produced in the process of building of scaffold, mainly contain two aspects, one is that distance between two cross bars is too large, stay hook cannot get on by hook, and now adjusting button can snap on cross bar, drives adjusting button by driving mechanism, make the cross bar of both sides close to each other, thus make stay hook be hooked on cross bar; That distance between two cross bars is too little in addition, stay hook cannot be hooked on cross bar, now, can by the drag-line on adjusting button around on the first support portion, adjusting button snaps on cross bar, and driving mechanism pulls in the process of drag-line, can make two cross bars mutually away from, when arriving the position be applicable to, stay hook catches on cross bar, realizes the fixing of station plate; Produce error when installation foot hand cradle, can be regulated by adjusting button, stay hook be hooked on cross bar very easily, facilitates cross bar to fix.
The utility model is set to further: described driving mechanism comprises the leading screw be arranged on bottom plate body, described leading screw two ends are overlapped respectively and are had drive nut, the hand of thread spiral of the drive nut at two ends is contrary, drive nut is fixed with the bogie be slidably matched with plate body, and the drag-line on bogie and adjusting button is fixed.
By adopting technique scheme, when screw turns, because the hand of spiral of the nut at leading screw two ends is contrary, therefore under the effect of leading screw, the nut at two ends can close to each other or mutually away from, thus pull drag-line by bogie, realize finely tuning the distance of two cross bars.
The utility model is set to further: the first described support portion is provided with pulley, and the periphery on described pulley is provided with arc groove.
By adopting technique scheme, the pulley that the first support portion is arranged, minimizing drag-line is pulled the friction in process, reduces resistance.
The utility model is set to further: be provided with hexagonal spanner projection in the middle part of described leading screw.
By adopting technique scheme, leading screw is turned by spanner projection, when cross bar position corrected by needs, can be turned spanner projection by common spanner, simple and convenient.
Compared with prior art, the beneficial effects of the utility model are: scaffold is used for fixing two cross bar positions of station plate when there is error, can be regulated by plate adjusting button with it, by the effect of driving mechanism, the position of cross bar is finely tuned, make the position of stay hook with it the position of two cross bars and plate mutually corresponding, facilitate the installation of scaffold station plate and fixing; In addition when installation foot hand cradle, also can be positioned the cross bar of two on scaffold by adjusting button in advance, prevent scaffold from the process of installing, occurring too large error.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the structure of the utility model scaffold station plate embodiment;
Reference numeral: 1, plate body; 11, stay hook; 2, adjusting device; 21, leading screw; 211, spanner projection; 22, bogie; 23, drag-line; 24, adjusting button; 3, the first support portion; 31, pulley; 311, groove; 4, the second support portion.
Detailed description of the invention
With reference to Fig. 1, the utility model scaffold station plate embodiment is described further.
A kind of scaffold station plate, comprise plate body 1, plate body 1 is provided with stay hook 11, adjusting device 2 is provided with below described plate body 1, described adjusting device 2 comprises the two groups of adjusting buttons 24 be positioned on plate body 1, two groups of adjusting buttons 24 lay respectively at the two ends of plate body 1, described adjusting button 24 is connected with driving mechanism, described adjusting button 24 is connected by drag-line 23 with between driving mechanism, described plate body 1 is provided with the first support portion 3 and the second support portion 4 for wearing drag-line 23, first support portion 3, the arragement direction of the second support portion 4 is identical with the length direction of drag-line 23, described stay hook 11 is between the first support portion 3 and the second support portion 4.
Easily error is produced in the process of building of scaffold, mainly contain two aspects, one is that distance between two cross bars is too large, stay hook 11 cannot get on by hook, now adjusting button 24 can snap on cross bar, drive adjusting button 24 by driving mechanism, make the cross bar of both sides close to each other, thus make stay hook 11 be hooked on cross bar; That distance between two cross bars is too little in addition, stay hook 11 cannot be hooked on cross bar, now, can by the drag-line 23 on adjusting button 24 around on the first support portion 3, adjusting button 24 snaps on cross bar, and driving mechanism pulls in the process of drag-line 23, can make two cross bars mutually away from, when arriving the position be applicable to, stay hook 11 catches on cross bar, realizes the fixing of station plate; Produce error when installation foot hand cradle, can be regulated by adjusting button 24, stay hook 11 be hooked on cross bar very easily, facilitates cross bar to fix.
First support portion 3 be mainly used in distance between two cross bars too little time, first support portion 3 is arranged on outside plate body 1, time driving mechanism pulls drag-line 23, by the effect of the first support portion 3, what make adjusting button 24 pulls direction contrary with the direction that drag-line 23 pulls, other first support portion 3 is provided with a breach, facilitates drag-line 23 to take off from the first support portion 3; Second support portion 4 for positioning adjusting button 24 and drag-line 23, the position of the second support portion 4 is positioned on plate body 1.
There are two adjusting buttons 24 side that there is not of plate body 1, can make stressed more even like this.
The present embodiment preferably adopts leading screw 21 to drive, the rotatable bottom being arranged on plate body 1 of leading screw 21, leading screw 21 two ends are overlapped respectively and are had drive nut, the hand of thread spiral of the drive nut at two ends is contrary, drive nut is fixed with the bogie 22 be slidably matched with plate body 1, bogie 22 is fixed with the drag-line 23 on adjusting button 24, time leading screw 21 rotates, because the hand of spiral of the nut at leading screw 21 two ends is contrary, therefore under the effect of leading screw 21, the nut at two ends can close to each other or mutually away from, thus pull drag-line 23 by bogie 22, realize finely tuning the distance of two cross bars, because leading screw 21 has the effect of self-locking, simultaneously, drive cross bar near or away from time, without the need to the power of Hua Tai great.
Pull resistance in the process of adjusting button 24 less to make drag-line 23, first support portion 3 is provided with the pulley 31 of a band groove 311, rolling friction is passed through between drag-line 23 and the first or second support portion 4, frictional force is little and periphery that is pulley 31 is provided with groove 311, drag-line 23 can be embedded in groove 311, plays anticreep effect.
Scaffold is used for fixing two cross bar positions of station plate when there is error, can be regulated by the adjusting button 24 on plate body 1, by the effect of driving mechanism, the position of cross bar is finely tuned, make the position of two cross bars mutually corresponding with the position of stay hook 11 on plate body 1, facilitate the installation of scaffold station plate and fix; In addition when installation foot hand cradle, also can be positioned by two cross bars on adjusting button 24 pairs of scaffolds in advance, prevent scaffold from the process of installing, occurring too large error.
Claims (4)
1. a scaffold station plate, comprise plate body, plate is provided with stay hook with it, it is characterized in that: below described plate body, be provided with adjusting device, described adjusting device comprises and is positioned at plate two groups of adjusting buttons with it, two groups of adjusting buttons lay respectively at the two ends of plate body, described adjusting button is connected with driving mechanism, described adjusting button is connected by drag-line with between driving mechanism, described plate is provided with the first support portion for wearing drag-line and the second support portion with it, first support portion, the arragement direction of the second support portion is identical with the length direction of drag-line, described stay hook is between the first support portion and the second support portion.
2. scaffold station according to claim 1 plate, it is characterized in that: described driving mechanism comprises the leading screw be arranged on bottom plate body, described leading screw two ends are overlapped respectively and are had drive nut, the hand of thread spiral of the drive nut at two ends is contrary, drive nut is fixed with the bogie be slidably matched with plate body, and the drag-line on bogie and adjusting button is fixed.
3. scaffold station according to claim 2 plate, is characterized in that: the first described support portion is equipped with pulley, and the periphery on described pulley is provided with arc groove.
4. scaffold station according to claim 3 plate, is characterized in that: be provided with hexagonal spanner projection in the middle part of described leading screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420516770.7U CN204081449U (en) | 2014-09-10 | 2014-09-10 | Scaffold station plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420516770.7U CN204081449U (en) | 2014-09-10 | 2014-09-10 | Scaffold station plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204081449U true CN204081449U (en) | 2015-01-07 |
Family
ID=52174182
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420516770.7U Active CN204081449U (en) | 2014-09-10 | 2014-09-10 | Scaffold station plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204081449U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106836784A (en) * | 2017-03-20 | 2017-06-13 | 无锡市龙海杰机械制造有限公司 | The treadle of false work of laborsaving assembly pulley is installed |
CN110593549A (en) * | 2019-08-09 | 2019-12-20 | 郑伟生 | Omnibearing adjustable connecting structure for scaffold and scaffold board |
CN110821135A (en) * | 2019-11-16 | 2020-02-21 | 江苏优美特工程技术有限公司 | Attached lifting scaffold |
-
2014
- 2014-09-10 CN CN201420516770.7U patent/CN204081449U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106836784A (en) * | 2017-03-20 | 2017-06-13 | 无锡市龙海杰机械制造有限公司 | The treadle of false work of laborsaving assembly pulley is installed |
CN110593549A (en) * | 2019-08-09 | 2019-12-20 | 郑伟生 | Omnibearing adjustable connecting structure for scaffold and scaffold board |
CN110821135A (en) * | 2019-11-16 | 2020-02-21 | 江苏优美特工程技术有限公司 | Attached lifting scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204081449U (en) | Scaffold station plate | |
CN103422663B (en) | Attached lift scaffold | |
CN204876508U (en) | Portable height -adjustable scaffold | |
CN209011517U (en) | A kind of height-adjustable building construction scaffold | |
PH12015500077A1 (en) | Interlocking blocks and tiles for buildings | |
CN204434086U (en) | A kind of Portable liftable portal frame | |
CN204456808U (en) | Assembly type overhanging unloading platform | |
CN204369468U (en) | A kind of lifting device for 220kV tension-resistant china bottle replacement | |
CN205476380U (en) | Remove raise scaffold | |
CN204715715U (en) | Folding movable scaffold | |
CN206859624U (en) | In the clamp system of pipe top installation pavement | |
CN204326527U (en) | A kind of concrete mould composed structure | |
CN204475814U (en) | A kind of working platform for building | |
CN204040556U (en) | A telescopic graduation two electronic box protection canopy | |
CN103541557A (en) | Simple device for vertical steel pipe | |
CN205046830U (en) | Formula steel pipe scaffold is detained to bowl | |
CN203080880U (en) | Rail-mounted wall whitewashing device | |
CN215254409U (en) | Scaffold for elevator well | |
CN205314670U (en) | Transformer substation's rail pole fixed bolster | |
CN203810219U (en) | Lamp groove mounting structure | |
CN202274557U (en) | Air conditioner external unit bracket for board house | |
CN104372935A (en) | Scaffold | |
CN205296823U (en) | Early form removal bearing leg hand frame | |
CN204199494U (en) | Curtain wall | |
CN203942222U (en) | Machine room light current chute |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |