CN204080613U - A kind of freight ropeway is passed a bridge - Google Patents
A kind of freight ropeway is passed a bridge Download PDFInfo
- Publication number
- CN204080613U CN204080613U CN201420483318.5U CN201420483318U CN204080613U CN 204080613 U CN204080613 U CN 204080613U CN 201420483318 U CN201420483318 U CN 201420483318U CN 204080613 U CN204080613 U CN 204080613U
- Authority
- CN
- China
- Prior art keywords
- cableway
- bridge
- pontic
- groove
- clip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 13
- 239000010959 steel Substances 0.000 claims abstract description 13
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000009434 installation Methods 0.000 abstract description 2
- 101100366060 Caenorhabditis elegans snap-29 gene Proteins 0.000 description 2
- 238000005452 bending Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 238000012876 topography Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
A kind of freight ropeway is passed a bridge, (2) are provided with draw-in groove a(4 to pontic) and draw-in groove b(4 '), pontic (2) is provided with screw-thread steel (3) near wire rope side, screw-thread steel (3) both sides are provided with clip a(5) and clip b(5 '), two of pontic (2) is provided with bridge point a(1) and bridge point b(1 ').The utility model adopts the rail gap bridge technology between cableway bearing rope, when goods dolly arrives first order cableway end door frame thing, by orbit transfer to second level cableway bearing rope, eliminate middle handling link, substantially increase cableway transport efficiency, realize multistage cableway continuative transport, minimizing personnel, time loss, effective raising conevying efficiency, and the utility model structure is simple, easy for installation etc.
Description
One, technical field
This experiment is novel belongs to transmission line construction technical field, and particularly a kind of freight ropeway is passed a bridge.
Two, background technology
Cableway transport plays an important role in mass transport, one of means of transportation that cableway transport equipment of applying in a flexible way in mountain area with a varied topography is most economical especially.In large span, long distance transportation situation, cableway must transport in segmentation.The freight volume born due to freight ropeway is large, and transporting cargo piece weight is large, at least at about 0.5-1.0 tons.Like this, the event of middle handling link just becomes cableway transport labor intensive, time the most, greatly reduces the problems such as cableway transport efficiency.
Three, summary of the invention
For solving the problem, the utility model spy provides a kind of freight ropeway to pass a bridge, it is characterized in that: (2) are provided with draw-in groove a(4 to pontic) and draw-in groove b(4 '), pontic (2) is provided with screw-thread steel (3) near wire rope side, screw-thread steel (3) both sides are provided with clip a(5) and clip b(5 '), two of pontic (2) is provided with bridge point a(1) and bridge point b(1 ').The utility model is achieved in that pontic (2) adopts Φ 28 round steel, makes bending structure, and middle employing is welded.Bridge point a(1) and bridge point b(1 ') being cut into groove, groove should be tried one's best gently, facilitates freight trolley to pass through.(2) are provided with draw-in groove a(4 to pontic) and draw-in groove b(4 '), for fixing groove part and bearing rope.Bridge point a(1) be fixed on first order cableway bearing rope, bridge point b(1 ') be fixed on the cableway bearing rope of the second level.Clip a(5) and clip b(5 ') for fixing gap bridge main body and bearing rope, stressed for ensureing gap bridge, pontic (2) is provided with screw-thread steel (3) near wire rope side and carries out reinforcement.The utility model is generally positioned over first order cableway end and cableway front end, second level intersection.First order cableway bearing rope below the cableway bearing rope of the second level, and should become about 30o angle.
The utility model, adopt the rail gap bridge technology between cableway bearing rope, when goods dolly arrives first order cableway end door frame, be transitioned into second level cableway bearing rope by the utility model, eliminate middle handling link, substantially increase cableway transport efficiency, realize multistage cableway continuative transport, reduce personnel, time loss, effectively improve conevying efficiency, and the utility model structure is simple, easy for installation etc.
Four, accompanying drawing explanation
Fig. 1 is the utility model structural representation
Fig. 2 is the utility model mounting structure schematic diagram
In figure: 1, bridge point a 1 ', bridge point b 2, pontic 3, screw-thread steel 4, draw-in groove a 4 ', draw-in groove b
5, clip a 5 ', clip b
Five, detailed description of the invention
A kind of freight ropeway is passed a bridge, (2) are provided with draw-in groove a(4 to pontic) and draw-in groove b(4 '), pontic (2) is provided with screw-thread steel (3) near wire rope side, screw-thread steel (3) both sides are provided with clip a(5) and clip b(5 '), two of pontic (2) is provided with bridge point a(1) and bridge point b(1 ').The utility model is achieved in that pontic (2) adopts Φ 28 round steel, makes bending structure, and middle employing is welded.Bridge point a(1) and bridge point b(1 ') being cut into groove, groove should be tried one's best gently, facilitates freight trolley to pass through.(2) are provided with draw-in groove a(4 to pontic) and draw-in groove b(4 '), for fixing groove part and bearing rope.Bridge point a(1) be fixed on first order cableway bearing rope, bridge point b(1 ') be fixed on the cableway bearing rope of the second level.Clip a(5) and clip b(5 ') for fixing gap bridge main body and bearing rope, stressed for ensureing gap bridge, pontic (2) is provided with screw-thread steel (3) near wire rope side and carries out reinforcement.The utility model is generally positioned over first order cableway end and cableway front end, second level intersection.First order cableway bearing rope below the cableway bearing rope of the second level, and should become about 30o angle.
Claims (1)
1. a freight ropeway is passed a bridge, it is characterized in that: (2) are provided with draw-in groove a(4 to pontic) and draw-in groove b(4 '), pontic (2) is provided with screw-thread steel (3) near wire rope side, screw-thread steel (3) both sides are provided with clip a(5) and clip b(5 '), two of pontic (2) is provided with bridge point a(1) and bridge point b(1 ').
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420483318.5U CN204080613U (en) | 2014-08-26 | 2014-08-26 | A kind of freight ropeway is passed a bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420483318.5U CN204080613U (en) | 2014-08-26 | 2014-08-26 | A kind of freight ropeway is passed a bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204080613U true CN204080613U (en) | 2015-01-07 |
Family
ID=52173348
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420483318.5U Active CN204080613U (en) | 2014-08-26 | 2014-08-26 | A kind of freight ropeway is passed a bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204080613U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105649347A (en) * | 2016-01-15 | 2016-06-08 | 北京市建筑工程研究院有限责任公司 | Multistage mobile-type construction material transporting platform |
CN111731328A (en) * | 2020-08-02 | 2020-10-02 | 张若玮 | Electric power equipment lifting-assisting type climbing cableway |
CN111845791A (en) * | 2020-08-02 | 2020-10-30 | 张若玮 | Floating type climbing cableway for electric power equipment |
-
2014
- 2014-08-26 CN CN201420483318.5U patent/CN204080613U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105649347A (en) * | 2016-01-15 | 2016-06-08 | 北京市建筑工程研究院有限责任公司 | Multistage mobile-type construction material transporting platform |
CN105649347B (en) * | 2016-01-15 | 2017-08-29 | 北京市建筑工程研究院有限责任公司 | Multistage portable construction haul platform |
CN111731328A (en) * | 2020-08-02 | 2020-10-02 | 张若玮 | Electric power equipment lifting-assisting type climbing cableway |
CN111845791A (en) * | 2020-08-02 | 2020-10-30 | 张若玮 | Floating type climbing cableway for electric power equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204080613U (en) | A kind of freight ropeway is passed a bridge | |
WO2011078908A3 (en) | Loop rope assembly | |
CN204055772U (en) | A kind of transmission line construction freight ropeway running trolley | |
CN203611992U (en) | Single-rail steel rail transportation trolley | |
CN103350953B (en) | For the jacking system of derrick car | |
CN203754234U (en) | Safety device for lifting hook assembly of pipe lifting machine | |
CN202243559U (en) | Push-pull device used for carrier vehicle | |
CN202944813U (en) | Combined type pulley block | |
CN202080664U (en) | Conveyor chain | |
CN202728227U (en) | Coal mine transportation system | |
CN206336693U (en) | A kind of anti-laterally mining belt carcass of tear | |
CN202687258U (en) | Transporting clamp for alloy roll collar semi-finished product | |
CN201989801U (en) | Safe exploiting and transportation connecting rod applied in mine | |
CN204821272U (en) | SPMT transportation frame roof beam device | |
CN204530334U (en) | Hot-metal ladle and carriage track check rail | |
CN203865896U (en) | Auxiliary device used for demounting tower crane attachment frames | |
CN203681545U (en) | Overhead manned device for fixing rope clip turning | |
CN202936115U (en) | Construction cableway docking platform and freight translation device | |
CN205776756U (en) | A kind of tatou for pneumatic membrane building netted wirerope system | |
CN102862794B (en) | Combined pulley set | |
CN102390412A (en) | Push-pull device for transport vehicle | |
CN205149901U (en) | Long and narrow simple and easy travelling bogie | |
CN205799328U (en) | Valve assembled π type spanner | |
CN101607633A (en) | The combined supporting device that is used for chain type rope way | |
CN204509883U (en) | Turnout passing bend protecting device for wire rope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |