CN204081425U - A kind of construction sliding scaffold - Google Patents

A kind of construction sliding scaffold Download PDF

Info

Publication number
CN204081425U
CN204081425U CN201420506281.3U CN201420506281U CN204081425U CN 204081425 U CN204081425 U CN 204081425U CN 201420506281 U CN201420506281 U CN 201420506281U CN 204081425 U CN204081425 U CN 204081425U
Authority
CN
China
Prior art keywords
scaffold
track
roller
construction sliding
assembly pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420506281.3U
Other languages
Chinese (zh)
Inventor
杨雪琴
卜俊辉
陈璐嵩
冉亮
蒋荣荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huning Steel Mechanism Co Ltd
Original Assignee
Jiangsu Huning Steel Mechanism Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huning Steel Mechanism Co Ltd filed Critical Jiangsu Huning Steel Mechanism Co Ltd
Priority to CN201420506281.3U priority Critical patent/CN204081425U/en
Application granted granted Critical
Publication of CN204081425U publication Critical patent/CN204081425U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction sliding scaffold, it is characterized in that, comprise scaffold body, track and assembly pulley, described track is fixing to be laid on the ground, and be arranged with many groups in parallel, described assembly pulley is arranged in orbit, coordinate and be slidably connected, and described scaffold body is arranged on assembly pulley with track.The utility model is sliding by being set to by scaffold, make scaffold can carry out slippage in different installation positions, enhance the utilization rate of scaffold, and greatly save material cost and the time cost of scaffold installation, and labour cost, improve operating efficiency.

Description

A kind of construction sliding scaffold
Technical field
The utility model relates to a kind of blade face structure of steel die, especially belongs to a kind of construction sliding scaffold, belongs to construction engineering technical field.
Background technology
At building field, scaffold application widely, but traditional scaffold is fixed, for each installation position, all need to arrange scaffold, not only cause increasing of scaffold material, and, add the set-up time, too increase installation difficulty and intensity simultaneously, consume a large amount of manpower and materials.
Utility model content
In order to solve the problem, the purpose of this utility model is that providing a kind of has slippage ability, easy to use and time saving and energy saving construction sliding scaffold.
For solving the problems of the technologies described above, the technical solution of the utility model is:
A kind of construction sliding scaffold, it is characterized in that, comprise scaffold body, track and assembly pulley, described track is fixing to be laid on the ground, and be arranged with many groups in parallel, described assembly pulley is arranged in orbit, coordinate and be slidably connected, and described scaffold body is arranged on assembly pulley with track.
Further, the bottom of described track is embedded with steel plate, and steel plate locates below ground level, and the steel plate of described track both sides is all fixedly connected with fixation clip, and described fixation clip then pushes down track both sides simultaneously.
And along the laying direction of track, adjacent steel plate spacing is 0.8m.
In addition, described adjacent track space is 2.6m, and in the scaffold body of correspondence, the spacing of adjacent scaffold upright rod is 1.3m.
Further, described assembly pulley comprises roller, roller housing and sleeve pipe, described roller housing is arranged on the top of roller, and formed with roller and be rotationally connected mode, and described sleeve pipe is weldingly fixed on the top of roller housing, the scaffold upright rod of described scaffold body is plugged in described sleeve pipe.
And described roller is steel wheel, and the external surface of described roller caves inward, and form the groove coordinated with track, and the surface of described groove is also provided with one deck wearing layer.
And the external diameter interference fit of the internal diameter of described sleeve pipe and scaffold upright rod.
In addition, the scaffold upright rod place between adjacent orbit is also provided with attachment fastener, is provided with interim strut in described attachment fastener.
And the roller housing of described roller both sides is also provided with temporary fixed baffle plate.
The beneficial effects of the utility model are: the utility model is sliding by being set to by scaffold, make scaffold can carry out slippage in different installation positions, enhance the utilization rate of scaffold, and greatly saved material cost and the time cost of scaffold installation, and labour cost, improve operating efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model one embodiment;
Fig. 2 is the connection diagram on track described in the utility model and ground;
Fig. 3 is the structural representation of the assembly pulley described in utility model;
Fig. 4 is the structural representation of interim strut described in the utility model;
Fig. 5 is the structural representation of temporary fixed baffle plate described in the utility model.
Detailed description of the invention
Below in conjunction with specific embodiment, the utility model is described in detail.
Fig. 1 is the structural representation of the utility model one embodiment; Fig. 2 is the connection diagram on track described in the utility model and ground; Fig. 3 is the structural representation of the assembly pulley described in utility model;
As shown in figures 1 and 3: construction sliding scaffold, comprise scaffold body 1, track 2 and assembly pulley 3, described track 2 is fixing to be laid on the ground, and be arranged with many groups in parallel, described assembly pulley 3 is arranged on track 2, coordinate with track and be slidably connected, described scaffold body 1 is then arranged on assembly pulley 2.
Wherein, the bottom of described track 2 is embedded with steel plate 21, steel plate 21 locates below ground level, and the steel plate 21 of described track 2 both sides is all fixedly connected with fixation clip 22, described fixation clip 22 then pushes down the both sides of track 2 simultaneously, to fix track, and along the laying direction of track 2, adjacent steel plate 21 spacing is 0.8m.And adjacent track 2 spacing is 2.6m, and in the scaffold body 1 of correspondence, the spacing of adjacent scaffold upright rod is 1.3m.
And in the present embodiment, described assembly pulley 3 comprises roller 32, roller housing 31 and sleeve pipe 33, described roller housing 31 is arranged on the top of roller 32, and formed with roller 32 and be rotationally connected mode, and described sleeve pipe 33 is weldingly fixed on the top of roller housing 31, the scaffold upright rod 11 of described scaffold body 1 is plugged in described sleeve pipe 33, wherein, the internal diameter of sleeve pipe 33 and the external diameter interference fit of scaffold upright rod 11, form the connection of scaffold body 1 and roller set 3.It described roll 32 and takes turns as steel wheel in the present embodiment, and the external surface of described roller 32 caves inward, and form the groove coordinated with track 2, and the surface of described groove is also provided with one deck wearing layer.
Fig. 4 is the structural representation of interim strut described in the utility model.
As shown in Figure 4: scaffold upright rod 11 place between adjacent orbit 2 is also provided with attachment fastener 4, interim strut 5 is provided with in described attachment fastener 4, for temporary support, ensure that mounted scaffold can not be excessive because of middle part vertical deflection, and the overall force and deformation of scaffold is had a negative impact.
Fig. 5 is the structural representation of temporary fixed baffle plate described in the utility model
As shown in Figure 5: in order to prevent operationally, roller set 3 is slided, the roller housing 31 of described roller 32 both sides is also provided with temporary fixed baffle plate 6.
Above detailed description of the invention does not limit the utility model in any form, and every technical scheme obtained in the mode of equivalent replacement or equivalent transformation, all drops in protection domain of the present utility model.

Claims (9)

1. a construction sliding scaffold, it is characterized in that, comprise scaffold body, track and assembly pulley, described track is fixing to be laid on the ground, and be arranged with many groups in parallel, described assembly pulley is arranged in orbit, and coordinate with track and be slidably connected, described scaffold body is then arranged on assembly pulley.
2. a kind of construction sliding scaffold according to claim 1, it is characterized in that, the bottom of described track is embedded with steel plate, and steel plate locates below ground level, and the steel plate of described track both sides is all fixedly connected with fixation clip, described fixation clip then pushes down track both sides simultaneously.
3. a kind of construction sliding scaffold according to claim 1, it is characterized in that, along the laying direction of track, adjacent steel plate spacing is 0.8m.
4. a kind of construction sliding scaffold according to claim 1, it is characterized in that, described adjacent track space is 2.6m, and in the scaffold body of correspondence, the spacing of adjacent scaffold upright rod is 1.3m.
5. a kind of construction sliding scaffold according to claim 1, it is characterized in that, described assembly pulley comprises roller, roller housing and sleeve pipe, described roller housing is arranged on the top of roller, and formed with roller and be rotationally connected mode, and described sleeve pipe is weldingly fixed on the top of roller housing, the scaffold upright rod of described scaffold body is plugged in described sleeve pipe.
6. a kind of construction sliding scaffold according to claim 5, it is characterized in that, described roller is steel wheel, and the external surface of described roller caves inward, and form the groove coordinated with track, and the surface of described groove is also provided with one deck wearing layer.
7. a kind of construction sliding scaffold according to claim 5, is characterized in that, the internal diameter of described sleeve pipe and the external diameter interference fit of scaffold upright rod.
8. a kind of construction sliding scaffold according to claim 5, it is characterized in that, the scaffold upright rod place between adjacent orbit is also provided with attachment fastener, is provided with interim strut in described attachment fastener.
9. a kind of construction sliding scaffold according to claim 5, is characterized in that, the roller housing of described roller both sides is also provided with temporary fixed baffle plate.
CN201420506281.3U 2014-09-04 2014-09-04 A kind of construction sliding scaffold Active CN204081425U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420506281.3U CN204081425U (en) 2014-09-04 2014-09-04 A kind of construction sliding scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420506281.3U CN204081425U (en) 2014-09-04 2014-09-04 A kind of construction sliding scaffold

Publications (1)

Publication Number Publication Date
CN204081425U true CN204081425U (en) 2015-01-07

Family

ID=52174158

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420506281.3U Active CN204081425U (en) 2014-09-04 2014-09-04 A kind of construction sliding scaffold

Country Status (1)

Country Link
CN (1) CN204081425U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930520A (en) * 2017-04-19 2017-07-07 北京理工大学 Suitable for the self-locking job platform of railroad track
CN109779239A (en) * 2019-02-01 2019-05-21 中国十七冶集团有限公司 A kind of sliding construction scaffold supporting device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930520A (en) * 2017-04-19 2017-07-07 北京理工大学 Suitable for the self-locking job platform of railroad track
CN106930520B (en) * 2017-04-19 2019-03-01 北京理工大学 Self-locking job platform suitable for railroad track
CN109779239A (en) * 2019-02-01 2019-05-21 中国十七冶集团有限公司 A kind of sliding construction scaffold supporting device
CN109779239B (en) * 2019-02-01 2020-07-21 中国十七冶集团有限公司 Scaffold supporting device for sliding construction

Similar Documents

Publication Publication Date Title
CN204775324U (en) Building materials transportation engineering car
CN204081425U (en) A kind of construction sliding scaffold
CN203922264U (en) A kind of automatic horizontal wire draw drum
CN204077743U (en) A kind of tubing transport trolley
CN205706773U (en) A kind of construction building materials transport vehicle
CN202467155U (en) Retractable scaffold pedal
CN202039851U (en) Lifting device of shaft sleeve inner wall construction assembling template
CN104264960A (en) Sliding platform for building construction
CN201932887U (en) Crawler-typed moving lifting platform special for greenhouse
CN202299051U (en) Waterproof curtain wall
CN203346740U (en) Draw shaft track installation structure beneficial to reducing sleeper corrosion
CN203774733U (en) Turning cable working well structure
CN202945749U (en) Workshop roof ridge tile steel plug
CN203607033U (en) Variable-number pole number plate
CN204626231U (en) A kind of concrete filled steel tube box bridge for the distortion of the Chinese People's Anti-Japanese Military and Political College of high roadbed district
CN203451058U (en) Clamp protecting sleeve
CN203896263U (en) Cement slope roof photovoltaic support system
CN202441389U (en) Novel shield-tunnel humanoid pavement structure
CN203977921U (en) Levelling charging pile structure
CN202117359U (en) Combined lightweight steel structure communication machine room
CN202747676U (en) Flat-plate solar collector capable of being flatly installed
CN202329382U (en) Clapboard and tube sheet fixing mechanism for heat exchanger
CN202810227U (en) Anti-seismic shock-absorbing flectional building reinforced structure
CN202810012U (en) Heat preservation roof
CN202369436U (en) Floating filler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant