CN204028213U - A kind of 220kV power circuit gate energy meter decompression alarm loop - Google Patents

A kind of 220kV power circuit gate energy meter decompression alarm loop Download PDF

Info

Publication number
CN204028213U
CN204028213U CN201420247289.2U CN201420247289U CN204028213U CN 204028213 U CN204028213 U CN 204028213U CN 201420247289 U CN201420247289 U CN 201420247289U CN 204028213 U CN204028213 U CN 204028213U
Authority
CN
China
Prior art keywords
energy meter
gate energy
voltage
power circuit
alarm loop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420247289.2U
Other languages
Chinese (zh)
Inventor
李凯
吕作义
谭凤杰
邓岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin No1 Thermoelectric Plant Of Datang Heilongjiang Power Generation Co Ltd
Original Assignee
Harbin No1 Thermoelectric Plant Of Datang Heilongjiang Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin No1 Thermoelectric Plant Of Datang Heilongjiang Power Generation Co Ltd filed Critical Harbin No1 Thermoelectric Plant Of Datang Heilongjiang Power Generation Co Ltd
Priority to CN201420247289.2U priority Critical patent/CN204028213U/en
Application granted granted Critical
Publication of CN204028213U publication Critical patent/CN204028213U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Measurement Of Unknown Time Intervals (AREA)

Abstract

The utility model discloses a kind of 220kV power circuit gate energy meter decompression alarm loop, comprise a gate energy meter, the secondary voltage circuit of described gate energy meter adds under-voltage replay, described under-voltage replay is connected on the secondary voltage between phases of gate energy meter respectively, and also introducing in described gate energy meter has transmission line of electricity isolating switch and the time relay; This 220kV power circuit gate energy meter decompression alarm loop can when gate energy meter decompression the very first time send alarm signal, prompting operations staff process in time, avoids the loss of electricity volume, reach Timeliness coverage, the timely elimination system failure, ensures the safe and stable operation of electric energy meter.

Description

A kind of 220kV power circuit gate energy meter decompression alarm loop
Technical field
The utility model relates to a kind of 220kV power circuit gate energy meter decompression alarm loop.
Background technology
The gate energy meter of thermal power plant is most important electric quantity metering device, is the important evidence of the external electricity disbursement and sattlement of thermal power plant.The voltage secondary circuit (auxiliary contact of transmission line of electricity isolation switch switch secondary voltage circuit) of gate energy meter lacks effective monitoring means usually, electric energy meter just will be caused to leak meter electricity volume once gate energy meter voltage secondary circuit decompression, and electricity volume work of remedying also have certain difficulty.For avoiding causing economic loss because losing electricity after gate energy meter decompression, guarantee the safe and stable operation of gate energy meter simultaneously, so alarm loop after design gate energy meter decompression, mainly install low-voltage monitoring circuit additional at gate energy meter voltage secondary circuit (after metering secondary voltage blocked operation case), to monitor the integrity of Source of Gateway Meter secondary voltage, alarm signal can be sent in time when Source of Gateway Meter decompression or PT secondary circuit broken string, prompting operations staff process in time, avoids the loss of electricity volume.
Utility model content
The technical problems to be solved in the utility model be to provide one can when gate energy meter decompression the very first time send alarm signal, prompting operations staff process in time, avoid the loss of electricity volume, reach Timeliness coverage, the timely elimination system failure, ensures the 220kV power circuit gate energy meter decompression alarm loop of the safe and stable operation of electric energy meter.
For solving the problem, the utility model adopts following technical scheme:
A kind of 220kV power circuit gate energy meter decompression alarm loop, comprise a gate energy meter, the secondary voltage circuit of described gate energy meter adds under-voltage replay, described under-voltage replay is connected on the secondary voltage between phases of gate energy meter respectively, and also introducing in described gate energy meter has transmission line of electricity isolating switch and the time relay.
As preferably, described under-voltage replay is accurate passive under-voltage replay.
As preferably, the described time relay is connected to DCS system.
The beneficial effects of the utility model are: owing to being provided with under-voltage replay, exported as Source of Gateway Meter decompression criterion by the normally closed contact logic disjunction gate of under-voltage replay, also introduce simultaneously and have transmission line of electricity isolating switch, to put into operation criterion as Source of Gateway Meter with the auxiliary normal opened contact of transmission line of electricity isolating switch, finally export with logic " with door ", driving time relay, the time relay is mainly used in escaping the impact of electric system impact on under-voltage replay, prevent its misoperation, and finally with time relay normal opened contact as photon board signal or be converted into on-off state and deliver to DCS system, to notify that operations staff deals with on the merits of each case in time.
Accompanying drawing explanation
Fig. 1 is the logic diagram in a kind of 220kV power circuit of the utility model gate energy meter decompression alarm loop.
Embodiment
Consult shown in Fig. 1, a kind of 220kV power circuit gate energy meter decompression alarm loop, comprise a gate energy meter, the secondary voltage circuit of described gate energy meter adds under-voltage replay, exported as Source of Gateway Meter decompression criterion by the normally closed contact logic disjunction gate of under-voltage replay, described under-voltage replay is connected on the secondary voltage between phases of gate energy meter respectively, also introduce in described gate energy meter and have transmission line of electricity isolating switch and the time relay, driving time relay is exported as logic " with door ", and with time relay normal opened contact as photon board signal or be converted into on-off state and deliver to DCS system.
Described under-voltage replay is accurate passive under-voltage replay, stronger with this device suitability.
The described time relay is connected to DCS system, is convenient to signal transmission.
The beneficial effects of the utility model are: owing to being provided with under-voltage replay, exported as Source of Gateway Meter decompression criterion by the normally closed contact logic disjunction gate of under-voltage replay, also introduce simultaneously and have transmission line of electricity isolating switch, to put into operation criterion as Source of Gateway Meter with the auxiliary normal opened contact of transmission line of electricity isolating switch, finally export with logic " with door ", driving time relay, the time relay is mainly used in escaping the impact of electric system impact on under-voltage replay, prevent its misoperation, and finally with time relay normal opened contact as photon board signal or be converted into on-off state and deliver to DCS system, to notify that operations staff deals with on the merits of each case in time.
The above, be only embodiment of the present utility model, but protection domain of the present utility model is not limited thereto, and any change of expecting without creative work or replacement, all should be encompassed in the new protection domain of this practicality and be as the criterion.

Claims (3)

1. a 220kV power circuit gate energy meter decompression alarm loop, it is characterized in that: comprise a gate energy meter, the secondary voltage circuit of described gate energy meter adds under-voltage replay, described under-voltage replay is connected on the secondary voltage between phases of gate energy meter respectively, and also introducing in described gate energy meter has transmission line of electricity isolating switch and the time relay.
2. 220kV power circuit gate energy meter decompression alarm loop according to claim 1, is characterized in that: described under-voltage replay is accurate passive under-voltage replay.
3. 220kV power circuit gate energy meter decompression alarm loop according to claim 1, is characterized in that: the described time relay is connected to DCS system.
CN201420247289.2U 2014-05-15 2014-05-15 A kind of 220kV power circuit gate energy meter decompression alarm loop Expired - Lifetime CN204028213U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420247289.2U CN204028213U (en) 2014-05-15 2014-05-15 A kind of 220kV power circuit gate energy meter decompression alarm loop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420247289.2U CN204028213U (en) 2014-05-15 2014-05-15 A kind of 220kV power circuit gate energy meter decompression alarm loop

Publications (1)

Publication Number Publication Date
CN204028213U true CN204028213U (en) 2014-12-17

Family

ID=52068055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420247289.2U Expired - Lifetime CN204028213U (en) 2014-05-15 2014-05-15 A kind of 220kV power circuit gate energy meter decompression alarm loop

Country Status (1)

Country Link
CN (1) CN204028213U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107748283A (en) * 2017-11-14 2018-03-02 贵州电网有限责任公司 A kind of micro energy lose electric energy meter metered voltage current monitoring alarm device and its monitoring method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107748283A (en) * 2017-11-14 2018-03-02 贵州电网有限责任公司 A kind of micro energy lose electric energy meter metered voltage current monitoring alarm device and its monitoring method

Similar Documents

Publication Publication Date Title
CN204316189U (en) Direct current system switch remote operation anti-error system
CN202309201U (en) Communication power system
CN204271609U (en) 10kV intelligent subscriber boundary switch controller
CN204028213U (en) A kind of 220kV power circuit gate energy meter decompression alarm loop
CN203014357U (en) GOOSE message/switch value conversion device for relay protection digitized transformation
CN202817567U (en) Intelligent box-type wind power substation
CN203951255U (en) Two the filling of the two electricity of a kind of DC power supply put
CN203930006U (en) Non-full phase tester actuation time of a kind of portable beaker three-phase
CN204304416U (en) Be used in the microcomputer protective relay device on the switch cubicle of installing on-load switch
CN204012904U (en) A kind of control cubicle of ups power
CN204065252U (en) A kind of simulator of circuit breaker of practicality
CN203911498U (en) Distributed photovoltaic grid-connected protective equipment
CN204154838U (en) A kind of distribution line phase fault character device for identifying
CN204154799U (en) Based on the DC wave recording device of relay-set
CN204374393U (en) Detect the warning device that instantaneous ac scurries into straight-flow system
CN203674786U (en) Voltage parallel cabinet AC voltage output apparatus
CN104362578B (en) Can reclosing RCCB
CN204315472U (en) Safe voltage transfer relay
CN204557108U (en) A kind of safety wire clamp
CN204304617U (en) Power monitoring circuit protective device
CN204068206U (en) The control device of steam turbine jumped by a kind of generator connection
CN203645409U (en) GSM power distribution room remote integration protection controller
CN203387199U (en) Generator synchronization grid connected automatic apparatus
CN103516044B (en) Full-automatic conversion controller of generator
CN103187795A (en) Automatic switching method of remote standby power supply

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20141217

CX01 Expiry of patent term