CN204059999U - A kind of Universal surveyor's rod - Google Patents
A kind of Universal surveyor's rod Download PDFInfo
- Publication number
- CN204059999U CN204059999U CN201420342516.XU CN201420342516U CN204059999U CN 204059999 U CN204059999 U CN 204059999U CN 201420342516 U CN201420342516 U CN 201420342516U CN 204059999 U CN204059999 U CN 204059999U
- Authority
- CN
- China
- Prior art keywords
- surveyor
- universal
- rod
- horizontal ruler
- staff
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of Universal surveyor's rod, comprise pedestal, described pedestal is rotationally connected a horizontal ruler, described pedestal is provided with the dial for measuring horizontal ruler rotational angle, described horizontal ruler is provided with the chute running through its vertical direction, and arranging one in chute can along the Vertical surveyors' staff of chute level, vertical sliding motion.Universal surveyor's rod of the present utility model, by horizontal ruler and the Vertical surveyors' staff of rotation, work can be positioned, the Universal surveyor's rod of said structure is applied in the construction of tubular truss bracket assembling, simple to operate, convenient, this Universal surveyor's rod is arranged on the termination of main chord, theoretically, and can in the circumferentially assembling of main chord without several bracket.
Description
Technical field
The utility model relate to tubular truss bracket assembling accessory, more precisely, design a kind of Universal surveyor's rod and its tubular truss bracket assembling in application.
Background technology
Along with the development of building trade, Large-Span Steel Pipe Truss Structure is applied more and more general in building structure.Steel pipe truss is made up of upper and lower chord member (comprising assembling bracket), web member.In processing and making process, because tubular truss is large from great, spatial volume, its bracket assembly precision is wayward; In traditional truss processing technology thereof, adopt locates bracket according to coordinate point setting-out making moulding bed on the operational platform, and it is loaded down with trivial details to make moulding bed program, and labour cost is high, often affects processing progress.
Utility model content
The utility model, in order to solve problems of the prior art, provides a kind of Universal surveyor's rod.
In order to realize above-mentioned object, the technical solution of the utility model is: a kind of Universal surveyor's rod, comprise pedestal, described pedestal is rotationally connected a horizontal ruler, described pedestal is provided with the dial for measuring horizontal ruler rotational angle, described horizontal ruler is provided with the chute running through its vertical direction, and arranging one in chute can along the Vertical surveyors' staff of chute level, vertical sliding motion.
Preferably, described horizontal ruler is rotationally connected with the center of pedestal.
Preferably, described Vertical surveyors' staff is provided with the locating piece for Vertical surveyors' staff being rested on a certain height.
Preferably, the lower end of described pedestal is provided with the bearing for fitting with main chord sidewall.
Preferably, the lower end of described bearing is provided with magnet.
Universal surveyor's rod of the present utility model, by horizontal ruler and the Vertical surveyors' staff of rotation, make it possible to position, the Universal surveyor's rod of said structure is applied in the construction of tubular truss bracket assembling, simple to operate, convenient, this Universal surveyor's rod is arranged on the termination of main chord, theoretically, and can in the circumferentially assembling of main chord without several bracket.
Accompanying drawing explanation
Fig. 1 shows the use schematic diagram of the utility model Universal surveyor's rod.
Fig. 2 shows the front view of Fig. 1.
Detailed description of the invention
The technical problem solved to make the utility model, the technical scheme of employing, the technique effect obtained should be readily appreciated that, below in conjunction with concrete accompanying drawing, are described further detailed description of the invention of the present utility model.
With reference to figure 1, Fig. 2, the utility model provides a kind of Universal surveyor's rod, comprise pedestal 3, described pedestal 3 is rotationally connected a horizontal ruler 4, make this horizontal ruler 4 can 360 ° of rotations on 3 horizontal planes of pedestal, in order to the angle measured and level of control scale 4 rotates, a dial 7 can be provided with on pedestal 3, namely this dial 7 is construed as can be a dial disc being fixed on that pedestal and horizontal ruler are rotationally connected place, is also construed as the scale of 360 ° of being set directly on pedestal.
Described horizontal ruler 4 is provided with the chute running through its vertical direction, on horizontal ruler 4, be namely provided with the chute of up/down perforation, and this chute distributes along the length direction of horizontal ruler 4.Arranging one in chute can along the Vertical surveyors' staff 5 of chute level, vertical sliding motion.
Universal surveyor's rod of the present utility model, by horizontal ruler and the Vertical surveyors' staff of rotation, makes it possible to location and installation basic point, and the Universal surveyor's rod of said structure is applied in the construction of tubular truss bracket assembling, comprises the following steps:
A, Universal surveyor's rod to be placed on the sidewall of main chord 1, to make pedestal 3 along the axis arranged of main chord 1;
B, the baseline on the baseline of bracket after cutting and main chord to be aimed at, namely now achieve the position of bracket in main chord radial direction by the baseline aligning on bracket and main chord (to arrange baseline and belong to existing way, no longer specifically state at this), then rotate horizontal ruler 4, and measure the height of bracket 2 at main chord 1 according to tooling drawing Vertical surveyors' staff 5;
C, measurement according to Vertical surveyors' staff 5, move to the height of measurement by bracket, location is welded.
The construction method of this tubular truss bracket assembling that the utility model provides, simple to operate, convenient, this Universal surveyor's rod is arranged on the termination of main chord, theoretically, can in the circumferentially assembling of main chord 1 without several bracket.
For the ease of installing, locating, measure, and be convenient to the drafting of tooling drawing, preferably, described horizontal ruler 4 is rotationally connected with the center of pedestal to the utility model.
The effect of pedestal is for this Universal surveyor's rod provides support, and be convenient to locate with main chord 1, the utility model preferably, after pedestal 3 and main chord 1 are located, in order to prevent pedestal 3 from moving, there is in the lower end of described pedestal the bearing 6 fitted tightly with main chord 1 sidewall.The lower surface of bearing 6 is the curved surface matched with main chord 1 sidewall.Further preferably, be provided with magnet (such as in the mode of inlaying) in the lower surface of bearing 6, can be adsorbed on main chord 1.
Vertical surveyors' staff 5 in the utility model to need in the chute of horizontal ruler 4 vertical, slide up and down, it can be by one end bending of Vertical surveyors' staff 5, and then chute is inserted in other end; The utility model preferably, described Vertical surveyors' staff 5 is provided with the locating piece 8 for Vertical surveyors' staff being rested on a certain height, this locating piece 8 is positioned at the upper end of horizontal ruler, and hold Vertical surveyors' staff 5 and prevent it from dropping, when needing the height regulating Vertical surveyors' staff 5, as long as pin locating piece, this Vertical surveyors' staff 8 of pull up or down, this locating piece also belongs to existing structure, no longer illustrates at this.
According to the construction method that the utility model provides, can quick assembling bracket, when bracket is vertical with main chord assemble time, what Vertical surveyors' staff 5 was measured is the height and position of bracket 2 root on main chord 1; When bracket 2 is located at an angle with main chord 1, what Vertical surveyors' staff 5 was measured is the height and position of the free termination of bracket 2 on main chord.
The utility model is by preferred embodiment having carried out detailed explanation.But, by studying carefully above, to the change of each embodiment with to increase also be that one of ordinary skill in the art institute is apparent.Being intended that all these changes and increasing of applicant has all dropped in scope that the utility model claim protects.
Similar numbering refers to similar element in the whole text.For clarity, the situation of some line, layer, element, parts or feature being amplified may be had in the accompanying drawings.
Term used herein is only and is illustrated specific embodiment, and it is also not intended to limit the utility model.Unless otherwise defined, all terms used herein (comprising technical term and scientific terminology) are all identical with the understanding of the utility model one of ordinary skill in the art.
Claims (5)
1. a Universal surveyor's rod, comprise pedestal, it is characterized in that: described pedestal is rotationally connected a horizontal ruler, described pedestal is provided with the dial for measuring horizontal ruler rotational angle, described horizontal ruler is provided with the chute running through its vertical direction, and arranging one in chute can along the Vertical surveyors' staff of chute level, vertical sliding motion.
2. Universal surveyor's rod according to claim 1, is characterized in that: described horizontal ruler is rotationally connected with the center of pedestal.
3. Universal surveyor's rod according to claim 2, is characterized in that: described Vertical surveyors' staff is provided with the locating piece for Vertical surveyors' staff being rested on a certain height.
4. Universal surveyor's rod according to claim 1, is characterized in that: the lower end of described pedestal is provided with the bearing for fitting with main chord sidewall.
5. Universal surveyor's rod according to claim 4, is characterized in that: the lower end of described bearing is provided with magnet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420342516.XU CN204059999U (en) | 2014-06-24 | 2014-06-24 | A kind of Universal surveyor's rod |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420342516.XU CN204059999U (en) | 2014-06-24 | 2014-06-24 | A kind of Universal surveyor's rod |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204059999U true CN204059999U (en) | 2014-12-31 |
Family
ID=52201541
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420342516.XU Expired - Fee Related CN204059999U (en) | 2014-06-24 | 2014-06-24 | A kind of Universal surveyor's rod |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204059999U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104047434A (en) * | 2014-06-24 | 2014-09-17 | 深圳市金鑫钢结构建筑安装工程有限公司 | Universal scale and pipe truss and corbel assembly construction method |
-
2014
- 2014-06-24 CN CN201420342516.XU patent/CN204059999U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104047434A (en) * | 2014-06-24 | 2014-09-17 | 深圳市金鑫钢结构建筑安装工程有限公司 | Universal scale and pipe truss and corbel assembly construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104047434B (en) | The constructional method of a kind of Universal surveyor's rod and the assembling of tubular truss bracket | |
CN103954229B (en) | Underground chamber whole-section deformation automatic monitoring device and method involved in device | |
CN207585620U (en) | A kind of measuring instrument for building | |
CN203579647U (en) | Novel multifunctional fast pipeline lofting tool | |
CN105113413B (en) | Hand plumb bob device | |
CN203993865U (en) | A kind of arbitrarily angled pipe communicated wire chalker | |
CN204059999U (en) | A kind of Universal surveyor's rod | |
CN204461264U (en) | Special portable folding chi is surveyed and drawn in a kind of construction work | |
CN200979407Y (en) | A goniometer | |
CN102777737A (en) | Sleeve clip type measurement tripod | |
CN207816153U (en) | One kind is advised for O-ring dimensional measurement tower | |
CN206648586U (en) | A kind of construction pipe angle measurement apparatus | |
CN205482955U (en) | Device is laid to circular sample prescription | |
CN106197390A (en) | A kind of spheroid centre of sphere coordinate location device | |
CN207335687U (en) | Quickly heighten level ceremony measurement of higher degree device | |
CN205785198U (en) | A kind of quickly detection earth excavation and backfill grade of side slope device | |
CN204187217U (en) | A kind of annular bolt collar group integral built-in and positioning tool | |
CN202582540U (en) | Process pipeline assembling angle positioning device | |
CN204718561U (en) | Portable electric pole gradient measurement instrument | |
CN204367708U (en) | Adjustable angle square | |
CN201188000Y (en) | Leveling ruler capable of measuring arbitrary inclination | |
CN202661058U (en) | Measuring scale for processing spherical roller of large self-aligning roller bearing | |
CN205403788U (en) | Measuring apparatu for civil engineering | |
CN201003939Y (en) | A slope measurer | |
CN205643113U (en) | Experimental scriber of pipe material |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP03 | Change of name, title or address |
Address after: Two road in Longgang District of Shenzhen City, Guangdong province 518100 Ping Street No. 9 Xinfeng Nianfeng community Patentee after: SHENZHEN JINXIN GREEN CONSTRUCTION CO., LTD. Address before: 518000 Guangdong city of Shenzhen province Futian District Tairan nine Road East Building 1104 Tang commercial Patentee before: The Shenzhen prosperous steel building installing engineering of gold Co., Ltd |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141231 Termination date: 20200624 |