CN204029556U - High-power photovoltaic system testing power supply fission transformer - Google Patents

High-power photovoltaic system testing power supply fission transformer Download PDF

Info

Publication number
CN204029556U
CN204029556U CN201420496306.6U CN201420496306U CN204029556U CN 204029556 U CN204029556 U CN 204029556U CN 201420496306 U CN201420496306 U CN 201420496306U CN 204029556 U CN204029556 U CN 204029556U
Authority
CN
China
Prior art keywords
yoke
transformer
iron core
core column
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420496306.6U
Other languages
Chinese (zh)
Inventor
吴智富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Yingdakot Magnetoelectric Technology Co ltd
Original Assignee
SHENZHEN INDUCTOR TECHNOLOGIES Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN INDUCTOR TECHNOLOGIES Co Ltd filed Critical SHENZHEN INDUCTOR TECHNOLOGIES Co Ltd
Priority to CN201420496306.6U priority Critical patent/CN204029556U/en
Application granted granted Critical
Publication of CN204029556U publication Critical patent/CN204029556U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

The utility model relates to a kind of high-power photovoltaic system testing power supply fission transformer, and for meeting needed for test macro, it increases leakage inductance.Concrete technical scheme is: high-power photovoltaic system testing power supply fission transformer comprises upper yoke, lower yoke, iron core column and line bag, iron core column is provided with between upper yoke and lower yoke, line looping is had mercy in iron core column, line bag and upper yoke, the fixing respectively by bonding way of lower yoke.Upper and lower iron yoke is fixedly connected with line bag by bonding way, leakage inductance than common transformer under the prerequisite not increasing the cost of raw material is much larger, the inrush current when impact substantially reducing transformer carries is the effective especially low cost solution of one to needing the transformer of large leakage inductance.

Description

High-power photovoltaic system testing power supply fission transformer
Technical field
The utility model relates to transformer, especially a kind of high-power photovoltaic system testing power supply fission transformer.
Background technology
Along with greatly developing of new forms of energy, in photovoltaic generation, the current transformer design and manufaction manufacturer of one of core component gets more and more, and the laboratory evaluation of current transformer is an important means of test current transformer quality, current transformer laboratory evaluation has been come by photovoltaic converter test platform, and wherein test platform transformer is one of device of this test platform key.Traditional transformer is all that leakage inductance is the smaller the better, and at simulating grid voltage jump (during from zero to 50% voltage, maximum voltage), traditional transformer inrush current is excessive, affects the normal work of test macro, and industry user is in the urgent need to a kind of transformer increasing leakage inductance.
Utility model content
In order to overcome the deficiencies in the prior art, the technical problems to be solved in the utility model is the leakage inductance increasing transformer.
For solving the problem, the technical scheme that the utility model adopts is as follows: high-power photovoltaic system testing power supply fission transformer, comprise upper yoke, lower yoke, iron core column and line bag, iron core column is provided with between upper yoke and lower yoke, line looping is had mercy in iron core column, line bag and upper yoke, the fixing respectively by bonding way of lower yoke.
Preferably: line bag is bonding with upper yoke, lower yoke respectively by epoxy resin.
Preferably: upper yoke, lower yoke and iron core column are cuboid.
Compared to existing technology, the beneficial effects of the utility model are: compared to traditional transformer device structure, the utility model decreases cost of labor in process of production.Upper and lower iron yoke is fixedly connected with line bag by bonding way, leakage inductance than common transformer under the prerequisite not increasing the cost of raw material is much larger, the inrush current when impact substantially reducing transformer carries is the effective especially low cost solution of one to needing the transformer of large leakage inductance.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the schematic diagram of upper and lower iron yoke of the present utility model and iron core column;
Fig. 3 is the schematic diagram of line bag.
In figure, mark is described as follows:
1, upper yoke; 2, lower yoke; 3, iron core column; 4, line bag.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
As Figure 1-3, high-power photovoltaic system testing power supply fission transformer, comprise upper yoke 1, lower yoke 2, iron core column 3 and line bag 4, iron core column 3 is provided with between upper yoke 1 and lower yoke 2, line bag 4 twines haves mercy in iron core column 3, line bag 4 and upper yoke 1, the fixing respectively by bonding way of lower yoke 2.
First by bonding way, silicon steel sheet is made iron core column, line bag is turned to by ribbon core mode, upper and lower iron yoke is made by lamination process, the inserted sheet mode but not the center pillar of traditional transformer, upper and lower iron yoke interlock, the line bag novel super high power photovoltaic testing power supply that assemble bonding with upper and lower iron yoke junction epoxide-resin glue is fissioned transformer.Leakage inductance than common transformer under the prerequisite not increasing the cost of raw material is much larger, the inrush current when impact substantially reducing transformer carries, and is the effective especially low cost solution of one to needing the transformer of large leakage inductance.
Use silica gel bonding way, by semi-automatic press device, silicon steel sheet is pressed into transformer fe stem stem as shown in Figure 2, surrounding arranges GPO3 plate; Then by up-coiler, copper strips or aluminium strip are wound in the iron core column as Fig. 2, make line bag; By semi-automatic press device, make upper and lower iron yoke assembly as shown in Figure 2 with folder clamping silicon steel sheet; The two ends of online bag, iron core column evenly apply epoxide-resin glue respectively, 2 same solenoid components are assembled into super high power photovoltaic testing power supply fission transformer as shown in Figure 1.
Leakage inductance is that a part of magnetic flux that motor primary and secondary is missed in the process of coupling, and the leakage inductance of transformer should be that the magnetic line of force that coil produces can not all by secondary coil, and the inductance therefore producing leakage field is called leakage inductance.GPO3 is the insulating sheet material that glass mat is made together with unsaturated polyester resin, has good electric property, withstand voltage height, fire-retardant, resistance to electric leakage, arc resistance can superior feature.
Above-mentioned execution mode is only preferred implementation of the present utility model; can not limit the scope of the utility model protection with this, change and the replacement of any unsubstantiality that those skilled in the art does on basis of the present utility model all belong to the utility model scope required for protection.

Claims (3)

1. a high-power photovoltaic system testing power supply fission transformer, it is characterized in that: comprise upper yoke, lower yoke, iron core column and line bag, iron core column is provided with between upper yoke and lower yoke, line looping is had mercy in iron core column, line bag and upper yoke, the fixing respectively by bonding way of lower yoke.
2. high-power photovoltaic system testing power supply as claimed in claim 1 fission transformer, is characterized in that: described line bag is bonding with upper yoke, lower yoke respectively by epoxy resin.
3. high-power photovoltaic system testing power supply as claimed in claim 1 fission transformer, is characterized in that: described upper yoke, lower yoke and iron core column are cuboid.
CN201420496306.6U 2014-08-29 2014-08-29 High-power photovoltaic system testing power supply fission transformer Active CN204029556U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420496306.6U CN204029556U (en) 2014-08-29 2014-08-29 High-power photovoltaic system testing power supply fission transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420496306.6U CN204029556U (en) 2014-08-29 2014-08-29 High-power photovoltaic system testing power supply fission transformer

Publications (1)

Publication Number Publication Date
CN204029556U true CN204029556U (en) 2014-12-17

Family

ID=52069391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420496306.6U Active CN204029556U (en) 2014-08-29 2014-08-29 High-power photovoltaic system testing power supply fission transformer

Country Status (1)

Country Link
CN (1) CN204029556U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116453842A (en) * 2023-04-27 2023-07-18 安徽英大科特磁电科技有限公司 Transformer manufacturing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116453842A (en) * 2023-04-27 2023-07-18 安徽英大科特磁电科技有限公司 Transformer manufacturing method

Similar Documents

Publication Publication Date Title
JP2017517871A (en) Main transformer for wound iron core vehicle
CN201910313U (en) Three-phase four-column reactor
WO2013078845A1 (en) Single phase transformer
CN204029556U (en) High-power photovoltaic system testing power supply fission transformer
CN203910427U (en) Transformer body supporting structure with support plate
CN203351350U (en) Combination type power transformer iron core set
CN204066968U (en) Single-phase three post 500KV superhigh pressure strong current transformer clamping piece magnetic shielding structures
CN206595131U (en) A kind of high frequency transformer
CN105405612A (en) Transformer for high-voltage output
CN205159071U (en) Energy -concerving and environment -protective type air -core type reactor
CN104240934A (en) Overturn support for transformer core
CN101020272A (en) Annular efficient DC arc welder
CN203338941U (en) EE type transformer
CN201449849U (en) Novel iron yoke binding structure of high-voltage transformer
CN206480476U (en) A kind of cross frame shape transformer structure
CN204596588U (en) The silicon steel structure of electrical transformer cores side column and center pillar
CN203871166U (en) High saturation flux density anti-resonance voltage transformer
CN213660170U (en) Low-loss magnetic core
CN202534485U (en) Magnetic shielding plate used for transformer
CN204155752U (en) A kind of transformer core turnover bracket
CN201859772U (en) Totally-enclosed type medium voltage current transformer
CN207651320U (en) A kind of high frequency transformer
CN203038770U (en) 10 kV and 20 kV conversion distribution transformer
CN201069690Y (en) Ring efficient DC arc welding device
CN201956164U (en) Iron core structure of transformer and electric reactor equipped with accessory iron core

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220909

Address after: 243000 workshop 1, Dongpo Industrial Park, zhengpugang New District, Maanshan City, Anhui Province

Patentee after: Anhui yingdakot magnetoelectric Technology Co.,Ltd.

Address before: 4th Floor A, Building D, Xinyong Fengzheng Industrial Zone, Fengzheng Road, Kengwei Avenue, Shangwu Community, Shiyan Street, Bao'an District, Shenzhen, Guangdong Province, 518000

Patentee before: SHENZHEN INDUCTOR TECHNOLOGIES Co.,Ltd.