CN204062049U CN201420422139.0U CN201420422139U CN204062049U CN 204062049 U CN204062049 U CN 204062049U CN 201420422139 U CN201420422139 U CN 201420422139U CN 204062049 U CN204062049 U CN 204062049U
Authority
CN
China
Prior art keywords
lng
hole
spool
safety check
usual
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420422139.0U
Other languages
Chinese (zh)
Inventor
江涛
杨国柱
甘鹏
罗军
魏瑛
武佳慧
江群
卢荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Houpu Clean Energy Group Co ltd
Original Assignee
Chengdu Huaqi Houpu Holding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Huaqi Houpu Holding Co Ltd filed Critical Chengdu Huaqi Houpu Holding Co Ltd
Priority to CN201420422139.0U priority Critical patent/CN204062049U/en
Application granted granted Critical
Publication of CN204062049U publication Critical patent/CN204062049U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model discloses a kind of LNG safety check open in usual, belong to technical field of LNG.LNG of the present utility model safety check open in usual, comprise valve body, being provided with in the through hole of described spool can the spool of relative sliding, the inwall of described through hole and the front end of spool are equipped with the conical seal (contact) face that can cooperatively interact, the front end of described spool is butted on the inwall step of through hole end by spring, makes tool between the conical seal (contact) face of spool front end and the conical seal (contact) face of through-hole wall at regular intervals; The outer wall of described spool is provided with other hole, and the tail end of described spool is provided with the liquid pass hole being communicated with other hole; Be connected with at the entrance point of described through hole the tail end that pipe joint one is butted on spool, the outlet end of described through hole is connected with pipe joint two.LNG of the present utility model safety check open in usual, is installed between LNG storage tank and LNG immersed pump, and for solving safety check two ends conducting under minute-pressure state, under high pressure or the large flow velocity of large discharge, safety check two ends forward is closed and prevented LNG to be transferred back the problem of LNG storage tank.

Description

LNG safety check open in usual
Technical field
The utility model relates to technical field of LNG, especially a kind of LNG safety check open in usual.
Background technique
LNG(Liquefied Natural Gas), i.e. the english abbreviation of LNG Liquefied natural gas.Rock gas is the inflammable gas that natural opening extraction comes in gas field, and main component is made up of methane.LNG is cooled to-162 DEG C by the rock gas of gaseous state at ambient pressure, makes it to condense into liquid; Greatly can save storage and transportation space after natural gas liquefaction, and have that calorific value is large, performance high.
Store with the equipment of conveying at existing LNG, the equipment such as pump can be used to pump, LNG is when pumping, the inner shape in pump pond can be made to be negative pressure, to make pump while extraction LNG liquid, partial gas phase gas can be drawn back, also just easily there is gas-liquid mixed phenomenon in LNG immersed pump, therefore often occur that pump discharge pressure is unstable, cause cavitation, damage component in pump for a long time.
Model utility content
Goal of the invention of the present utility model is: for above-mentioned Problems existing, a kind of LNG safety check open in usual is provided, be installed between LNG storage tank and LNG immersed pump, for solving safety check two ends conducting under minute-pressure state, under high pressure or the large flow velocity of large discharge, safety check two ends forward is closed and is prevented LNG to be transferred back the problem of LNG storage tank; Meanwhile, also solve the LNG gas phase when LNG immersed pump starts and take out phenomenon, guarantee that pump only can extract LNG liquid phase medium, forward closes LNG only in the pipe-line system being delivered to needs, can meet the normal usage requirement of LNG immersed pump.When being in low pressure, the two ends of this safety check are communicated with, the pressure of balance LNG storage tank and LNG immersed pump.
The technical solution adopted in the utility model is as follows:
LNG of the present utility model safety check open in usual, comprise valve body, being provided with in the through hole of described valve body can the spool of relative sliding, the inwall of described through hole and the front end of spool are equipped with the conical seal (contact) face that can cooperatively interact, the front end of described spool is butted on the inwall step of through hole end by spring, makes tool between the conical seal (contact) face of spool front end and the conical seal (contact) face of through-hole wall at regular intervals; The outer wall of described spool is provided with other hole, and the tail end of described spool is provided with the liquid pass hole being communicated with other hole; Be connected with at the entrance point of described through hole the tail end that pipe joint one is butted on spool, the outlet end of described through hole is connected with pipe joint two.
Owing to have employed said structure, valve body screws in valve body built with spring, spool, pipe joint one, spool is pushed up to spring by pipe joint one simultaneously, make spring can be applied to the certain precompression of spool, guarantee that the sealing surface of spool and valve body departs from, be in opening state, the other end and the LNG immersed pump export pipeline of pipe joint one are weldingly connected; The other end and the LNG storage tank gas phase pipeline of pipe joint two are weldingly connected, and spool and valve inner have one section of free travel, and spool departs from valve body sealing surface under the action of the spring, and be opening state, gas phase gas can be passed through interstitial flow between spool and valve body.When the side of pipe joint one has the LNG liquid of the large flow velocity of large discharge to come, LNG liquid can force spool travel, namely LNG acts on the power of spool higher than the active force at spring, the active force making spool overcome spring moves right to valve body sealing surface, valve forward is closed, and blocks LNG and continues to flow to pipe joint two; When the side flow velocity of pipe joint one recovers normally, LNG liquid effects reduces in the power of spool, and spool departs from valve body sealing surface under the action of the spring, flows to be formed again with the side of pipe joint two and be communicated with in the side of pipe joint one, and valve recovers to open.LNG of the present utility model safety check open in usual, is installed between LNG storage tank and LNG immersed pump, and for solving safety check two ends conducting under minute-pressure state, under high pressure or the large flow velocity of large discharge, safety check two ends forward is closed and prevented LNG to be transferred back the problem of LNG storage tank.
LNG of the present utility model safety check open in usual, described pipe joint two overcoat has nut alive, and described nut thread alive is connected to the outer wall of valve outlet end.
Owing to have employed said structure, on pipe joint two, cover has nut alive, and nut of living screws on valve body outside thread, and screwing nut alive by the conical seal (contact) face pinch seal of valve body spherical seal surface and pipe joint, can be convenient to installation and removal.
LNG of the present utility model safety check open in usual, on the outer wall of described spool, uniform ring is furnished with 4 other holes, and described through-hole wall is provided with the cavity relative with other hole.
Owing to have employed said structure, this cavity is convenient to fluid behind other hole, carries out in this cavity again after conical seal (contact) face, discharges, guarantee the circulation of LNG stream body from the outlet end of valve body.
In sum, owing to have employed technique scheme, the beneficial effects of the utility model are:
1, LNG of the present utility model safety check open in usual, be installed between LNG storage tank and LNG immersed pump, for solving safety check two ends conducting under minute-pressure state, under high pressure or the large flow velocity of large discharge, safety check two ends forward is closed and is prevented LNG to be transferred back the problem of LNG storage tank;
2, LNG of the present utility model safety check open in usual, also solve the LNG gas phase when LNG immersed pump starts and take out phenomenon, guarantee that pump only can extract LNG liquid phase medium, forward closes LNG only in the pipe-line system being delivered to needs, can meet the normal usage requirement of LNG immersed pump; .
3, LNG of the present utility model safety check open in usual, low temperature resistant, and during low pressure, safety check two ends are opening state, and during high pressure or when the LNG stream amount velocity ratio of safety check is larger, safety check two ends forward is closed.
Accompanying drawing explanation
The utility model illustrates by example and with reference to the mode of accompanying drawing, wherein:
Fig. 1 is the using state figure of LNG safety check open in usual in the utility model;
Fig. 2 is the structural representation of LNG safety check open in usual in the utility model.
Mark in figure: 1-storage tank, 2,7-liquid phase, 3,6-gas phase, 4-pump pond, 5-immersed pump, 8-safety check, 8-1-valve body, 8-2-spool, 8-3-spring, 8-4-lives nut, 8-5-pipe joint one, 8-6-pipe joint two.
Embodiment
All features disclosed in this specification, or the step in disclosed all methods or process, except mutually exclusive feature and/or step, all can combine by any way.
Arbitrary feature disclosed in this specification (comprising any accessory claim, summary), unless specifically stated otherwise, all can be replaced by other equivalences or the alternative features with similar object.That is, unless specifically stated otherwise, each feature is an example in a series of equivalence or similar characteristics.
As shown in Figure 1, LNG of the present utility model safety check open in usual, comprise valve body 8-1, being provided with in the through hole of described valve body 8-1 can the spool 8-2 of relative sliding, the inwall of described through hole and the front end of spool 8-2 are equipped with the conical seal (contact) face that can cooperatively interact, the front end of described spool 8-2 is butted on the inwall step of through hole end by spring 8-3, makes tool between the conical seal (contact) face of spool 8-2 front end and the conical seal (contact) face of through-hole wall at regular intervals; On the outer wall of described spool 8-2, uniform ring is furnished with 4 other holes, and described through-hole wall is provided with the cavity relative with other hole, and the tail end of described spool 8-2 is provided with the liquid pass hole being communicated with other hole; The tail end that pipe joint one 8-5 is butted on spool 8-2 is connected with at the entrance point of described through hole, the outlet end of described through hole is connected with pipe joint two 8-6, described pipe joint two 8-6 overcoat has nut 8-4 alive, and described nut 8-4 alive is threadedly connected to the outer wall of valve body 8-1 outlet end.
As shown in Figure 2, LNG of the present utility model safety check open in usual, in use, is installed between LNG storage tank 8-1 and LNG immersed pump 8-5, and for solving safety check two ends conducting under minute-pressure state, wherein LNG immersed pump 8-5 is placed in the 8-4 of pump pond.
LNG of the present utility model safety check open in usual, at valve body 8-1 built with spring 8-3, spool 8-2, pipe joint one 8-5 screws in valve body 8-1, spool 8-2 is pushed up to spring 8-3 by pipe joint one 8-5 simultaneously, make spring 8-3 can be applied to the certain precompression of spool 8-2, guarantee that the sealing surface of spool 8-2 and valve body 8-1 departs from, be in opening state, the pipe joint one 8-5 the other end and LNG immersed pump export pipeline are weldingly connected, on pipe joint two 8-6, cover has nut 8-4 alive, the nut 8-4 that lives screws on valve body 8-1 outside thread, screwing nut 8-4 alive can by the conical seal (contact) face pinch seal of valve body 8-1 spherical seal surface and pipe joint two 8-6, the other end and the LNG storage tank gas phase pipeline of pipe joint two 8-6 are weldingly connected, there is one section of free travel spool 8-2 and valve body 8-1 inside, spool 8-2 departs from valve body 8-1 sealing surface under the effect of spring 8-3, for opening state, gas phase gas can be passed through interstitial flow between spool 2 and valve body 8-1,
When the side of pipe joint one 8-5 has the LNG liquid of the large flow velocity of large discharge to come, LNG liquid can force spool 8-2 displacement, namely LNG acts on the power of spool 8-2 higher than the active force at spring 8-3, the active force making spool 2 overcome spring 8-3 moves right to valve body 8-1 sealing surface, valve forward is closed, and blocks LNG and continues to flow to pipe joint two 8-6; When the side flow velocity of connecting head 8-5 recovers normally, LNG liquid effects reduces in the power of spool 8-2, spool 8-2 departs from valve body 8-1 sealing surface under the effect of spring 8-3, flows to be formed again with the side of pipe joint two 8-6 and be communicated with in the side of pipe joint one 8-5, and valve recovers to open.
LNG of the present utility model safety check open in usual, during low pressure, two ends are communicated with, the pressure of balance LNG storage tank and LNG immersed pump; Simultaneously, also solve the LNG gas phase when LNG immersed pump starts and take out phenomenon, guarantee that pump only can extract LNG liquid phase medium, forward is closed and is prevented LNG to be transferred back LNG storage tank, LNG only in the pipe-line system being delivered to needs, can meet the normal usage requirement of LNG immersed pump.
The utility model is not limited to aforesaid embodiment.The utility model expands to any new feature of disclosing in this manual or any combination newly, and the step of the arbitrary new method disclosed or process or any combination newly.

Claims (3)

1.LNG safety check open in usual, it is characterized in that: it comprises valve body (8-1), being provided with in the through hole of described valve body (8-1) can the spool (8-2) of relative sliding, the front end of the inwall of described through hole and spool (8-2) is equipped with the conical seal (contact) face that can cooperatively interact, the front end of described spool (8-2) is butted on the inwall step of through hole end by spring (8-3), makes tool between the conical seal (contact) face of spool (8-2) front end and the conical seal (contact) face of through-hole wall at regular intervals; The outer wall of described spool (8-2) is provided with other hole, and the tail end of described spool (8-2) is provided with the liquid pass hole being communicated with other hole; Be connected with at the entrance point of described through hole the tail end that pipe joint one (8-5) is butted on spool (8-2), the outlet end of described through hole is connected with pipe joint two (8-6).
2. LNG safety check open in usual as claimed in claim 1, is characterized in that: described pipe joint two (8-6) overcoat has nut alive (8-4), and described nut alive (8-4) is threadedly connected to the outer wall of valve body (8-1) outlet end.
3. LNG safety check open in usual as claimed in claim 1 or 2, is characterized in that: on the outer wall of described spool (8-2), uniform ring is furnished with 4 other holes, and described through-hole wall is provided with the cavity relative with other hole.
CN201420422139.0U 2014-07-30 2014-07-30 LNG safety check open in usual Active CN204062049U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420422139.0U CN204062049U (en) 2014-07-30 2014-07-30 LNG safety check open in usual

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420422139.0U CN204062049U (en) 2014-07-30 2014-07-30 LNG safety check open in usual

Publications (1)

Publication Number Publication Date
CN204062049U true CN204062049U (en) 2014-12-31

Family

ID=52203566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420422139.0U Active CN204062049U (en) 2014-07-30 2014-07-30 LNG safety check open in usual

Country Status (1)

Country Link
CN (1) CN204062049U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107654840A (en) * 2017-10-31 2018-02-02 成都华气厚普机电设备股份有限公司 A kind of indexing hydrogen cell automobile is hydrogenated with rifle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107654840A (en) * 2017-10-31 2018-02-02 成都华气厚普机电设备股份有限公司 A kind of indexing hydrogen cell automobile is hydrogenated with rifle
CN107654840B (en) * 2017-10-31 2023-09-05 厚普清洁能源(集团)股份有限公司 Indexing type hydrogen fuel cell automobile hydrogenation gun

Similar Documents

Publication Publication Date Title
WO2010129178A3 (en) System and method of providing high pressure fluid injection with metering using low pressure supply lines
CL2013001728A1 (en) A process for filling a gas storage vessel under pressure comprises a cryogenic gas comprising liquefied gas within the gas storage container through a first conduit arrangement in a nozzle that is inserted into a passage through a fluid flow control unit, close the container and allow the cryogenic fluid to become gaseous; and associated apparatus.
CN202628024U (en) Hyperpressure packer device
BR112015029096A2 (en) beverage extraction cartridge
CN106285561B (en) Downhole safety valve system
CN103542252A (en) Filling device for LNG (Liquefied Natural Gas)
CN204062049U (en) LNG safety check open in usual
CN203421494U (en) Natural gas hydrate dynamics inhibitor atomizing and injecting device
GB201320575D0 (en) Pump assembly comprising a plurality of jet pumps
CN204239926U (en) The tool joint pin of a kind of waterpipe hydraulic pressure
CN203671239U (en) Skid-mounted gas charging device for storage tank with built-in cryopump
WO2014023743A3 (en) Subsea processing
CN104456085B (en) Integration note alcohol injecting device
CN203231080U (en) LNG (liquefied natural gas) filling pry
CN203023801U (en) Liquid replenishment system
CN205155542U (en) Modified torch gas divides fluid reservoir to press liquid system
CN204877402U (en) Oil field alternate water injection and CO2's device
CN103032054A (en) Pressurization oil extraction method and device thereof through guiding high-pressure gas-liquid jet close to deepwater oil field mud line well opening
CN203560730U (en) Grease filling device special for filling grease into Christmas tree
CN105508310A (en) Aviation fuel jet pump capable of sucking fuel from double ends
CN202933418U (en) Liquid nitrogen fire extinguishment and gas replacement device in shaft
CN201137816Y (en) Intelligent anti-theft anti-pollution pipeline transmission equipment
CN212867875U (en) Pressure reducing device
CN204494045U (en) A kind of injection grease gun
CN204530864U (en) The horizontal storage pressure used in a kind of water storage pressurization system and press-bearing water tank

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 610041 No.3, floor 11, building 6, no.599, shijicheng South Road, Chengdu high tech Zone, China (Sichuan) pilot Free Trade Zone, Chengdu City, Sichuan Province

Patentee after: Houpu clean energy Co.,Ltd.

Address before: 610041 D, Tianfu Software Park, 216 century South Road, Chengdu hi tech Zone, Sichuan, China

Patentee before: CHENGDU HUAQI HOUPU HOLDING Co.,Ltd.

CP03 Change of name, title or address
CP01 Change in the name or title of a patent holder

Address after: No.3, 11th floor, building 6, no.599, shijicheng South Road, Chengdu hi tech Zone, China (Sichuan) pilot Free Trade Zone, Chengdu, Sichuan 610041

Patentee after: Houpu clean energy (Group) Co.,Ltd.

Address before: No.3, 11th floor, building 6, no.599, shijicheng South Road, Chengdu hi tech Zone, China (Sichuan) pilot Free Trade Zone, Chengdu, Sichuan 610041

Patentee before: Houpu clean energy Co.,Ltd.

CP01 Change in the name or title of a patent holder