Prior art keywords
pipe fitting
thermal insulation
transport trolley
bracing frame
prefabricated direct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420553269.8U
Other languages
Chinese (zh)
Inventor
赖贞澄
张居山
庄须文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Langge Site Energy Saving Technology Co Ltd
Original Assignee
Harbin Langge Site Energy Saving Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Langge Site Energy Saving Technology Co Ltd filed Critical Harbin Langge Site Energy Saving Technology Co Ltd
Priority to CN201420553269.8U priority Critical patent/CN204055857U/en
Application granted granted Critical
Publication of CN204055857U publication Critical patent/CN204055857U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Handcart (AREA)

Abstract

The utility model relates to a kind of prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley.For the irregular pipe fitting of steel pipe, the mode such as transfer car(buggy) and manpower all can be used in transport process to help, the steel pipe pipe fitting of different size can not get up, and a car is multiplex waits effect.The utility model composition comprises: sole plate (1), described sole plate comprises 2 long columns (7), horizontal column (16), 2 long power arms (15), described long column welds with described horizontal column, described long column welds with described long power arm, described long column welds with bracing frame (5), described bracing frame inside is connected with support works block (4) by tie bolt (3), coupling nut (6) is equipped with through tie bolt in described bracing frame side, described long power arm has guide-track groove, on described guide-track groove, cover has slide frame (13), described slide frame welds with short column (2).The utility model is used for prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley.

Description

Prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley
technical field:
the utility model relates to prefabricated direct-buried thermal insulation pipe pipe fitting and has just managed interregional transportation equipment field, is specifically related to a kind of prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley.
background technology:
at present, for the irregular pipe fitting of steel pipe, as elbow, threeway, the products such as reducing, the mode such as transfer car(buggy) and manpower all can be used in transport process to help, for different tube diameters, the steel pipe pipe fitting of different size can not get up, and a car is multiplex waits effect.
adopt prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley can transport arbitrarily various model pipe fitting when steel pipe pipe fitting transports, the function of a tractor serves several purposes can be realized, and structure is simple, easy to use, effectively raise the degree of utilization of car body.
utility model content:
the purpose of this utility model is to provide a kind of prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley.
above-mentioned object is realized by following technical scheme:
a kind of prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley, its composition comprises: sole plate, described sole plate comprises 2 long columns, horizontal column, 2 long power arms, described long column welds with described horizontal column, described long column welds with described long power arm, described long column welds with bracing frame, described bracing frame inside is connected with support works block by tie bolt, coupling nut is equipped with through tie bolt in described bracing frame side, described long power arm has guide-track groove, on described guide-track groove, cover has slide frame, described slide frame welds with short column.
described prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley, described short column welds with bracing frame, and described bracing frame inside is connected with support works block by tie bolt, and coupling nut is equipped with through tie bolt in described bracing frame side.
described prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley, described long power arm is connected with 4 cardan wheel bearings, and described cardan wheel bearing is connected with roller by adapter shaft, and baffle ring is equipped with through adapter shaft in described cardan wheel bearing side.
described prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley, fixing locking device is equipped with in described slide frame one side, and dead lock for safety device is equipped with in described slide frame another side.
described prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley, described support works block is fan-shaped.
beneficial effect:
1. the long column that the utility model adopts welds with horizontal column, long power arm respectively, this welded structure can ensure at steel pipe pipe fitting reliable and stable when transporting, described short column is moved freely at described long power arm by slider bar, the pipe fitting of convenient adjustment transport different-diameter.
2. bracing frame inside of the present utility model is connected with support works block by tie bolt, coupling nut is equipped with through tie bolt in described bracing frame side, adopt this structure, enable described support works block flexible in support movements, by the clamping steel pipe pipe fitting of support works block, easy to use, reliable for effect.
3. long power arm of the present utility model is connected with 4 cardan wheel bearings, cardan wheel bearing is connected with roller by adapter shaft, and baffle ring is equipped with through adapter shaft in cardan wheel bearing side, arbitrarily changes direction freely when this structure can make steel pipe pipe fitting transport, time saving and energy saving, practical flexibly.
4. fixing locking device is equipped with in slide frame one side of the present utility model, be used for fixing locked cardan wheel, convenient and reliable at loading steel pipe pipe fitting, dead lock for safety device is equipped with in described slide frame another side, this structure is used to the short vertical shaft in fastening slider bar, prevent the slider bar described in transport steel pipe pipe fitting from moving, make transport trolley safe and reliable.
5. support works block of the present utility model adopts sector structure, and this structure can make described support works block utilize the circular arc of sector to clamp steel pipe caliber more fully.
6. the utility model can transport arbitrarily various model pipe fitting when steel pipe pipe fitting transports, and can realize the function of a tractor serves several purposes, and structure is simple, easy to use, effectively raises the degree of utilization of car body.
7. the utility model solves the drawback that original technology exists, make a car can be multiplex, even a car can replace the function of multiple transfer car(buggy) in the past, and greatly reduces work-hours, effectively raise work efficiency, avoid the wasting of resources of personnel, machine and equipment.
accompanying drawing illustrates:
accompanying drawing 1 is structural representation of the present utility model.
accompanying drawing 2 is birds-eye vieies of accompanying drawing 1.
accompanying drawing 3 is left views of accompanying drawing 1.
in figure: same-sign circuit guides has annexation.
detailed description of the invention:
embodiment 1:
a kind of prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley, its composition comprises: sole plate 1, described sole plate comprises 2 long columns 7, horizontal column 16, 2 long power arms 15, described long column welds with described horizontal column, described long column welds with described long power arm, described long column welds with bracing frame 5, described bracing frame inside is connected with support works block 4 by tie bolt 3, coupling nut 6 is equipped with through tie bolt in described bracing frame side, described long power arm has guide-track groove, on described guide-track groove, cover has slide frame 13, described slide frame welds with short column 2.As shown in Figure 1, 2, 3.
embodiment 2:
prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley according to embodiment 1, described short column welds with bracing frame, described bracing frame inside is connected with support works block by tie bolt, coupling nut is equipped with through tie bolt in described bracing frame side, and described support works block is gone slick.
embodiment 3:
prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley according to embodiment 1 or 2, described long power arm is connected with 4 cardan wheel bearings 8, described cardan wheel bearing is connected with roller 10 by adapter shaft 11, baffle ring 9 is equipped with through adapter shaft in described cardan wheel bearing side, and roller is rotated flexibly by cardan wheel bearing.
embodiment 4:
prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley according to embodiment 1 or 2 or 3, by described slide frame one side machining hole and threaded screw thread, then fixing locking device 12 is loaded, dead lock for safety device 14 is installed in described slide frame another side, the short vertical shaft be used in fastening slider bar, prevents the slider bar described in transport steel pipe pipe fitting from moving.
embodiment 5:
prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley according to embodiment 1 or 2 or 3 or 4, is processed into fan-shaped by described support works block, by the circular arc clamping steel pipe caliber of sector.

Claims (5)

1. a prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley, its composition comprises: sole plate, it is characterized in that: described sole plate comprises 2 long columns, horizontal column, 2 long power arms, described long column welds with described horizontal column, described long column welds with described long power arm, described long column welds with bracing frame, described bracing frame inside is connected with support works block by tie bolt, coupling nut is equipped with through tie bolt in described bracing frame side, described long power arm has guide-track groove, on described guide-track groove, cover has slide frame, described slide frame welds with short column.
2. prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley according to claim 1, it is characterized in that: described short column welds with bracing frame, described bracing frame inside is connected with support works block by tie bolt, and coupling nut is equipped with through tie bolt in described bracing frame side.
3. prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley according to claim 1 and 2, it is characterized in that: described long power arm is connected with 4 cardan wheel bearings, described cardan wheel bearing is connected with roller by adapter shaft, and baffle ring is equipped with through adapter shaft in described cardan wheel bearing side.
4. prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley according to claim 1 and 2, is characterized in that: fixing locking device is equipped with in described slide frame one side, and dead lock for safety device is equipped with in described slide frame another side.
5. prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley according to claim 1 and 2, is characterized in that: described support works block is fan-shaped.
CN201420553269.8U 2014-09-25 2014-09-25 Prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley Expired - Fee Related CN204055857U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420553269.8U CN204055857U (en) 2014-09-25 2014-09-25 Prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420553269.8U CN204055857U (en) 2014-09-25 2014-09-25 Prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley

Publications (1)

Publication Number Publication Date
CN204055857U true CN204055857U (en) 2014-12-31

Family

ID=52197422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420553269.8U Expired - Fee Related CN204055857U (en) 2014-09-25 2014-09-25 Prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley

Country Status (1)

Country Link
CN (1) CN204055857U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104249749A (en) * 2014-09-25 2014-12-31 哈尔滨朗格斯特节能科技有限公司 Prefabricated embedded thermal-insulation pipe fitting transporter and manufacturing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104249749A (en) * 2014-09-25 2014-12-31 哈尔滨朗格斯特节能科技有限公司 Prefabricated embedded thermal-insulation pipe fitting transporter and manufacturing method thereof
CN104249749B (en) * 2014-09-25 2017-09-29 哈尔滨朗格斯特节能科技有限公司 Prefabricated direct-buried thermal insulation pipe pipe fitting transport vehicle and preparation method

Similar Documents

Publication Publication Date Title
CN204055857U (en) Prefabricated direct-buried thermal insulation pipe pipe fitting transport trolley
CN103231355A (en) Pipe placing rack of workshop pipe prefabrication production line
CN208249711U (en) A kind of turnover plate type rail clamping device
CN204019144U (en) A kind of auxiliary platform that clamps of processing large circle machine large flange used
CN203410493U (en) Special bogie for butt joint of engine test rig
CN203509286U (en) Cutting device for transition slope of steel structural tube
CN105292992A (en) Special petroleum tube processing and conveying equipment
CN204871074U (en) Dolly device is transported to curb
CN204156403U (en) One-tenth dish electrical line releasing reel
CN204135234U (en) Bivector traction wheel apparatus in the straightening drum of bar straightener
CN206319693U (en) Multidirectional regulation attachment means in a kind of tent rack
CN104249749A (en) Prefabricated embedded thermal-insulation pipe fitting transporter and manufacturing method thereof
CN203794491U (en) Crane for machining screw
CN207063498U (en) A kind of steel structural upright column bag card
CN203670380U (en) Guard bar folding device for movable overhaul platform
CN204544971U (en) A kind of heavy caliber seamless steel pipe clamping device
CN204979999U (en) Track is transported with slope type to installation of electric power cabinet
CN205111034U (en) Flexible rail set of barrel circumferential weld welding carriage
CN205092501U (en) A telescoping device that condenser was changed on was used for pylon
CN204964114U (en) Back lift -over device
CN204340539U (en) A kind of bilateral wheel of locking device
CN204162354U (en) The outer pillar transfer car(buggy) of prefabricated direct-buried thermal insulation pipe
CN204340540U (en) A kind of the monolateral of locking device is taken turns
CN204264194U (en) The wire rod labour-saving go-cart of a kind of carrying dish circle
CN204700195U (en) A kind of angle-bender material placing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141231

Termination date: 20160925

CF01 Termination of patent right due to non-payment of annual fee